HomeMy WebLinkAboutReplacement HVAC on Civic Center Buildings �T-- PUBLIC
i r
.J,
,A,,.., _,, . v, MEMO
,„N..„, ., gen:
aE WOR K S
TO: Honorable Mayor and City Council
FROM: Richard J. Folkers, ACM/Director of Public Works
SUBJECT: REPLACEMENT OF HEATING - A/C UNITS ON CIVIC CENTER
BUILDINGS
DATE: March 25, 1999
RECOMMENDATION:
By minute motion accept the proposed by Hugh Hoard, Inc. (H & H) to install a proto-type
heating/air conditioning (HVAC) unit to be used for future bidding.
BACKGROUND:
There are 12 roof HVAC units on the Community Service and Administrative buildings that are
scheduled for replacement. There are design problems that have made equipment and
installation specifications difficult to develop.
H & H Heating - A/C has been performing the majority of repair and service to the Civic Center
facility and is very familiar with all aspects of our HVAC units and installation. While trying to
prepare specifications, Public Works staff requested a completed installation proposal that would
replace an existing unit with no or minimum roof modification and use the existing electric, gas,
condensation drains and roof intake and discharge openings. The installation requirements also
included all new exterior duct work and a platform cap that would facilitate the installation of a
urethane foam roof without any interference from the HVAC units.
Attached is a cost proposal for the complete installation of one unit to be used as a standard
reference for the bidding of other replacement units. Public Works staff recommends the City
Council approve the installation proposal. Sufficient funds are available in account#110-4340-
413-3310 to perform this work.
›e71.67
ARICHAI O , pA O1N: REVIEWED A D CONCUR
J. 7. m DENIED TY GER
LCEIVED x OTHER
RF/rGB/et
htnga&c. TIA-r DATE
.'‘YES .,_ _ BUD AND CONCUR
OES:._,-:, - DIRECTOR
ABSENT:,_ .`1\eu..Q ,.4 . x ..,.�
ABSTAIN:_._'Y\C,
V RIFIEt, �- : ,.
C,:1 i.°:L.:. oil . _ .: +Clerk's Office
JOB #PUL3U39 1 1
Page No of Pages
.... firapasttl
Contractor's License / / / / Hugh Hoard Air Conditioning • Heating
No. 510566 ' ' Refrigeration
INC.INc
74-991 Joni Drive,* 20 r 0 II ED
Palm Desert,CA 92260-2043 Phone(619)340-3088
FAX(619) 341-2785
PROPOSAL SUBMITTED TO MAR — 8 19990NE DATE
PALM DESERT CITY/TOM BASLER 77 —6450 MARCH 3, 1999
STREET PUBLIC
73510 FRED WARING DRIVE CITY OF PALM DESER PALM DESERT CITY
City STATE AND ZIP CODE JOB LOCATION
PAlM DFSFRT_ CA 92260 COMMUNITY SERVICES BLDG.
ARCr.IECr GATE of PLANS JOB ergNE
We hereby submit specifications and.Inmates for.
WE PROPOSE TO PERFORM THE FOLLOWING
SUPPLY AND INSTALL:
1 — 5.0 TON CARRIER PACKAGED GAS/ELECTRIC HVAC UNIT
48GS-060090-301 THREE PHASE
BID PRICE:
$3848.00
INCLUDES NECESSARY: CRANE LIFT, NEW ROOF DUCTWORK, ROOF CAP,
ELECTRICAL AND GAS
P
*THIS IS A PROTO—TYPE* a
(price includes tax and labor)
This proposal good for 30 days;if not accepted within said period,seller reserves the right to withdraw said proposal with or without notice to
buyer. If buyer delays construction over sixty calendar days after signing contract,seller may have right to increase contract price to cover
any material or labor�ng increases,or in the alternative,to cancel said contract.
7�7r Propose hereby to furnish material and labor—complete in accordance with the above soecit lcations.for the sum of
dollars($ 1
Payment to be made as follows
*PROGRESSIVE BILL *
All material is guaranteed to be as specified. All work to be completed in
workmanlike manner according to standard practices. Any alterations or deviations Authorized
from the above specifications involving extra costs will De executed only upon written Signature
Orders.and Will become an extra charge over and above the estimate.All agreements UGH Or. D
contingent upon strikes.accidents or delays beyond our control.Owner to carry lire. Note' This proposal may be wind damage and other necessary insurance Our workers are lolly covered by withdrawn by us If not accepted withi Zn J0 days
Workman s Compensation Insurance
Arcrpla trr of f ropuoal - The above prices.
specifications and conditions are satisfactory and are hereby accepted• you are Signature
authorized to do the work as specified.Payment will be made as outlined above.
