HomeMy WebLinkAboutRes 90-118 and RDA 232 Establish Project Area No. 3 INTEROFFICE MEMORANDUM CITY OF PALM DESERT DATE : August 23 , 1990 TO : CITY MANAGER , HONORABLE MAYOR AND MEMBERS OF CITY COUNCIL HONORABLE CHAIRMAN AND MEMBERS OF REDEVELOPMENT AGENCY BOARD FROM : EXECUTIVE DIRECTOR , REDEVELOPMENT AGENCY .. SUBJECT : ESTABLISHMENT OF PROJECT AREA NO. 3 Recommendation : That City Council , by minute motion : 1 . Approve the Proposal as submitted by Rosenow Spevacek Group , Inc . /Cotton Beland Associates , Inc . , for consulting services in the establishment of Project Area No. 3 ; 2 . Authorize the Executive Director to execute an agreement with Rosenow Spevacek Group/Cotton Beland Associates for such services ; and 3 . Approve Resolution No . 90-118 of the City Council of the City of Palm Desert establishing a Redevelopment Revolving Fund . 4 . Approve Resolution No . 232 of the Palm Desert Redevelopment Agency for the transfer of funds in the amount of $240 , 000 . 00 to the Palm Desert Redevelopment Agency for the development of the Project Area. Background: Project Area No. 3 is being proposed for the purpose of improving conditions in a recently annexed area of the City. A large portion of the area to be considered was annexed to the City in 1988 for the purpose of improving conditions and services to that area . Through the establishment of a Redevelopment Project Area , the Agency would be able to provide for the improvement of the housing stock , the improvement of public infrastructure and public facilities in the area . The proposed Project Area is approximately 586 acres in size ( see attached map) . The Redevelopment Agency is considering a thorough process which would include input in Project Area development by the resident and property owners of the area . In addition to this , the Agency is required to accomplish a thorough inventory of the structures in the area for the purpose of establishing blight . The Agency is proposing to retain the firm of Rosenow Spevacek Group , Inc . ( RSG ) for the purpose of assisting in the development of the Project Area . .. In addition , the firm of Cotton Beland Associates , Inc . , would work with RSG to accomplish an Environmental Impact Report for the project . The Agency submitted a budget for the project area development in its 1990-91 budget proposal . That total amount of $240 , 000 . 00 is now included in the 1990-91 budget , however , those funds must be transferred from the City to the Agency as a loan . As established by law , one project area cannot pay for the development of another . The proposed breakdown for the budgeted amount was : PROPOSED BUDGET Administration $ 40 , 000 - Mailings - Legal and advertising - Maps - diagrams - Filing fees Consultants - Engineering 20 , 000 - EIR 60 , 000 - Blight Report 60 , 000 Legal Expenses 60 , 000 TOTAL ESTIMATED EXPENSES $240 , 000 The proposals submitted by RSG/CBA are as follows : Blight Report/RSG $ 60 , 525 . 00 EIR/CBA 61 , 187 . 00 C;49 Carlos L . Ortega Executive Director CLO : DY :mh '7 ;d44"-41/4* Attachments Gam..)4 ` 2 4i SCOPE OF SERVICES This section outlines the services the RSG/CBA consultant team will provide to facilitate preparation and processing of the Redevelopment Plan, Draft and Final EIRs, and attendant documents. I. SELECT PROJECT AREA, PREPARE PRELIMINARY PLAN AND ESTABLISH THE PROJECT AREA COMMITTEE 1. Scoping Meeting - Data Collection. The consultant team will hold an initial scoping conference with the City staff to: o Discuss and further identify the objectives of the redevelopment program. o Review the designated survey area and discuss the area's problems, needs and opportunities. o Solidify the survey area and potential project area. o Identify current and proposed development activity including potential valuation and scheduling of new development. o Identify key resource people and delineate studies including: traffic studies, public improvements needs and cost studies, improvement plans, general and community plans, and economic/marketing studies. o Identify key planning issues in the areas of economics, land use, circulation, parking, growth, public facilities and housing. o Collect available base data. 2. Field Reconnaissance. The consultant team will conduct a reconnaissance survey to become familiar with the community and will conduct a detailed land use survey to record pertinent information. From the recorded survey, notes on land use, building/property conditions, specific problems and potential opportunities will be made for each parcel of property. The percentage of urban uses and blighting conditions (as defined by the California Redevelopment Law) will be specifically noted. 