HomeMy WebLinkAbout2025-10-14 ARC Regular Meeting Agenda Packet
ARCHITECTURAL REVIEW COMMISSION
CITY OF PALM DESERT
MEETING AGENDA
Tuesday, October 14, 2025
12:30 p.m.
Administrative Conference Room, City Hall
73-510 Fred Waring Drive
Palm Desert, CA 92260
Pursuant to Assembly Bill 2449, this meeting may be conducted as a hybrid meeting allowing public
access via teleconference or in person, and up to two Commissioners may attend remotely.
To participate via Zoom, use the following link: https://palmdesert.zoom.us/j/88270234862 or
call (213) 338-8477, Zoom Meeting ID: 882 7023 4862
•
Written public comment may also be submitted to planning@palmdesert.gov. E-mails
received by 9:30 a.m. prior to the meeting will be distributed to the Commission. Any
correspondence received during or after the meeting will be distributed to the Commission as
soon as practicable and retained for the official record. Emails will not be read aloud except
as an ADA accommodation.
•
Pages
1.CALL TO ORDER
2.ROLL CALL
3.NON-AGENDA PUBLIC COMMENT
This time has been set aside for the public to address the Architectural Review
Commission on issues that are not on the agenda for up to three minutes.
Because the Brown Act does not allow the Commission to act on items not listed
on the agenda, members may briefly respond or refer the matter to staff for a
report and recommendation at a future meeting.
4.CONSENT CALENDAR
All matters listed on the Consent Calendar are considered routine and may be
approved by one motion. The public may comment on any items on the Consent
Agenda within the three-minute time limit. Individual items may be removed by
the Architectural Review Commission for a separate discussion.
RECOMMENDATION:
To approve the consent calendar as presented.
4.a APPROVAL OF MINUTES 5
RECOMMENDATION:
Approve the Architectural Review Commission Regular Meeting
Minutes of August 12, August 26, and September 9, 2025.
1.
Approve the Architectural Review Commission and Planning
Commission Joint Study Session Minutes of September 23, 2025.
2.
5.BUSINESS ITEMS
Items listed in this section are presented for the Commission's review and
action. Public comment is allowed on each item, with a three-minute time limit
for each speaker. The Commission may provide direction, request additional
information, or take action as appropriate.
5.a CONSIDERATION OF ROOFTOP EQUIPMENT SCREENING APPROVAL
FOR DESERT KID COFFEE AT 44850 SAN PABLO AVENUE
23
RECOMMENDATION:
Staff recommends that the Architectural Review Commission (ARC) find that
the original equipment screening method proposed in building permit
TIMP25-0031 does not meet the required findings for approval. Staff further
recommends that the ARC find that the revised screening method, as
presented in the set of plans submitted with this Design Review Application
(MISC25-0025), satisfies the findings necessary for approval
Architectural Review Commission Regular Meeting
October 14, 2025
2
5.b CONSIDERATION OF A REQUEST FOR APPROVAL OF A HEIGHT
EXCEPTION TO PERMIT THE DEVELOPMENT OF A NEW SINGLE-
FAMILY RESIDENCE LOCATED AT 47600 SILVER SPUR TRAIL
245
RECOMMENDATION:
Staff recommends that the Architectural Review Commission (ARC)
determine that the findings required for approval have been met and
approve the Residential Height Exception subject to the following conditions:
The single family home shall conform to the plans and elevations
submitted and approved by ARC, including the maximum building
height of 17 feet 6 inches measured from finished grade.
1.
The maximum building height shall not exceed 17 feet 6 inches as
approved. Any future increase in height shall require separate
review and approval by ARC.
2.
The exterior materials and color palette shall be consistent with the
approved Desert Contemporary design, utilizing neutral earth tones.
3.
The structure shall maintain all required setbacks and site design
standards per the R-1 Residential Single Family zoning
requirements, ensuring no encroachment on neighboring
properties.
4.
6.INFORMATIONAL REPORTS
6.a COMMITTEE MEETING UPDATES
6.a.1 Cultural Arts Committee
Liaisons provide updates to facilitate communication between the
Cultural Arts Committee and the Architectural Review Commission.
These are informational items with no formal action.
6.a.2 ARC Subcommittee
A subcommittee member will provide an update to the Commission to
confirm that final construction drawings for larger projects substantially
conform to the conditions of ARC approval.
6.b CITY STAFF
City staff will provide updates on relevant projects, activities, and other
matters within the Commission's scope. These are informational items with
no formal action.
6.c ATTENDANCE REPORT 285
7.REQUESTS FOR ACTION
Commissioners may propose future agenda items within the Commission's
scope. Items that receive support from at least one other Commissioner may be
placed on a future agenda for discussion and possible action. No formal action
may be taken at this time.
8.ADJOURNMENT
The next Regular Meeting will be held on October 28, 2025, at 12:30 p.m.
Architectural Review Commission Regular Meeting
October 14, 2025
3
9.PUBLIC NOTICES
Agenda Related Materials: Pursuant to Government Code §54957.5(b)(2) the
designated office for inspection of records in connection with this meeting is the
Office of the City Clerk, Palm Desert Civic Center, 73-510 Fred Waring Drive,
Palm Desert. Staff reports for all agenda items considered in open session, and
documents provided to a majority of the legislative bodies are available for
public inspection at City Hall and on the City’s website at www.palmdesert.gov.
Americans with Disabilities Act: It is the intention of the City of Palm Desert to
comply with the Americans with Disabilities Act (ADA) in all respects. If, as an
attendee or a participant at this meeting, or in meetings on a regular basis, you
will need special assistance beyond what is normally provided, the City will
attempt to accommodate you in every reasonable manner. Please contact the
Office of the City Clerk, (760) 346-0611, at least 48 hours prior to the meeting to
inform us of your needs and to determine if accommodation is feasible.
AFFIDAVIT OF POSTING
I hereby certify under penalty of perjury under the laws of the State of California
that the foregoing agenda for the Architectural Review Commission was posted
on the City Hall bulletin board and City website not less than 72 hours prior to
the meeting.
/S/ Monique Lomeli, CMC
Senior Deputy Clerk
Architectural Review Commission Regular Meeting
October 14, 2025
4
ARCHITECTURAL REVIEW COMMISSION
CITY OF PALM DESERT
REGULAR MEETING MINUTES
1. CALL TO ORDER
A Regular Meeting of the Architectural Review Commission was called to order by Chair
Vuksic on August 12, 2025, at 12:31 p.m. in the Development Services Conference
Room, City Hall, located at 73-510 Fred Waring Drive, Palm Desert, California.
2. ROLL CALL
3. APPOINTMENT OF CHAIRPERSON AND VICE-CHAIRPERSON FOR FISCAL YEAR
2025-2026
Deputy Director Flores provided a brief overview of the newly implemented rotational
appointment for the Chair and Vice Chair as outlined in the City Clerk memo provided in
the agenda. Chair Vuksic called for a motion to approved the appointment of
Commissioner McIntosh as Chair and Commissioner Blakeley as Vice Chair.
Commissioner Colvard called to approve the appointments of Commissioners McIntosh
and Blakeley. Commissioner Gregory seconded the motion.
Motion by: Commissioner Colvard
Seconded by: Commissioner Gregory
Motion Carried (6 to 0)
4. NONAGENDA PUBLIC COMMENT
None
5
Architectural Review Commission Meeting Minutes
August 12, 2025
2
5. CONSENT CALENDAR
Chair McIntosh opened up the public comment period. With no members of the pu blic
wishing to speak, Chair McIntosh closed the public comment period. The Consent
Calendar was approved as presented.
Motion by: Chair Vuksic
Seconded by: Commissioner Blakeley
Motion Carried (6 to 0)
5.a APPROVAL OF MINUTES
Motion by: Chair Vuksic
Seconded by: Commissioner Blakeley
The Architectural Review Commission (ARC) regular meeting minutes of June
24, 2025, were approved as presented.
Motion Carried (6 to 0)
6. BUSINESS ITEMS
6.a APPOINTMENT OF CULTURAL ARTS COMMITTEE LIAISON FOR FISCAL
YEAR 2025-2026
Chair McIntosh called for nominations for a commission liaison for the Cultural
Arts Committee. Chair McIntosh moved to reappoint Commission Colvard as
liaison for the Cultural Arts Committee. Commissioner Vuksic seconded the
motion.
Motion by: Commissioner McIntosh
Seconded by: Chair Vuksic
Motion Carried (6 to 0)
6.b CONSIDERATION FOR DESIGN REVIEW APPROVAL FOR A PRIVATE
PICKLEBALL COURT AT 73481 PURSLANE
Assistant Planner Aguirre narrated a PowerPoint presentation on the item and
responded to Commission inquiries. Shawn Rost, Applicant, was present in-
person.
Chair McIntosh opened the public comment period and invited the applicant to
speak. Shawn Rost, Applicant, introduced himself and answered questions from
the Commission. Mr. Rost spoke in favor of the project and asked that the
Commission approve the project as presented. He shared information regarding
the noise study noting the noise consultant pointed out several conditions of the
home which help mitigate noise being carried out to the surrounding area. He
further shared he self-reported not having permitted the sports court asserting he
does not want to sidestep any process or approval and did not intend to do
anything wrong. Mr. Rost stated his intentions were not to disrupt those around
6
Architectural Review Commission Meeting Minutes
August 12, 2025
3
the property and shared his desire to correct the issue, adding that his project
otherwise complies with the code.
Evan Dockser, Palm Desert Resident, spoke in opposition to the project. Mr.
Dockser expressed concerns regarding the property, noting it is currently in
escrow and has undergone extensive renovation. He stated to his understanding
after speaking with staff that the pickleball court may not have been approved
due to setback requirements. He further stated concerns that the applicant built
the pickleball court and asked for forgiveness instead of permission and does not
feel the Commission should approve or allow the court.
Kitty Dockser, Palm Desert Resident, spoke in opposition to the project. Mrs.
Dockser raised concerns about the noise study because the consultant was hired
by the applicant. She further voiced concerns that the renovation has been noisy
and with the sale of the property there will be no requirements which will prohibit
the number of consecutive and concurrent recreational users for the pickleball
court. She encouraged commissioners to see the existing conditions and asked
that a licensed surveyor confirm the dimensions, including the setbacks. Mrs.
Dockser asserted that approval of the project would set a concerning precedent
and would be a detriment to the surrounding neighbors.
Kent Stone, Palm Desert Resident, observed the request is difficult because
approval is being sought after the project has been built. He stated that
identifying these issues needs to start sooner in the process of approved plans to
construction plans so you are not having to approve construction after the fact.
He asserted that intervention for the court’s construction should have been
addressed earlier to avoid having upset neighbors and community members.
Shawn Rost, Applicant, stated since the pickleball court has been built it has only
been played on once and added that they have not made noise, any noise was
from another source. He reiterated he is not trying to sidestep the process and
self-reported the court’s construction without a permit. Mr. Rost stated he is
requesting approval for a project that meets city standards.
With no other members of the public wishing to comment, Chair McIntosh closed
the public comment period. Discussion on the item ensued with Commissioners
providing comments on the project.
Motion by: Commissioner Gregory
Seconded by: Commissioner Blakeley
Motion carried to continue Case No. MISC25-0018 to a date uncertain with the
following comments:
1. Provide a survey of the property drafted by a license surveyor to confirm
setbacks.
2. Sound engineer who provided noise study should be present at the next
ARC review meeting to answer questions from the Commission.
Motion Carried (6 to 0)
7
Architectural Review Commission Meeting Minutes
August 12, 2025
4
7. INFORMATIONAL REPORTS
7.a COMMITTEE MEETING UPDATES
7.a.1 Cultural Arts Committee
Commissioner Colvard provided an update for the Cultural Art Committee
(CAC) reporting the CAC has approved a request to enter into a 10-year
lease agreement with Golden Voice for the installation of a sculpture
experience called Taffy, by artist, Stephanie Lin. The sculpture experience
includes six vertical towers ranging from 25 feet to 50 feet in height and 5
feet to 7 feet in diameter. The art piece was shown at Coachella fest and
will be installed at the Civic Center Park, located in the open grassy area
between the skate park and City Hall north wing building.
