Loading...
HomeMy WebLinkAboutAppendix F_Infiltration EvaluationCatavina Residential Development Draft Initial Study/Mitigated Negative Declaration September 2025 Appendix F Infiltration Evaluation Catavina Residential Development Draft Initial Study/Mitigated Negative Declaration September 2025 This page intentionally left blank. GEOTECHNICAL | ENVIRONMENTAL | MATERIALS October 2, 2024 Project No. 4038-CR Blue Fern West, LLC 18300 Redmond Way, Suite 120 Redmond, Washington 98052 Attention: Mr. Shane Bouchard Subject: Infiltration Evaluation Proposed Single-Family Residential Development Catavina Project Assessor’s Parcel Number (APN) 620-170-009 38105 Portola Avenue Palm Desert, Riverside County, California References: See Page 6 Dear Mr. Bouchard: As requested and authorized, GeoTek, Inc. (GeoTek) has performed an Infiltration Evaluation in order to provide infiltration test results for three (3) proposed stormwater basins associated with the subject single-family residential development. The intent of this study is to evaluate the infiltration properties of the subsurface soils within the proposed project storm water disposal areas (basins). This report presents the results of this evaluation. Site Description The approximately 79.12-acre rectangular shaped project site is located at 38105 Portola Avenue, in the City of Palm Desert, Riverside County, California (see Figure 1). The site is currently occupied by an abandoned golf course and associated improvements. A clubhouse, a storage warehouse building and a parking area occupy the east central portion of the site. A vehicle maintenance building, a storage equipment building, and two cell towers are located on the southeast corner of the site. A restroom building and a pump house are located in the central portion of the site. A water well is understood to be associated with the pump house. There are two large, dry ponds located in the northern and central sections of the site, and several concrete-paved cart paths traverse the site. Power lines extend along the eastern boundary of the site in a north-south direction. GeoTek, Inc. 1548 North Maple Street, Corona, California 92878 (951) 710-1160 Office (951) 710-1 167 Fax www.geotekusa.com Blue Fern West, LLC Project No. 4038-CR Infiltration Evaluation October 2, 2024 Palm Desert, Riverside County, California Page 2 The site can be identified as Riverside County Assessor’s Parcel Number (APN) 620-170-009. Topographically, the site can be considered as having relatively flat terrain. Site drainage is generally directed to the south. Site elevations vary from about 270 to 285 feet above mean sea level. The site is bound by Frank Sinatra Drive, followed by residential development and vacant land to the north. Vacant land, followed by Portola Avenue, Desert Willow Golf Resort Maintenance Department and The Palm Desert Golf Academy at Desert Willow Golf Resort bound the site to the east. A mobile home park and Palm Desert Green Golf Course bound the site to the west. A mobile home park bounds the site to the south. Project Description Based upon review of a Conceptual Site Plan, prepared by MSA Consulting, Inc. and dated August 23, 2024, site development for the project will consist of a 556-lot, single-family residential development. Other project improvements are anticipated to include parks/open spaces, storm water disposal facilities (basins), underground utilities, interior street/parking/drive areas and landscape/hardscape