HomeMy WebLinkAboutInfo Item - Community Garden Cost Estimate • CITY OF PALM DESERT • r INTEROFFICE MEMORANDUM TO: Honorable Mayor and City Council FROM: Spencer Knight, Landscape Manager SUBJECT: INFORMATIONAL ITEM - - COMMUNITY GARDEN COST ESTIMATE DATE: 3/23/00 Attached are cost estimates for the Community Garden. These costs reflect the following changes: 1) The shade structure in the Demonstration Garden. This structure is now a 20' x 20', prefabricated metal structure (see Exhibit A). If the City desires to upgrade this structure at a future date it can be easily removed and replaced. It will be on a concrete pad. 2) The character and quantity of site furnishings, and the character of the individual garden storage buildings was changed, creating a minor cost decrease. 3) The perimeter block wall was modified from that which was used at City Hall to a more standard type wall construction (like what was used at the Coachella Valley Water District well site to the south of the garden area). This change helped to decrease costs. Please note that the Attached cost sheets include a standard flush, single stall restroom facility with sink. The Landscape Committee felt a standard flush type restroom facility was needed. The additional cost will be less than $20,000. Schedule of Exhibits: A) Photo of proposed shade structure for the Demonstration Garden. B) Plot plan of proposed shade structure for the Demonstration Garden. C) Preliminary cost estimate for the installation of complete Community Garden. D) Preliminary cost estimate for installation of Community Garden infrastructure, grading, and Demonstration Garden Phase only. E) Preliminary cost estimate for installation of Community Garden — Standard Garden Phase. F) Engineer's cost estimate for landscaping all Community Garden areas with a Desert Willow style plant pallet. G) Preliminary cost estimate for Community Garden infrastructure, grading, wall, irrigation system, perimeter landscape, and only the Demonstration Garden. 3/23/00-G:\PubWorks\Sonja De La Fuente\My Documents\STAFF REPORTS\Info Item-Community Garden Cost Estimate.doc-sd • Memo: Community Gard ost Estimate ' 3/22/00 Page 2 of 2 Exhibit F provides a comparison cost for a conventional landscape installation in garden areas with a Desert Willow style plant pallet. Exhibit G provides an estimate of the costs associated with the infrastructure, grading, wall, irrigation system and perimeter landscape for all of the Community Gardens and the interior of only the Demonstration Garden. This exhibit defers from Exhibit D by the inclusion of all the perimeter block wall, irrigation system, and perimeter landscape. The garden area located between Guadalupe Avenue and the Coachella Valley Water District well site is half of the Standard Garden and its individual cost would be approximately half of the Standard Garden costs (Exhibit E). The Economy of Scale cost factor found in Exhibits D & E reflects the increase in unit price resulting from the smaller work volumes occurring in the phase form of installation. This increase, being hard to estimate by individual unit, is represented by a percentage figure. H. SPE CER K IGHT ' I-<EVIEWED YND‘..4ce-4. UR CITY MANAGER E WED A NCUR RE IEWED AND CONCUR ACM/PUBLIC ORKS DIRECTOR FINANCE DIRECTOR HSK/sd CITY COUNCIL/ACTION: Attachments APPROVED ✓✓ DENIED RECEIVED OTHER *By Minute Motion, conceptually MEETINe, fl TE_ 3.02- - C7 approve the project as proposed AYES. by staff with direction that NOES: appropriate reporting on the ABSENT: zYur u& progress of same is made to the ABSTAIN: VERIFIED BY: I'LD pp Council. Original on File with City Ojerk's Office 3/23/00-G:\PubWorks\Sonja De La Fuente\My Documents\STAFF REPORTS\Info Item-Community Garden Cost Estimate.doc-sd EXHIBIT A IP • The Apache• Shown with optional 6" x 6" legs and cupola. • filih _ .. } 1-4-101:0- , \ ` _ Milk*,. ill ..... . 