7.a.2 ARC Subcommittee
Deputy Director Flores reported the applicant for the Shadow Ridge
project has construction documents which are ready for review by an ARC
subcommittee. Upon request of volunteers to form an ARC subcommittee
for the project, Commissioner Gregory and Chair McIntosh volunteered to
review the construction documents to confirm substantial conformance.
7.b CITY STAFF
Deputy Director Flores provided the following updates:
Introduced new Senior Planner, Siji Fernandez, and shared there are two
additional new planners to the team, Associate Planner, Bobby Keatinge,
and Assistant Planner, Payton Thomas.
A study session will be held with City Council to receive direction for
procedures and standards on outdoor lighting.
Staff will look into options regarding informational or educational training
for noise including process used to obtain noise studies.
Joint study sessions with ARC, PC, and potentially City Council will be
held for several long-range planning projects, including Unified
Development Code Update, Hillside and Downtown objective design
standards, and Circulation Element.
Commissioners inquired about ways to deter developers from asking for
forgiveness instead of permission for construction.
7.c ATTENDANCE REPORT
The attendance report was provided with the agenda materials. The Commission
took no action on this item.
8. REQUESTS FOR ACTION
No requests for future agenda items were proposed.
8
Architectural Review Commission Meeting Minutes
August 12, 2025
5
9. ADJOURNMENT
The Architectural Review Commission adjourned at 2:20 p.m.
Respectfully submitted,
_________________________________________________
Melinda Gonzalez, Executive Administrative Assistant
Recording Secretary
ATTEST:
___________________________________________________
Carlos Flores, Interim Deputy Director of Development Services
Secretary
APPROVED BY ARC: __/__/2025
9
10
ARCHITECTURAL REVIEW COMMISSION
CITY OF PALM DESERT
REGULAR MEETING MINUTES
1. CALL TO ORDER
A Regular Meeting of the Architectural Review Commission was called to order by
Chairman McIntosh on Tuesday, August 26, 2025, at 12:30 p.m. in the Development
Services Conference Room, City Hall, located at 73 -510 Fred Waring Drive, Palm
Desert, California.
2. ROLL CALL
3. NON-AGENDA PUBLIC COMMENT
None.
4. CONSENT CALENDAR
5. BUSINESS ITEMS
5.a CONSIDERATION TO APPROVE A DESIGN REVIEW FOR THE
CONSTRUCTION OF A TWO-STORY INDUSTRIAL WAREHOUSE BUILDING
WITH A TOTAL AREA OF 7,624 SQUARE FEET ON A 21,446 SQUARE FOOT
LOT LOCATED AT 73731 SPYDER CIRCLE
Consultant Rich Malacoff, AICP, The Altum Group, narrated a PowerPoint
presentation and responded to Commissioner's inquiries.
Motion by: Commissioner Latkovic
Seconded by: Commissioner Sanchez
To approve the project with the following conditions:
1. South elevation shall mimic the north elevation in character, including the
addition of window illusions/spandrel windows for visual enhancement.
11
Architectural Review Commission Regular Meeting Minutes
August 26, 2025
2
2. Wainscoting on the northwest corner shall match the design used on the
west elevation.
3. Lighting fixtures on the south elevation shall be lowered and/or modified to
reduce glare impacting adjacent residential properties.
4. Mediterranean palm trees at the entrances shall be replaced with either
Washingtonian hybrids or Date palms for improved site compatibility and
safety.
Motion Carried (4 to 0)
6. INFORMATIONAL REPORTS
6.a COMMITTEE MEETING UPDATES
6.a.1 Cultural Arts Committee
None.
6.a.2 ARC Subcommittee
Carlos Flores, Deputy Director of Development Services, reported that the
ARC subcommittee met to review the Shadow Ridge residential project.
Chair McIntosh and Commissioner Gregory were present. The review
focused on single-family homes and landscaping.
The only outstanding item concerns an increase in building heights on
certain units to accommodate HVAC and other mechanical equipment.
While the proposed heights remain within code requirements, the
applicant is working with their architect and mechanical consultant to
explore potential design modifications that could reduce the overall height.
Updated plans have not yet been submitted.
6.b CITY STAFF
Deputy Director Flores provided an update on upcoming City Council agenda
items, staffing, and Commission meeting logistics.
6.c ATTENDANCE REPORT
The attendance report was included in the agenda materials; no action was
taken.
7. REQUESTS FOR ACTION
None.
8. ADJOURNMENT
The Architectural Review Commission adjourned at 1:15 p.m.
12
Architectural Review Commission Regular Meeting Minutes
August 26, 2025
3
9. PUBLIC NOTICES
____________________________________
Monique Lomeli, CMC, Senior Deputy Clerk
Recording Secretary
______________________________________________
Carlos Flores, Deputy Director of Development Services
Staff Liaison
13
14
ARCHITECTURAL REVIEW COMMISSION
CITY OF PALM DESERT
REGULAR MEETING MINUTES
1. CALL TO ORDER
A Regular Meeting of the Architectural Review Commission was called to order by
Chairman McIntosh on Tuesday, September 9, 2025, at 12:33 p.m. in the Council
Chamber, City Hall, located at 73-510 Fred Waring Drive, Palm Desert, California.
2. ROLL CALL
3. NON-AGENDA PUBLIC COMMENT
None.
4. BUSINESS ITEMS
4.a CONSIDERATION TO APPROVE A SIGN PROGRAM FOR AN EXISTING,
MULTITENANT COMMERCIAL BUILDING AT 72-171 HIGHWAY 111
Kayleen Aguirre, Assistant Planner, narrated a PowerPoint presentation and
responded to Commission inquiries.
In response to Commission inquiries, Carlos Flores, Deputy Director of
Development Services, clarified the conditions of continuance provided by the
Architectural Review Commission at its June 24, 2025, meeting.
Glenn Davis, Signarama, applicant, responded to Commission inquiries and
provided clarification regarding the number of tenant spaces and allowable
signage within the sign program.
Chair McIntosh opened the public comment period. There being no members of
the public desiring to speak, the public comment period was closed.
15
Architectural Review Commission Regular Meeting
September 9, 2025
2
Motion by: Commissioner Vuksic
Seconded by: Commissioner Sanchez
To approve the proposed sign program for an existing, multi-tenant commercial
building at 72-171 Highway 111, as presented.
Motion Carried (6 to 0)
4.b CONSIDERATION OF REVISED DESIGN REVIEW FOR A FAÇADE
MODIFICATION TO EXISTING STOREFRONT FOR RESTORATION
HARDWARE LOCATED AT 73100 EL PASEO, SUITES 3–10.
Payton Thomas, Assistant Planner, delivered a PowerPoint presentation and
responded to questions from the Commission.
Brian Foust, of Foust Architecture and project applicant, presented an overview
of the proposed project revisions.
David Fletcher, building owner's representative, expressed support for the
proposed revisions and addressed questions from the Commission.
Mike Resnik, RH Architects, provided clarification regarding landscaping
decisions at the rear of the building.
During the course of discussion, Commissioners expressed the following:
Concerns about the proposed western elevation.
Support for retaining the existing palm trees.
Need for sconces or other design elements to the rear entrance to
enhance visual continuity with the front façade.
Concerns about the recessed awnings, suggesting they be extended by
three feet to create greater architectural depth.
Motion by: Commissioner Vuksic
Seconded by: Commissioner Sanchez
To find that the revised project, Case No. MISC24-0023 (Revision), continues to
satisfy all findings required for design review approval, and to approve the
request subject to the following conditions:
1. The awnings shall be finished in “Heather Beige,” matching the provided
physical material sample.
2. The awning depth shall be increased to 36 inches.
3. Wall sconces shall be installed on either side of the back entry.
Motion Carried (6 to 0)
4.c CONSIDERATION OF A RECOMMENDATION TO PLANNING COMMISSION
FOR THE APPROVAL OF A CONDITIONAL USE PERMIT (CUP25-0004) FOR
16
Architectural Review Commission Regular Meeting
September 9, 2025
3
A NEW TEMPORARY MONOPOLE COMMUNICATION TOWER LOCATED AT
75178 GERALD FORD DR
Deputy Director Flores delivered a PowerPoint presentation and responded to
questions from the Commission.
Daisy Uy Kimpang, Associate Director of Verizon Southern California Division,
provided an overview of the intent for both the temporary and permanent
facilities, noting a target completion timeline of four to six months, and responded
to Commission inquiries.
Eric Fulsang of Fulsang Architecture, Inc. addressed questions regarding the
proposed movable landscaping elements, explaining the decision to maintain
plants in above-ground planter boxes to avoid disturbing the ground at the
temporary site.
During the course of discussion, Commissioners provided feedback and
suggested the addition of two 24 -inch box shrubs in temporary containers along
the north and east sides of the temporary enclosure.
Motion by: Commissioner Sanchez
Seconded by: Commissioner Gregory
To determine that the requirements of the findings have been met based on the
analysis, and to approve the request with the addition of two 24 -inch box shrubs
in temporary containers placed on the north and east sides of the temporary
enclosure, recommending approval of the request to the Planning Commission.
Motion Carried (6 to 0)
5. INFORMATIONAL REPORTS
The Commission recessed at 1:53 p.m. and reconvened at 1:58 p.m. with six members
present.
5.a COMMITTEE MEETING UPDATES
5.a.1 Cultural Arts Committee
None.
5.a.2 ARC Subcommittee
None.
5.b CITY STAFF
Deputy Director Flores reported the following:
A joint study session with the Planning Commission on objective design
standards for the Hillside Area is tentatively scheduled for September 23,
2025.
17
Architectural Review Commission Regular Meeting
September 9, 2025
4
The development community has requested a pre-application process for
ARC design review; staff is reviewing this option and will provide an
update at a future meeting.
The City Council approved the appointment of Chris Escobedo as
permanent City Manager, pending contract finalization.
The City Council voted to continue allowing decks on El Paseo under the
state mandates which expire in June 2026.
Staff may return in early 2026 to propose an extension of the deck
program.
5.c ATTENDANCE REPORT
The attendance report was included with agenda materials; no action was taken.
6. REQUESTS FOR ACTION
None.
7. ADJOURNMENT
The Architectural Review Commission adjourned at 2:06 p.m.
8. PUBLIC NOTICES
_____________________________________
Monique Lomeli, CMC, Senior Deputy Clerk
Recording Secretary
__________________________________________
Carlos Flores, Deputy Director of Development Services
Staff Liaison
18
ARCHITECTURAL REVIEW COMMISSION & PLANNING COMMISSION
CITY OF PALM DESERT
JOINT STUDY SESSION MINUTES
*Commissioner Gregory arrived at 12:34 p.m.
1. CALL TO ORDER - STUDY SESSION
A Joint Study Session of the Palm Desert Architectural Review Commission and
Planning Commission was called to order by Depu ty Director of Development Services
Carlos Flores on Tuesday, September 23, 2025, at 12:30 p.m. in the Administrative
Conference Room, City Hall, located at 73-510 Fred Waring Drive, Palm Desert,
California.
2. STUDY SESSION TOPICS
2.1 UPDATE ON THE HILLSIDE OBJECTIVE DESIGN STANDARDS
Carlos Flores, Deputy Director of Development Services, provided an overview of
the Hillside Objective Design Standards (ODS) and the objectives of the study
session.
Consultants John Kaliski and Amee Bhatt delivered presentations on the draft
standards and responded to Commission inquiries.
During discussion, Commissioners provided the following feedback:
Viewshed and Aesthetics
Emphasize preservation of viewsheds, particularly from public rights -of-
way.
Clarify and enhance ridgeline and scenic corridor protections.
Consider including a viewshed protection ordinance or more robust
viewshed-related objectives.
19
Joint Architectural Review Commission and Planning Commission Study Session Minutes
September 23, 2025
2
Grading and Slope
Provide clearer direction on how grading limits apply (absolute, net, or to
cut/fill individually).
Address potential unintended consequences (e.g., pushing development
further upslope) and allow for discretionary action near public lands,
roads, or easements.
Clarify the application of slope analysis and definition/use of ridgelines.
Design Standards & Flexibility
Concerns about rigid application of standards potentially stifling strong
design.