improvements. The three (3) proposed basins are planned in the central and southeastern portions of the subject site (see Figure 2). Field Exploration Six (6) percolation test borings, Borings I-1 through I-6, were excavated within the area of the proposed basins. The borings were excavated to depths of about five (5) feet each below the existing grades. Logs of the borings are presented in Appendix A. The approximate locations of the borings are indicated on the attached Infiltration Test Location Map, Figure 2. All borings were approximately 8-inches in diameter. Four-inch diameter slotted PVC pipes encapsulated in filter sock were inserted into the four (4) percolation test holes. The annular space between the test hole sidewalls and PVC pipe was filled with gravel. G E O T E K Blue Fern West, LLC Project No. 4038-CR Infiltration Evaluation October 2, 2024 Palm Desert, Riverside County, California Page 3 Soil/Geologic Conditions Dune sand deposits were encountered in all borings and extended to the maximum depth explored (5 feet). These materials consisted of poorly graded sands (SP soil type based upon the Unified Soil Classification System). The logs of the borings are presented in Appendix A. Groundwater Groundwater or perched water was not encountered nor observed in any of the borings conducted for this evaluation. Groundwater was not encountered in any of the previous excavations performed at the site to a maximum depth of 51.5 feet below the ground surface (ESS, 2015a). Infiltration Testing Following pre-soaking of the test holes in general conformance with the referenced document (County of Riverside, 2011), percolation testing was performed in the lower approximate 24 inches in each of the percolation borings. The percolation testing was conducted in general conformance with the referenced document prepared by the County of Riverside. The percolation rates were converted to an infiltration rate via the Porchet Method. The infiltration rate for each of the borings is presented in the follow table after the water level had stabilized. Boring No. Infiltration Rate (inches per hour) Depth of Boring (feet) Boring I-1 35.53 5 Boring I-2 53.51 5 Boring I-3 48.62 5 Boring I-4 16.73 5 Boring I-5 56.86 5 Boring I-6 62.03 5 Copies of the percolation data sheets and infiltration conversion sheets (Porchet Method) are included in Appendix B. The reported infiltration rates are the measured rate without any factor of safety applied. Over the lifetime of the water quality facility, the infiltration rates may be affected by silt build up and biological activities, as well as local variations in near surface soil conditions. A suitable factor of safety should be applied to the field rates in the design of the infiltration systems. G E O T E K Blue Fern West, LLC Project No. 4038-CR Infiltration Evaluation October 2, 2024 Palm Desert, Riverside County, California Page 4 It should be noted that the infiltration rates provided above were performed in relatively undisturbed native soils. Infiltration rates will vary and are mostly dependent on the underlying consistency of the site soils and relative density. Infiltration rates will be impacted by weight of equipment travelling over the soils, placement of engineered fill and other various factors. GeoTek, Inc. assumes no responsibility or liability for the ultimate design or performance of the storm water facilities. Representatives of GeoTek should observe the soils exposed at