4°. aasft_ ape - „........_ _..... _,., . ::._...... . , •. p.A.... , . .)„. . .lkorAi . . . . ... tek • ,.. .4, .1 • tt. --"E" .. a 7- 7 i I 1• r 4 Apache �,,, Style Tubular .' • '� "Illit.:4° Standard Sizes —"- oohs, - _ 16' x 16' 3" x 3" legs * `'r - 20' x 20' 3" x 3" legs �_ - 24' x 24' 3" x 3" legs -- •::;..K .. 28' x28' 3" x3" legs 36' x 36' 3" x 5" legs * Hexagon Design * Powder Coated Steel Frame Optional: 6" x 6" legs * Roof: Aluminum , Galvalume, Wood or Cupola available on all sizes. 14 I 1999 Page 7 N 0 i m 40 / 11:\\*-111 S) 0 4to 207 *. 604 ‘) N \ /TO1R v,� r�;1 t lea _ — — a II 1.-1 /" W incoks- 1 \ \111/ a 1\ fil\%\i\N • 411:: r •• 4•://r 1 ;.is , t' sl5ii 111 dz .i.I PLAN VIEW o .314' DIA. ANCHOR BELTS `_ a, 12' L.& MINT DOTTOH OF 'PIB })LOCK I O p V. W. O') f NUTE$ REINFORCE ANDPOUR_ - - CONCRETE ID SATISFY Liz i 1 , : i l , - LDCAL BUILDING CDDES t d , t i ; a SHELTER PRODUCTS g. tn.. a ` �' o i . DI . ilF 111NDW1N MFG., 1NC. Q 1 ( p. o Z o CENTRAL IAA.. o 120' APACHE SHELTER n -_ t�-tt 1 A-2020 r�, SIDE VIES H F .. H W • • PALM DESERT COMMUNITY GARDENS EXHIBIT C PRELIMINARY COST ESTIMATE 03-21-00 DESCRIPTION QUANTITY UNIT UNIT COST EXTENSION GRADING Grading 1 I.s. $20,000.00 $20,000 UTILITIES Utilities 1 I.s. $25,000.00 $25,000 MOBILIZATION Mobilization 1 I.s. $3,000.00 $3,000 BUILDING Shade Structure 1 I.s. $25,000.00 Restroom Faucility(single @ main garden) 1 I.s. $20,000.00 Storage Buildings 4 ea. $1,500.00 $6,000.00 $51,000 PLOTS Plots 1 I.s. $25,500.00 Path ways 560 c.y. $5.00 $2,800.00 Soil 188 c.y. $15.00 $2,820.00 $31,120 HARDSCAPE Parking 2800 s.f. $6.50 $18,200.00 Curb 420 I.f. $8.00 $3,360.00 Ornamental wrought iron 790 I.f. $36.00 $28,440.00 Block wall 1500 I.f. $60.00 $90,000.00 Entry Gate side 7 ea. $1,600.00 $11,200.00 Entry Gate main 1 ea. $5,000.00 $5,000.00 $156,200 LANDSCAPE Trees 24"Box 10 ea. $285.00 $2,850.00 Washingtonia robusta 290 f.t. $40.00 $11,600.00 Shrubs 15 Gal 14 ea. $90.00 $1,260.00 Shrubs 5 Gal 350 ea. $18.50 $6,475.00 Boulders 30 ea. $85.00 $2,550.00 Desert Dust 7125 s.f. $0.75 $5,343.75 $30,079 SITE FURNISHING Site furnishing 6 ea. $500.00 $3,000.00 Tools I.s. $3,000.00 $3,000.00 $6,000 IRRIGATION Irrigation 1 I.s. $14,300.00 $14,300 SUBTOTAL $336,698.75 10%CONTINGENCY $33,669.88 TOTAL ESTIMATE* S370,368.63 *FIGURES ARE FOR ESTIMATE PURPOSES ONLY. ACTUAL CONSTRUCTION COST MAY VARY. • • PALM DESERT COMMUNITY GARDENS EXHIBIT D PRELIMINARY COST ESTIMATE BY PHASES 03-21-00 DESCRIPTION QUANTITY UNIT UNIT COST EXTENSION INFRASTRUCTURE /GRADING GRADING Grading 1 I.s. $20,000.00 $20,000 UTILITIES Utilities 1 I.s. $25,000.00 $25,000 MOBILIZATION Mobilization 1 I.s. $3,000.00 $3,000 SUBTOTAL INFRASTRUCTURE/GRADING $48,000.00 DEMONSTRATION GARDEN BUILDING Restroom Faucility(single @ main garden) 1 I.s. $20,000.00 Storage building 1 ea. $1,500.00 $1,500.00 $21,500 PLOTS Plots 1 I.s. $7,500.00 Path ways 154 c.y $5.00 $770.00 Soil 62 c.y. $15.00 $930.00 $9,200 HARDSCAPE Parking 800 s.f. $6.50 $5,200.00 Curb 120 I.f. $8.00 $960.00 Ornamental wrought iron fence 220 I.f. $36.00 $7,920.00 Block wall 162 I.f. $60.00 $9,720.00 Entry Gate side 2 ea. $1,600.00 $3,200.00 $27,000 LANDSCAPE Trees 24"Box 3 ea. $285.00 $855.00 Washingtonia robusta 80 f.t. $40.00 $3,200.00 Shrubs 15 Gal 4 ea. $90.00 $360.00 Shrubs 5 Gal 90 ea. $18.50 $1,665.00 Boulders 9 ea. $85.00 $765.00 Desert Dust 2053 s.f. $0.75 $1,539.75 $8,385 SITE FURNISHING Site furnishing 