Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
APPROVED SOLR24-0354 PLAN.pdf
SOLR24-0354 L GI / G2nk Snao-a Or SCOPE OF WORK — t �► � ue,.,�•, P Imval ;Q SUNLOGIX ENERGY Pal•.r,. uniryi 38698A EL VIENTO RD STE D D aenengrn PALM DESERT,CA,92211 27 x REC N-PEAK 2 REC370NP2 BLACK d clean n9 uc0 ROOF MOUNTED SOLAR PHOTOVOLTAIC MODULES fl'I r _ wI PHONE:7so-84a-66o7 i4 w Spnngs P 77678ASHBERRY CT - PI n nP t SYSTEM SIZE: 9.99 KW DC STC .PALM DE C4 „ • x 9.36 KW DC PTC , ti F'r ® tio�HLeE PALM ASHBERRY CT CONTRACTOR:ZACHARY N GAMEZ 9.1 3 KW AC CEC y PALM DESERT,CA 92211 CeunSC LM Club Palmas `� RAL v STATE 3010NSE# LICENC-0CLASS EX M312 2GTE EQUIPMENT SUMMARY ry _ ® ®u� I Tescana ceuntry CWb t PaImO n + / e Fzlla a, 27 REC N-PEAK 2 REC370NP2 BLACK eDeseNO Palm Desert cvc 27 ENPHASE IQ8M-72-M-US i - f CeD",pa'" ,w e ME AND ADDRESS (27X325/1000=8.78 KW INVERTER OUTPUT) /f r1y9 PROJECT ROE PATSY a } 1 Hyatt Regency InUlan© Q Enaisslda Resent Is i ,VCIIs PeSert 8 5pa ROOM E 01 TESLA POWERWALL 2 BATTERY ,. ` e`a a nUlaawells ® RESIDENCE ROOF TILT:18' _ 1 77676 ASHBERRY CT AZIMUTH:91°,181',271° 1 °, r PALM DESERT,CA,92211 1 STORY BUILDING PHONE:(541)420-2723 The UAng r--',0 CONSTRUCTION TYPE:V-B aoe and a=-- OCCUPANCY GROUP:R APN:632600065 CODE COMPLIANCE STAMP VICINITY MAP PROJECT JURISDICTION PALM DESERT THIS PROJECT SHALL COMPLY WITH SITE(33.7377083,-116.3630729) CITY OF 2022 CA BUILDING CODE 2022 CA PLUMBING CODE GENERAL NOTES MODULE WATT:370 W (27)REC N-PEAK 2 2022 CA FIRE CODE REC370NP2 BLACK 2022 CA RESIDENTIAL CODE SYSTEM SIZE:9.99 KW DC(STC) 9.36 KW DC(PTC) 2022 CA MECHANICAL CODE -SOLAR PHOTOVOLTAIC SYSTEM WUTH ENERGY STORAGE TO BE INSTALLED ON RESIDENTIAL STRUCTURE. :9.13 KW AC(CEC) 2022 CA ENERGY CODE -THE SYSTEM WILL NOT BE INTERCONNECTED UNTIL APPROVAL FROM THE LOCAL JURISDICTION AND LOCAL UTILITY.UTILITY SHALL BE (27)MICROINVERTERS: NOTIFIED PRIOR TO ACTIVATION OF SOLAR PHOTOVOLTAIC INSTALLATION. 2022 CA ELECTRICAL CODE DEPARTM NO OF BUILDING 8SAFETY ENPHASE IO8M-72-M-US 2020 NATIONAL ELECTRICAL CODE -ALL EXTERNAL CONDUIT AND FITTINGS SHALL BE RAIN TIGHT AND SHOULD BE APPROVED TO USE IN WET AND DRY LOCATIONS. APPROVED PHOTOVOLTAIC UNDER3oKW (01)BATTERY: 2022 ENERGY COMPLIANCE T-24 -ALL CONDUITS AND EQUIPMENTS SHALL BE PAINTED TO MATCH THE EXISTING BACKGROUND. resLA PowERWALLz App ROVED PLAN TH S APP-VALLL I"'E CONSTRUED E A PERM T FOR -THE PROJECT HAS BEEN DESIGNED IN COMPLIANCE WITH CBC SECTION 1609 TO WITHSTAND A MINIMUM OF 97 MPH WIND LOAD „N=,Tap T"saET°FaPP—E"P—e-11RE"E�ONiHE1Oe AZIMUTH:91°,181°271° -DESIGN COMPLYING WITH LATEST EDITION OF CALIFORNIA ELECTRICAL CODE, NEC AND ALL LOCAL ORDINANCES. THE APPLICANT HAS AGREED TO THE TERMS OF THE PV ROOF TILT:18' -SHOULD USE PROPER GROUND BAR AND KITS FOR GROUNDING E`IGI�HECKLRTWIILLLREQUIR PARE R THE MOUNTING HEIGHTA-STORY UL LISTED FOR ELECTRICAL AND FIRE SAFETY -THE SOLAR PHOTOVOLTAIC INSTALLATION SHALL NOT OBSTRUCT ANY PLUMBING. MECHANICAL OR BUILDING ROOF VENTS. UL 1703 FOR MODULES AND UL 1741 FOR -THE DISTANCE BETWEEN BOTTOM OF PANEL TO THE TOP OF ROOF SHOULD BE MIN 411. DRAWING INFORMATION INVERTERS PER CITY SOLAR REQUIREMENTS -BACKFEED BREAKER SHOULD BEAT THE OPPOSITE END OF BUS BAR Es°"""°" — -INSTALLERS TO FOLLOW ALL LOCAL JURISDICTION GUIDELINES. Photovoltaic System-30KW and Under NOTE: Requirements-Attached -SEE THE SPECS SHEETS FOR ADDITIONAL INFORMATION. The attached City of Pal.Desert 3DkW and Under PhotoVottaic s,nn NO DISCHARGE OF ANY POLLUTANTS TO ANY -THE ELECTRICAL CONTRACTOR SHALL COMPLY WITH ALL THE REQUIREMENTS OF LOCAL UTILITY. Requirements will be enforced during all field inspections It is required to be attached to the approved photovoltaic plans at all STORM WATER DRAIN SYSTEM -ALL NEC REFERENCES SHALL BE DIRECTLY INTERCHANGEABLE WITH CEC REFERENCES. ti=r,,cure to adhere tothese reOUirements will re3wt ina disapproved inspection until such time they are provided and -A LADDER SHALL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA. demonstrated to be in,until with the inspector of record. -WORKING DISTANCE AROUND ELECTRICAL EQUIPMENT WILL BE MAINTAINED IN ACCORDANCE WITH CEC 110.26. -NO VENTS ( PLUMBING, MECHANICAL OR DORMER)TO BE COVERED OR REROUTED AROUND SOLAR MODULES.RELOCATION TO BED NE ONLY AFTER APPROVAL. SIGNATURE AND SEAL -ALL LABELS AND PLACARDS SHALL BE ATTACHED ACCORDING TO NEC AND THE LOCAL AHJ. SHEET INDEX -METAL CONDUIT AND ENCLOSURE SHALL BE USED WHERE PV SOURCE OR OUTPUT CIRCUITS ARE RUN INSIDE THE BUILDING. -ALL OUTDOOR EQUIPMENT SHALL BE MIN NEMA 3R RATED. -PER CALIFORNIA RESIDENTIAL CODE(CRC)SECTIONS R314 AND R315 SMOKE ALARM AND CARBON MONOXIDE DETECTORS ARE RETROFITTED INTO THE EXISTING PV-1 COVER PAGE DWELLINGS. PV-2 PLOT PLAN -ALL PHOTOVOLTAIC EQUIPMENT SHALL BE LISTED BY RECOGNIZED TESTING LAB. PV-3 ROOF PLAN -ALL SOLAR ENERGY SYSTEMS SHALL MEET APPLICABLE HEALTH AND SAFETY STANDARDS REQUIREMENTS IMPOSED BY THE CITY AND STATE OF CALIFORNIA. PV-4A-4B ELECTRICAL LINE DIAGRAM -SOLAR ENERGY SYSTEMS FOR PRODUCING ELECTRICITY SHALL MEET ALL APPLICABLE SAFETY AND PERFORMANCE STANDARDS ESTABLISHED BY CALIFORNIA ELECTRIC PV-5 ATTACHMENT DETAIL CODE,THE INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS,ACCREDITED TESTING LABORATORIES SUCH AS UNDERWRITER LABORATORIES AND WHERE DATE:05/13/2024 PV-6A LIST OF PLACARDS APPLICABLE, RULES OF PUBLIC UTILITIES COMMISSION REGARDING SAFETY AND RELIABILITY. PV-6B MONITORING CHART -THE INSTALLATION OF EQUIPMENT AND ALL ASSOCIATED WIRING AND INTERCONNECTION SHALL BE PERFORMED ONLY BY QUALIFIED PERSONS. -WHEN BACKFEED BREAKER IS USED AS POINT OF INTERCONNECTION, BREAKER SHOULD NOT READ LINE AND LOAD. SHEET NAME Digitally signed by COVERSHEET TarnecaWilliams c°"tail"to: twilliams@palmdesert.gov Date:2024.06.28 12 41:20-07'00' SHEET NUMBER PV1 WIND SPEED:97 MPH SO L R24-0 U N LOG RISK CATEGORY II EXPOSURE C A 36 INCH WIDE PATHWAY SHALL BE PROVIDED POINT LOAD CALCULATION PER r' TO THE EMERGENCY ESCAPE AND RESCUE OPENING ARRAY SUNLOGIX ENERGY 70 1 11 38698A EL VIENTO RD STE D 'O ITEM #OR LN FT WT(LBS) TOTAL WT(LBS) PALM DESERT,CA,92211 PH ON E:760-844-6507 N MODULES 27 47 1269 BACKYARD x +I ROOF RAILS 184 0.5 92.0 CONTRACTOR:ZACHARY N GAMEZ STATE