the bottom of the stormwater disposal basins during construction/earthwork operations to confirm suitability and that the conditions exposed are as anticipated for the proposed stormwater disposal basin. LIMITATIONS The earth materials observed on the project site appear to be representative of the tested areas; however, soil materials vary in character between excavations and natural outcrops or conditions exposed during site construction. Site conditions may vary due to seasonal changes or other factors. GeoTek, Inc. assumes no responsibility or liability for work, testing or recommendations performed or provided by others. GeoTek’s conclusions and recommendations are professional opinions that are limited to the extent of the available data. Observations during construction are important to allow for any change in recommendations found to be warranted. These opinions have been derived in accordance with current standards of practice and no warranty is expressed or implied. Standards of practice are subject to change with time. G E O T E K Bl u e F e r n W e s t , L L C Pr o j e c t N o . 40 3 8 -CR In f i l t r a t i o n Ev a l u a t i o n Oc t o b e r 2 , 2 0 2 4 Pa l m D e s e r t , R i v e r s i d e Co u n t y , C a l i f o r n i a Pa g e 5 Th e o p p o r t u n i t y t o b e o f s e r v i c e on t h i s p r o j e c t is s i n c e r e l y a p p r e c i a t e d . I f y o u s h o u l d h a v e a n y qu e s t i o n s , p l e a s e d o n o t h e s i t a t e t o c on t a c t Ge o T e k . Re s p e c t f u l l y s u b m i t t e d , Ge o T e k , I n c . Ed w a r d H . L a M o n t CE G 1 8 9 2 , E x p . 0 7 / 3 1 / 2 6 Pr i n c i p a l G e o l o g i s t Br u c e A . H i c k GE 2 2 8 4 , E x p . 1 2 / 3 1 / 2 4 Ge o t e c h n i c a l E n g i n e e r An n a M . S c o t t Pr o j e c t G e o l o g i s t En c l o s u r e s: Fi g u r e 1 – Si t e L o c a t i o n an d T o p o g r a p h y Ma p Fi g u r e 2 – In f i l t r a t i o n Te s t Lo c a t i o n M a p Ap p e n d i x A – Lo g s of E x p l o r a t o r y Bo r i n g s Ap p e n d i x B – Pe r c o l a t i o n D a t a S h e e t s an d Co n v e r s i o n Sh e e t s (P o r c h e t M e t h o d ) Di s t r i b u t i o n : (1) A d d r e s s e e vi a e m a i l (P D F f i l e ) \\ge o t e k f s 1 \Ri v e r s i d e \Pr o j e c t s \40 0 1 t o 4 0 5 0 \40 3 8 C R B l u e F e r n W e s t , L L C C a t a v i n a P r o j e c t \In f i l t r a t i o n E v a l u a t i o n \40 3 8 C R IN F I L T 1 0 -02 -20 2 4 . d o c “M g a a n o " LE M O N T No . 1 8 9 2 d o aW O s o l Co t G E O T E K 8 to I ul 6‘ C ED W A R D H . 2 of Blue Fern West, LLC Project No. 4038-CR Infiltration Evaluation October 2, 2024 Palm Desert, Riverside County, California Page 6 REFERENCES County of Riverside, 2011, “Design Handbook for Low Impact Development, Best Management Practices”, dated September. Earth Systems Southwest, 2015a, “Geotechnical Engineering Report, Proposed Catavina Residential Development, Southwest Corner of Frank Sinatra Drive and Portola Avenue, Palm Desert, Riverside County, California,” File No. 12329-01, dated February 6. _____, 2015b, “Report of Infiltration Testing, Proposed Catavina Residential Development, Southwest Corner of Frank Sinatra Drive and Portola Avenue, Palm Desert, Riverside County, California,” File No. 12329-01, dated August 21. MSA Consulting, Inc., 2024, “Conceptual Site Plan, Catavina, Palm Desert, CA”, dated August 23. G E O T E K Blue Fern West, LLC Assessor’s Parcel Number (APN) 