Consider introducing a clear section on exceptions and flexibility for
unique site constraints.
Ensure the intent and purpose of each standard are communicated to
allow for thoughtful interpretation.
Provide mechanisms for terraced or creative design approaches,
especially on irregular lots.
Explore whether certain walls exceeding length limits could be allowed
with exceptional design quality.
Solar and Sustainability Features
Refine guidelines for solar panel placement and visibility; consider
requiring south- or west-facing installations to reduce visibility.
Reevaluate setbacks for solar panels, especially the 24-inch minimum
clearance; possibly increase for better performance and aesthetics.
Clarify and refine language around solar-related shading, correcting errors
and ensuring appropriate sun exposure considerations.
Landscape and Fencing
Define the intent behind fencing and wall limitations; ensure they support
open landscape goals while still addressing functional use.
Avoid dense planting arrangements that create unintended barriers,
especially where hedges are discouraged.
Clarify language in landscape sections to better reflect the balance
between natural preservation and design flexibility.
Design Exceptions and Discretion
Add explicit language on the process for exceptions to standards.
20
Joint Architectural Review Commission and Planning Commission Study Session Minutes
September 23, 2025
3
Consider whether exceptions should be reviewed by the ARC or PC,
rather than left to staff discretion, to ensure consistency and design
integrity.
Address concerns about planner turnover and the risk of inconsistent
interpretations.
Emphasize the importance of upholding design quality even when
objective standards are technically met.
Technical and Formatting Issues
Correct language and typos (e.g., shading times on west -facing walls).
Clarify technical standards such as Section 2.1.4 (Major Ridgeline
Protection) and Section 2.4.13 (building wall length limitations).
Ensure utility visibility is addressed; undergrounding requirements should
be explicit.
Refine terminology for features like “shade,” “solids,” and “secondary
allowances” for better clarity.
Implementation Considerations
Consider testing or applying the standards to existing local designs to
evaluate real-world applicability.
Strengthen communication of the ODS to other departments, including
Code Compliance, to support enforcement.
Ensure consistency with existing zoning, especially for the roughly 100
parcels within the Hillside Planned Residential Zone.
3. ADJOURNMENT
The Joint Study Session adjourned at 2:19 p.m.
4. PUBLIC NOTICES
_______________________________
Monique Lomeli, Senior Deputy Clerk
Recording Secretary
_______________________________________________
Carlos Flores, Deputy Director of Development Services
Staff Liaison
21
22
Page 1 of 8
ARCHITECTURAL REVIEW COMMISSION
CITY OF PALM DESERT
STAFF REPORT
MEETING DATE: October 14, 2025
PREPARED BY: Kayleen Aguirre, Assistant Planner
SUBJECT: CONSIDERATION OF ROOFTOP EQUIPMENT SCREENING APPROVAL
FOR DESERT KID COFFEE AT 44850 SAN PABLO AVENUE
RECOMMENDATION:
Staff recommends that the Architectural Review Commission (ARC) find that the original
equipment screening method proposed in building permit TIMP25 -0031 does not meet the
required findings for approval. Staff further recommends that the ARC find that the revised
screening method, as presented in the set of plans submitted with th is Design Review
Application (MISC25-0025), satisfies the findings necessary for approval
The Applicant has provided three options for materials, which ARC has the discretion to choose
from and include as a condition of approval.
BACKGROUND/ANALYSIS:
Case No.: MISC25-0025
Related Case No.: AUP24-0005
Related Building Permit No.: TIMP25-0031
Executive Summary:
An Administrative Use Permit (AUP24-0005) was approved on October 23, 2024, for the
operation of a coffee roasting facility within an existing commercial building. The café facility was
approved to occupy the full 5,404 square feet of tenant space for roasting, customer seating, a
coffee bar, kitchen, restrooms, and office areas. The proposed kitchen would provide light food
items, including pastries and sandwiches.
Following the AUP approval, a Tenant Improvement building permit (TIMP25-0031) was applied
for on May 14, 2025. Planning review comments addressing equipment screening and other
items were distributed on June 13 and July 21, 2025. TIMP25-0031 was subsequently issued
on August 11, 2025, with the following Planning condition:
“Prior to final inspection, the applicant shall submit for approval the proposed method of
rooftop equipment screening. Submittal shall include updated elevations, roof plan, and all
applicable plan sheet revisions. Screening shall consist of a single, continuous enclosure
made of solid material, fully concealing all rooftop equipment from view on all sides, and
designed to integrate cohesively with the materials and architectural style of the existing
parapets.”
23
Architectural Review Commission
City of Palm Desert
(MISC25-0025 – Desert Kid Coffee Equipment Screening)
Page 2 of 8
The Applicant is requesting that the Architectural Review Commission (ARC) waive the above
Planning condition and approve the equipment screening as originally proposed in the Tenant
Improvement building permit submittal. Staff recommends that the ARC deny this request. The
approved Tenant Improvement p lans are available for reference in Attachment 3.
In addition, the Applicant has provided a revised set of plans with an alternative screening
method of the rooftop equipment. Staff recommends that the ARC approve this revised plan set,
included in Attachment 2. A complete narrative of the project background and the applicant’s
request is included in Attachment 1.
A. Property Description
The project site is developed as a tenant suite within an existing multitenant commercial
building located in the San Pablo Overlay District, within the Downtown area . The site is
improved with adjacent sidewalk frontage, landscaped areas, and six (6) dedicated parking
spaces.
Photo 1 – Northeast Corner of San Pablo and Alessandro Drive
24
Architectural Review Commission
City of Palm Desert
(MISC25-0025 – Desert Kid Coffee Equipment Screening)
Page 3 of 8
Photo 2 – Rear and South Side of the Building on Alessandro Drive
B. Zoning, General Plan and Adjacent Uses
The property is zoned Downtown Core Overlay (D.O.) and is designated Downtown by the
General Plan Land Use Element. Palm Desert Municipal Code (PDMC) Chapter 25.18.040
Land Use and Permit Requirements, states that restaurants may be permitted subject to th e
approval of an Administrative Use Permit (AUP) pursuant to PDMC Section 25.64.040.
Table 1 – Adjacent Land Uses and Designations
Existing Uses General Plan Zoning
Project
Site
Single Tenant Space within
an Existing Multi-Tenant
Commercial Building
D.O. – Downtown Core Overlay
North Restaurant without Alcohol
Sales
D.O. – Downtown Core Overlay
South Pawnbroker
D.O. – Downtown Core Overlay
East Multi-Tenant Commercial
Building
D – Downtown District
West Retail Bicycle Sales,
Services, and Rentals
D.O. – Downtown Core Overlay
C. Project Description
The Tenant Improvement building permit is for a new café business in the San Pablo corridor.
Planning staff reviewed the TIMP25-0031 construction documents and determined that
rooftop equipment screening was insufficient.
25
Architectural Review Commission
City of Palm Desert
(MISC25-0025 – Desert Kid Coffee Equipment Screening)
Page 4 of 8
Revised plans have been provided by the applicant to satisfy staff’s request for a cohesive
screening method for new rooftop equipment. The following revised elevations and roof p lans
were submitted for ARC consideration:
Elevations
Front Elevation (West)
Rear Elevation (East)
26
Architectural Review Commission
City of Palm Desert
(MISC25-0025 – Desert Kid Coffee Equipment Screening)
Page 5 of 8
Right Elevation (South)
Roof Plan
Material Options
ARC may consider the applicant’s proposed material options (Options A, B, and C) and select
one for inclusion as a condition of approval. Details are provided in the Applicant’s Narrative
(Attachment 1).
27
Architectural Review Commission
City of Palm Desert
(MISC25-0025 – Desert Kid Coffee Equipment Screening)
Page 6 of 8
Option A - SleekFence Aluminum Fence System
Option B - SleekFence Shadowbox
Option C - Standard Equipment Screen Louvers
Zoning Ordinance Summary:
The project site is developed as a tenant suite within an existing multitenant commercial building
located in the San Pablo Overlay District, within the Downtown area. The following findings are
provided to assist the ARC in determining whether the revised rooftop equipment screening
satisfies the applicable design and zoning standards pursuant to PDMC Chapter 25.72. Staff
believes that plans as presented in TIMP25-0031 do not meet the findings below.
Findings
1. That the proposed development conforms to all legally adopted development standards.
Complies: The existing site complies with applicable zoning code requirements for height,
setbacks, land use compatibility, parking, and lot coverage. The business requires 5
parking spaces, at a ratio of 3 spaces per 1,000 square feet, only accounting for 1,620
square feet of restaurant space. The parking spaces are available within the existing
commercial center. The commercial center was developed with ample parking for existing
multi-tenant buildings. The proposed use complies with all applicable provisions of the
zoning code, including parking, and land use compatibility with the existing businesses.
The rooftop equipment proposed in the revised plan set (Attachment 2) conforms with
PDMC § 25.40.090C.2, which states, “All rooftop equipment in commercial and industrial
zones, including heating and air conditioning units, shall be completely screened from
surrounding properties by use of a wall or fence or shall be enclosed within a building .”
The plans as originally presented in TIMP25-0031 would not meet this requirement.
2. That the design and location of the proposed development and its relationship to
neighboring existing or proposed developments and traffic is such that it will not impair
the desirability of investment or occupation in the neighborhood; and that it will not
unreasonably interfere with the use and enjoyment of neighboring existing or proposed
developments and that it will not create traffic hazards or congestion.
Complies: The proposed rooftop equipment screening in the revised plan set in
Attachment 2 (“Project”) is consistent with the surrounding residential character and is not
expected to negatively impact the desirability of the neighborhood. It provides sufficient
screening for rooftop equipment and does not introduce traffic hazards or congestion. The
project will not interfere with the use or enjoyment of neighboring properties.
Rooftop screening as originally presented in TIMP25-0031 does not adequately screen
equipment and creates an undesirable visual impact along San Pablo.
28
Architectural Review Commission
City of Palm Desert
(MISC25-0025 – Desert Kid Coffee Equipment Screening)
Page 7 of 8
3. That the design and location of the proposed development is in keeping with the character
of the surrounding neighborhood and is not detrimental to the harmonious, orderly, and
attractive development contemplated by this title and the General Plan of the City.
Complies: The proposed Project is consistent with the character of the surrounding
neighborhood, which includes a mix of restaurants and other commercial uses within the
Downtown Overlay District. The proposed Project minimizes visual impact by screening
all rooftop equipment appropriately and is, therefore, not detrimental to the harmonious,
orderly, and attractive development envisioned by the City’s Zoning Code and General
Plan.
Rooftop screening as originally presented in TIMP25-0031 does not adequately screen
equipment and creates an undesirable visual impact along San Pablo.
4. That the design and location of the proposed development would provide a desirable
environment for its occupants, as well as for its neighbors and that it is aesthetically of
good composition, materials, textures, and colors.
Complies: The Applicant has provided quality material options for the rooftop equipment
screening to be integrated with the architectural character of the existing building.
Screening will be painted to match the building’s exterior and will effectively minimize the
visual impact by fully screening all rooftop equipment from public view. As such, the
proposed Project will provide a desirable addition to the San Pablo corridor that will not
be detrimental to the aesthetic quality of the neighborhood.
Rooftop screening as originally presented in TIMP25-0031 does not adequately screen
equipment and creates an undesirable visual impact along San Pablo.
5. That the proposed use conforms to all the requirements of the zone in which it is located
and all other applicable requirements.
Complies: The proposed Project conforms to all land use and development requirements
of the Downtown Overlay (DO) zoning district set forth by the Palm Desert Municipal
Code. This includes full conformance to regulations for setbacks, allowable residential
uses, and design requirements. The proposed café use is permitted with an
Administrative Use Permit, and the revised rooftop screening satisfies the design
standards for mechanical equipment concealment. No deviations from zoning
requirements are proposed.
6. That the overall development of the land shall be designed to ensure the protection of the
public health, safety, and general welfare.
Complies: The proposed Project has been designed in accordance with applicable
regulations and standards intended to protect public health, safety, and general welfare.