LICENSE# LICENSE CLASS EXPIRE DATE 108 , C 48 0212812026 � MOUNTS 50 0.5 25.0 CV ROOF AZIMUTH 91°,181°,271° SWIMMING FROM NORTH POOL PROJECT NAME AND ADDRESS 21± ROOF ACCESS MICRO INVERTER/ 27 2.4 64.8 PATSY POINTS CRC R324.6 OPTIMIZER ROOME TOTAL WEIGHT 1450.8 RESIDENCE /� 1 77676 ASHBERRY CT o T ± MODULE DIMENSIONS 69.10inx40.94 19.6 PALM DESERT,CA,92211 in PHONE:(541)420-2723 WEIGHT PER MOUNT 29.0 CONSTRUCTION TYPE:V-B �- OCCUPANCY GROUP:R 36" FIRE PATHWAY APN:632600065 - PER CFC 605.11.1.2.1 WEIGHT PER SQ FT(LBS/SQFT) 2.7 JURISDICTION ROOF 2:09 MODULES - PALM DESERT ROOF 3 ROOF TILT@18° AZIMUTH@181° I WIND LOAD CALCS CITY OF ROOF 3:06 MODULES - - F- ROOF 1 ROOF 1:12 MODULES 1450.8 - MODULES AND RACKING WEIGHT(W) 00000 LBS MODULE WATT:370 W ROOF TILT@18° - - r3 ROOF TILT@18° � (27)REC N-PEAK 2 AZIMUTH@271° I ROOF 2 AZIMUTH@91° TOTAL MODULES AREA(A) 529.2 SQFT REC370NP2 BLACK - SYSTEM SIZE:9.99 KW DC(STC) :9.36 KW DC(PTC) WIND PRESSURE(PSF)P 35 PSF :9.13 KW AC(CEC) 1 O (27)MICROINVERTERS: (� o „ L=5/16"DIA LAG SCREWS 328 LBS/IN ENPHASE IQ8M-72-M-US D=LAG SCREWS EMBEDEMENT 2.5 INCH (01)BATTERY: (E)WALL TESLA POWERWALL2 36" FIRE PATHWAY QUANTITY OF LAG SCREWS(Q) 100 QTY o AZIMUTH:91°,181°,271° PER CFC 605.11.1.2.1 ROOF TI MOUNTINN GG HEIGHT:1-STORY 2 (E)WALL DRAWING INFORMATION (E)MAIN SERVICE PANEL IEI AND (N)SOLAR BREAKER < �`RI`T'°" � o MATT ROOF COVERAGE �=oN (N)RAPID SHUTDOWN SWITCH ARRAY AREA 561.6 SQFT ROOF ACCESS ROOF AREA 4025.0 SQFT SIGNATURE AND SEAL POINTS CRC R324.6 +I %COVERAGE 14.0 %<33 DRIVE WAY N (N)BATTERY, Co (N)GATEWAY, (N)COMBINER BOX LOCATIONS OF DC CONDUCTORS BRANCH#1 AND CONDUIT WIRING SYSTEMS AND RACEWAYS FOR PHOTOVOLTAIC CIRCUITS SHALL (N)LOAD CENTER BE LOCATED AS CLOSE AS POSSIBLE TO THE RIDGE OR HIP OR VALLEY AND FROM HIP BRANCH#2 (IN GARAGE) OR VALLEY AS DIRECTLY AS POSSIBLE TO AN OUTSIDE WALL TO REDUCE TRIP HAZARDS AND MAXIMIZE THE VENTILATION OPPORTUNITIES.CONDUIT MANNER RUNS BETWEEN SUB ARRAYS - BRANCH#3L - - AND DC COMBINER BOX SHALL BE INSTALLED IN A MANNER THAT MINIMIZES THE TOTAL CITY OF PALM DESERT AMOUNT OF CONDUIT ON ROOF BY TAKING THE SHORTEST RUNS AND MINIMIZED IN THE 7 DEPARTMENT OF BUILDING&SAFETY DATE:05/13/2024 01_O11 PATHWAYS BETWEEN THE ARRAYS.DC WIRING SHALL BE INSTALLED IN A METALLIC APPROVED PHOTOVOLTAIC UNDER 30KW CONDUIT OR RACEWAYS WHEN LOCATED WITHIN ENCLOSED SPACES IN A BUILDING. �Pa°ALaEwME «,°O,°,FA"� —O. CONDUIT SHALL RUN ALONG THE BOTTOM OF THE LOAD BEARING MEMBERS NTL�°M°LE,�. TH.—o.AIIR-1111NS—.1 TNE,oR SHEET NAME THE APPLICANT HAS AGREED TO THE TERMS OF THE PV ELIGIBILITY CHECKLIST.ANY DEVIATION FROM TH E PLOT PLAN ASHBERRY CT e% �E K�.sMw.LpR°4 REPAN ::wp� PLOT PLAN SHEET NUMBER PV2 SCALE: 1/16"=1'-0" PV2 NOTE: V O L R24-0 354 1/3'L MAX TYP 1/3'L MAX TYP U N L r� G PV BREAKER IN MAIN PANEL ACTS AS A 72"O.0 MAX MEANS OF AC DISCONNECT 690.15(D)(1) N OLAR STANDARD RAIL TYP SUNLOGIX ENERGY 38698A EL VIENTO RD STE D PALM DESERT,CA,92211 PH ON E:760-844-6507 ROOF AZIMUTH w X 91° 1 81°271° CONTRACTOR:ZACHARY N GAMEZ 21'-1" FROM NORTH TE LICSTAENSE# LICENSE CLASS EXPIRE DATE o ,0634,4 46 02/2812026 9'-5" ________ ____ PROJECT NAME AND ADDRESS PATSY M "2 ROOM E -71 9'-5" 11'-0" RESIDENCE ND MOUNTING MID MOUNTING CLIP,TYP CLIP,TYP 77676 ASHBERRY CT PALM DESERT,CA,92211 PHONE:(541)420-2723 TYPICAL RACK MOUNT LAYOUT CONSTRUCTION TYPE:V B OCCUPANCY GROUP:R N PV3 SCALE: 3/16"=1'-0" APN:632600065 JURISDICTION PALM DESERT REC N PEAK 2 CITY OF REC370NP2 BLACK 16'-7" 5'-2" 4 MODULE WATT:370 W ROOF 3 (27)REC N-PEAK 2 ROOF 2:09 MODULES BLACK SYSTEM SI ROOF TILT@18° SYSTEM SZE 9.36 KW DC(PTC) AZIMUTH@181° IROOF 9.13 KW AC(CEC) ROOF 3:06 MODULES (27)MICROINVERTERS: ROOF TILT@18° 01)c ENPHASE IQ8M-72-M-US AZIMUTH@271° ROOF 1:12 MODULES ( BATTERY:ROOF TILT@18° = TESLAPOWERWALL2 1 AZIMUTH@91° AZIMUTH:91°,181°,z71° lo � ROOF TILT:18° M LEGEND MOUNTING HEIGHTA-STORY DRAWING INFORMATION ROOF2 JB -JUNCTION BOX E=°R1— °^r I INV - INVERTER ER.-I ACD -AC DISCONNECT MSP -MAIN SERVICE PANEL SUB -SUB PANEL ® -ATTIC VENTS SIGNATURE AND SEAL Q ❑0 -DORMER VENTS J (E)MAIN SERVICE PANEL U 50 QTY ATTACHMENT ® -SKYLIGHT AND (N)SOLAR BREAKER POINTS @ 72"O.C. ® -CHIMNEY cn a MAX PM -PRODUCTION METER cn o A/C -AIR CONDITON UNIT DATE:05/13/2024 (N)RAPID SHUTDOWN ❑ -SOLAR MODULES SWITCH (N)BATTERY, CITY OF PALM DESERT (N)GATEWAY, DEPARTMENT OF BUILDING&SAFETY (N)COMBINER BOX AND ASHBER Y OVED PHOTOVOLTAIC UNDER 30KW ■ -FIRE ACCESS PATHWAY SHEET NAME (N)LOAD CENTER ROOF PLAN ROOF PLAN (IN GARAGE) T"oM=p°E�"'gip°o"°°R�°°`°E"sV"5'°`� °"T"°° NOTE: INSTALL CONDUIT AT LEAST 7/8"ABOVE E -ELECTRIC METER 2 THE APPLICANT HAS AGREED TO THE TERMS OF THE PV ELIOIALITYCHECKLIST.ANY DEVIATION FROM THE ROOF SURFACE. CHECKLIST WILL REQUIRE PLAN REVIEW. PV3 SCALE:3/32"=1'-0" aw� .-,... .aL.e..p.- CB -COMBINER BOX sHEETNUMaER -CONDUIT ON ROOF PV3 L GIB' BI-DIRECTIONAL SUNLOGIX ENERGY NOTE:DERATE THE MAIN BREAKER FROM 200A TO 175A. O UTILITY METER 38698A EL VIENTO RD STE D LOAD CALCS ATTACHED 1 PHASE,3 WIRE PALM DESERT,CA,92211 (N)BRANCH CIRCUIT#1=09 MODULES 120/240 V PHONE:760-844-6507 (N)BRANCH CIRCUIT#2=09 MODULES N GATEWAY BREAKER N)175A DERATED X (N)BRANCH CIRCUIT#3=09 MODULES 80A DPB LOCATED MAIN DISCONNECT CONTRACTOR:ZACHARY N GAMEZ AT OPPOSITE END OF MAIN . STATDEfiL�ICENSEk LICENCE LASS E02/R8z026E NOTE: INSTALL HEAT ALARM INSIDE GARAGE. INSTALL BATTERY ON BREAKER A SIDE WALL TO PROTECT IT FROM VEHICLE IMPACT. SAME MODEL AS MSP PROJECT NAME AND ADDRESS 30 A DPB PATSY FOR TESLA POWERWALL2 (E)200A MAIN BR230, 10 KAIC EXTERNAL RAPID SHUT DOWN SERVICE PANEL ROOM E (N)TESLAPOWERWALL2-14kWh PVBREAKER TFSI ASITF CTS WIRES CUTLER-HAMMER RESIDENCE UL 1973,UL1642,UL9540 50 A DPB Lt 77676 ASHBERRY CT NEMA 3R EATON BR250 L PALM DESERT,CA,92211 2'EMT N PHONE:(541)420-2723 (2)AWG#14 CONSTRUCTION TYPE:V-B OCCUPANCY GROUP:R e THWN-2 IN APN:632600065 1 "EMT JURISDICTION (3)AWG#3 PALM DESERT 11=m L1 =BLACK CITY OF L2=RED 3 FT N=WHITE THW N ❑ 3/4"EMT#1 ❑ (1)AWG#8 AWG#10 G=GREEN MODULE WATT:370 W L1=BLACK (27)REC N-PEAK 2 L2=RED REC370NP2 BLACK N=WHITE SYSTEM SIZE:9.99 KW DC(STC) AWG#8 SUPPLY LUGS NEW,IF NO :9.36 KW DC(PTC) G=GREEN EXISTING :9.13 KW AC(CEC) GROUNDING (27)MICROINVERTERS: ELECTRODE ENPHASE IQ8M-72-M-US (01)BATTERY: TESLA POWERWALL2 PHOTOVOLTAIC ARRAY ® THWN-2 IN AZIMUTH:91',181',271' BRANCH CIRCUIT 1-09 MODULES 11 N GEN/LOAD LUGS 1 3/4"EMT ROOF TILT:18' MOUNTING HEIGHTA-STORY ... (3)20A DP (3)AWG#6 L1 =BLACK JUNCTION BOX 3/4"EMT IN L2=RED DRAWING INFORMATION 3/4"EMT N=WHITE IEI "I"TIOH (3)AWG#8 (N)200A RATED (1)AWG#8 BRANCH CIRCUIT 2-09 MODULES u L2=REDCK TESLA GATEWAY G=GREEN N N 60A MIT. N=WHITE WITH OPTIONAL LOAD CENTER o" ... ❑ u (1)AWG#8 BUS BAR 120/240V BREAKER G=GREEN u BACK UP LOAD LISTS SE IQ8M ^n -KITCHEN LIGHTS ENPHA MICRO INVERTER ` , -MICROWAVE PLUGS BRANCH CIRCUIT 3=09 MODULES G D -INTERNET EQUIPMENTS SIGNATURE AND SEAL ❑ ❑ ••. ❑ GARAGE DOOR OPENER N -OTHER LIGHTS ' G m -ANY OTHER THWN-2 3/4"EMT AWG#8 EGO TO L1=BLACK IQ COMBINER RT IQ COMBINER 4 PARTIAL L2=RED X2-lQ-AMI-240-4 LOADS N=WHITE W/lQ ENVOY ENPHASE Q CABLE AWG#8 SOLAR PV USE ONLY DATE:05/13/2024 IN FREE AIR G=GREEN L1=BLACK 90°C WET& L2-RED CITY OF PALM DESERT GL=GRlE'�E!Ni� DRY DEPARTMENT OFOTO OLTAI UNDER FETY 30KW (N)125 A RATED #6AWGCU APPROVED PHOTOVOLTAIC UNDER30KW LOAD CENTER SHEET NAME BRANCH CIRCUIT 120/240V ELECTRICAL DIAGRAM #I,Isc=1.35A K.L oM .'lI, .„I To,APPa V.1,�,s T,Ek 1 ,E,oe FOR PARTIAL THE APPLICANTHASAGREEDTOTHETENF OF THEPV BACK UP LOADS ELIGIBILITYCHECKLIST.ED ANY TO THE TIER FROM THE CHECKLIST WILL REQUIRE PLAN REVIEW. SHEET NUMBER PV4A ELECTRICAL NOTES: SOLR24-0354 MICROINVERTERS I 1.)ALL EQUIPMENT TO BE LISTED BY UL OR RECOGNIZED TESTING LABORATORY. MAX OUTPUT POWER=325W AC L G I % 2.)ALL PLACARDS AND SIGNAGE REQUIRED BY LATEST EDITION OF CEC AND NEC WILL BE INSTALLED AS REQUIRED. 1.35x9=12.15A PER BRANCH CIRCUITS#1,#2,#3 3.)ALL THE CONDUIT RUNS SHALL HAVE SUFFICIENT WEATHER PROOF JUNCTION BOXES/COMBINER BOXES. MAX BRANCH AC REQUIRED CONDUCTOR AMPACITY SUNLOGIX ENERGY 4.)WORKING CLEARANCES AROUND ALL NEW AND EXISTING ELECTRICAL EQUIPMENT SHALL COMPLY WITH NEC AND CEC 38698A EL VIENTO RD STE D 5. ALL PV ARRAYS SHALL BE EQUIPPED WITH DC GROUND FAULT PROTECTION AND ALL THE MOUNTING METALLIC EQUIPMENT SHALL BE GROUNDED AWG#10 DERATED A PALM DES -844-6,92211 ) AWG#10 DERATED AMPACITY PHONE:760-844-6507 ACCORDING TO MANUFACTURER INSTRUCTIONS. 40X0.7XO.65=18.20A 6.)ALTERNATE POWER SOURCE PLACARD SHALL BE METALLIC OR PLASTIC ENGRAVED OR MACHINE PRINTED LETTER IN A CONTRASTING COLOR .THE PLAQUE 18.20A>15.19A,THEREFORE AC WIRE SIZE IS VALID X SHALL BE ATTACHED BY POP RIVETS OR SCREWS OR OTHER APPROVED METHODS AND SHALL BE UV RESISTANT IF EXPOSED TO DIRECT SUNLIGHT. CONTRACTOR:ZACHARY N GAMEZ 7.)ALL WIRE TERMINATIONS SHALL BE APPROPRIATELY LABELED AND READILY VISIBLE. TOTAL OUTPUT CURRENT FROM COMBINER BOX 1.35X27=36.45A STATE LICEN-I LICENSE CLASS I EXPIRE DATE 8.)AL THE PHOTOVOLTAIC SYSTEMS AND REQUIRED WIRINGS SHALL BE INSTALLED BY QUALIFIED PERSONNEL ONLY AC REQUIRED CONDUCTOR AM PAC ITY=36.45X1.25=45.56A 6 "saeia"se 9.) MICRO INVERTER SHALL CONTAIN GROUND FAULT DETECTION AND INTERRUPTION DEVICES. AWG#8 DERATED AMPACITY 10.)ALL WIRES ARE SIZED ACCORDING TO TEMPERATURE DERATING AND LOCATION. 55xO.87x1.0=47.85A 11.) IF THE EXISTING GROUNDING ELECTRODE SYSTEM CANNOT BE VERIFIED OR IS ONLY METALLIC WATER PIPING, CONTRACTOR SHALL INSTALL A 47.85A>45.56A>THEREFORE AC WIRE SIZE IS VALID PROJECT NAME AND ADDRESS SUPPLEMENTAL GROUNDING ELECTRODE PATSY OUTPUT CURRENT FROM TESLA=21.00A TOTAL CURRENT FROM BACK UP GATEWAY ROOM E AS PER CALIFORNIA RESIDENTIAL CODE CRC SECTIONS R14 AND R15 36.45A+21.00A=57.45A RESIDENCE PROVIDE SMOKE ALARMS ON THE FOLLOWING LOCATIONS: AC REQUIRED CONDUCTOR AM PAC ITY=57.45AX1.25=71.81A 1.SMOKE ALARM IN ALL SLEEPING ROOMS. AWG#4 DERATED AMPACITY 77676 ASHBERRY CT 2.CO ALARMS IN ALL SLEEPING ROOMS WITHIN WHICH FUEL BURNING APPLIANCES ARE INSTALLED. 95XO.87x1.0=82.65A PALM DESERT,CA,92211 82.65A>71.81A,THEREFORE AC WIRE SIZE IS VALID PHONE:(541)420-2723 3.SMOKE ALARMS AND CO ALARM IN AREA PRECEDING SLEEPING ROOMS (SUCH AS HALLWAY),AND CONSTRUCTION TYPE:V-B 4.SMOKE ALARM AND CO ALARM ON EACH STORY LEVEL OF THE DWELLING INCLUDING BASEMENTS AND HABITABLE ATTIC ROOMS OCCUPANCY GROUP:R APN:632600065 JURISDICTION PALM DESERT SOLAR MODULE SPECIFICATIONS MICROINVERTER SPECIFICATIONS CITY OF MANUFACTURER/MODEL# REC370NP2 BLACK MANUFACTURER/MODEL# EN PHASE IQ8M-72-M-US VMP 34.7V NOMINAL AC POWER 325 W (270)REC N-EAK 2DULE WATT: 70 W IMP 10.68A NOMINAL OUTPUT VOLTAGE 240 VAC REC370NP2 BLACK SYSTEM SIZE:9.99 KW DC(STC) VOC 41 AV NOMINAL OUTPUT CURRENT 1.35 A :9.36 KW DC(PTC) 9.13 KW AC(CEC) ISC 11.41A USE 705.13 POWER CONTROL SYSTEM PCS (27)MICROINVERTERS: TEMP.COEFF.VOC -0.26%/°K (N)BATTERY SPECIFICATIONS PCS CONTROLLED CURRENT SETTING:160A(200*0.8). ENPHASE IQ8M-72-M-US MODULE DIMENSION 69.10"L x 40.94"W x 1.20"D(In Inch) MANUFACTURER/MODEL# TESLA POWERWALL2 MEANS IF THE COMBINED GRID PLUS SOLAR PLUS ESS (01)BATTERY: EXCEEDS 140A THEN THE ESS SYSTEMS BEGINS TO CUTRAIL TESLA POWERWALL2 PTC RATING 346.68W NOMINAL AC POWER 5.0 KW POWER TO STAY WITHIN 160A LIMIT AZIMUTH:91°,181°,271° NOMINAL OUTPUT VOLTAGE 240V THE MAX OUTPUT CURRENT FROM THIS SYSTEM TOWARDS ROOF TILT:18' NOMINAL CURRENT 21 AMPS THE MAIN PANEL IS CONTROLLED ELECTRONICALLY.REFER TO MOUNTING HEIGHTA-STORY TOTAL ENERGY 14 KWHR THE MANUFACTURERS INSTRUCTION FOR MORE INFORMATION. DRAWING INFORMATION USABLE ENERGY 13.5 KWHR "IP=ION wlr DIMENSIONS 29.6"X45.3"X5.75" SIGNATURE AND SEAL DATE:05/13/2024 CITY OF PALM DESERT DEPARTMENT OF BUILDING&SAFETY APPROVED PHOTOVOLTAIC UNDER 30KW SHEET NAME ELECTRICAL DIAGRAM THE APPLICANT HAS AGREED TO THE TERMS OF THE PV ELIGIBILITY CHECKLIST.ANY DEVIATION FROM THE CHECKLIST WILL REQUIRE PLAN REVIEW. SHEET NUMBER PV4B SOLR24-0354 MASTIC, MESH AND MASTIC GI FLASHING SUNLOGIX ENERGY 38698A EL VIENTO RD STE D PALM DESERT,CA,92211 IRON RIDGE PHONE:760-844-6507 XR10 RAIL (E)CONCRETE S TILE ROOF MAX 1 LAYER X CONTRACTOR:ZACHARY N GAMEZ STATE LICENSE# LICENSE CLASS EXPIRE DATE 1_14 C40 02/28I2028 PE ASU TILE REPLACEMENT MOUNT (E) 1/2"CDX PLYWOODPROJECT NAME AND ADDRESS PATSY ROOM E RESIDENCE 77676 ASHBERRY CT PALM DESERT,CA,92211 PHONE:(541)420-2723 CONSTRUCTION TYPE:V-B OCCUPANCY GROUP:R 2X4 TRUSSES APN:632600065 @24"O.0 JURISDICTION (2)5/16"x3-1/2" SS LAG BOLT@ 6'O.0 Max. PALM DESERT OVER EXISTING SHEATHING