620-170-009 Catavina Project 38105 Portola Avenue Palm Desert, Riverside County, California Project No. 4038-CR Figure 1 Site Location and Topography Map APPROXIMATE SITE AREA Modified from the Cathedral City, Myoma, Rancho Mirage and La Quinta 2021 7.5-Minute Topographic Map Sheets ul —A. FI.A DR &NAH l — cluA*ena —VERBENA RD Lis LOMAS d 2 A 33 t 1 ft FRANK S/HATKA D o — California State University San Bernardino h Palm Desert Campus I T PALMFAF DESERT— I I DESERT GREENS DR N 5 2 ADOBE 5 ^1—1 c CeT5S RGE / m I .1 6 J E(- COUNTRY CLUB OR UJ in ! 3 5 - % ■ m D 2 2 i iw R Cz University of Calitornia Rive Palm Desert C T - T1. D yj Ml 8 I ^ust COUNTRY CLUB DR ______ OOUQUEL THEL* E 3 D s rPNFHUSi n & HOVELY LN WI ICTSAN s alZ4 Off n ! 1 ).--8N E- ?5 Y n T , CAM ARROYO 1 A, e.*eto1 TTTT J O >WTC OR - 1 —0—CLANCY LN _____ 1 I I Ji 7 10 Miles 025 0.5 J novctr LN c ■ 9 o 1 00o PARIS WAY t 1 31 Cc h e t l a Vali y T I y”* i I ( MtwtNttm—ATT"" NORTH GEO E K 3 T n T’ S H O R E b e J l CH O L L A L N K RI N d R D 5H E P H E R D LN J 1 o 70 S 7 0 S I A VE R D E WA V I Ch □ CU N Y t H O I S H O R n i 0:9 LL O n s i Fi g u r e 2 In f i l t r a t i o n Te s t Lo c a t i o n Ma p Bl u e F e r n W e s t , L L C Ca t a v i n a Pr o j e c t – Si t e P l a n A 38 1 0 5 P o r t o l a A v e n u e Pa l m D e s e r t , R i v e r s i d e C o u n t y , C a l i f o r n i a Pr o j e c t N o . 4 0 3 8 -CR LE G E N D (L o c a t i o n s a r e A p p r o x i m a t e ) Si t e B o u n d a r y I-6 In f i l t r a t i o n Te s t I-5 I-6 I-4 I-3 I-2 I-1 uLtsuutuint-iot-ietm "eTT”Th-it =il—1 smany«h■ f 1 T mimymT U t 'VI-1 J 44 ►W L 2•hewall ==ureee7^T if■Ml Tn IL -- — • I |th—Ih X ■U 4H-f TP Y14 g -----C1eIt11111 T7011 2llsmesr■■1... 0—===y t lru —t.. 'Ir4 L LU3 *h Ll LU (UeNw—I whISM1 Si ■3 ...mmmgingT I lit ■-T -dii 05l i *, 4 *7 y‘ h‘1 "■ Fr*e vy 1 s11"i 1,1 1 ** 11--2 In 1T ) 7 $ kI ■ * [.£I ---h T —I- -H - L T1.... I. 2 d—t " 21 rTmmn" Toes I t ' I“a’ameetnei q i— am wn==IH“I/’m *11 *f—4 —em A----- -i.—4 L 1-te/ wer I.EBey u k,u Uat4 ||5 MII.4 IT"9 ThI r »— — b 1 1 —omat “T Fh,"Tf FT 1.A TrnAwremI 1 - -----HyTTi t m“F Ih IJui -----11"ersdsm J .LV 4 aii #em / uu i --4-4f.rf 4 / >i flm ka “ jha 3' r' I 17 i. -1 ." ndThe 9 J*1 — - L FIr 90* I 1 1$“a/—1 1 ■ /X. i IV V.Art r'A “he L"J -T w 1 i57g t F1• ’I Jf1.#91L, I — L ut Krr-- MC •♦ 4I—s.ele l ahcas"s“I d.M ■#1JrI4 Oil l ri l ——AAM NORTH", y 4nITe"C •zI nkhkaLXMUKEL. r 1 - I IK it r j t/ r‘ I L ■ *H | i l H I — f h 11 —• I Y 11. In e Frs, Id C. 1 — ----- i R T—f 1... Q y j ‘ /r* - eu ■ J 17 2—iie 1 ser ri Ih. II s I * $ e i- i C 11 Wl i 1 i r i n PI" 1 we --- l: g2 5 rr— — E ' 1 ■ n . * 11 ' ■ f * Ji L 1 1 g C . 1 1 I (yuin i a < f j ommae e== —im ? 7.3 — V J — t 2 " | H 2Gr * B ( tr tfr)i fl I II F ■ g f j / wsanP hi -uns I-M % “ed71 I ( *—all.I / a. r Uaran ----iV aF “ere 3 25 ll lg L ll if =* “TEE" — ii __DI1 [[ —110 H 3 . \ FY V\ A W.Lstw. $ —p DC -5 - 1 DhiIf 1′0 ll I! P Ya- APPENDIX A LOGS OF EXPLORATORY BORINGS Proposed Single-Family Residential Development Catavina Project 38105 Portola Avenue Palm Desert, Riverside County, California Project No. 4038-CR G E O T E K GeoTek, Inc. LOG OF EXPLORATORY BORING ##### 0 SP ---Small Bulk ---No Recovery ---Water Table RV = R-Value Test SR = Sulfate/Resisitivity Test SH = Shear Test HC= Consolidation MD = Maximum DensityLE G E N D Sample type: ---Ring ---SPT ---Large Bulk Lab testing:AL = Atterberg Limits EI = Expansion Index SA = Sieve Analysis 30 25 20 15 10 