The project will be subject to all required reviews and permitting processes to ensure
29
Architectural Review Commission
City of Palm Desert
(MISC25-0025 – Desert Kid Coffee Equipment Screening)
Page 8 of 8
compliance with building, zoning, and safety codes. No evidence has been presented
indicating that the height exception would result in conditions detrimental to the
community. No adverse impacts to public infrastructure, emergency access, or
surrounding properties are anticipated.
Staff recommends denial of the original screening method and approval of the revised plan set,
which satisfies the applicable design and zoning requirements.
ATTACHMENTS:
1. Applicant Narrative
2. Revised Plans (MISC25-0025)
3. Approved TIMP25-0031
4. AUP24-0005
30
7755--114455 SStt CChhaarrlleess PPllaaccee,, SSttee 44,, PPaallmm DDeesseerrtt,, CCAA 9922221111 TTeelleepphhoonnee:: ((776600)) 334466--88001144 FFaaxx ((776600)) 556688--00996633
September 17, 2025
CITY of PALM DESERT
Attn: Planning - Kayleen Aguirre
73510 Fred Waring Drive
Palm Desert, California 92260
RE: Desert Kid Coffee – 44850 San Pablo (AUP 24-0005 / Bldg. Permit TIMP25-0031). ARC Narrative
Hi Kayleen,
In conjunction with our ARC Application for review and approval on one of the various options on the roof
mounted equipment screen enclosures, I have prepared the following narrative for consideration:
o We started on this project in June of 2024 and it took us until Oct. 23, 2025, to gain the AUP approval. This
project was supposed to be limited to an Interior Remodel (T.I.). The existing building structure has 60 ft.
clear span top chord bearing TJL trusses at 24” o.c. The roof truss framing system are at maximum structural
capacity, so our approach has been to limit any additional loading.
o During Construction Drawing development we had to design a seperate equipment platform above the
kitchen to accommodate ALL new imposed equipment weights (HVAC / MAU, Kitchen hood and Exhaust).
The existing structure could not handle additional loading.
o Permit TIMP25-0031 dated 08/11/25. We had to weave through 7 department / agency approvals and there
was NO mention of concern with the equipment enclosure we selected (See Option A exhibit), until the 11 th
hour of the approval process. Planning notified us on 7/21/25 that the enclosure screens were problematic
and they could not permit the project to proceed forward without these being addressed or we received ARC
approval. We decided to address this after I got back from vacation on a MOU basis in order to give this
issue appropriate review and study.
o In review of the structural limitations of this facility and the aesthetic impact after having performed a
subsequent sight line study, I would like to advocate for approval of our original equipment screen enclosure
concept with a few options for the committee to consider:
1. Option A – This “Sleek Fence” product virtually eliminates the view behind the enclosure (except at the
¾” slat opening). Looking at the brochure, the trees beyond are barely discernible and this does allow for
air to pass through. In reality, only a couple of feet of this product will be exposed (4-5 horizontal boards)
and is located near the center of the building. This attaches to our structural equipment platform and will
be painted to match the existing parapets.
2. Option B – This product is from the same manufacturer, and we would be happy to replace this SOLID
panel in lieu if the open slot is an issue.
31
7755--114455 SStt CChhaarrlleess PPllaaccee,, SSttee 44,, PPaallmm DDeesseerrtt,, CCAA 9922221111 TTeelleepphhoonnee:: ((776600)) 334466--88001144 FFaaxx ((776600)) 556688--00996633
ARC Narrative
Page Two …
3. Option C – This is an industry std. Equipment Screen enclosure by Architectural Louvers that has a 0%
sight line at horizontal or below. The plans we have submitted with the cloud and Delta 2a have
incorporated THIS product; due to the structural instability of the existing roof we widened this to 38’ to
attach to our equipment platform and existing parapets rather than the roof diaphragm. Shts. A3.1, A3.5,
A3.6 and A4.1 show the impact of incorporating this screen.
In conclusion, I feel that the necessary width of Option C adversely impacts the rear elevation, and it is
NOT a better solution than our initial screen enclosure. The sight line study on Sht. A3.6 shows the
minimal height needed above existing parapets to shield the equipment, and I therefore request that you
approve the original submittal with Option A or B equipment screening.
Regards,
Chris Mc Fadden Architect
32
2
View email in browser
SLEEKFENCE · 2 Vliet Farm Rd · Asbury, New Jersey 08802 · USA
update your preferences or unsubscribe
OPTION - A
33
POST CAP
POST HEIGHTS:
• 7'
• 9'
• 12'
WALL THICKNESS 0.138"
4"x4"x 0.138" (WALL
THICKNESS) POST
WITH OPTIONAL
5"x8" BASEPLATE
ALUMINUM FENCE
POST WITH STEEL
BASEPLATE INSERT
BASEPLATE WITH
INSERT SIZE &
ANCHORAGE TO BE
DESIGNED PER SITE
REQUIREMENTS
SLAB OR FOOTING
TO BE DESIGNED
PER SITE
REQUIREMENTS
OPTIONAL
CONCRETE MOUNT POST
ADJUSTABLE MOUNTING CHANNEL
FOR PANEL ATTACHMENT AT ANY ANGLE
POST
F-CHANNEL
U-CHANNEL
FENCE SLAT
U-CHANNEL CAN BE
MOUNTED DIRECTLY
TO THE POST FOR
CUSTOM BUILD ONSITE.
TOP VIEW
2"
GRADE LEVEL
76 1/2"
PA
N
E
L
H
E
I
G
H
T
:
6
9
"
3"
1"
NO
M
.
H
E
I
G
H
T
:
7
2
"
MI
N
.
F
O
O
T
I
N
G
D
E
P
T
H
36
"
GA
P
3/
4
"
SLAT WALL
THICKNESS:
1.15mm / 18 GAUGE
HORIZONTAL SLAT VIEW
GA
P
3/
4
"
4"
5/8"
1 855-875-0855
support@sleekfence.com
www.sleekfence.com
https://www.sleekfence.com/learning-hub
RATED FOR HURRICANE ZONES (HVHZ)
WIND RATINGS AND RESOURCES:
FIRE RATING: ASTM E84 Class A, NON-COMBUSTIBLE
HIGH QUALITY PRE-ASSEMBLED PANEL FOR
RESIDENTIAL, COMMERCIAL AND INDUSTRIAL USE
ALUMINUM: 6063-T6
HAS A HIGH RESISTANCE TO FRACTURE
AND FATIGUE AND IS VERY STRONG
POWDER COATING: QUALICOAT
LICENSED APPLICATOR
STYLE:
ACTUAL PANEL DIMENSIONS:
FASTENERS:
SCALE:
SCREEN FENCE
72" WIDE BY 69" HIGH
STAINLESS STEEL
NTS
SLEEKFENCE™ ALUMINUM FENCE SYSTEM
PANEL HEIGHT OPTIONS
• 46"
• 69"
• 92"
• CUSTOM
34
SLEEKFENCE™ v 855 875 0855 v support@sleekfence.com v SLEEKFENCE.COM
SLEEKFENCE SHADOWBOX
Built for the blueprint:
fencing that fits the
master plan.
Introducing the newest addition to the SLEEKFENCE
system: Shadowbox. Made with 5-¾” interlocking
boards, this fresh new design gives you total privacy
with a completely different look and feel.
Just like our Privacy and Screen fence styles,
SLEEKFENCE Shadowbox fencing and gates packs
a punch – both as a design statement and a
structurally-engineered solution.
OPTION - B
35
SLEEKFENCE™ v 855 875 0855 v support@sleekfence.com v SLEEKFENCE.COM
A CLASSIC DESIGN
SUBTLE DESIGN. SERIOUS PERFORMANCE.
For projects that call for timeless design, Shadowbox
is the ultimate fencing solution. Its subtly layered,
overlapping texture captures one of today’s most
popular architectural trends: classic inspiration, executed
with modern precision. This fence is perfect for large
projects requiring full privacy plus enduring style.
Refined visual texture – Staggered board-on-board slats
provide depth without heaviness.
Built to last – Made from structural-grade powder-coated
aluminum that resists rust, warping, and fading.
Interested in learning more about Shadowbox? Our sales
team is here to help. Whether you're building a custom
home, managing a multi-phase development, or simply
exploring new fencing styles, we offer personalized
consultations to make the process simple.
Need layout guidance or technical input? Our in-house
engineers and CAD team are available to provide detailed
drawings and support tailored to your project needs.
Flexible styling – Pairs beautifully with traditional,
transitional, and contemporary surroundings.
Fully compatible – Works seamlessly with all SLEEKFENCE
posts, gates, and mounting hardware.
Call us at 1-855-875-0855, send an email to us at
support@sleekfence.com, or submit a request through
our support form. We’ll walk you through everything you
need.
Bring timeless design and modern durability to your next
project with Shadowbox by SLEEKFENCE.
WHY CHOOSE SHADOWBOX?
36
OPTION - C
37
38
BONE WHITE HEIRLOOM WHITE DOVE GRAY HORIZON BLUE
RAWHIDE SAND STONE SLATE GRAY HAWAIIAN BLUE
PUEBLO TAN SIENNA PATINA GREEN DEEP BLUE
ANTIQUE BRONZE REDWOOD MEDIUM BRONZE HARTFORD GREEN
BEIGE BUCKSKIN DARK BRONZE BLACK
CLEAR MEDIUM BRONZE DARK BRONZE BLACK
ARCHITECTURAL LOUVERS • 266 WEST MITCHELL AVENUE, CINCINNATI, OH 45232 • 888-568-8371
Slight color variation may occur in color anodized production runs.
Due to variations in computer monitors, we cannot guarantee the accuracy of colors presented on-screen with actual products.
Please refer to a color card or paint swatches to ensure color accuracy.
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
NAILING SCHEDULE TABLE
·
·
·
·
·
WOOD SHEAR AND DIAPHRAGMS:
WOOD CONSTRUCTION
·
·
·
·
·
GENERAL NOTES AND SPECIFICATIONS
WOOD WIND DESIGN
SEISMIC DESIGN
PARAMETERS DESIGN CBC 2022
·
·
·
·
·
·
BASIS OF DESIGN
CONCRETE FOUNDATION, FLOOR SLABS,
·
CONCRETE NOTES
·
·
·
·
·
·
·
·
·
·
·
·
·
·
ADDITIONAL NOTES
RESEARCH REPORT
·
STRUCTURAL OBSERVATION/ SIGNIFICANT CONSTRUCTION STAGES
(Only Checked items are required)
Firm or Individual to be responsible for the "Structural Observation":
Name:Licensed Architect:Registered Engineer:
Phone:Registration Number:
CONSTRUCTION
STAGE
Construction Type Elements/Connections to be observed
Foundation Footing, Stem Walls, Piers
Mat Foundation
Caisson, Pile, Grade beams
Stepping/Retaining
Foundation, Hillside Special
Anchors
Others:
Concrete
Masonry
Wood
Others:
Wall
Steel Moment Frame
Steel Braced Frame
Concrete Moment Frame
Masonry Moment Frame
Others:
Concrete
Steel Deck
Wood
Others:
Frame
Diaphragm
Others
Rebar Size & Placement
Shear Wall, Framing Connections
Plywood Sheathing & Roof Nailing
DECLARATION BY OWNER OR OWNER'S REPRESENTATIVE
I, the owner of the project the owner's representative, declare that the above listed firm or individual is hired by me
to be the Structural Observer.
Signature Date
DECLARATION BY ARCHITECT OR ENGINEER OF RECORD ( required if the Structural Observer is different
from the Architect or Engineer of Record)
I, the Architect or Engineer of Record for the project, declare that the above listed firm or individual is designated by
me to be responsible for the "Structural Observation').
Signature License No.Date
GENERAL NOTES FOR STRUCTURAL OBSERVATION:
ICC-ES REPORT #
S-1.0 GENERAL NOTES
S-2.0 FOUNDATION PLAN
S-2.1 ROOF FRAMING PLAN
S-3.0 FOUNDATION & FRAMING DETAILS
S-4.0 FRAMING DETAILS
SHEET INDEX
SPECIAL INSPECTIONS
S-3.1 FOUNDATION & FRAMING DETAILS
GENERAL NOTES
S-1.0
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I J
1A
67
FOUNDATION NOTES
1. ALL HOLDOWNS & ANCHOR BOLTS SHALL BE SET IN PLACE BY TEMPLATE
PRIOR TO FOUNDATION INSPECTION.