AND ROOF TRUSSES AS CITY OF SHOWN. MIN 2-1/2" PENETRATION MODULE WATT:370 W (27)REC N-PEAK 2 REC370NP2BLACK SYSTEM SIZE:9.99 KW DC(STC) :9.36 KW DC(PTC) :9.13KWAC(CEC)1 ATTACHMENT TYPE: PEGASUS S TILE REPLACEMENT MOUNT (CONCRETE S TILE ROOF) (27)MICROINVERTERS: PV5 SCALE: NTS ENPHASE IQ8M-72-M-US (01)BATTERY: TESLA POWERWALL2 AZIMUTH:91°,181°,271° ROOF TILT:18' MOUNTING HEIGHTA-STORY DRAWING INFORMATION SOLAR PANEL F°KI°.ION PORTRAIT �� K� 2X4 TRUSS@ 24" O.0 I- �81, SIGNATURE AND SEAL co O DATE:05/13/2024 CITY F PALM DEZ DEPARTMENT OF BUILDING&SAFETY APPROVED PHOTOVOLTAIC UNDER 3OKW SHEET NAME ATTACHMENT 5'-9" MAX DETAILS THE APPLICANT HAS AGREED TO THE TERMS OF THE PV ELIGIBILITY CHECKLIST.ANY DEVIATION FROM THE CHECKLIST WILL REQUIRE PLAN REVIEW. SHEET NUMBER PV5A ! WARNING ! ! WARNING ! IF DERATING THE MAIN BREAKER J N LOG ELECTRIC SHOCK HAZARD ! WARNING ! THE TERMINALS ON LINE AND LOAD AT SERVICE EQUIPMENT LOCATION SUNLOGIX ENERGY SIDE MAY BE ENERGIZED IN THE TURN OFF PHOTOVOLTAIC 38698A EL VIENTO RD STE D POWER SOURCE OUTPUT CONNECTIONS, WARNING PALM DESERT,CA,92211 OPEN POSITION DISCONNECT PRIOR TO WORKING PHONE'60-844-6507 INSIDE PANEL DONOT RELOCATE THIS OVER CURRENT DC VOLTAGE IS ALWAYS PRESENT DEVICE MAIN BREAKER SIZE IS REDUCED �, WHEN SOLAR MODULES ARE TO 175A FOR PHOTOVOLTAIC CIRCUIT. X CONTRACTOR:ZACHARY N GAMEZ EXPOSED TO SUNLIGHT DO NOT INCREASE MAIN BREAKER SIZE. STATE LICENSEll LICENSE CLASS EXPIRE DATE NEC 705.12 (B)(2)(3)(b)PLACED ON °fi (690.13(B) CEC AT ALL 'IJ" BOXES, COMBINER NEC 110.27 C, COMBINER BOX, MAIN PANEL/BREAKER LOCATION BOX,ENCLOSURES/EMT ENCLOSURE/CONDUIT ENCLOSURES/DISCONNECTS ENCLOSURE/DISCONNECT PROJECT NAME AND ADDRESSPATSY AT SERVICE EQUIPMENT LOCATION ! WARNING ! ROOME CAUTION PV SOLAR BREAKER RESIDENCE PCS CONTROLLED CURRENT SETTING:160A DO NOT RELOCATE THIS 77676 ASHBERRY CT MAXIMUM OUTPUT CURRNT FROM TALM DSERT,CA, POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE SYSTEM TOWARD THE MAIN PANE IS HIS OVERCURRENT DEVICE PHONEE(541)20-27231 THE FOLLOWING SOURCE WITH DISCONNECT LOCATED CONTROLLED ELECTRONICALLY.REFER TO THEPLACED ON SOLAR+ESS BREAKER CONSTRUCTIONTYPE:V-B MANUFACTURER INSTRUCTIONS OCCUPANCY GROUP:R APN:632600065 AS SHOWN FOR MORE INFORMATION. JURISDICTION N SOLAR PV SYSTEM EQUIPPED PA c Y OF DESERT WITH RAPID SHUTDOWN ENERGY STORAGE MODULE WATT 2 W (27)REC N-PEAK 2 TURN RAPID SHUTDOWN REC370NP2BLACK SYSTEM DISCONNECT SWITCH TO THE SYSTEM SIZE999KWDC(STC) OFF" POSITION TO ELECTRIC :9.13 KW AC(CEC) NOMINAL ESS AC VOLTAGE 240 V SHUT DOWN PV SYSTEM SOLARPV PANELS TERS NOMINAL ESS DC VOLTAGE 400V AND REDUCE E2NPHIASEOIO8M-R72 M US AVAILABLE FAULT CURRENT SHOCK HAZARD (01)BATTERY: DERIVED FROM ESS 32A IN THE ARRAY TESLAPOWERWALL2 (N)PHOTOVOLTAIC DATE CALCULATION PERFORMED 03/06/2024 AZIMUTH:91',181°,271' SOLAR ON ROOF WITHIN 3 FT OF MAIN PANEL/AC ROOF TILT:18' BATTERY CHEMISTRY: LITHIUM ION DISCONNECT IMOUNTING HEIGHTA-STORY PLACED ON RSD SWITCH DRAWING INFORMATION ! WARNING ! 0 ! WARNING ! PHOTOVOLTAIC POWER SOURCE �SION THREE POWER SOURCE SECOND ON ALL CONDUITS SPACED AT MAX 10 FT SOURCE IS PV,THIRD SOURCE IS ESS SIGNATURE AND SEAL BATTERY, LOAD CENTER e CEC 705.12 D(3),NEC 690.59 ON MAIN ! WARNING ! AND GATEWAY(IN GARAGE) PANEL PHOTOVOLTAIC POWER SOURCE CEC 690.31 (G)3-4 ON ALL EMT CONDUIT, PHOTOVOLTAIC N a ENCLOSURE,COMBINER MAIN SERVICE PANEL BOXES,DISCONNECTS PV BREAKER AND RAPID AC DISCONNECT DATE:05/13/2024 SHUTDOWN SWITCH CITY F PALM DESERT RAPID SHUTDOWN DEPARTMENT OF BUILDING B SAFETY RATED AC OUTPUT CURRENT 57.45 A ASHBERRY CT APPROVED PHOTOVOLTAIC UNDER 30KW • SOLARPV SYSTEM SHEET NAME NOMINAL OPERATING AC VOLTAGE 240 V PLAQUES SHALL BE PLASTIC ENGRAVED IN A CONTRASTING PLACARDS COLOR TO THE PLAQUE. PLAQUE SHALL BE ATTACHED TO THE "� MP�a�^wee e o:aP��mP� Ms;;Eeo�OF THE THE APPLICANT AS AGREED T THE ER S FROM THE PV CEC 690.56 C(3) PLACED WITHIN 3 FT AGB S WARNING LABELS SERVICE EQUIPMENT WITH POP-RIVETS OR ADHESIVE. EL"CHECK H LIST REQUIRE ANY O T EPLANREVIEW CEC 690.54 PLACED ON MAIN PANEL OF RAPID SHUT DOWN SWITCH SHEET NUMBER WHITE LETTERS ON RED BACKGROUND AND NON-BOLD ARIAL OR SIMILAR FONT.MARKING SHALL BE REFLECTIVE,WEAT ETY'RESTST4i? _"°"'"""°"°"`"'"` AND GATEWAY X2 PV6A MATERIAL SUITABLE FOR THE ENVIRONMENT SOLR24-0354 UNLDGI ,K SUNLOGIX ENERGY 8698A EL VIENTO RD STE D ALM DESERT,CA,92211 HONE:760-844-6507 OPTIMIZERS/MICRO-INVERTERS CHART X CONTRACTOR:ZACHARY N GAMEZ STATE LICENSEk LICENSE LASS EXPIRE DATE 1063k10 CA6 C 02I282026 PROJECT NAME AND ADDRESS PATSY ROOM E RESIDENCE 77676 ASHBERRY CT PALM DESERT,CA,92211 PHONE:(541)420-2723 CONSTRUCTION TYPE:V-B OCCUPANCY GROUP:R APN:632600065 JURISDICTION PALM DESERT CITY OF MODULE WATT:370 W (27)REC N-PEAK 2 REC370NP2 BLACK SYSTEM SIZE:9.99 KW DC(STC) :9.36 KW DC(PTC) :9.13 KW AC(CEC) (27)MICROINVERTERS: ENPHASEIQ8M-72-M-US (01)BATTERY: TESLA POWERWALL2 AZI M UTH:91°,181°,271° ROOF TILT:18* MOUNTING HEIGHTA-STORY DRAWING INFORMATION U �YISION jJ > CO U r v A N SIGNATURE AND SEAL 0 DATE:05/13/2024 CITY OF PALL DESERT DEPARTMENT OF BUILDING&SAFETY APPROVED PHOTOVOLTAIC UNDER 30KW SHEET NAME HALL MONITORING CHART THE APPLICANT HAS AGREED TO THE TERMS OF THE PV ELIGIBILITY CHECKLIST.ANY DEVIATION FROM THE CHECKLIST WILL REQUIRE PLAN REVIEW. SHEET NUMBER IzOLR24-0354 SOLAR'S MOST TRUSTED ® REC ZA RE[ N-PEAK 2 BLACK SERIES PREMIUM FULL BLACK MONO N-TYPE SOLAR PANELS Lh. MONO N-TYPE:THE NO LIGHT INDUCED MOST EFFICIENT C-SI DEGRADATION TECHNOLOGY P%o, 18 he SUPER-STRONG FLEXIBLE FRAME UP TO 7000 PA INSTALLATION SNOW LOAD OPTIONS <#> FEATURING REC'S BIFACIAL CELLS CAN PIONEERING PRODUCEENERGYFROM TWIN DESIGN BOTH SIDES 370QRODU�T REE R, PALM r D P.o RU5TU - .. POWERTHE APPLICANT HAS AGREED TO THE TERMS OF THE PV 30Nd� ..OD • MOST GENERALDATA 1755 2.5[69.10 0.11 120 half-cut bifacial mono c-Si n-type cells 28[1.1] _ 845[33.271 455[17.911 Cell type: ~� "~ 6 strings of 20 cells in series _________ 156[6.14] Glass: 0.13 in(3.2 mm)solarglass with anti-reflective surface treatment El 1100[43.31+ in a ccorda nce with EN 12150 Backsheet: Highly resistant polymer(black) s.s 0.2 Frame: Anodized aluminum(black) [0.22 0.011 with silver support bars Junction box: 3-part,3 bypass diodes,lead-free