BORING TERMINATED AT 6.0 FEET No groundwater encountered Borinng backfilled with soil cuttings 5 F-m SAND, light greyish brown, slightly moist, trace silt Sand becomes f with trace m, moist Dr y D e n s i t y (p c f ) Ot h e r s MATERIAL DESCRIPTION AND COMMENTS Dune Sand Deposits: SAMPLES US C S S y m b o l Boring No.: I-1 Laboratory Testing De p t h ( f t ) Sa m p l e T y p e Bl o w s / 6 i n Sa m p l e N u m b e r Wa t e r C o n t e n t (% ) COORDINATES:33.765995, -116.374095 ELEVATION:264 ft amsl DATE:9/19/2024 PROJECT NO.:4038-CR HAMMER:140#/30"RIG TYPE:GT-16 Track PROJECT NAME:Catavina Project - Site Plan A DRILL METHOD:Hollow Stem OPERATOR:Victor Z. CLIENT:Blue Fern West, LLC DRILLER:2R Drilling LOGGED BY:JC □ GeoTek, Inc. LOG OF EXPLORATORY BORING ##### 0 SP ---Small Bulk ---No Recovery ---Water Table RV = R-Value Test SR = Sulfate/Resisitivity Test SH = Shear Test HC= Consolidation MD = Maximum DensityLE G E N D Sample type: ---Ring ---SPT ---Large Bulk Lab testing:AL = Atterberg Limits EI = Expansion Index SA = Sieve Analysis 30 25 20 15 10 BORING TERMINATED AT 6.0 FEET No groundwater encountered Borinng backfilled with soil cuttings 5 F-m SAND, light greyish brown, slightly moist, trace silt Sand becomes f with trace m, moist Dr y D e n s i t y (p c f ) Ot h e r s MATERIAL DESCRIPTION AND COMMENTS Dune Sand Deposits: SAMPLES US C S S y m b o l Boring No.: I-2 Laboratory Testing De p t h ( f t ) Sa m p l e T y p e Bl o w s / 6 i n Sa m p l e N u m b e r Wa t e r C o n t e n t (% ) COORDINATES:33.766366, -116.374103 ELEVATION:265 ft amsl DATE:9/19/2024 PROJECT NO.:4038-CR HAMMER:140#/30"RIG TYPE:GT-16 Track PROJECT NAME:Catavina Project - Site Plan A DRILL METHOD:Hollow Stem OPERATOR:Victor Z. CLIENT:Blue Fern West, LLC DRILLER:2R Drilling LOGGED BY:JC □ GeoTek, Inc. LOG OF EXPLORATORY BORING ##### 0 SP ---Small Bulk ---No Recovery ---Water Table RV = R-Value Test SR = Sulfate/Resisitivity Test SH = Shear Test HC= Consolidation MD = Maximum DensityLE G E N D Sample type: ---Ring ---SPT ---Large Bulk Lab testing:AL = Atterberg Limits EI = Expansion Index SA = Sieve Analysis 30 25 20 15 10 BORING TERMINATED AT 6.0 FEET No groundwater encountered Borinng backfilled with soil cuttings 5 F-m SAND with trace c sand, light greyish brown, slightly moist, trace silt Moist Dr y D e n s i t y (p c f ) Ot h e r s MATERIAL DESCRIPTION AND COMMENTS Dune Sand Deposits: SAMPLES US C S S y m b o l Boring No.: I-3 Laboratory Testing De p t h ( f t ) Sa m p l e T y p e Bl o w s / 6 i n Sa m p l e N u m b e r Wa t e r C o n t e n t (% ) COORDINATES:33.768718, -116.374045 ELEVATION:275 ft amsl DATE:9/19/2024 PROJECT NO.:4038-CR HAMMER:140#/30"RIG TYPE:GT-16 Track PROJECT NAME:Catavina Project - Site Plan A DRILL METHOD:Hollow Stem OPERATOR:Victor Z. CLIENT:Blue Fern West, LLC DRILLER:2R Drilling LOGGED BY:JC □ GeoTek, Inc. LOG OF EXPLORATORY BORING ##### 0 SP ---Small Bulk ---No Recovery ---Water Table RV = R-Value Test SR = Sulfate/Resisitivity Test SH = Shear Test HC= Consolidation MD = Maximum DensityLE G E N D Sample type: ---Ring ---SPT ---Large Bulk Lab testing:AL = Atterberg Limits EI = Expansion Index SA = Sieve Analysis 30 25 20 15 10 BORING TERMINATED AT 6.0 FEET No groundwater encountered Borinng backfilled with soil cuttings 5 F-m SAND with trace c sand, light greyish brown, slightly moist, trace to few silt Moist Dr y D e n s i t y (p c f ) Ot h e r s MATERIAL DESCRIPTION AND COMMENTS Dune Sand Deposits: SAMPLES US C S S y m