2. ALL POSTS SHALL BE CONNECTED TO SILL PLATE WITH "A35" AT EA. SIDE
TYP. UNLESS HARDWARE IS NOTED ON PLAN.
3. ALL FOOTING SHALL HAVE F'c = 2500 PSI UNLESS NOTED OTHERWISE.
4. PLATE WASHERS ARE REQUIRED FOR ALL HOLDOWNS BRACKETS.
5. ALL BOLT HOLES SHALL BE DRILLED A MAXIMUM OF 1/16" OVERSIZED.
INSPECTOR TO VERIFY.
6. ALL HOLDOWN ANCHOR NUTS SHALL BE FINGER TIGHT AND 1/2 WRENCH
TURN JUST PRIOR TO COVERING THE WALL FRAMING.
7. HOLD-DOWN CONNECTOR BOLTS INTO WOOD FRAMING REQUIRE
APPROVED PLATE WASHERS.
8. CONNECTOR BOLTS INTO WOOD FRAMING REQUIRE STEEL PLATE
WASHERS IN ACCORDANCE AF&PA’S 2015 SPECIAL DESIGN PROVISIONS
FOR WIND AND SEISMIC (SDPWS-15)
9. FOUNDATION SILL SHALL BE NATURALLY DURABLE OR
PRESERVATIVE-TREATED WOOD. FIELD-CUT ENDS, NOTCHES AND DRILLED
HOLES OF PRESERVATIVE-TREATED WOOD SHALL BE FIELD-TREATED PER
AWPA M4.
10. CONTRACTOR TO VERIFY ALL DIMENSIONS & ELEVATIONS WITH
ARCHITECTURAL PLANS PRIOR TO STARTING ANY WORK.
11. ALL STUDS OVER 10 FEET TALL AND LESS THAN 15 FEET SHALL BE 2x6 OR
3x4 @ 16" O.C.
12. FASTENERS IN PRESERVATIVE TREATED WOOD OR FIRE RETARDANT
TREATED WOOD SHALL BE OF HOT ZINC COATED GALVANIZED STEEL OR
STAINLESS STEEL..
INDICATES SHEAR WALL TYPE, SEE SCHEDULE
INDICATES GRID LINE
INDICATES POST BELOW
INDICATES NEW WALL
LEGEND
INDICATES (N) FOOTING
INDICATES (E) FOOTING
A
SIZE
21" SQ
MARK
1
REINFORCEMENT
@ BOTTOM
FOOTING SCHEDULE
THICKNESS
24"(4) #5 EA. WAY
CONCRETE F'c
2500 PSI
DEPUTY INSP.
NO
INDICATES EXISTING WALL
A C
1
2
(E) CONC. SLAB
ON GRADE
12
'
-
5
"
5
5'
-
0
"
5
HDU
84X6
HDU
84X6
HDU
84X6
HDU
8
4X6
2
S3.0
2
S3.0
1
S3.0
3
S3.0TYP.
3
S3.0TYP.
3
S3.0TYP.
3
S3.0TYP.
1 1
11
6
S3.0
6
S3.0
6
S3.0
6
S3.0
SCALE: 1/4" = 1'-0"
FOUNDATION PLAN & 1st. FLOOR SHEAR WALLS ABOVE
(E) POST & FOOTING
(E) POST & FOOTING
B
14
'
-
6
"
5
5'
-
1
"
5
4'
-
0
"
5
7
S3.0
HDU
84X6
HDU
84X6
HDU
84X6
HDU
8
4X6
HDU
84X6
HDU
8
4X6
8
S3.0
8
S3.0
8
S3.0
7
S3.0
7
S3.0
16
S3.0
1
S3.0
3
S3.0TYP.
7
S3.1
7
S3.1
Notes:
1.75"7"24" o.c.6" o.c. to Blkg.10d @ 12" o.c.10d @ 2" o.c.15/32" Struct I*
10d @ 2" o.c. 10d @ 12" o.c.See note 5.1.75"7"12" o.c.15/32" Struct I*
Both Sides
1/2" Dia. x 6" long lag @ 12" o.c.
2"1.75"3/8" Dia. x 6" long lag @ 8" o.c7"32" o.c.12" o.c. to Blkg.10d @ 12" o.c.10d @ 4" o.c.15/32" Struct I
15/32" Struct I 8" o.c. to Blkg.8d @ 2" o.c. 8d @ 12" o.c.24" o.c.3/8" Dia. x 6" long lag @ 6" o.c1.75"7"2"
Bolt
Embed.
Sheathing
Material
15/32" Struct I
15/32" Struct I
Wall ID Shear transfer,
Bottom sill and
Top Plate
A35/LTP4 @
24" o.c. to Blkg.
16" o.c. to Blkg.
8d @ 12" o.c.8d @ 6" o.c.
10d @ 6" o.c. 10d @ 12" o.c.
Panel Nailing
Edges Fields
48" o.c.
48" o.c.
Anchor Bolt
5 8" @
20d common nail @ 6" o.c.
20d common nail @ 6" o.c.
Sill-Plate Connection
1.75"7"
1.75"7"
Bolt Edge
Distance (N)
Footing
2"
2"
Min. Blkg.
Thk. below
Sill-Plate
2"
2"
15/32" Struct I 8" o.c. to Blkg.8d @ 3" o.c. 8d @ 12" o.c.24" o.c.3/8" Dia. x 6" long lag @ 6" o.c1.75"7"2"
15/32" Struct I*
Both Sides
8d @ 2" o.c. 8d @ 12" o.c.See note 5 16" o.c.1.75"7"2"
Shear
(lbs/ft)
YES
See note 4
NO
Special
Inspection
NO
YES
See note 4
YES
See note 4
YES
See note 4
YES
See note 4
YES
See note 4
715
392
477
1,221
2,442
1,024
771
2,049
LRFD - Shear Wall Schedule from Table 4.3A SDPWS-2021 (values multiplied by 0.5)
1/2" Dia. x 6" long lag @ 8" o.c.
1/2" Dia. x 6" long lag @ 6" o.c.
Bolt Edge
Distance (E)
Footing
1
2
3
4
5
6
7
8
1.5"
1.5"
3.5"
3.5"
3.5"
3.5"
3.5"
3.5"
1) This nailing schedule is for common nails only and all panels edges fastened to framing. Plywood can be installed either horizontally or vertically.
2) Shear Panels 3 to 8 requires 3X framing members at the bottom sill plate when resting on concrete, and behind vertical or horizontal panel edges. Also minimum 1/2" edge
nailing distance at panel ends and edges.
3) Use square plate washers 3" x 3" x 1/4" thk. for 5/8" diameter bolts.
4) Deputy inspection required where the fastener spacing of the sheathing is 4 - inches on center or less. Applies to shear panel 3, 4, 5, 6, 7 & 8.
5) For 2x4 stud walls:
-Use 4x blocking between joist when joist are perpendicular to wall or align a 4x continue member over the wall when joist are parallel to wall. Use LTP4 at 5" o.c. both sides.
For 2x6 stud walls:
-Use 4x blocking between joist when joist are perpendicular to wall or align a 4x continue member over the wall when joist are parallel to wall. Use LTP4 at 5" o.c. to connect
aligned faces of wall and blocking or continue member and use A35 at 5" o.c. to connect the non aligned face of blocking or continue member with the top of top plate.
*Framing at adjoining panel edges shall be nominal 3" or wider. nails shall be staggered in two lines along panel edges when nail spacing is 2" o.c., or when 10d common nails spaced 3" o.c. penetrate framing
more than 1-5/8".S-2.0
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I J
1a
1a
68
LOW ROOF/ FLOOR FRAMING NOTES
1. ROOF SHEATHING SHALL BE 1/2" PLYWOOD, CD-X P11 32/16, w/ 8d COMMON
NAILS @ 6", 12" O.C.
2. ALL SHEAR WALLS ARE FULL HEIGHT TO THE ROOF AND FLOOR
DIAPHRAGM.
3. ALL POSTS ARE 4 x 6 MINIMUM U.N.O.
4. ALL POSTS SHALL BE CONNECTED TO SILL PLATE WITH "A35" AT EA. SIDE
TYP. UNLESS HARDWARE IS NOTED ON PLAN.
5. ALL EXT. WALLS, SHEAR WALLS & BEARING WALLS EXCEEDING 10'-0" AND
LESS THAN 15'-0" HEIGHT SHALL BE 2x6 OR 3x4 @ 16" O.C.
6. ALL WOOD FRAMING MEMBERS U.N.O. SHALL BE:
2x MEMBER DF #2 OR BETTER
4x MEMBER DF #2 OR BETTER
2x STUDS DF #2 OR BETTER
7. ALL DIAPHRAGM AND SHEAR WALL NAILING SHALL UTILIZE COMMON NAILS
OR GALVANIZED BOX.
8. FASTENERS IN PRESERVATIVE TREATED WOOD OR FIRE RETARDANT
TREATED WOOD SHALL BE OF HOT ZINC COATED GALVANIZED STEEL OR
STAINLESS STEEL.
9. CITY LICENSED FABRICATOR REQUIRED FOR GLULAM BEAMS, VERSA LAM,
TJI & STRUCTURAL STEEL.
10. ROOF DIAPHRAGM NAILING TO BE INSPECTED BEFORE COVERING FACE
GRAIN OF PLYWOOD SHALL BE PERPENDICULAR TO SUPPORTS. PLYWOOD
SPANS SHALL CONFORM TABLE 2304.7
11. SHOP WELDS MUST BE PERFORMED IN A CITY LICENSED FABRICATOR
SHOP.
12. WELDING TO BE DONE BY WELDERS CERTIFIED BY THE CITY BUILDING
DEPARTMENT FOR STRUCTURAL STEEL.
13. CONTINUOUS DEPUTY INSPECTION BY A REGISTER DEPUTY INSPECTOR IS
REQUIRED FOR FIELD WELDING.
14. ALL WOOD BEAM SHALL BE CONNECTED TO POST WITH COLUMN CAP.
UNLESS HARDWARE IS NOTED ON PLAN.
15. ALL WOOD HEADER SHALL BE CONNECTED TO POST OR 2-2x TRIMED STUD
WITH POST CAP. UNLESS HARDWARE IS NOTED ON PLAN.
3
S-4.0
A
BEAM SCHEDULE (U.N.O.) - ROOF
BEAM
TYPE SIZE POST
SUPPORT REMARKS
6x10 D.F.#2HDR1 4x6 -
STL1 --
STL2 -
W6x9
W6x9
INDICATES SHEAR WALL TYPE, SEE SCHEDULE
INDICATES GRID LINE
INDICATES POST BELOW
INDICATES NEW WALL
LEGEND
HDR
STL
DENOTES HEADER
DENOTES STEEL BEAM
ABBREVIATIONS
ROOF RAFTERS (R.R.) - SIZE AND SPACING PER PLAN
INDICATES EXISTING WALL
HSS 4x4x1/8
(E) ROOF TRUSSES
A
1
2
12
'
-
5
"
5
5'
-
0
"
5
(E) HDR
(E
)
H
D
R
(E) HDR (E) HDR(E) HDR(E) HDR(E) HDR(E) HDR(E) HDR
(N) 4x6 HDR(N) 4x6 HDR
(N) 4x6 HDR
(N) 4x6 HDR
(N) 4x6 HDR
(E
)
H
D
R
(E
)
H
D
R
(E
)
H
D
R
(E
)
H
D
R
(E
)
H
D
R
HD
R
1
(E) POST
(E) POST
(E) POST
(E
)
R
O
O
F
T
R
U
S
S
E
S
FR
A
M
I
N
G
(N
)
4
x
6
H
D
R
(N
)
4
x
6
H
D
R
(N
)
4
x
6
H
D
R
(N
)
4
x
6
H
D
R
(N
)
4
x
6
H
D
R
DBL.
R.R.
2x8 R.R.
@ 16" O.C.
2x8 R.R.
@ 16" O.C.
2x8 R.R.
@ 16" O.C.