IP68 rated,in accordance with IEC 62790 S n 11 0.2 Connectors: StaubliMC4PV-KBT4/KST4(4mm2) [0.43 0.11 in accordance with IEC 62852,IP68 onlywhen connected Cable: 12 AWG(4 mm2)PV wire,43+47 in(1.1+1.2 m) - 1200[47.21 m in accordancewith EN 50618 [ozo.s.a o.o.s 021 156[6.14] Dimensions: 69.1 x 40.94 x 1.2 in(19.70 ft2)/1755 x 1040 x 30 mm(1.83 m2) Weight: 44.0 lbs(20.0 kg) ',�45[1.8] 22.5[oe] 638 ,[zs., 0.041 y Origin: Made in Singapore 30n.2] Measurements in mm[in]111 ELECTRICAL DATA e':RECxxxNP2 Black PEE Power Output-PMAx(Wp) 350 355 360 365 370 IEC 61215:2016,IEC 61730:2016,UL 61730 Watt Class Sorting-(W) 0/+5 0/+5 0/+5 0/+5 0/+5 IEC62804 PID IEC 61701 Salt Mist Nominal Power Voltage-VMPP(V) 33.1 33.5 33.9 34.3 34.7 IEC62716 Ammonia Resistance Nominal Power Current-IMPp(A) 10.57 10.60 10.62 10.65 10.68 UL61730 Fire Type Class 2 1n Open Circuit Voltage-Voc(V) 40.6 40.7 40.8 40.9 41.1 IEC62782 Dynamic Mechanical Load IEC 61215-2:2016 Hailstone(35mm) Short Circuit Current Isc(A) 11.25 11.27 11.31 11.36 11.41 ISO 14001,ISO 9001,IEC 45001,IEC 62941 Panel Efficiency(%) 19.1 19.4 19.7 20.0 20.3 Power output-PMAx(Wp) 264 268 272 276 280 Intertekwnek C E �❑ Nominal Power Voltage-VMPP(V) 31.0 31.3 31.7 32.1 32.5 Nominal Power Current-IMPp(A) 8.54 8.56 8.58 8.60 8.63 � Nominal Module Operating Temperature: 44.3°C( 2°C) C) Open Circuit Voltage-Voc(V) 38.0 38.1 38.2 38.2 38.4 ° Z Temperature coefficient of PMAx -0.34/o/°C Short Circuit Current-Isc(A) 9.06 9.10 9.13 9.18 9.22 Values at standard test conditions(STC:air mass AM 1.5,irradiance 10.75 W/sq ft(1000 W/m2),temperature 77°F(25°C),based on a production spread Temperature coefficient ofVoc: -0.26%/°C with a tolerance ofPM.,VDc&Isc 3%within one watt class.Nominal module operatingtemperature(NMOT:air mass AM 1.5,irradiance 800 W/M2, Temperature coefficient oflsc: 0.04%/°C temperature 68°F(20°C),windspeed 3.3 ft/s 0 m/s).*Where xxx indicates the nominal power class(P..)at STC above. "The temperature coefficients stated are linear values MAXIMUM RATING _ERY INFORMATI Operational temperature: -40...+85°C Standard REC ProTrust Panels per pallet: 33 Maximum system voltage: 1000V Installed byan REC No Yes Yes Panels per40ftGP/high cube container: 858(26 pallets) °' Certified Solar Professional o Maximum test load(front): +7000 Pa(1461bs/ft2)' System Size All 425 kW 25 500 kW Panels per 53 ft truck: 924(28 pallets) Y 0 Maximum test load(rear): 4000Pa(83.51bs/ft2)" Product Warranty(yrs) 20 25 25 3 Max series f use rating: 25A Power Warranty(yrs) 25 25 25 m Max reverse current: 25A Labor Warranty(yrs) 0 25 10 Typical low irradiance performance of module at STC: t "See installation manual for mounting instructions. Power m Year l 98% 98% 98% a, ..e Design load Test load/1.5(safetyfactor) o ° o ,�__T Z Annual Degradation 0.25% 0.25% 0.25% ------- __J_____; y Power in Year 25 92% 92% 92% w o See warranty documents for details.Conditions apply a.--�-----�----------�----- r✓ Po =Irrad[ance(W/m2) ,_ a ,n CITY OF PALM DESERT DEPARTMENT OF BUILDING&SAFETY N m APPROVED PHOTOVOLTAIC UNDER 30KW O 0 y TO-T or aa-1.1-M TeF 7 rvTicoMaETEo. O THE APPLICANT HAS AGREED TO THE TERMS OF THE PV Founded in1996,RECGrou is an international pioneering solar company dedicated toem empowering consumers withclean,afforda lesolf'� Fps w'sREo�REPaNa"E Ew.T"E P P g energy P Y P g o Solar's Most Trusted,REC is committed to high quality,innovation,and a low carbon footprint in the solar materials and solar panel itrwnerRr€e to . :;<° w^°...... Headquartered in Norway with operational headquarters in Singapore,REC also has regional hubs in North America,Europe,and Asia-Pac fic. d www.recgroup.com SOLR24-0354 ENPHASE c ` a r -- s � Fil IQ8M and IQ8A Microinverters Our newest IQ8 Microinverters are the industry's first microgrid-forming,software defined Easy to install microinverters with split-phase power conversion capability to convert DC power to AC Lightweight and compact with plug-n- power efficiently.The brain of the semiconductor-based microinverter is our proprietary play connectors application specific integrated circuit(ASIC)which enables the microinverter to operate in grid-tied or off-grid modes.This chip is built in advanced 55nm technology with high speed Power Line Communication(PLC) digital logic and has superfast response times to changing loads and grid events,alleviating between components constraints on battery sizing for home energy systems. Faster installation with simple two-wire cabling High productivity and reliability • a Produce power even when the grid is down* t 1 111,- —,ty More than one million cumulative hours of testing Part of the Enphase Energy System,IQ8 IQ8 Series Microinverters redefine Series Microinverters integrate with the reliability standards with more than one Class II double-insulated enclosure IQ Battery,IQ Gateway,and the Enphase million cumulative hours of power-on Optimized for the latest high-powered App monitoring and analysis software. testing,enabling an industry-leading PV modules limited warranty of up to 25 years. Microgrid-forming Complies with the latest advanced grid support— CERTIFIED Remote automatic updates for the L_ SAFETY -A latest grid requirements Connect PV modules quickly and easily IQ8 Series Microinverters are UL listed Configurable to support a wide range to the IQ8 Series Microinverters that has as PV Rapid Shutdown Equipment and of grid profiles integrated MC4 connectors. conform with various regulations,when Meets CA Rule 21(UL 1741-SA)and IEEE installed according to manufacturer's 1547:2018(UL 1741-SB) instructions. Note: CITY OF PALM DESERT DEPARTMENT OF BUILDING&S.A,,FE.,T,,Y IQ8 Mlcr InvertQ[�ROVED PHOTOVOLTAIC UNDh@S0"h previous generatic -ters 0Q7 Series,K *Only when installed with IQ System Controller 2,meets UL 1741. **IQ8M and IQ8A support split-phase,240V installations only. T,=°MPLETE 0•aPPa°E°P�SMus,aEkE THE APPLICANT HAS AGREED TO THE TERMS OF THE PV ELIOIBILITY CHECKLIST.ANY DEVIATION FROM THE CHECKLIST WILL REQUIRE PLAN REVIEW. ©2022 Enphase Energy.All rights reserved.Enphase,the Enphase logo,IQ8 Microinverters, °°^°• ^•^^° o...„..,..aw�„^.�*.