3. Computer Analysis. RSG has developed a highly sophisticated computer data management system to sort and analyze parcel level information. All data collected during the field reconnaissance will be entered into the system for analysis. Additionally, we will collect and input assessor information (parcel number, situs address, owner name and address, valuation, exemptions and tax rate area) for each parcel. Once the input is complete, various datasorts will be run to produce reports needed to prepare required documents; these reports will document existing land use, parcel/building condition, zoning and general plan land uses, current valuation and ownership. RSG will also use computerized spreadsheets to analyze the project's financial feasibility. 1 4. Designate the Redevelopment SurveyThe California � Area.� Redevelopment Law requires that the City establish a redevelopment survey area within which the Planning Commission and Agency selects a project area. The consultant team will assist in delineating a survey area, and will process the resolution and survey area map for adoption by the City Council. 5. Delineate Urbanized and Blighting Conditions. Upon completion of the parcel condition datasorts, summanes of urban uses and blighting conditions will be prepared. These summaries will be reviewed with City staff and Agency General and Special Counsels; upon their concurrence, maps will be prepared to graphically depict these conditions. . 6. Definition of Redevelopment Implementation Activities. Defining development projects that redevelopment may implement is now required by the California Redevelopment Law for presentation to the affected taxing agencies. Further, comprehensively defining the scope of the redevelopment program early in the process will greatly enhance presentations to the City Council, Planning Commission and community groups. RSG will facilitate the process of defining the implementation programs and activities. 7. Designate the Project Area/Prepare Preliminary Plan. A Preliminary Plan will be prepared that delineates the proposed project area and outlines the need for establishing a redevelopment program for the area. As part of this activity, the map and legal description for the project area will be prepared for inclusion in documents, and submission to the State Board of Equalization and affected taxing agencies. 8. Establish Project Area Committee. Once the Preliminary Plan and project area is adopted, RSG will initiate the required procedures to establish a Project Area Committee (PAC). Recent changes to the California Redevelopment Law have expanded the notification and selection procedures. Notices regarding PAC selection activities must be mailed to all property owners, businesses, residents and community organizations in the project area. RSG will assemble the necessary mailing list and coordinate the transmittal of the notices. Postage and assemblage may either be paid for directly by the Agency, or as a reimbursable to RSG. II. PREPARE DRAFT REDEVELOPMENT PLAN, RELOCATION PLAN, OWNER PARTICIPATION RULES, PRELIMINARY REPORT, DRAFT AND FINAL EIRS AND PROJECT AREA COMMITTEE/CITIZEN MEETINGS 1. Prepare the Draft Redevelopment Plan. Once the proposed project area is designated, the consultant team will prepare the Redevelopment Plan in accordance with the California Redevelopment Law. The Redevelopment Plan establishes the legal and financial framework for implementing the redevelopment program, and must include provisions for the relocation of displaced businesses and residents, a replacement housing program, and rules for owner participation. Our prior experience preparing redevelopment plans and implementing redevelopment projects ensures that the final provisions in the Plan are realistic and reflect goals that can later be achieved. I marker plmasoro 5 2. Prepare Relocation Plan and Owner Participation and Business Re-entry Rules. Concurrent with preparing the Redevelopment Plan, the Method of Relocation and Owner Participation and Business Re-entry guidelines will be drafted. The Method of Relocation will incorporate the "California Relocation Assistance and Real Property Acquisition Guidelines" and outline the procedures the Agency would follow in the event of property acquisition and relocation. The Owner Participation and Business Re-entry Rules outline the procedures for participation in the redevelopment program. Both of these documents will be circulated for public review prior to consideration for adoption by the Agency. The documents will be revised as necessary to incorporate subsequent revisions and modifications. 3. Financial Analysis. Utilizing the Base Year Report prepared by the County " Auditor-Controller, financial projections of anticipated tax increment revenue will be prepared. These projections will incorporate trended valuation growth rates based upon review of historical growth activity and analysis of future development proposals for the project area. The tax rate areas that comprise the project area will also be identified as well as the taxing agencies that levy taxes within them. Utilizing each agency's tax levy, the revenue breakdown will be analyzed to determine the revenue to the Agency after potential fiscal agreements. 