2x8 R.R.
@ 16" O.C.
STL1
STL1
ST
L
2
ST
L
2
POST P1
HSS 4x4x1/8
POST P1
HSS 4x4x1/8
POST P1
HSS 4x4x1/8
POST P1
HSS 4x4x1/8
4
S3.0
4
S3.0
4
S3.0
4
S3.0
13
S3.0
13
S3.0
13
S3.0
13
S3.0
18
S3.0
18
S3.0
18
S3.0
18
S3.0
18
S3.0
18
S3.0
9
S3.0
HVAC &
CONNECTION
PER MNFR.
HOOD VENT &
CONNECTION
PER MNFR.
14
S3.0
10
S3.0TYP.
10
S3.0TYP.
10
S3.0TYP.
10
S3.0TYP.
10
S3.0TYP.
10
S3.0TYP.
10
S3.0TYP.
10
S3.0TYP.
11
S3.0
12
S3.0
12
S3.0
12
S3.0
ROOF FRAMING PLAN & 1st. FLOOR SHEAR WALLS BELOW
SCALE: 1/4" = 1'-0"
14
'
-
6
"
5
5'
-
1
"
5
4'
-
0
"
5
2x8 R.R.
@ 16" O.C.
DBL. R.R.
DBL. R.R.
DB
L
.
R
.
R
.
DB
L
.
R
.
R
.
2x8 R.R.
@ 16" O.C.2x8 R.R.
@ 16" O.C.
11
S3.0
14
S3.0
14
S3.0
19
S3.0
19
S3.0
CB
(2
)
C
M
S
T
1
2
(2
)
C
M
S
T
1
2
(2
)
C
M
S
T
1
2
(2
)
C
M
S
T
1
2
(2
)
C
M
S
T
1
2
(2
)
C
M
S
T
1
2
20
S3.0
20
S3.0
20
S3.0
20
S3.0
20
S3.0
(E
)
B
E
A
M
(E
)
B
E
A
M
(E
)
B
E
A
M
(E) HDR
(E) 2x8
ROOF FRAMING
(E) 2x8
ROOF FRAMING
(E
)
H
D
R
(E
)
H
D
R
10
S3.0TYP.
8
S3.1
8
S3.1
2x6 STUDS
2x4 STUDS
S-2.1
Notes:
1.75"7"24" o.c.6" o.c. to Blkg.10d @ 12" o.c.10d @ 2" o.c.15/32" Struct I*
10d @ 2" o.c. 10d @ 12" o.c.See note 5.1.75"7"12" o.c.15/32" Struct I*
Both Sides
1/2" Dia. x 6" long lag @ 12" o.c.
2"1.75"3/8" Dia. x 6" long lag @ 8" o.c7"32" o.c.12" o.c. to Blkg.10d @ 12" o.c.10d @ 4" o.c.15/32" Struct I
15/32" Struct I 8" o.c. to Blkg.8d @ 2" o.c. 8d @ 12" o.c.24" o.c.3/8" Dia. x 6" long lag @ 6" o.c1.75"7"2"
Bolt
Embed.
Sheathing
Material
15/32" Struct I
15/32" Struct I
Wall ID Shear transfer,
Bottom sill and
Top Plate
A35/LTP4 @
24" o.c. to Blkg.
16" o.c. to Blkg.
8d @ 12" o.c.8d @ 6" o.c.
10d @ 6" o.c. 10d @ 12" o.c.
Panel Nailing
Edges Fields
48" o.c.
48" o.c.
Anchor Bolt
5 8" @
20d common nail @ 6" o.c.
20d common nail @ 6" o.c.
Sill-Plate Connection
1.75"7"
1.75"7"
Bolt Edge
Distance (N)
Footing
2"
2"
Min. Blkg.
Thk. below
Sill-Plate
2"
2"
15/32" Struct I 8" o.c. to Blkg.8d @ 3" o.c. 8d @ 12" o.c.24" o.c.3/8" Dia. x 6" long lag @ 6" o.c1.75"7"2"
15/32" Struct I*
Both Sides
8d @ 2" o.c. 8d @ 12" o.c.See note 5 16" o.c.1.75"7"2"
Shear
(lbs/ft)
YES
See note 4
NO
Special
Inspection
NO
YES
See note 4
YES
See note 4
YES
See note 4
YES
See note 4
YES
See note 4
715
392
477
1,221
2,442
1,024
771
2,049
LRFD - Shear Wall Schedule from Table 4.3A SDPWS-2021 (values multiplied by 0.5)
1/2" Dia. x 6" long lag @ 8" o.c.
1/2" Dia. x 6" long lag @ 6" o.c.
Bolt Edge
Distance (E)
Footing
1
2
3
4
5
6
7
8
1.5"
1.5"
3.5"
3.5"
3.5"
3.5"
3.5"
3.5"
1) This nailing schedule is for common nails only and all panels edges fastened to framing. Plywood can be installed either horizontally or vertically.
2) Shear Panels 3 to 8 requires 3X framing members at the bottom sill plate when resting on concrete, and behind vertical or horizontal panel edges. Also minimum 1/2" edge
nailing distance at panel ends and edges.
3) Use square plate washers 3" x 3" x 1/4" thk. for 5/8" diameter bolts.
4) Deputy inspection required where the fastener spacing of the sheathing is 4 - inches on center or less. Applies to shear panel 3, 4, 5, 6, 7 & 8.
5) For 2x4 stud walls:
-Use 4x blocking between joist when joist are perpendicular to wall or align a 4x continue member over the wall when joist are parallel to wall. Use LTP4 at 5" o.c. both sides.
For 2x6 stud walls:
-Use 4x blocking between joist when joist are perpendicular to wall or align a 4x continue member over the wall when joist are parallel to wall. Use LTP4 at 5" o.c. to connect
aligned faces of wall and blocking or continue member and use A35 at 5" o.c. to connect the non aligned face of blocking or continue member with the top of top plate.
*Framing at adjoining panel edges shall be nominal 3" or wider. nails shall be staggered in two lines along panel edges when nail spacing is 2" o.c., or when 10d common nails spaced 3" o.c. penetrate framing
more than 1-5/8".
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I J
1A
1a
1a
1a
1a
1a
1a
1a
1a
69
E.N.
1.75"
MIN.
SEE PLAN
SE
E
P
L
A
N
4"4"
3"
C
L
R
(4)1
2" DIA. THREADED ROD. SIMPSON
SET-XP EPOXY
ESR #2508
6"
4"x4"x1
8"
STEEL COLUMN
1/2" THK.
STEEL PLATE
10"
10
"
1/2" THK.
STEEL PLATE
4"x4"x1
8"
STEEL COLUMN
1/4
1/4
(4)1
2" DIA. THREADED ROD. SIMPSON
SET-XP EPOXY
ESR #2508
E70
E70
STEEL BEAM
PER PLAN
1/2"THICK STL.
PLATE W/4-5/8"Ø
M. BOLTS
1/8
1/4" STIFFENER
PLATE BOTH
SIDES
ELEVATION
PLATE DETAIL
A
HSS 4x4x1/8
STEEL COLUMN
SPLICE WHERE
OCCURS
NOTE:
HOT DIP GALVANIZE EXPOSED
STEEL MEMBERS OR USE RED
PAINT TO PROTECT AGAINST
CORROSION
3" x 2" x 3/8" THK.
x 3" HT. ANGLE
TOP VIEW
(2) 5/8" DIA. BOLT
A307
1/4" GAP
11/16"
HOLE TYP.
STEEL BEAM
PER PLAN
STEEL BEAM
PER PLAN
SIDE VIEWANGLE
1"
1"
1"
3"
3" x 2" x 3/8" THK.
x 3" HT. ANGLE
CONT. WOOD FILLER
EA. SIDE W/ 3/4"Ø
THRU BOLTS @ 16" O.C.
STAGG.
B.N.
SHTG
PER PLAN
HANGERS (TYP.)
FOR SIZE AND LOCATIONS OF
MECHANICAL AND ARCH'L PLANS
NOTE: SEE PLUMBING, ELECTRICAL
LSTA24
TYP.
'JB' OR 'U'
PER PLAN
OR BEAM
DOUBLE JOIST
OPENINGS.
OR
P
E
R
P
L
A
N
4'
-
0
"
M
A
X
.
PARALLEL PERPENDICULAR
POST PER PLAN W/
SIMPSON "HUC"
CONCEALED HANGER
HEADER PER PLAN
DOUBLE PLATE
STUDS
PER PLAN
HEADER BEAM
PER PLAN
(E) DOUBLE
PLATE
SIMPSON "A35"
EA.
2-2x TRIMMER
2x KING
STUD
(E) STUD
12" MIN
24
"
4"4"E.N.
℄ WALL & FTN'G
EM
B
E
D
M
E
N
T
12" MIN
24
"
4"4"E.N.
℄ WALL & FTN'G
112"
11
2"
112 "
6"LAP PER 6
S-3.1
EXISTING NEW
~
3"
C
L
R
3"
C
L
R
E.N.NOTES:
1. THREADED ROD SHALL BE ASTM A307
OR A36.
2. TIGHTEN ALL BOLTS PRIOR TO
COVERING.
3. BOLT HOLES IN POST TO BE 1/16"
LARGER THAN BOLT. INSPECTOR TO
VERIFY.
3"
8"
M
I
N
.
1.75"
1"
6"
E.N.
B.N.
E.N.
3'
TOP VIEW
3'
E.N.
B.N.
E.N.
S-3.0
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I J
1A
1a
1a
SEE ARCH DWGS.
LINE OF 2 x 6 STUD WALL
WHERE INDICATED
70
45°
45
°
6d
3"M
I
N
.
45°
SEE SCHED. (24" MIN.)
CONCRETE
48d (24"MIN.)
CONC. BLOCK
D = 6d #3 THROUGH #8
D = 8d #9 THROUGH #11
D = 10d #14 THROUGH #18
STANDARD BEND
7"
M
I
N
.
EM
B
E
D
M
E
N
T
112"d
12
d
d
4d
3"MIN.
D
NOTES:
1. ALL SPLICES SHALL BE CLASS B TENSION LAP SPLICES U.N.O.
2. LENGTHS SHOWN ARE FOR GRADE 60 UNCOATED BARS.
3. LENGTHS SHOWN ARE IN INCHES.
4. INCREASE LENGTHS 30% FOR LIGHT WEIGHT CONC. & AT FOUR BAR BUNDLES
(WHERE 2 BARS LAP WITH 2 OTHER BARS) INDIVIDUAL BARS WITHIN A BUNDLE
SHALL NOT OVERLAP.
5. TOP BARS - HORIZONTAL BARS PLACED WITH MORE THAN 12" OF FRESH CONC.
CAST BELOW THEM.
6. INCREASE LENGTHS 50% WHERE a < db OR WHERE b < db FOR BEAMS & COL.S OR
WHERE b < 2db FOR OTHER ELEMENTS.
7. FOR #14 & #18 BARS, USE MECHANICAL SPLICE IN ACCORDANCE WITH CBC
REQUIREMENTS.
TENSION LAP SPLICE SCHEDULE
WHERE: "a" IS THE CLEAR COVER
"b" IS THE CLEAR SPACING
"db" IS THE BAR DIA.
"db"
"b"
"a"
"a
"
CLOSED TIE
LAP SPLICE
ALTERNATE CLOSED TIE
ANCHOR BOLT
STANDARD HOOK
42" LENGTH
(21" EACH SIDE OF DAMAGED ZONE)
3"
1/4
12"
3.
5
"
1"
PARALLEL
2"
1"
S-3.1
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I J
1A
1a
1a
71
WALL SHEATHING
ROOF / FLOOR SHEATHING
TYPICAL BORING & NOTCHING AT
SHEAR WALL PLATE DETAIL
40% D (MAX.)
BORING & NOTCHING DETAIL
TYPICAL FLOOR & ROOF JOIST
JOIST SPAN BETWEEN CL. OF BEARING WALLS
1/3 SPAN
2"
M
I
N
.
1/3 SPAN
"Y
"
"X
"
D/
D
E
P
T
H
1/3 SPAN
TYPICAL STUD WALL
FRAMING DETAIL
WIDTH=D
NON-BEARING
5 8" MIN.