� °^•'^°^'^'°^'° and other names are trademarks of Enphase Energy,Inc.Data subject to change. I08MA-MC4-12A-DS-0080-02-EN-US-2 2-12-12 IQ8M and IQ8A Microinverters SOLR24-0354 Commonly used module pairings' w 260-460 295-500 Module compatibility 54-cell/108 half-cell,60-cell/120 half-cell,66-cell/132 half-cell and 72-cell/144 half-cell MPPT voltage range V 30-45 32-45 Operating range V 16-58 Min./Max.start voltage V 22/58 Max.input DC voltage V 60 Max.continuous input DC current A 12 Max.input DC short-circuit current A 25 Max.module I A 20 Overvoltage class DC port II DC port backfeed current mA 0 PV array configuration 1 x 1 Ungrounded array;No additional DC side protection required;AC side protection requires max 20A per branch circuit OUTPUT DATA Q: 0: Peak output power VA 330 366 Max.continuous output power VA 325 349 Nominal(L-L)voltage/range V 240/211-264 Max.continuous output current A 1.35 1.45 Nominal frequency Hz 60 Extended frequency range Hz 47-68 AC short circuit fault current over 2 3 cycles Arms Max.units per 20 A(L-L)branch circuit3 11 Total harmonic distortion <5 Overvoltage class AC port III AC port backfeed current mA 30 Power factor setting 1.0 Grid-tied power factor(adjustable) 0.85 leading-0.85 lagging Peak efficiency % 97.8 97.7 CEC weighted efficiency / 97.5 97 Night-time power consumption mw 60 MECHANICAL DATA Ambient temperature range -40°C to+60°C(-40°F to+140°F) Relative humidity range 4%to 100%(condensing) DC Connector type Staubli MC4 Dimensions(H x W x D) 212 mm(8.3")x 175 mm(6.9")x 30.2 mm 0.2") Weight 1.1 kg(2.43 Ibs) Cooling Natural convection-no fans Approved for wet locations Yes Pollution degree PD3 Enclosure Class II double-insulated,corrosion resistant polymeric enclosure Environ.category/UV exposure rating NEMA Type 6/outdoor COMPLIANCE PAL ENT Milo, CA Rule 21(UL 1741-SA),UL 62109-1,IEEE 1547:2018(UL 1741-SB),FCC Part 15 Class B,ICES-0003 CI ss B, PF�RovED PHOTOVOLTAIC UNDE 33QKWO1 Certifications This product is UL Listed as PV Rapid Shutdown Equipment and conforms with NEC 2014,NEC 2017,a 0,MPAI<oM=.�oA.s A""•"_____•""o.R FN�a C 2 - 2018 Rule 64-218 Rapid Shutdown of PV Systems,for AC and DC conductors,when installed accordi TMg�a E,oF a;;a"1T."1L.RH s'N e t E;IOe THE APPLICANT HAS AGREED TO THE TERMS OF THE PV ELIGIBILITY CHECKLIST.ANY DEVIATION FROM THE (1)Pairing PV modules with wattage above the limit may result in additional clipping losses.See the compatibility calculator at CHECKLST WILL REQUIRE PLAN REVIEW. https://Iink.enphase.com/module-compatibility.(2)Nominal voltage range can be extended beyond nominal if required by the utility. °°^°• ^�^° °,,.„..,„,aw.„,„°.�.��. °^•'^°^'^'°^'° (3)Limits may vary.Refer to local requirements to define the number of microinverters per branch in your area. IQ8MA-MC4-12A-DS-0080-02-EN-U22 2-12-12 SOLR24-0354 POWERWALL Tesla Powerwall is a fully-integrated AC battery system for residential or light commercial use. Its rechargeable lithium-ion battery pack provides energy storage for solar self-consumption, time-based control, and backup. Powerwall's electrical interface provides a simple connection to any home or building. Its revolutionary compact design achieves market-leading energy density and is easy to install, enabling owners to quickly realize the benefits of reliable, clean power. PERFORMANCE SPECIFICATIONS MECHANICAL SPECIFICATIONS AC Voltage(Nominal) 120/240 V Dimensions 1150 mm x 755 mm x 155 mm Feed-In Type Split Phase (45.3 in x 29.7 in x 6.1 in) Grid Frequency 60 Hz Weight 125 kg(276 Ibs) Mounting options Floor or wall mount Total Energy' 14 kWh Usable Energy' 13.5 kWh 755 mm 155 mm (29.7 in) (6.1 in) Real Power,max continuous 5 kW(charge and discharge) Real Power,peak(10s,off-grid/backup) 7 kW(charge and discharge) Apparent Power,max continuous 5.8 kVA(charge and discharge) T o M L F Apparent Power,peak(10s,off-grid/backup) 7.2 kVA(charge and discharge) Maximum Supply Fault Current 10 kA Maximum Output Fault Current 32 A 1150 mm (45.3 in) Overcurrent Protection Device 30 A Imbalance for Split-Phase Loads 100% Power Factor Output Range +/-1.0 adjustable Power Factor Range(full-rated power) +/-0.85 Internal Battery DC Voltage 50 V Round Trip Efficiency',' 90% Warranty 10years ENVIRONMENTAL SPECIFICATIONS 'Values provided for 25°C(77°F),3.3 kW charge/discharge power. Operating Temperature —20°C to 50°C(-4°F to 122°F) AC to battery to AC,at beginning of life. Optimum Temperature 0`C to 300C(32°F to 86°F) COMPLIANCE INFORMATION Operating Humidity(RH) Up to 100%,condensing Certifications UL 1642,UL 1741,UL 1973, Storage Conditions -20°C to 30°C(-4°F to 86°F) UL 9540,IEEE 1547,UN 38.3 Up to 95%RH,non-condensing State of Energy(SoE):25%initial Grid Connection Worldwide Compatibility Maximum Elevation 3000 m(9843 ft) Emissions FCC Part 15 Class B,ICES 003 Environment Indoor and outdoor rated Environmental RoHS Directive 2011/65/EU Enclosure Type EMA CITY OF PALM DESERT ARTMENT OF BUILDING&SAFETY Seismic AC156,IEEE 693-2005(high) Ingress Rating P67(BWIJQROVED PHOTOVOLTAIC UNDEgHPxYA ��'°'*``��//TM'E Wet Location Rating P�oE`pw,""�T.FaPP"oEo`P�°si TAF°k 1 THPPP EAPPLLIICI ANT HAS AGREED TO THE TERMS OF THE PV Noise Level A 1m U y LIST WILILL REQUIRE PLAN REVIEW THE T-5 L n TESLA.COM E ERGY SOLR24-0354 TYPICAL SYSTEM LAYOUTS WHOLE HOME BACKUP Optional', I � I Solar Solar inverter Main panel Backup Gateway Utility meter Grid including service disconnect Powerwall Whole home backup PARTIAL HOME BACKUP Optional I � I Solar o 0 o O Solar inverter ------------------------ Sub panel Backup Gateway Main panel Utility meter Grid T 5 L n n Powerwall Backup loads Home loads CITY OF PALM DESERT DEPARTMENT OF BUILDING&SAFETY APPROVED PHOTOVOLTAIC UNDER 30KW THE APPLICANT HAS AGREED TO THE TERMS OF THE PV ELIGIBILITY CHECKLIST.ANY DEVIATION FROM THE CHECKLIST WILL REQUIRE PLAN REVIEW. T-5 L n NA-BACKUP-2018-01-30 TESLA.COM E ERGY SOLR24-0354 POWERWALL Backup Gateway The Backup Gateway for Tesla Powerwall provides energy management and monitoring for solar self-consumption,time-based control,and backup. The Backup Gateway controls connection to the grid,automatically detecting outages and providing a seamless transition to backup power.When equipped with a circuit breaker,the Backup