4. Prepare the Preliminary Report. A Preliminary Report will be prepared that outlines the reasons for selecting the project area, describes the physical, social and economic conditions in the area, preliminarily assesses the feasibility of financing the proposed redevelopment programs, and identifies projects to be implemented by the Agency and how they will alleviate the identified blighting conditions. The report will be transmitted to the affected taxing agencies and will be the basis for fiscal negotiations. 5. Prepare the Draft and Final Project EIRs. CBA will prepare all required environmental documentation including the Initial Study, Draft and Final EIRs, and required CEQA notices. The EIR will include an executive summary, project description and evaluation of the following potential project impacts: earth, air, water, plant life, animal life, noise, light and glare, land use, natural resources, risk of upset, population, housing, traffic circulation, public services, energy, utilities, human health, aesthetics, recreation, archaeological/historical, alternatives, areas of no significant impacts, short and long-term impacts, significant irreversible impacts, and growth inducing and significant impacts. CBA will also prepare responses to comments by the public and public agencies, and will attend public hearings or meetings to present findings and respond to questions. The services to be provided are more fully described in the attached proposal prepared by CBA. 6. Consultations with the PAC and Community Groups. RSG will assist in staffing all PAC and community group meetings. The CBA Project Manager will also attend meetings that focus on issues related to the EIR. The fee quote includes a minimum of eight (8) meetings, additional meetings would be billed on a time and materials basis at the hourly rates presented in the cost proposal. marker,p lmdsorp 6 I III. TAXING AGENCY NEGOTIATIONS, PUBLIC HEARING AND FOLLOW-UP 1. Taxing Agency Consultations/Negotiations. RSG proposes to have an active role in the fiscal negotiations with the affected taxing agencies. In this capacity we will prepare all necessary support documentation to outline the need for establishing a redevelopment program; this will include financial studies, reports, graphics and maps. The RSG Project Manager will be responsible for attending taxing agency meetings, and assisting City staff with the fiscal review process, if called. 2. Taxing Agency/Public Notices. RSG will prepare all required notices and ensure that they are ready for transmittal in the time frame required by law. ., Though not part of the fixed fee quote, if the City desires, RSG will coordinate the printing, assembly and transmittal of the required mailings; this task would be handled as a reimbursable. 3. Prepare the Report to City Council on the Redevelopment Plan. This is one of the major tasks of the adoption process since the report must include documentation that all the requirements of the law have been met with respect to: o the reasons and the need for the Redevelopment Plan, o the reasonableness of the redevelopment program proposals, o the socio-economic characteristics of the Project Area, o the methodology of financing the Plan, o the relocation assistance plan and neighborhood impact analysis, o evidence of consultation with affected citizens, property owners, and taxing agencies, o compliance with CEQA, and o evaluation of potential project impacts on surrounding neighborhoods. This report forms the basis for a defense against legal challenges, if any, to the Redevelopment Plan. The report also allows the City Council to evaluate the financial feasibility and desirability of the redevelopment program. The consultant team will prepare this report in simple, direct language that is understandable to all reviewing parties. 4. Property Owner Mailings and Notices. Required hearing notices will be prepared by RSG including master property owner and community organization lists and mailing labels; the mailing list will be updated 30 days prior to 1 transmittal of the notice of the public hearing. Mailing materials will be delivered in a timely manner for distribution from City offices with the cost of printing, envelope assembly and postage assumed by the City. However, if desired, RSG will assume this task as a reimbursable. 5. Attendance at Meetings and the Public Hearing. The Project Manager will attend project management team/staff, Planning Commission, and City Council meetings as desired by staff. The feequote includes fifteen (15) project J management team/staff meetings, two (2) Planning Commission, ten 60.) Agency/City Council, and ten (10) taxing agency meetings, and the final public hearing. Additional meetings will be charged on a time and materials basis at the rates quoted in the Fee Quote section of this proposal. I market\plmdsprp I 6. Prepare Staff and Progress Reports. Resolutions and the Adoption Ordinance. RSG will prepare all necessary staff reports and resolutions in the format designated by the City. Reports, resolutions and documents will be submitted one (1) week prior to the City's agenda submittal deadline to allow sufficient time for staff review. The Project Manager will work with the legal counsel to prepare the adoption ordinance. 