Loading...
HomeMy WebLinkAboutQUOTE- The Westin Desert Willow- CarportDATE: PROPOSAL #: SUBMITTED TO: PROJECT NAME: LOCATION: SCOPE OF WORK: We Propose hereby to furnish material and labor complete in accordance with above specifications, for the sum of: Payment for completed work will be decided between contractor and sub-contractor Option 1: Option 2: 6/17/2021 8130 The Westin Desert Willow Carport 75 Desert Ridge Palm Desert, CA 92270 Remove and replace damaged sheet metal and replace with new metal (paint to be done by others) New sheet metal will not match existing. Remove the entire top metal carport and replace with new one. ( painting to be done by others). Ph. (760) 565-1464 Fax. (760) 343-3892 Lic. 998909 montse@ugeinc.com Amount 6950 9500 Per Option PROPOSAL#: PAYMENT: 1.) 2.) ACCEPTANCE OF CONTRACT: 1.) 2.) 3.) 4.) Prepared by: Date: Note: This contract may be withdrawn by us if not Accepted within 7 days. Acceptance: Signature: Signature: All invoices must be paid within 30 days of invoice date, or subject to 1.5% per month charge may be added to that invoice. 100% payable upon completion of job. Work not stipulated on proposal will require a change order The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. This Contract is null and void if project is not started within 30 days from date of acceptance. Universal General & Engineering, Inc. Universal General & Engineering, Inc. 8130 Montse Flores Date: Date: Ph. (760) 565-1464 Fax. (760) 343-3892 Lic. 998909 montse@ugeinc.com