60% D (MAX.)
60
%
D
PARTITION
WIDTH=D
BORED HOLE
60
%
D
25% D (MAX.)
40% D (MAX.)
5 8" MIN.
1 1/4"x16 GA. STRAP W/ 6-10d
COMM. NAILS EA. END @EA.
PLATE (STRAP NOT REQ'D FOR
SILL PLATE)
114" x 16 GA. STRAP W/ 8-10d
COMM. NAILS EA. END @EA.
PLATE (STRAP NOT REQ'D FOR
SILL PLATE)
114" x 16 GA. STRAP W/ 11-10d
COMM. NAILS EA. END @ EA.
PLATE (STRAP NOT REQ'D FOR
SILL PLATE)
114" Ø MAX.
BORED
HOLE
NOTCHES 6'-0"
O.C. MIN.
2x4 DBL. TOP PLATE 2x4 OR 3x4 SILL
PLATE (SIM.)
2"Ø MAX.
BORED
HOLE
3"Ø MAX.
BORED
HOLE
2x6 DBL. TOP PLATE 2x6 OR 3x6 SILL
PLATE (SIM.)
2x8 DBL. TOP PLATE 2x8 OR 3x8 SILL
PLATE (SIM.)
BORED HOLE
SEE SCHED.
NON-BEARING
WALL
16" MIN. BETWEEN HOLE
&/OR NOTCH
NOTCH & HOLES
PERMITTED
NOTCH & HOLES
PERMITTED
DOUBLE STUDS EA. SIDE
OF OPENING MORE THAN
4'-0" IN WIDTH
PLYWOOD EDGE NAIL'G
FULL HT. @PLYWOOD
SHEAR WALLS
10-16d NAILS MIN. BETWEEN
SPLICES UNLESS SHOWN
OTHERWISE ON THE PLANS
2-8d NAILS EA.
SIDE
1-2x PL. 4'-0" MAX.
2-2x PL. OVER 4'-0"
HDR. BM.
PER PLAN
SILL BOLTING
(TYP.)NOTCH IN
STUD
NOTCH IN
STUD
EXTERIOR & BEARING
PARTITION
LSTI73
712"
~~
4'-0 SPLICE W/ 16d @ 3" O.C. STAGG
(TYP.) U.N.O.
SPLICE LENGTH
312"MIN.2"MIN.312"MIN.
VA
R
I
E
S
~
24" MIN.
~
12"
MI
N
.
312"
MAX.10"MIN.10"MIN.
112"M
I
N
.
NOTCHES 6'-0"
O.C. MIN.
2"
MA
X
.
512"
MAX.12"MIN.12"MIN.
212"M
I
N
.
2"
MA
X
.
512"
MAX.12"MIN.12"MIN.
312"M
I
N
.
NOTCHES 6'-0"
O.C. MIN.
2x CRIPPLE
2-10d
NAILS
16d NAILS @12"
3-16d
NAILS
10
'
-
0
"
M
A
X
.
10
'
-
0
"
M
A
X
.
48"LAP
2-16d
NAILS @ 16"
3-16d
NAILS
A
B
S-4.0
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I J
1A
72
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
10
-
0
7
-
2
0
2
5
1
2
:
4
4
:
4
2
P0.0
NG
SB
GE
N
E
R
A
L
I
N
F
O
R
M
A
T
I
O
N
-
P
L
U
M
B
I
N
G
73
NO
PA
R
K
I
N
G
CL
E
A
N
A
I
R
VE
H
I
C
L
E
a l e s s a n d r o d r i v e
160.00'
S 89 17' 50" E
140.23'
N 89 17' 50" W
65.00'
N 00
02' 00" E
45.23'
N 00
02' 00" E
s
a
n
p
a
b
l
o
a
v
e
.
C1
1
2
3
(E)1"ø G
5
44"ø S
4"ø GR
FCO-1
FCO-1
8
7
6
6
I.E.= -3' - 3"
I.E.= -2' - 11"
GI-1
SB-1
(E)1 1/2"ø CW
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
2025-07-09
As indicated
10
-
0
7
-
2
0
2
5
1
1
:
5
5
:
1
3
PS1.0
PR
O
P
O
S
E
D
S
I
T
E
P
L
A
N
-
P
L
U
M
B
I
N
G
1/8" = 1'-0"1PROPOSED SITE PLAN - PLUMBING
GENERAL NOTES
A. REFER TO SHEET P0.0 FOR GENERAL NOTES.
CODED NOTES
1. APPROXIMATE LOCATION OF THE EXISTING 1'' NG PIPE.
CONTRACTOR SHALL VERIFY EXACT LOCATION, SIZE, AND
CONDITION IN THE FILED.
2. APPROXIMATE LOCATION OF THE EXISTING 1-1/2" CW INCOMING
SERVICE PIPE. CONTRACTOR SHALL VERIFY EXACT LOCATION,
SIZE, AND CONDITION IN THE FIELD.
3. DEMOLISH (E)3"⌀SANITARY PIPE AND REPLACE WITH NEW 4"⌀
SANITARY MAIN, REFER TO AS-BUILT DRAWINGS FOR EXACT
LOCATION, SIZE AND CONTINUATIONS OF EXISTING SANITARY.
4. NEW 4"⌀SANITARY PIPING SHALL REPLACE EXISTING 3"⌀
CURRENTLY INSTALLED BELOW GRADE TO SITE MAIN.
CONTRACTOR TO FIELD VERIFY EXISTING SANITARY SITE MAIN
SIZE, LOCATION, AND INVERT ELEVATION PRIOR TO CONNECTION.
5. 4"⌀GREASE WASTE PIPE CONTINUE TO CONNECT GREASE
INTERCEPTOR AND SAMPLING BOX, CONTRACTOR TO VERIFY
GREASE INTERCEPTOR AND SAMPLING BOX LOCATION AND INVERT
ELEVATION AND NEW SANITARY PIPE SIZE, LOCATION AND INVERT
BEFORE CONNECTION.
6. 4"⌀SANITARY AND GREASE WASTE PIPE, REFER SHEET P1.0 FOR
CONTINUATION.
7.1-1/2"⌀CW PIPE, REFER SHEET P2.0 FOR CONTINUATION.
8.(E)1"⌀NG PIPE, REFER SHEET P2.0 FOR CONTINUATION.
1a
1a
1a
1a
1a
74
Display / Sales Area
Hallway
Toilet
Utility
Dressing Rm.
Staging Area
Adjacent Property
WASHER
(D)L-1
(D)WC-1
(D)2"ø S
(D)2"ø S
(D)2"ø V
(D)2"ø V
1
(D)3"ø S
2"⌀VENT
UP
(D)3"⌀S
(D)3"⌀S
(D)3"⌀S
2
2
2
2
2
(D)3"⌀S
2
(D)2"⌀VTR3
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
1/4" = 1'-0"
10
-
0
7
-
2
0
2
5
1
1
:
5
5
:
1
4
PD1.0
DE
M
O
L
I
T
I
O
N
-
F
L
O
O
R
P
L
A
N
-
S
A
N
I
T
A
R
Y
A
N
D
V
E
N
T
1/4" = 1'-0"ADEMOLITION - FLOOR PLAN - SANITARY AND VENT
GENERAL NOTES
A. REFER TO SHEET P0.0 FOR GENERAL NOTES.
1. (E)3"⌀SANITARY PIPE DEMOLISHED AND REPLACED WITH (N)4"⌀
SANITARY MAIN, REFER SHEET PS1.0 FOR CONTINUATION.
2. ALL EXISTING SANITARY AND VENT PIPE DEMOLISHED.
3. DEMOLISH EXISTING VENT THROUGH ROOF, CONTRACTOR SHALL
PREPARE EXISTING OPENING FOR NEW VENT, SEE SHEET P1.1 FOR
MORE INFORMATION.
CODED NOTES
75
Display / Sales Area
Hallway
Toilet
Utility
Dressing Rm.
Staging Area
Adjacent Property
WASHER
(D)L-1
(D)WC-1
(D)3/4"ø HW
(D)1/2"ø CW
(D)1/2"ø HW
(D)1/2"ø CW
(D)1/2"ø CW
(E)1"ø G
(D)3/4"ø CW
(D)3/4"ø HW (D)GWH
199 MBH
(D)1"ø CW
1
2
3
(E)GAS METER
(D)1 1/4"ø G
4
4
4
4
(E)HB-1
(E)HB-1(E)1/2"ø CW
(E)1/2"ø CW
(D)1/2"ø G
3 3 3
3
(D)2"ø G
(E)3/4"ø G
(E)1 1/2"ø G
(E)1 1/2"ø G
(E)3/4"ø G
(E)1 1/2"ø G
(E)3/4"ø G (E)3/4"ø G
(E)1 1/2"ø G (E)1 1/2"ø G
(E)3/4"ø G
(E)1 1/4"ø G
(D)DRYER
35 MBH
5
6
(E)2"ø G
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
2025-07-09
1/4" = 1'-0"
10
-
0
7
-
2
0
2
5
1
1
:
5
5
:
1
4
PD2.0
DE
M
O
L
I
T
I
O
N
-
F
L
O
O
R
P
L
A
N
-
D
O
M
E
S
T
I
C
W
A
T
E
R
&
G
A
S
1/4" = 1'-0"ADEMOLITION - FLOOR PLAN - DOMESTIC WATER AND GAS
GENERAL NOTES
A. REFER TO SHEET P0.0 FOR GENERAL NOTES.
1. (E)1"⌀CW PIPE DEMOLISHED UP TO THIS POINT, REFER SHEET
PS1.0 FOR (E)1-1/2"⌀COLD WATER MAIN.
2. (E)1"⌀NG PIPE CONTINUE, REFER SHEET PS1.0 FOR
CONTINUATION.
3. (E)3/4"⌀NG PIPE UP TO ROOF, REFER SHEET PD2.1 FOR
CONTINUATION.
4. ALL EXISTING DOMESTIC HOT AND COLD WATER PIPING, GAS
PIPING, FIXTURES, EQUIPMENT, SUPPORTS, AND ACCESSORIES IN
THIS AREA SHALL BE DEMOLISHED BACK TO SOURCE.
5. DEMOLISH EXISTING 2"⌀PIPE ELBOW, REFER SHEET P2.0 FOR NEW
1-1/2"⌀NG PIPE CONNECTION.
6. CONTRACTOR TO COORDINATE REPLACEMENT UPGRADE FOR
UTILITY METER WITH LOCAL UTILITY COMPANY, SEE P6.0 FOR
TOTAL CFH CAPACITY REQUIRED.
CODED NOTES
1
1
1a
1a1a
1a
76
(E)3/4"ø G (E)3/4"ø G (E)3/4"ø G
1
73 MBH
73 MBH73 MBH
73 MBH
73 MBH
(E)RTU-4
(455 LBS)
(E)RTU-1
(455 LBS)
(E)RTU-3
(455 LBS)(E)RTU-5
(455 LBS)
(E)RTU-2
(455 LBS)
1
1 1 1
(E)3/4"ø G(E)3/4"ø G
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
1/4" = 1'-0"
10
-
0
7
-
2
0
2
5
1
1
:
5
5
:
1
5
PD2.1
DE
M
O
L
I
T
I
O
N
-
R
O
O
F
P
L
A
N
-
D
O
M
E
S
T
I
C
W
A
T
E
R
&
G
A
S
GENERAL NOTES
A. REFER TO SHEET P0.0 FOR GENERAL NOTES.
CODED NOTES
1. (E)3/4"⌀NG PIPE DOWN, REFER SHEET PD2.0 FOR CONTINUATION.
1/4" = 1'-0"1DEMOLITION - ROOF PLAN - DOMESTIC WATER AND GAS
77
Adjacent Property
Office
Accessible
Entry Kitchen
Toilet 2
Toilet 1
Entry
Retail
Entry
Seating
Retail
Coffee Bar
QC Lab
Training/
Shipping & Recieving
Production/
Roasting Room
Hall
Pantry
Admin.
Mech.