2 ea. $500.00 $1,000.00 $1,000 IRRIGATION Irrigation 1 I.s. $5,800.00 $5,800 SUBTOTAL DEMONSTRATION GARDEN $120,884.75 20%ECONONMY OF SCALE $24,176.95 10%CONTINGENCY $12,088.48 TOTAL ESTIMATE* $132,973.23 'FIGURES ARE FOR ESTIMATE PURPOSES ONLY. ACTUAL CONSTRUCTION COST MAY VARY. r . • • ., PALM DESERT COMMUNITY GARDENS EXHIBIT E PRELIMINARY COST ESTIMATE BY PHASES 03-21-00 DESCRIPTION QUANTITY UNIT UNIT COST EXTENSION STANDARD GARDEN* BUILDING Storage building 1 ea. $1,500.00 $1,500.00 $1,500 PLOTS Plots 1 I.s. $7,500.00 Path ways 154 c.y $5.00 $770.00 Soil 62 c.y. $15.00 $930.00 $9,200 HARDSCAPE Parking 800 s.f. $6.50 $5,200.00 Curb 120 I.f. $8.00 $960.00 Ornamental wrought iron fence 220 I.f. $36.00 $7,920.00 Block wall 162 I.f. $60.00 $9,720.00 Entry Gate side 2 ea. $1,600.00 $3,200.00 $27,000 LANDSCAPE Trees 24"Box 3 ea. $285.00 $855.00 Washingtonia robusta 80 f.t. $40.00 $3,200.00 Shrubs 15 Gal 4 ea. $90.00 $360.00 Shrubs 5 Gal 90 ea. $18.50 $1,665.00 Boulders 9 ea. $85.00 $765.00 Desert Dust 2053 s.f. $0.75 $1,539.75 $8,385 SITE FURNISHING Site furnishing 2 ea. $500.00 $1,000.00 $1,000 IRRIGATION Irrigation 1 I.s. $5,800.00 $5,800 SUBTOTAL DEMONSTRATION GARDEN $52,884.75 20% ECONONMY OF SCALE $10,576.95 10%CONTINGENCY $5,288.48 TOTAL ESTIMATE** $68,750.18 *DOES NOT INCLUDE ANY INFRASTRUCTURE/GRADING(grading,utilities,mobilization) **FIGURES ARE FOR ESTIMATE PURPOSES ONLY. ACTUAL CONSTRUCTION COST MAY VARY. • 0 EXHIBIT F Palm Desert Community Garden Landscape Cost for Desert Willow Style Landscape Item Qty. Units Unit Cost Total Mobilization 27,000 square feet $ 0.30 $ 8,100.00 Clearing & Grubbing 27,000 square feet $ 0.36 $ 9,720.00 Plant Materials 27,000 square feet $ 1.25 $ 33,750.00 Boulders 27,000 square feet $ 0.35 $ 9,450.00 Decomposed Granite 27,000 square feet $ 0.60 $ 16,200.00 Irrigation System 27,000 square feet $ 1.00 $ 27,000.00 Hardscape (cobble) 5,000 square feet $ 7.00 $ 35,000.00 Earthwork 300 cubic yards $ 4.00 $ 1,200.00 Maintenance & Plant Establishment 27,000 square feet $ 0.35 $ 9,450.00 Sub-Total $ 149,870.00 Design Cost 10 % $149,870.00 $ 14,987.00 Project Management 15 % $149,870.00 $ 22,480.50 Contingency 10 % $149,870.00 $ 14,987.00 Sub-Total 35 % $149,870.00 $ 52,454.50 TOTAL $ 202,324.50 S • PALM DESERT COMMUNITY GARDENS EXHIBIT G PRELIMINARY COST ESTIMATE Infrastructure,Grading,Wall,Irrigation System,Perimeter Landscape, ( and Demonstration Garden ONLY 03-21-00 DESCRIPTION QUANTITY UNIT UNIT COST EXTENSION GRADING Grading 1 I.s. $20,000.00 $20,000 UTILITIES Utilities 1 I.s. $25,000.00 $25,000 MOBILIZATION Mobilization 1 I.s. $3,000.00 $3,000 BUILDING Shade Structure 1 I.s. $25,000.00 Restroom Faucility(single @ main garden) 1 I.s. $20,000.00 Storage Buildings 1 ea. $1,500.00 $1,500.00 $46,500 PLOTS Plots 1 I.s. $7,500.00 Path ways 154 c.y. $5.00 $770.00 Soil 62 c.y. $15.00 $930.00 $9,200 HARDSCAPE Parking 2800 s.f. $6.50 $18,200.00 Curb 420 I.f. $8.00 $3,360.00 Ornamental wrought iron 790 I.f. $36.00 $28,440.00 Block wall 1500 I.f. $60.00 $90,000.00 Entry Gate side 7 ea. $1,600.00 $11,200.00 Entry Gate main 1 ea. $5,000.00 $5,000.00 $156,200 LANDSCAPE Trees 24"Box 7 ea. $285.00 $1,995.00 Washingtonia robusta 280 f.t. $40.00 $11,200.00 Shrubs 15 Gal 14 ea. $90.00 $1,260.00 Shrubs 5 Gal 350 ea. $18.50 $6,475.00 Boulders 30 ea. $85.00 $2,550.00 Desert Dust 7125 s.f. $0.75 $5,343.75 $28,824 SITE FURNISHING Site furnishing 1 ea. $500.00 $500.00 Tools I.s. $1,000.00 $3,000.00 $3,500 IRRIGATION Irrigation 1 I.s. $14,300.00 $14,300 SUBTOTAL $306,523.75 10%CONTINGENCY $30,652.38 TOTAL ESTIMATE` $337,176.13 'FIGURES ARE FOR ESTIMATE PURPOSES ONLY. ACTUAL CONSTRUCTION COST MAY VARY.