1 7. Adoption Follow-Up. The Project Manager will assist the City Clerk in transmitting the adopted Ordinance to the newspaper for publication, recording t necessary documents, mailing necessary final documents to the State, County and affected taxing entities, and submitting the Notice of Determination as required. • I I I I I I I I I market\plmdsprp 8 ! ! 2. Scope of Services Highlights This section briefly describes those aspects of the scope of services that are given particular emphasis on this project, or involve a unique approach. The approach to all impact areas is described in the detailed task descriptions following this section. Land Use. CBA will assist the Agency in developing a buildout scenario for the project area based on the General Plan and anticipated intensity of development. Preparation of a quantified development program for the project area is the key prerequisite for analyzing project impacts. With this development potential identified, other impacts, particularly those on urban systems and services, can be assessed. Circulation. CBA will contract with DKS Associates for traffic analysis of this project J and the amendment to the existing project. DKS will prepare a traffic impact analysis report which considers buildout within this project and the previous project area, and reports on the impact of each project area separately. This traffic impact report will appear as a technical appendix to each document, with information relevant to the specific project being considered extracted for inclusion in the body of the EIR. Schools. School districts have become increasingly aware of the potential of redevelopment to fund school improvements, and have used challenges to the EIR to attempt to force agencies to provide facilities or funds for school expansion. CBA proposes a careful analysis of primary and secondary impacts on school enrollment from development in the project area in order to respond to such requests with realistic estimates of impacts on the school districts affected by the project. 1 I 1 • 3 I Task Descriptions.- The following discussion describes the specific tasks Cotton/Beland/Associates(CBA)will perform in preparing the Environmental Impact Report and related documents. Task objectives, work products and methods are described for each work task. Task 1. Initial Study and Notice of Preparation Objective The purpose of this task is to familiarize the project team with the project area and to develop a project description in specific terms of land use, development intensity and public actions for use in preparation of the Draft EIR. In addition, the CEQA process will be started with the preparation of an Initial Study and issuance of the Notice of Preparation. Products Product Project Day Draft Project Description 21 Initial Study and NOP 35 Related Projects List 35 Subtasks 1.1 Review Available Documentation. CBA will review necessary in- ] formation related to the project available from Agency and City staff. 1.2 Inspect Project Area. CBA and other members of the EIR team as appropriate will survey the project area and surrounding areas to identify local conditions of the natural environment, land use, traffic and general environmental setting of the project. Based on this sur- vey, review of aerial photos and other documentation, CBA will prepare working notes on surrounding land use, potential problems and opportunities and environmental factors in and around the pro- ject area for consideration in the EIR. 1.3 Draft Project Description. Based on discussion with the Agency, CBA will prepare a draft Project Description for review. The pro- ject description will include maps or diagrams indicating the re- gional setting, project location and boundaries, and the nature of the actions proposed. 1.4 Related Projects. In order to identify cumulative impacts, related 1 projects must be defined early in the EIR process. CBA will work with the Agency and the City staff to prepare a draft list of related projects for review. CBA will also identify assumptions regarding General Plan buildout, absorption rates, and other factors important 4 re'A in estimating cumulative impact for use in analysis of traffic and other impacts. 1.5 Initial Study and Notice of Preparation. CBA will prepare an initial study in the form of a summary project description and an annotated CEQA checklist for City review. Following approval of the initial study by the City, CBA will prepare a Notice of Prepara- tion for distribution by the Agency. dd I I I I I I 1 S I I 5 re: 1 1 Task 2. Administrative Draft EIR Objective The purpose of this task is to prepare a complete draft of the project EIR for review by the City staff prior to publication. The adminis- trative draft will include all text, tables and figures. Products Product Project Day Draft Project Description 21 Initial Study and NOP 35 Related Projects List 35 Subtasks 1141 2.1 Agency Contacts. CBA will contact appropriate agencies and indi- viduals as identified by