b o l Boring No.: I-4 Laboratory Testing De p t h ( f t ) Sa m p l e T y p e Bl o w s / 6 i n Sa m p l e N u m b e r Wa t e r C o n t e n t (% ) COORDINATES:33.768763, -116.374885 ELEVATION:273 ft amsl DATE:9/19/2024 PROJECT NO.:4038-CR HAMMER:140#/30"RIG TYPE:GT-16 Track PROJECT NAME:Catavina Project - Site Plan A DRILL METHOD:Hollow Stem OPERATOR:Victor Z. CLIENT:Blue Fern West, LLC DRILLER:2R Drilling LOGGED BY:JC □ GeoTek, Inc. LOG OF EXPLORATORY BORING ##### 0 SP ---Small Bulk ---No Recovery ---Water Table RV = R-Value Test SR = Sulfate/Resisitivity Test SH = Shear Test HC= Consolidation MD = Maximum DensityLE G E N D Sample type: ---Ring ---SPT ---Large Bulk Lab testing:AL = Atterberg Limits EI = Expansion Index SA = Sieve Analysis 30 25 20 15 10 BORING TERMINATED AT 6.0 FEET No groundwater encountered Borinng backfilled with soil cuttings 5 F-m SAND, light greyish brown, slightly moist, trace silt Sand becomes f with trace m, moist Dr y D e n s i t y (p c f ) Ot h e r s MATERIAL DESCRIPTION AND COMMENTS Dune Sand Deposits: SAMPLES US C S S y m b o l Boring No.: I-5 Laboratory Testing De p t h ( f t ) Sa m p l e T y p e Bl o w s / 6 i n Sa m p l e N u m b e r Wa t e r C o n t e n t (% ) COORDINATES:33.768801, -116.373352 ELEVATION:275 ft amsl DATE:9/19/2024 PROJECT NO.:4038-CR HAMMER:140#/30"RIG TYPE:GT-16 Track PROJECT NAME:Catavina Project - Site Plan A DRILL METHOD:Hollow Stem OPERATOR:Victor Z. CLIENT:Blue Fern West, LLC DRILLER:2R Drilling LOGGED BY:JC □ GeoTek, Inc. LOG OF EXPLORATORY BORING ##### 0 SP ---Small Bulk ---No Recovery ---Water Table RV = R-Value Test SR = Sulfate/Resisitivity Test SH = Shear Test HC= Consolidation MD = Maximum DensityLE G E N D Sample type: ---Ring ---SPT ---Large Bulk Lab testing:AL = Atterberg Limits EI = Expansion Index SA = Sieve Analysis 30 25 20 15 10 BORING TERMINATED AT 6.0 FEET No groundwater encountered Borinng backfilled with soil cuttings 5 F SAND with trace m sand, light greyish brown, slightly moist, trace silt Moist Dr y D e n s i t y (p c f ) Ot h e r s MATERIAL DESCRIPTION AND COMMENTS Dune Sand Deposits: SAMPLES US C S S y m b o l Boring No.: I-6 Laboratory Testing De p t h ( f t ) Sa m p l e T y p e Bl o w s / 6 i n Sa m p l e N u m b e r Wa t e r C o n t e n t (% ) COORDINATES:33.768839, -116.377199 ELEVATION:273 ft amsl DATE:9/19/2024 PROJECT NO.:4038-CR HAMMER:140#/30"RIG TYPE:GT-16 Track PROJECT NAME:Catavina Project - Site Plan A DRILL METHOD:Hollow Stem OPERATOR:Victor Z. CLIENT:Blue Fern West, LLC DRILLER:2R Drilling LOGGED BY:JC □ APPENDIX B PERCOLATION DATA AND CONVERSION SHEETS Proposed Single-Family Residential Development Catavina Project 38105 Portola Avenue Palm Desert, Riverside County, California Project No. 4038-CR G E O T E K Project:Job No.:4038-CR Test Hole No.:Tested By:Date:9/19/2024 Depth of Hole As Drilled: Before Test:After Test:60 Reading No. Time Time Interval (Min) Total Depth of Hole (Inches) Initial Water Level (Inches) Final Water Level (Inches) Δ in Water Level (Inches) Rate (Minutes per Inch) 11:30 AM 60 24 11:55 AM 25 0 24.00 11:56 AM 60 24 12:21 PM 25 0 24.00 12:22 PM 60 24 12:24 PM 2 1.56 22.44 12:25 PM 60 24 12:27 PM 2 6 18.00 12:28 PM 60 24 12:30 PM 2 10.8 13.20 12:31 PM 60 24 12:33 PM 2 12 12.00 12:34 PM 60 24 12:36 PM 2 12.12 11.88 12:37 PM 60 24 12:39 PM 2 12.12 11.88 60 60 PERCOLATION DATA SHEET Catavina Project - Site Plan A I-1 JC Comments Trial N/A Pre-soaked with 5+ gallons of clear water prior to Trials Trial N/A Testing