Gateway can be installed at the service entrance. The Backup Gateway communicates directly with Powerwall,allowing you to monitor energy use and manage backup energy reserves from any mobile device with the Tesla app. PERFORMANCE SPECIFICATIONS MECHANICAL SPECIFICATIONS AC Voltage(Nominal) 230 V,120/240 V Dimensions 740 mm x 378 mm x 129 mm Feed-In Type Single&Split Phase (29.1 in x 14.9 in x 5.1 in) Grid Frequency 50 and 60 Hz Weight 16.4 kg(36 Ibs) Mounting options Wall mount Disconnect Current 200 A Maximum Input Short Circuit Current 10 kA 378 mm 129 mm Overcurrent Protection Device' 100-200 A;Service Entrance Rated (14.9 in) (5.1 in) Overvoltage Category Category IV El El AC Meter Revenue grade(+/-1 IN) Connectivity Ethernet,Cellular(3G),Wi-Fi User Interface Tesla App Operating Modes Support for solar self-consumption, time-based control,and backup 740 mm Backup Operation Automatic disconnect for seamless (29.1 In) backup transition Modularity Supports up to 10 AC-coupled Powenvalls Warranty 10 years 'Circuit breaker required for installation at service entrance. COMPLIANCE INFORMATION ENVIRONMENTAL SPECIFICATIONS Certifications UL 1642,UL 1741,IEC 62109-1, Operating Temperature -20°C to 50°C(-4°F to 122°F) CSA C22.2.107.1 Operating Humidity(RH) Up to 100%,condensing Grid Connection Worldwide Compatibility — Maximum Elevation 3000 m(9843 ft) Emissions FCC Part 15 Class B,ICES 003, IEC 61000-6-3,EN 55024, Environment Indoor and outdoor rated EN 301489-1,EN 301489-7, Enclosure Type NEMA 3R EN 301489-17 Ingress Rating P44 CITY OF PALM DESERT Environmental RoHS Directive 2011/65/EU, DEPARTMENT OF BUILDING&SAFETY W EEE Directive 2012/19/EU, APPROVED PHOTOVOLTAIC UNDER 3UKW Battery Directive 2006/66/EC REACHRegulation ALLo,aPPao EOP�sMus,aEkE o.E o Seismic AC156,IEEE 693-2005(high) THE APPLICANT HAS AGREED TO THE TERMS OF THE PV ELIGIBILITY CHECKLIST.ANY DEVIATION FROM THE CHECKLIST WILL REQUIRE PLAN REVIEW. T=5 L n 2018-02-13 TESLA.COM E ERGY SOLR24- // IRONRIDGE XR Rail° Family Solar Is Not Always Sunny Over their lifetime, solar panels experience countless extreme weather events. Not just the worst storms in years, but the worst storms in 40 years. High winds capable of ripping panels from a roof, and snowfalls weighing enough to buckle a panel frame. XR Rails® are the structural backbone preventing these results. They resist uplift, protect against buckling and safely and efficiently transfer loads Into the building structure. Their superior spanning capability requires fewer ��®� roof attachments, reducing the ��®® number of roof penetrations ®� and the amount of installation time. �® I •r Force-Stabilizing Curve Sloped roofs generate both vertical and lateral ' forces on mounting rails which can cause them to bend and twist.The curved shape of XR Rails® is specially designed to increase strength in both directions while resisting the twisting.This unique feature ensures greater security during extreme weather and a longer system lifetime. Compatible with Flat& Pitched Roofs Corrosion-Resistant Materials XR Rails°are IronRidge°offers All XR Rails°are made of 6000 eries CITYOFPAAZ-EW,E compatible with a range of tilt leg aluminum alloy,then protected with arpEPARTMENTOFBUILDIN FETY FlashFoot®and options for flat anodized finish.Anodizing prevents SUIT' 'OVEDPHOTOVOLTAICUND OION other pitched roof roof mounting and structural corrosion,while a So'PrIM—E=„- „110 III I11-11 attachments. applications. a more attractive appearance. oFaPP„oEppµsM„s eEKEPiONiHE1T, ANT HAS AGREED TO THE TERMS ELIGIBILITY CHECKLIST,ANY DEVIATION FROM THE CHECKLIST WILL REQUIRE PLAN REVIEW. SOLR24- XR Rail° Family The XR Rail®Family offers the strength of a curved rail in three targeted sizes. Each size supports specific design loads, while minimizing material costs. Depending on your location, there is an XR Rail®to match. i i XR10 XR100 XR1000 XR10 is a sleek,low-profile mounting XR100 is a residential and commercial XR1000 is a heavyweight among rail,designed for regions with light or mounting rail. It supports a range of solar mounting rails. It's built to handle no snow. It achieves spans up to 6 feet, wind and snow conditions,while also extreme climates and spans up to 12 while remaining light and economical. maximizing spans up to 10 feet. feet for commercial applications. 6'spanning capability 10'spanning capability 12'spanning capability Moderate load capability Heavy load capability Extreme load capability Clear&black anodized finish Clear&black anodized finish Clear anodized finish Internal splices available Internal splices available Internal splices available Rail Selection The table below was prepared in compliance with applicable engineering codes and standards.* Values are based on the following criteria:ASCE 7-16, Gable Roof Flush Mount, Roof Zones 1 & 2e, Exposure B, Roof Slope of 8 to 20 degrees and Mean Building Height of 30 ft. Visit IronRidge.com for detailed certification letters. f � Rail Span 90 120 None 140 XR10 XR1000 160 90 120 20 140 160 9 30 0 160 40 90 — 160 DEPARTMENT OF PALM DESERT OF BUILDING 8 SAFETY OVED PHOTOVOLTAIC UNDE 80 160 120 160 MIPeM>"oEpawsY slEroFaPPao THE Ms;;Ek ^a AND E.o, THE APPLICANT HAS AGREED TO THE TERMS OF THE PV Y CHECKLIST.ANY DEVIATION F CHECKLIST WILL REQUIRE PLAN REVIEW. Table is meant to be a simplified span chart for conveying general rail capabilities.Use approved ce ifiG�IisuaJ�itk glance. 0 :00 ,40_ DAY ON • : SOLAR T" TILE REPLACE MOUNT cuttingNo 11ft Flashing slides into place - Fl post twist-locks into position i Gain • - •• - •- • - • • the tile • to purchase replacement INSTALLATIONSEASIER TILE Pegasus Solar's Tile Replace Mount eliminates grinding of tiles and gives you extra tiles to replace broken tiles. Reduce fatigue and increase crew productivity by making installations easier and faster. 