the City regarding potential impacts of the project on that agency, in order to obtain information for the Draft EIR. 2.2 Prepare Administrative Draft EIR. CBA will prepare an ad- ministrative draft EIR in accordance with CEQA, City and Agency EIR guidelines. The administrative draft will be provided for re- view by all involved agencies prior to publication of the official draft EIR. The EIR will be formatted to include the following sec- tions: Executive Summary. The Executive Summary will identify each significant effect of the project; areas of controversy including is- - sues raised by agencies and the public; and issues to be resolved in- - cluding the choice among alternatives and whether or how to miti- gate significant effects. The Executive Summary will be formatted to clearly identify ap- propriate agency findings with regard to mitigation measures and significant effects of the project in each subject area of the initial study checklist. Exhibits Impact Summary Table Introduction. The Introduction will summarize the legal role of the EIR in the development process, and the unique aspects of devel- opment under the Redevelopment Plan. • Section 1. Description of the Proposed Project. The project de- scription will include a description of the project and key project alternatives. The project description will include maps locating and 1 describing the proposed project, and a table and diagrams describing the alternatives to be considered throughout the EIR. The project 1 6 1 description will also include the list of public improvements to be funded by the project. 1 -- Exhibits Regional Setting Map Project Location and Boundaries Map J Redevelopment Plan Public Improvements Table Others as appropriate JSection 2. Description of Environmental Setting. This section will briefly describe the environmental setting of the proposed pro- ject. A more detailed description of the environmental setting will be included in the following section discussing project impacts and mitigation measures. 3 Section 3. Environmental Impact and Mitigation Measures. This section will discuss the environmental setting, significant envi- ronmental effects, unavoidable adverse impacts and mitigation mea- 1 sures for each of the project impacts, organized in accordance with the Agency's environmental impact checklist. If desired by the Agency, impacts will be discussed for two basic alternatives for ] development of the project area to the same level of detail so that either can be utilized as the proposed project. The assumptions regarding significant impact and type of analysis for each of the I impact categories in the Initial Study Checklist are summarized in the table on the following page. Graphic illustrations will be provided as outlined. The discussion of mitigation measures will distinguish between mitigation measures proposed by the Agency and other measures I not included but which could reasonably be expected to reduce ad- verse impacts if included in the proposed project. Where several mitigation measures are available, the basis for selecting from among these measures will be discussed. The discussion of mitiga- tion measures will provide the background for findings under Sec- tion 15091 (a) of the CEQA guidelines. Mitigation measures will be discussed in sufficient detail to provide the basis for a mitigation monitoring and reporting program. CBA will contract with DKS Associates for preparation of a J technical report covering both this project and the current plan amendment being considered. This report will provide information on existing conditions, project trip generation, and future conditions J with and without the project for arterials throughout the City. 24-hour segment capacity analysis is appropriate because of the long-term nature of the project. Locations where enhanced inter- ] sections (multiple left-turn lanes, right-turn-only lanes, etc.) would be expected to be required in the future will be identified. 3 1 Impact Analysis Summary 1 Potential Detailed Maps Impact Category from Significant Analysis Impact and Methodology, Data Sources, CEQA Checklist Effects Required Tables Graphics Comments 1 Earth Maybe No No If needed GP Seismic Element 2 Air Yes Yes Yes No SCAQMD Methods 3 Water Maybe No No If needed Flooding maps J 4 Plant Life No No No Yes 5 Animal Life No No No Maybe 6 Noise Yes No Yes No FHWA Model 7 Light and Glare No No No No 8 Land Use Yes Yes Yes Yes Existing use survey, computer maps, buildout estimate 3 9 Natural Resources No No No No 10 Risk of Upset No No No No Fire Dept interview 11 Population No Yes Yes No SCAG I/O Model, J 12 Housing Relate to SCAG projections No Yes Yes No Relate to SCAG projections 13 Transportation 1 Traffic Yes Yes Yes Yes Segment Analysis Other modes No No No No Interviews 14 Public Services ::3 Fire Maybe No No No Interviews Police Maybe No No No Interviews Schools Maybe Yes Yes If needed Interviews, usage factors ] Other No No No No Interviews, usage factors 15 Energy No No If needed No Interviews, usage factors 16 Utilities Water Maybe No Yes No Interviews, usage factors Sewer Maybe No Yes Maybe Interviews, usage factors Power No No Yes No Interviews, usage factors 3 Gas No No Yes No Interviews, usage factors Storm Drainage Maybe Yes No If needed Interviews, usage factors Communication No No No No Interviews Solid Waste Maybe No Yes No Interviews, usage factors 17 Human Health No No No No I 18 Aesthetics No No No No 19 Recreation Maybe No No No Interviews, usage factors 20 Cultural Resources >.