intervals adjusted 1 0.09 for rapid infiltration rates 2 0.11 3 0.15 4 0.17 5 0.17 6 0.17 G E O T E K Project:Job No.:4038-CR Test Hole No.:Tested By:Date:9/19/2024 Depth of Hole As Drilled: Before Test:After Test:60 Reading No. Time Time Interval (Min) Total Depth of Hole (Inches) Initial Water Level (Inches) Final Water Level (Inches) Δ in Water Level (Inches) Rate (Minutes per Inch) 11:30 AM 60 24 11:55 AM 25 0 24.00 11:56 AM 60 24 12:21 PM 25 0 24.00 12:22 PM 60 24 12:23 PM 1 7.56 16.44 12:24 PM 60 24 12:25 PM 1 13.44 10.56 12:26 PM 60 24 12:27 PM 1 12.6 11.40 12:28 PM 60 24 12:29 PM 1 13.92 10.08 12:30 PM 60 24 12:31 PM 1 14.4 9.60 12:32 PM 60 24 12:33 PM 1 14.52 9.48 6 0.11 4 0.10 5 0.10 2 0.09 3 0.09 Trial N/A Testing intervals adjusted 1 0.06 for rapid infiltration rates Comments Trial N/A Pre-soaked with 5+ gallons of clear water prior to Trials 60 60 PERCOLATION DATA SHEET Catavina Project - Site Plan A I-2 JC G E O T E K Project:Job No.:4038-CR Test Hole No.:Tested By:Date:9/19/2024 Depth of Hole As Drilled: Before Test:After Test:60 Reading No. Time Time Interval (Min) Total Depth of Hole (Inches) Initial Water Level (Inches) Final Water Level (Inches) Δ in Water Level (Inches) Rate (Minutes per Inch) 11:30 AM 60 24 11:55 AM 25 0 24.00 11:56 AM 60 24 12:21 PM 25 0 24.00 12:22 PM 60 24 12:23 PM 1 9.24 14.76 12:24 PM 60 24 12:25 PM 1 12 12.00 12:26 PM 60 24 12:27 PM 1 12.84 11.16 12:28 PM 60 24 12:29 PM 1 14.88 9.12 12:30 PM 60 24 12:31 PM 1 15.12 8.88 12:32 PM 60 24 12:33 PM 1 15.24 8.76 6 0.11 4 0.11 5 0.11 2 0.08 3 0.09 Trial N/A Testing intervals adjusted 1 0.07 for rapid infiltration rates Comments Trial N/A Pre-soaked with 5+ gallons of clear water prior to Trials 60 60 PERCOLATION DATA SHEET Catavina Project - Site Plan A I-3 JC G E O T E K Project:Job No.:4038-CR Test Hole No.:Tested By:Date:9/19/2024 Depth of Hole As Drilled: Before Test:After Test:60 Reading No. Time Time Interval (Min) Total Depth of Hole (Inches) Initial Water Level (Inches) Final Water Level (Inches) Δ in Water Level (Inches) Rate (Minutes per Inch) 11:30 AM 60 24 11:55 AM 25 0 24.00 11:56 AM 60 24 12:21 PM 25 0 24.00 12:22 PM 60 24 12:32 PM 10 0 24.00 12:33 PM 60 24 12:43 PM 10 1.44 22.56 12:44 PM 60 24 12:54 PM 10 2.04 21.96 12:55 PM 60 24 1:05 PM 10 2.52 21.48 1:06 PM 60 24 1:16 PM 10 2.64 21.36 1:17 PM 60 24 1:27 PM 10 2.64 21.36 6 0.47 4 0.47 5 0.47 2 0.44 3 0.46 Trial N/A 1 N/A Comments Trial N/A Pre-soaked with 5+ gallons of clear water prior to Trials 60 60 PERCOLATION DATA SHEET Catavina Project - Site Plan A I-4 JC G E O T E K Project:Job No.:4038-CR Test Hole No.:Tested By:Date:9/19/2024 Depth of Hole As Drilled: Before Test:After Test:60 Reading No. Time Time Interval (Min) Total Depth of Hole (Inches) Initial Water Level (Inches) Final Water Level (Inches) Δ in Water Level (Inches) Rate (Minutes per Inch) 11:30 AM 60 24 11:55 AM 25 0 24.00 11:56 AM 60 24 12:21 PM 25 0 24.00 12:22 PM 60 24 12:23 PM 1 7.32 16.68 12:24 PM 60 24 12:25 PM 1 9.12 14.88 12:26 PM 60 24 12:27 PM 1 12.72 11.28 12:28 PM 60 24 12:29 PM 1 13.44 10.56 12:30 PM 60 24 12:31 PM 1 13.92 10.08 12:32 PM 60 24 12:33 PM 1 14.04 9.96 6 0.10 4 0.09 5 0.10 2 0.07 3 0.09 Trial N/A Testing intervals adjusted 1 0.06 for rapid infiltration rates Comments Trial N/A Pre-soaked with 5+ gallons of clear water prior to Trials 60 60 PERCOLATION DATA SHEET Catavina Project - Site Plan A I-5 JC G E O T E K Project:Job No.:4038-CR Test Hole No.:Tested By:Date:9/19/2024 Depth