Date of Acceptance Signature
NOTICE TO BUYER
Under the Mechanics'Lien Law.any contractor,subcontractor, the office of the county recorder of the county where the property
laborer.materialman or other person who helps to Improve your Is situated and requiring that a contractor's payment bond be
property and is not paid for his labor,services or material,has a recorded in such office.Said bond shall be in an amount not less
right to enforce his claim against your property. than fifty percent(50%)of the contract price and shall,in addition
to any conditions for the performance of the contract.be con-
Under the law,you may protect yourself against such claims by dltioned for the payment in full of the claims and all persons fur-
filing,before commencing such work of improvement.an original nishing labor, services. equipment or materials for the work
contract for the work of Improvement or a moficatlon thereof.in described in said contract.
JOB #PDC3039 1 1
Prtwrna1Page No ofPages
Contractor's License Hugh Hoard Air Conditioning • Heating
No. 510566 INC. Refrigeration
74-991 Joni Drive,# 20 ED
Palm Desert,CA 92260-2043 Phone (619) 340-3088
FAX(619) 341-2785
PROPOSAL SUBMITTED TO: MAR ., 8 ONE DATE
PALM DESERT CITY/TOM BASLER MAR 77.6-6450 MARCH 3 , 1999
STREET PUBLIC WORKS DE A R M N
73510 FRED WAKING DRIVE CITY OF PALM 7ESERT PALM DESERT CITY
CITY, STATE AND ZIP CODE JOB LOCATION
PAIM DESERT. CA 92760 COMMUNITY SERVICES BLDG. ,
ARCHITECT DATE OF PLANS JOB PHONE
We hereby submit specifications and estimates for:
WE PROPOSE TO PERFORM THE FOLLOWING
SUPPLY AND INSTALL :
1 — 5.0 TON CARRIER PACKAGED GAS/ELECTRIC HVAC UNIT
48GS--060090--301 THREE PHASE
BID PRICE:
$3848.00
INCLUDES NECESSARY: CRANE LIFT, NEW ROOF DUCTWORK, ROOF CAP,
ELECTRICAL AND GAS
*THIS IS A PROTO—TYPE*
( ori.Ce, includes tax and labor )
This proposal good for 30 days;if not accepted within said period,seller reserves the right to withdraw said proposal with or without notice to
buyer. If buyer delays construction over sixty calendar days after signing contract,seller may have right to increase contract price to cover
any material or labor increases, or in the alternative,to cancel said contract.
'Ill a rropUSP hereby to furnish material and labor— complete in accordance with the above specifications, for the sum of.
dollars ($ ),
Payment to be made as follows.
*PROGRESSIVE BILL G*
All material is guaranteed to be as specified. All work to be completed in a
workmanlike manner according to standard practices. Any alterations or deviations Authorized
from the above specifications involving extra costs will be executed only upon written Signature 7n
orders,and will become an extra charge over and above the estimate. All agreements HUGH HOARD
D
contingent upon strikes,accidents or delays beyond our control. Owner to carry fire, Note: This proposal may be
` wind damage and other necessary insurance. Our workers are fully covered by withdrawn by us if not accepted within 30 days.
�Workman's Compensation Insurance.
'.�icteptan a of Fa Vpiaial — The above prices,
specifications and conditions are satisfactory and are hereby accepted. You are Signature
authorized to do the work as specified. Payment will be made as outlined above. Robert A. Spiegel, Mayor
Attest:
March 25, 1999 Signature
1Date of Acceptance. Sheila R. Gilligan, City Clerk
NOTICE TO BUYER
Under the Mechanics'Lien Law,any contractor,subcontractor, the office of the county recorder of the county where the property
laborer.materialman or other person who helps to improve your is situated and requiring that a contractor's payment bond be
property and is not paid for his labor,services or material,has a recorded in such office.Said bond shall be in an amount not less
right to enforce his claim against your property. than fifty percent(50%)of the contract price and shall,in addition
to any conditions for the performance of the contract, be con-
Under the law,you may protect yourself against such claims by ditioned for the payment in full of the claims and all persons fur-
filing,before commencing such work of improvement,an original nishing labor, services, equipment or materials for the work
contract for the work of Improvement or a mofication thereof,in described in said contract.