<> .3 Archaeological Sites Maytie No No No Records check I 1 8 rc `1 Section 4. Alternatives. Project alternatives will be analyzed to determine potential impacts and to compare these to impacts antici- = pated to occur with the proposed project. The discussion of alterna- tives will consider alternatives as agreed with City staff. The fol- lowing is suggested as an appropriate range of alternatives for a re- 1 development plan: 1. The "no development" alternative, providing retention of existing land uses, required by law to be considered as the no project alternative. 2. Continued development under the existing redevelopment plan, general plan and zoning without the Redevelopment Plan Amendment or improvements proposed. 3. Lesser intensity of development. 4. Greater intensity of development, with more land use conversion. 5. Increased emphasis on another land use within the project area. 6. Others as appropriate. Section 5. Areas of No Significant Impact. Areas of no signifi- cant impact identified in the Initial Study will be listed. The justifi- 1 cation for findings of no significant impact will be summarized in the discussion of environmental impact above. Section 6. The Relationship Between Local Short-Term Uses of Man's Environment and the Maintenance and Enhancement of Long-Term Productivity. Because the proposed project is the adoption of a public agency plan, this section must be included in the EIR. This section will discuss the cumulative and long-term ef- fects of the project. Special attention will be given to impacts which narrow the range of beneficial uses of the environment or pose long-term risks to health and safety. Reasons why the project is believed to be justified now, rather than reserving an option for further alternatives, will be explained. Section 7. Significant Irreversible Environmental Changes. This section will discuss uses of nonrenewable resources, long-term commitments of resources, and potential irreversible environmental damage that may result from environmental accidents associated with the project. 9 raRt 1 1 Section 8. Growth-Inducing Impacts. The potential for the pro- ject to induce growth in nearby areas through extension of urban services will be identified. Indirect and induced impacts of em- ployment generated by the project will be identified using the SCAG regional input-output model. 1 Section 9. Cumulative Effects. This section will identify the po- tential cumulative effects resulting from this project, other known projects identified by City staff, and General Plan buildout that may be anticipated to an appropriate horizon year. Emphasis in discussion of cumulative effects will be on traffic im- .. pacts, impacts on urban systems and services, and air and water quality impacts as they relate to the growth projections of the re- gional Air Quality Management Plan and Water Quality Manage- ment Plan. Mitigation measures for cumulative effects will be identified. Section 10. Organizations and Persons Consulted. This section will identify organizations and persons consulted in preparation of the EIR. I j J 10 tC I Task 3. Publication Draft EIR Objective. The purpose of this task is to prepare a final Draft EIR for dis- tribution. Products Product Project Day 1 City Markup (staff product) 115 Pre-Press Review Draft 130 Draft EIR (60 copies) 145 Subtasks .. 3.1 Review Administrative Draft (City/Agencytask . The Cityand ) the Agency will review the administrative draft EIR and prepare re- visions in the form of a marked-up copy of the administrative draft EIR indicating all desired changes, corrections and areas for expan- sion, etc. 3.2 Prepare Publication Draft EIR and Notice of Completion. CBA will incorporate City and Agency comments in the Draft EIR and prepare a final Draft EIR for publication. CBA will incorporate comments and prepare a final draft within 10 working days of re- ceipt of comments on the Administrative Draft EIR. 3 pre-press re- view copies of the draft will be provided to the Agency for review prior to printing. Following authorization to print, CBA will print 60 copies of the Draft EIR for distribution by the Agency. CBA will prepare a Notice of Completion for filing by the Agency. 