of Hole As Drilled: Before Test:After Test:60 Reading No. Time Time Interval (Min) Total Depth of Hole (Inches) Initial Water Level (Inches) Final Water Level (Inches) Δ in Water Level (Inches) Rate (Minutes per Inch) 11:30 AM 60 24 11:55 AM 25 0 24.00 11:56 AM 60 24 12:21 PM 25 0 24.00 12:22 PM 60 24 12:23 PM 1 11.04 12.96 12:24 PM 60 24 12:25 PM 1 12.72 11.28 12:26 PM 60 24 12:27 PM 1 13.08 10.92 12:28 PM 60 24 12:29 PM 1 13.2 10.80 12:30 PM 60 24 12:31 PM 1 13.32 10.68 12:32 PM 60 24 12:33 PM 1 13.32 10.68 6 0.09 4 0.09 5 0.09 2 0.09 3 0.09 Trial N/A Testing intervals adjusted 1 0.08 for rapid infiltration rates Comments Trial N/A Pre-soaked with 5+ gallons of clear water prior to Trials 60 60 PERCOLATION DATA SHEET Catavina Project - Site Plan A I-5 JC G E O T E K Equation -It = Havg = (HO+HF)/2 = It = Inches per Hour Time Interval, Δt = 2 Client:Blue Fern West, LLC Project:Catavina Project Project No:4038-CR Date:9/19/2024 Boring No.I-1 Percolation to Infiltration Rate (Porchet Method) Final Depth to Water, DF =47.88 Test Hole Radius, r =4 Initial Depth to Water, DO =36 35.53 Total Test Hole Depth, DT = 60 ΔH (60r) Δt (r+2Havg) HO = DT - DO = 24 HF = DT - DF = 12.12 ΔH = ΔD = HO- HF = 11.88 18.06 G EOT E K Equation -It = Havg = (HO+HF)/2 = It = Inches per Hour Time Interval, Δt = 1 Client:Blue Fern West, LLC Project:Catavina Project Project No:4038-CR Date:9/19/2024 Boring No.I-2 Percolation to Infiltration Rate (Porchet Method) Final Depth to Water, DF =45.48 Test Hole Radius, r =4 Initial Depth to Water, DO =36 53.51 Total Test Hole Depth, DT = 60 ΔH (60r) Δt (r+2Havg) HO = DT - DO = 24 HF = DT - DF = 14.52 ΔH = ΔD = HO- HF = 9.48 19.26 G EOT E K Equation -It = Havg = (HO+HF)/2 = It = Inches per Hour Time Interval, Δt = 1 Client:Blue Fern West, LLC Project:Catavina Project Project No:4038-CR Date:9/19/2024 Boring No.I-3 Percolation to Infiltration Rate (Porchet Method) Final Depth to Water, DF =44.76 Test Hole Radius, r =4 Initial Depth to Water, DO =36 48.62 Total Test Hole Depth, DT = 60 ΔH (60r) Δt (r+2Havg) HO = DT - DO = 24 HF = DT - DF = 15.24 ΔH = ΔD = HO- HF = 8.76 19.62 G EOT E K Equation -It = Havg = (HO+HF)/2 = It = Inches per Hour Time Interval, Δt = 10 Client:Blue Fern West, LLC Project:Catavina Project Project No:4038-CR Date:9/19/2024 Boring No.I-4 Percolation to Infiltration Rate (Porchet Method) Final Depth to Water, DF =57.36 Test Hole Radius, r =4 Initial Depth to Water, DO =36 16.73 Total Test Hole Depth, DT = 60 ΔH (60r) Δt (r+2Havg) HO = DT - DO = 24 HF = DT - DF = 2.64 ΔH = ΔD = HO- HF = 21.36 13.32 G EOT E K Equation -It = Havg = (HO+HF)/2 = It = Inches per Hour Time Interval, Δt = 1 Client:Blue Fern West, LLC Project:Catavina Project Project No:4038-CR Date:9/19/2024 Boring No.I-5 Percolation to Infiltration Rate (Porchet Method) Final Depth to Water, DF =45.96 Test Hole Radius, r =4 Initial Depth to Water, DO =36 56.86 Total Test Hole Depth, DT = 60 ΔH (60r) Δt (r+2Havg) HO = DT - DO = 24 HF = DT - DF = 14.04 ΔH = ΔD = HO- HF = 9.96 19.02 G EOT E K Equation -It = Havg = (HO+HF)/2 = It = Inches per Hour Time Interval, Δt = 1 Client:Blue Fern West, LLC Project:Catavina Project Project No:4038-CR Date:9/19/2024 Boring No.I-6 Percolation to Infiltration Rate (Porchet Method) Final Depth to Water, DF =46.68 Test Hole Radius, r =4 Initial Depth to Water, DO =36 62.03 Total Test Hole Depth, DT = 60 ΔH (60r) Δt (r+2Havg) HO = DT - DO = 24 HF = DT - DF = 13.32 ΔH = ΔD = HO- HF = 10.68 18.66 G EOT E K