25-year Warranty � Universal © Manufactured with advanced materials and Fits most the thickness and batten or batten-less roofs.S-flashing works on concrete coatings to outlast the roof itself � and clay tiles.Compatible with all rails. Code Compliant Kit Packaging '' Flashing kit incladas fia�iiiiiy,Nv�t, Fully IBC/CBC Code Compliant mounting bolt and EPDtFP LENT OF BUILDIN eci kit Exceeds ASCE 7 16 Standards / includes unive rsal sle ase THE APPLICANT HAS AGREED TO THE TERMS OF THE PV CHECI<LIST WILL REQUIRE PLAINEW Tested to AC286 flashing(optional). Pegasus Solar Inc 100 West Ohio Avenue, Richmond,CA 94804 510.210.3797 www.pegasussolar.com TILE REPLACE MOUNT 1.Remove tile to be 2.Install sled over replaced and locate optional base flashing rafter. _ and drive lag screws to required embed- ment.Waterproof per all applicable codes and standards as required by the AHJ. 3.Slide replacement 4.Insert post with flashing under left T-bolt into sled and up-roof tiles, channel.Once ensuring post hole engaged,rotate post lines up with sled clockwise to tighten channel. T-bolt. Install EPDM boot over post and snug to flashing. 15 01.5" Flat Tile Replace Kit o�\ 4.V. — �\ 2.2" 1 15 ol.5" S Tile Replace Kit F118" ]5.7" a" W o 1.5" W Tile Replace Kit fi . 18 4.7" _4 8.5" 12.7" Sled Kit 1.6 6.8" 0 0 ARNOW D 0 0 Specifications Tile Replace Flashing Kit(Flat,S &W) Sled Kit(Universal) SKU PSTR-FFBO PSTR-FSBO PSTR-FWBO PSTR-SB00 Tile Type Flat-Tile S-Tile&Clay Tile W-Tile Any Hardware Included Flashing,Post,Mounting Bolt, EPDM Boot Sled,5/16"SS Lags,Base Flashing Install Application Rails Certifications IBC,ASCE/SEI 7-16,AC286 Dg CITY OF PALM DESERT gpF�L Material Painted Galvalume Plus Flashing,Aluminum Post Alumin m S eUPA12TMENT OF BUILDING A rl Fd In APPROVED PHOTOVOLTAIC UNDER 30KW Kit Quantity 12 °eP FAY o"ooaPPa°oeEo�P",_s;aEo'NTE.'T' Boxes Per Pallet 36 THE APPLICANT HAS AGREED TO THE TERMS OF THE PV ELIGIBILITY CHECKLIST.ANY DEVIATION FROM THE CHECKLIST WILL REQUIRE PLAN REVIEW. Patents Pending.All rights reserved.©2020 Pegasus Solar Inc. m=••b o=„„„„„,aW,o, „,„„ „aL,=„.p.M. Pegasus Solar Inc - 100 West Ohio Avenue, • • CA 94804 510.210.3797 SOLR24-0354 LOAD CALCULATION SINGLE FAMILY DWELLING(NEW OR EXISTING) CUSTOMER NAME:PATSY ROOME 77676 Ashberry Ct Palm Desert,CA 92211,USA Multiplying STEP 1 Unit #OF EACH factor Breaker size VA/WATTS OTHER LOADS ART 220.14 INSIDE SQUARE FOOTAGE 2601 Sq ft GENERAL LIGHTING 3 7803 SMALL APPLIANCE AND LAUNDARY CU RCU ITS 2 1500 3000 OTHER LAODS DISH WASHER 1 1 20 1920 Microwave 1 1 20 1920 REFRIGERATOR 1 1 20 1920 WATER HEATER 0 1 40 0 DRYER 1 1 30 5760 11 POLE OVEN/RANGE 1 1 1 40 768012 POLE GARBAGE DISOSAL 1 1 20 1920 SUB PANEL 0 1 60 0 POOL AND OTHERS 1 1 15 2880 2 pole 34803 APPLYING DEMAND FACTOR ART 220.82 FIRST 10,000 VA X100% 10000 VA 1 10000 REMAINING VA X 40% 24803 VA 0.4 9921.2 TOTAL T 19921.2 STEP2 HEATING OR AC LOAD HEATING UNIT 3 OR LESS 0 0 0 AC UNIT 1 2 30 11520 AC UNIT 2 0 0 0 AC UNIT 3 0 0 0 OTHER LOADS EV CHARGER 1 40 7680 OTHER LOADS RV 240 0 0 0 TOTAL TOTAL VA AMPERE LOAD 39121.2 VA TOTAL AMPERE LOAD 163.005 A MIN SERVICE REQUIREMENT 175 A MIN SERVICE PROVIDED 200 A CITY OF PALM DESERT DEPARTMENT OF BUILDING&SAFETY APPROVED PHOTOVOLTAIC UNDER 30KW THE APPLICANT HAS AGREED TO THE TERMS OF THE PV ELIGIBILITY CHECKLIST.ANY DEVIATION FROM THE CHECKLIST WILL REQUIRE PLAN REVIEW. Eligibility Checklist Expedited Solar Photovoltaic Permitting for One- and Two-family Dwellings These criteria are intended for expedited solar permitting process. If any items are UNCHECKED, revise design to fit within Eligibility Checklist, otherwise permit application must go through standard process which is (10 Business Day initial review/7 Business Day Follow-up Review) 1. General Requirements ® The photovoltaic system size is 30kW AC CEC rating or less. ® The solar array is roof-mounted on a one-or two-family dwelling unit or permitted accessory structure. ® The photovoltaic system is utility interactive. ® Permit application and declaration is completed and attached. 2. Planning Department Requirements ® Existing MPU Amps Doubling,e.g. 100 to 200 OR 125 to 225. PLANNING WILL NEED TO REVIEW. El Maximum height of"tilted"panels shall not exceed eighteen (18)inches. ® All wires shall be strapped to the modules/racking system. No loose or hanging wires are permitted. p The racking system shall match the module frame and shall be a color compatible with the architectural character of the home or building. ® Modules shall be flush with one another and gaps between panels shall be minimized. p Screening of panels is not required.Any screening material proposed shall be compatible with the architectural character of the home of building. 3. Electrical Requirements ® No more than four photovoltaic module strings are connected to each Maximum Power Point Tracking (MPPT)input where source circuit fusing is included in the inverter: 1) No more than two strings per MPPT input where source circuit fusing is not included 2) Fuses(if needed)are rated to the series fuse rating of the PV module 3) No more than one non-inverter-integrated DC combiner is utilized per inverter A For central inverter systems: No more than two inverters are utilized. ® The PV system is connected to the load side of the utility distribution equipment. ® A Solar PV Standard Plan and supporting documentation is completed and attached. 4. Structural Requirements ® A completed Structural Criteria and supporting documentation is attached Wind and Seismic(if required). 5. Fire Safety Requirements ® Clear access pathways provided. ® Fire classification photovoltaic system is provided. ® All required marking and labels are provided. R A diagram of the roof layout of electrical panels, modules, clear access pathways and approximate locations of electrical disconnecting means and roof access points are completed and attached. I understand and affirm that the above information regarding the solar photovoltaic is true and accurate. If during the inspection process any deviation in this scope will result in stop work and full plan review. In the event a project requires supplemental plan reviews,a plan review fee of$168.00 per hour(with one-half hour minimum)will be collected from the applicant. Applicant Signature: ��P p Date: (0/22/2 CIT'NTOFB I DING& DEPARTMENT OF BUILDING 8 SAFETY Project Address: 7767<o ASH13ERRY CT. APPROVED PHOTOVOLTAIC UNDER IwW THE APPLICANT HAS AGREED TO THE TERMS OF THE PV ELIGIBILITY CHECKLIST.ANY DEVIATION FROM THE ECKLIST WILL REQUIRE PLAN REVIEW.