1 j j 11 reff • I Task 4. Response to Comments, Final EIR Objective The purpose of this task is to prepare responses to comments by the public and public agencies on the Draft EIR, and to amend the Draft EIR incorporating changes in response to comments received. Products Product Project Day Comments on EIR (Agency Task) 195 Pre-Press Final EIR 210 Mitigation Monitoring Program 210 Final EIR (40 copies) 225 Subtasks 114 4.1 Final EIR. CBA will prepare a revised EIR including the fol- lowing: Revised cover page Revised table of contents Revised text of EIR incorporating changes Response to comments on the Draft EIR Comments received Our project budget includes an allowance for responses to com- ments and modifications to the Draft EIR that is normally sufficient for projects that are not highly controversial. If a large number of comments are received, or if comments raise new issues or require additional analysis not anticipated by the City in preparation of the Draft EIR, this allowance is likely to be exceeded. 4.2 Findings, Statement of Overriding Considerations, Mitigation Monitoring and Reporting Program. CBA will prepare Findings of Fact pursuant to State EIR guidelines for significant unavoidable environmental effects of the project. CBA will prepare a statement of overriding considerations for Planning Commission, City Council and Agency action. A Mitigation Monitoring and Reporting Pro- gram will be prepared for approval with approval of the project. • s I 12 c: I 1 Task 5. Hearings Objective The purpose of this task is to provide expert testimony at public hearings on the Draft EIR. Subtasks 5.1 Hearings. CBA will provide expert testimony at public hearings on the Draft EIR. A CBA representative familiar with the project and CEQA will attend public hearings to present the conclusions of the EIR and answer questions from the public and City officials. At- tendance by a CBA Principal at two public hearings and attendance by a representative of Barton Aschman at one public hearing is in- " cluded in the budget estimate. Task 6. Notices and Processing (Additional Services) 1 (This task is not included in the basic fee proposal, and will be provided as additional services in accordance with the standard fee schedule if requested by the Agency.) Objective The purpose of this task is to support the Agency in fulfilling the notice and document distribution requirements of state law. Subtasks 6.1 Prepare notices. CBA, if requested by the Agency, will prepare the following additional notices: Notice of Availability of Draft EIR (newspaper) Notice of Determination. 6.2 File Notices and Mail Documents. CBA, at the Agency's request, will file and mail the following notices and documents: Notice of Preparation: file with State Clearinghouse, mail by certi- fied mail (or other method providing evidence of receipt) to respon- sible agencies, taxing agencies, and others on an agency-approved mailing list. Notice of Completion and Draft EIR: file with State Clearing- house, mail by certified mail (or other method providing evidence of receipt) to responsible agencies, taxing agencies, and others on an agency-approved mailing list. Notice of Availability: publish in Agency-approved newspaper. r Notice of Determination: File with County Clerk. 13 i I 3. Project Schedule CBA will maintain the following project schedule, subject to the timely provision of in- )] formation and response to draft materials by the City: Day 1: Contract initiation Day 30: Draft Project Description Draft Initial Study Draft related projects list Day45: Notice of Preparation filed with final Initial Study. P .. Agreement on project description Agreement on related projects list Day 105: Draft Traffic Report Complete Day 120: Administrative Draft EIR to Agency (5 copies) 1 Day 135: Agency comments on Administrative Draft to CBA Day 150: Pre-press draft EIR to Agency (2 copies) Day 155: City approval of pre-press draft Day 160: Notice of Completion Notice of Availability (optional) Draft EIR to City and Agencies (60 copies) Day 205: EIR comments to CBA 1 Day 210: Pre-press final EIR Mitigation Monitoring Program • Day 220: Final EIR to City (40 copies) Day 230: Notice of Determination (optional) " The above schedule is representative of the minimum critical path times for key program steps. The actual schedule will be determined by the requirements of other actions on the Agency's adoption schedule. I 14 t 1 I N THE CITY CF P'AWM DESERT. CAUwoANIA I ' I "'"//' REDEVELOPMENT PROJECT AREA Na 3 I I - KIK A PORTION Of SECTORS 9. IQ 1S AND 16 OI TOIIIISHIP S SOUTH. I —- M OW'44'n-__�s�o 10 _____ __ __ ..�` i(II /,1 RAKE 6 EAST, SAN ERNYgNO IEROIAN ,I i•=��r irri�� --- *JOWL!r�/r •N� I 1... , Robert Orin. Wiliam Frost 6 Assoriola DCTORER 19119 i IIIMINVEMIIMil f A. M.N • • f M Ni.N ..illi...1__ -- L' IK /7 i 't/6 ./ a.. it-:rF *-.1 r-`N n I NAVIN., If, _.............. 4... . �r I It kN` I �I ,, , .` \\ MEM j7 ..., V14 kohl ili, ri. � �M.rI 1 y� 7 f '�1 f j. r t _IIr r I. F - I i a1 I g •$ ea �T-` II _I II .7►_,*"�.. INEMEZZ I - I Mo�oso I I 's" ti �•�,.. I I,nOTiC-f7F:JI�J7EDI:4 /E I -- I(II 77C.L/ 114' 171117 a + I I �` 'i�s....- I NM MOON IMF \ AN ~IMP RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PALM DESERT ESTABLISHING A REDEVELOPMENT REVOLVING FUND THE CITY COUNCIL OF THE CITY OF PALM DESERT HEREBY FINDS , DETERMINES , RESOLVES AND ORDERS AS FOLLOWS : Section 1 . The Community Redevelopment Law ( California Health and Safety Code Section 33000 , et seq. ) provides for the establishment of a special fund to be kept in the treasury of the City of Palm Desert known as the Redevelopment Revolving Fund . The City Counci I hereby authorizes and directs that a "Redevelopment Revolving Fund" be established in the treasury of the City and that the sum of $240 , 000 be appropriated to and set aside in such Fund . Section 2 . The monies in the Redevelopment Revolving Fund shall be paid to or on behalf of the Palm Desert Redevelopment Agency upon the terms set forth in Section 3 hereof, for any of the following purposes : A . Deposit in a trust fund of the Agency to be expended for the development of Project Area No. 3 . B . Any expenses necessary or incidental to the carrying out of the development of the Project Area . Section 3 . The monies paid to or on behalf of the Agency from the Redevelopment Revolving Fund shall constitute a loan of such monies by the City to the Agency. Such loan shall be repaid from the proceeds tax increment generated by the proposed Project Area from monies paid to or on behalf of the Agency from the Redevelopment Revolving Fund. Such loan may also be repaid by r Resolution No. the Agency from any source of Agency funds lawfully available therefor . Monies paid to or on behalf of the Agency from the Redevelopment Revolving Fund shall bear interest from the date of such payment to the date of repayment by the Agency at a rate •. equal to the average percentage rate the City receives on its own investments for the period which begins on the date of such payment and ends on the date of such repayment . Section 4 . The Finance Director of the City is hereby authorized and directed to establish such accounting and other procedures as may be necessary, convenient or desirable under the circumstances to accomplish the purposes and intent of this Resolution . Section 5 . The City Clerk is hereby authorized and directed to cause a copy of this Resolution to be transmitted to the Agency and the Agency is hereby requested to indicate its agreement to the terms hereof. APPROVED AND ADOPTED this 23rd day of August , 1990 . AYES : NOES : ABSENT: ABSTAIN : MAYOR ATTEST : CITY CLERK 2 • RESOLUTION NO. A RESOLUTION OF THE PALM DESERT REDEVELOPMENT AGENCY AGREEING TO THE TERMS OF A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PALM DESERT ESTABLISHING A REDEVELOPMENT REVOLVING FUND THE PALM DESERT REDEVELOPMENT AGENCY HEREBY FINDS , DETERMINES , RESOLVES AND ORDERS AS FOLLOWS : ,. Section I . The Community Redevelopment Law ( California Health and Safety Code Section 33000 , et seq . ) provides for the establishment of a special fund to be kept in the treasury of the City of Palm Desert known as the "Redevelopment Revolving Fund" . Pursuant to its Resolution entitled "A Resolution of the City Council of the City of Palm Desert Establishing a Redevelopment Revolving Fund" , the City Council has authorized and directed that a " Redevelopment Revolving Fund" be established in the treasury of the City and that the sum of $ 240 , 000 . 00 be appropriated to and set aside in such Fund. Section 2 . The monies in the Redevelopment Revolving Fund shall be paid to or on behalf of the Palm Desert Redevelopment Agency upon the terms set forth in Section 3 hereof, for any of the following purposes : A . Deposit in a trust fund of the Agency to be expended for the development of Project Area No. 3 . 8 . Any expenses necessary or incidental to the carrying out of the development of the Project Area . Resolution No. Section 3 . The monies paid to or on behalf of the Agency from the Redevelopment Revolving Fund shall constitute a loan of such monies by the City to the Agency. Such loan shall be repaid from the proceeds tax increment generated by the proposed Project Area from monies paid to or on behalf of the Agency from the Redevelopment Revolving Fund. Such loan may also be repaid by the Agency from any source of Agency funds lawfully available therefor . Monies paid to or on behalf of the Agency from the Redevelopment Revolving Fund shall bear interest from the date of such payment to the date of repayment by the Agency at a rate equal to the average percentage rate the City receives on its own investments for the period which begins on the date of such payment and ends on the date of such repayment . Section 4 . The Finance Director of the Agency is hereby authorized and directed to cooperate with the Finance Director of the City to establish such accounting and other procedures as may be necessary, convenient or desirable under the circumstances to accomplish the purposes and intent of this Resolution . Section 5 . The Agency hereby agrees to the terms and conditions with respect to the establishment of the Redevelopment Revolving Fund as set forth in this Resolution and the Resolution of the City Council described in Section 1 hereof. 2 Resolution No. APPROVED AND ADOPTED this 23rd day of August , 1990 . AYES : NOES : ABSENT : as ABSTAIN : CHAIRMAN ATTEST: Sheila R. Gilligan , Secretary 3