L-1
WC-1
2"ø S
1 1/2"ø S
4"ø S
4"ø S
4"ø S
4"ø S
2"ø S
2"ø V
3"ø S
2"ø V
1 1/2"ø V
1 1/2"ø S
3"ø GR
3"ø GR
4"ø GR
3"ø GR
2"ø V
2"ø V
3"ø GR
3"ø GR
3"ø GR
3"ø GR
4"ø GR
2"ø V
3"ø GR
2"ø V
2"ø V
2"ø V
3"ø GR
3"ø GR
3"ø GR
3"ø GR
4"ø GR
4"ø GR
4"ø GR
3"ø GR3"ø GR
3"ø GR
1 1/2"ø GR
1 1/2"ø GR
1 1/2"ø GR
1 1/2"ø GR
1 1/2"ø GRFD-1
L-1
WC-1
FD-1
FD-1
FD-1 FD-1
FD-1
FD-1
FD-1
FD-1
FD-1
FD-1
FCO-1
FCO-1
FCO-1
FCO-1
1/4" / 1'-0"
1/4" / 1'-0"
1/
4
"
/
1
'
-
0
"
1/
4
"
/
1
'
-
0
"
1/
4
"
/
1
'
-
0
"
2"⌀VENT UP
3"⌀VENT UP
2"⌀VENT UP
2"ø V
2"ø V
2"ø V
2"ø V2"ø V
4"ø S
3"ø S
3"ø S
3"ø S
4"ø S
2"ø V
2"ø V
2"⌀AAV
2"⌀AAV
190
101
102
106
108
125
141
135
133
216
138 137
158
157
156
159
160
166
196
204 205 207
122 124 127 128 126 1
2
FS-1
FS-1
FS-1
FS-1
FS-1
FS-1
FS-1
WCO-1
WCO-1
WCO-1
WCO-1
3
1/4"
/ 1
'-0"
FCO-1
3"ø S
4"ø S
(E)4"ø S
FS-1
3"ø GR
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
2025-07-09
1/4" = 1'-0"
10
-
0
7
-
2
0
2
5
1
2
:
5
1
:
5
7
P1.0
PR
O
P
O
S
E
D
F
L
O
O
R
P
L
A
N
-
S
A
N
I
T
A
R
Y
A
N
D
V
E
N
T
1/4" = 1'-0"1PROPOSED FLOOR PLAN - SANITARY AND VENT
GENERAL NOTES
CODED NOTES
1. 4"⌀SANITARY PIPE, REFER SHEET PS1.0 FOR CONTINUATION.
2. 4"⌀GREASE WASTE PIPE, REFER SHEET PS1.0 FOR
CONTINUATION.
3. 1"⌀CONDENSATE DRAIN PIPE FROM ROOF, REFER SHEET P1.1 FOR
CONTINUATION.
A. REFER TO SHEET P0.0 FOR GENERAL NOTES.
216.0 1 R/O Water System Formulator
207.0 1 Pitcher Rinser 6x9 w/spinjet
205.0 1 Rinse Sink - Undermount
204.0 1 Dishwasher
196.0 1 Mop Sink Cabinet
190.0 1 Hand Sink - Wall Mounted
166.0 1 Ice Machine
160.0 1 1-Comp Prep Sink
159.0 1 Hand Sink - Wall Mounted
158.0 1 Dishwasher
157.0 1 One Compartment Sink
156.0 1 3-Comp. Utensil Sink
141.0 1 Sous vide cooker
138.0 1 1-Comp Prep Sink
137.0 1 Hand Sink - Wall Mounted
216.0 1 R/O Water System Formulator
135.0 2 Pour Over Unit
133.0 1 Rinse Sink - Undermount
128.0 1 Espresso AV 2 Group
127.0 1 Espresso Steam Unit
126.0 1 Pitcher Rinser / Drip Tray
125.0 1 Ice Bin
124.0 1 Espresso AV 2 Group
122.1 1 Pitcher Rinser / Drip Tray
116.0 1 Rinse Sink - Undermount
108.0 1 Iced Beverage Tap system
102.0 1 Rinse Sink - Undermount
101.0 1 Hand Sink - Wall Mounted
Tag Qty.Item Description
KITCHEN EQUIPMENT SCHEDULE
1a
1a
1a
1a
78
R 10' - 0"
R 10' - 0"
R 10' - 0"
2"⌀VTR
3"⌀VTR2"⌀VTR
1"ø CD
1"ø CD
CO
CO
1/8" / 1'-0"
1
(E)RTU-1
(455 LBS)
(E)RTU-4
(455 LBS)
(E)RTU-2
(455 LBS)(E)RTU-5
(455 LBS)
(E)RTU-3
(455 LBS)
1/
8
"
/
1
'
-
0
"
MAU-1
(1,617 LBS)
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
2025-07-09
1/4" = 1'-0"
10
-
0
7
-
2
0
2
5
1
1
:
5
5
:
2
1
P1.1
PR
O
P
O
S
E
D
R
O
O
F
P
L
A
N
-
S
A
N
I
T
A
R
Y
A
N
D
V
E
N
T
GENERAL NOTES
CODED NOTES
1. 1"⌀CONDENSATE DRAIN PIPE DOWN, TERMINATE AT THE TAIL
PIECE OF LAV/SINK WITH FIXED AIR GAP SIMILAR TO JR SMITH 3955.
A. REFER TO SHEET P0.0 FOR GENERAL NOTES.
1/4" = 1'-0"1PROPOSED ROOF PLAN - SANITARY AND VENT
1
79
Adjacent Property
Office
Accessible
Entry
Kitchen
Toilet 2
Toilet 1
Entry
Retail
Entry
Seating
Retail
Coffee Bar
QC Lab
Training/
Shipping & Recieving
Production/
Roasting Room
Hall
Pantry
Admin.
Mech.
WC-1
L-1
WC-1
L-1
1/2"ø HWR
1/2"ø HW
1/2"ø CW
3/4"ø CW
1/2"ø CW
1/2"ø HW
1/2"ø HWR
3/4"ø CW
3/4"ø CW
1/2"ø HWR
1/2"ø HW
1/2"ø CW
1"ø CW
3/4"ø HW
3/4"ø HWR
3/4"ø HW
3/4"ø CW
1/2"ø HW
1/2"ø HWR
1/2"ø CW
1/2"ø HW
1/2"ø HWR
1/2"ø HW
1/2"ø CW
1/2"ø HWR
1/2"ø HWR
1/2"ø HW
1/2"ø CW
1"ø CW
1"ø HW
3/4"ø HWR
3/4"ø CW
3/4"ø HW
3/4"ø HWR
1/2"ø FW
1/2"ø CW
1/2"ø HW
1/2"ø HWR
1/2"ø CW
1/2"ø HW
1/2"ø HWR
1/2"ø FW
1/2"ø CW
1/2"ø HWR
1/2"ø HW
1/2"ø HWR
1/2"ø HW
1/2"ø FW
1/2"ø CW
1/2"ø FW
1/2"ø FW
3/4"ø FW3/4"ø FW
3/4"ø CW
3/4"ø HW
1/2"ø HWR
3/4"ø FW
3/4"ø CW
1/2"ø HW
1/2"ø HWR
3/4"ø HWR
1"ø HW
1"ø CW
3/4"ø FW
1/2"ø FW
1/2"ø FW
1/2"ø CW
1/2"ø FW
1/2"ø CW
1/2"ø FW
3/4"ø CW
3/4"ø FW
1/2"ø FW
1/2"ø FW
1/2"ø FW3/4"ø CW
3/4"ø FW
1 1/4"ø CW
3/4"ø HWR
1 1/4"ø HW
1/2"ø HWR
1/2"ø HW
1/2"ø CW
1/2"ø FW
1/2"ø HWR
1/2"ø HW
1/2"ø CW
1/2"ø CW
1/2"ø HW
1/2"ø FW
1/2"ø CW
1/2"ø HWR
1/2"ø HWR
1/2"ø HW
1/2"ø HW
1/2"ø HWR
190
1 1/4"ø G
3/4"ø G
196
156
157
159
138
137
158
101
102
106
110
113
122
117
116
124
207
126 127
128
133
135
216
160
166
204
205
208
212
213
1/2"ø CW
1/2"ø CW
1/2"ø FW
1/2"ø FW
3/4"ø FW
3/4"ø HWR
1
4
5
(E)1"ø G2
3
(E)GAS METER
1 1/2"ø CW
1 1/2"ø CW
1 1/2"ø CW
1/2"ø FW
1/2"ø CW
1/2"ø HW 1/2"ø FW
3/4"ø FW
1/2"ø HW
3/4"ø CW
3/4"ø FW
3/4"ø FW
3/4"ø CW
1/2"ø HW
1/2"ø HWR
3/4"ø HWR
3/4"ø HW
1"ø CW
3/4"ø FW
3/4"ø CW
3/4"ø HW
3/4"ø HWR
1/2"ø HWR
1/2"ø HW
1/2"ø CW
3/4"ø HWR
1 1/4"ø HW
1 1/2"ø CW
3/4"ø FW
TMV-1
TMV-1
TMV-1
TMV-1
TMV-1
ET-1
1/2"⌀TP
1/2"⌀TP FD-1
FD-1
FD-1
FD-1
FD-1
FD-1
FD-1FD-1
FD-1
FD-1
1/2"⌀TP
1/2"⌀TP
1/2"⌀TP
1/2"⌀TP
1/2"⌀TP
1/2"⌀TP 1/2"⌀TP
1/2"⌀TP
GWH-1
199 MBH
155
33 MBH
FD-1 RCP-1
1/2"ø CW
(E)HB-1
(E)HB-1 (E)1/2"ø CW
(E)1/2"ø CW
END CAP
3 3 3
3
6
(E)2"ø G
(E)1 1/2"ø G
(E)3/4"ø G
(E)1 1/2"ø G
1 1/4"ø G
3/4"ø G
1 1/4"ø G
(E)3/4"ø G
1 1/2"ø G
(E)1 1/2"ø G
1 1/2"ø G
8
7
2 1/2"ø G
182
183.6 MBH
1 1/4"ø G
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
2025-07-09
1/4" = 1'-0"
10
-
0
7
-
2
0
2
5
1
2
:
5
1
:
3
2
P2.0
PR
O
P
O
S
E
D
F
L
O
O
R
P
L
A
N
-
D
O
M
E
S
T
I
C
W
A
T
E
R
A
N
D
G
A
S
1/4" = 1'-0"1PROPOSED FLOOR PLAN - DOMESTIC WATER AND GAS
GENERAL NOTES
CODED NOTES
1. 1-1/2"⌀CW PIPE, REFER SHEET PS1.0 FOR CONTINUATION.
2. (E)1"⌀NG PIPE CONTINUE, REFER SHEET PS1.0 FOR
CONTINUATION.
3. (E)3/4"⌀NG PIPE UP TO ROOF, REFER SHEET P2.1 FOR
CONTINUATION.
4. (N)3/4"⌀NG PIPE DOWN TO CONVECTION OVEN(155.0).
5. (N)1-1/4"⌀NG PIPE DOWN TO GAS WATER HEATER(GWH-1).
6. (N)1"⌀NG PIPE UP TO ROOF, REFER SHEET P2.1 FOR
CONTINUATION.
7. CONTRACTOR TO COORDINATE REPLACEMENT UPGRADE FOR
UTILITY METER WITH LOCAL UTILITY COMPANY, SEE P6.0 FOR
TOTAL CFH CAPACITY REQUIRED.
8. REFER TO M1.0 AND M1.1 FOR WATER HEATER COMBUSTION AIR
DESIGN REQUIREMENTS.
A. REFER TO SHEET P0.0 FOR GENERAL NOTES.
213.0 1 Water Boiler 5 gal w/aeration
212.0 1 Batch Brewer
208.0 1 Espresso Machine
207.0 1 Pitcher Rinser 6x9 w/spinjet
205.0 1 Rinse Sink - Undermount
204.0 1 Dishwasher
196.0 1 Mop Sink Cabinet
190.0 1 Hand Sink - Wall Mounted
182.0 1 Coffee Roaster
166.0 1 Ice Machine
160.0 1 1-Comp Prep Sink
159.0 1 Hand Sink - Wall Mounted
158.0 1 Dishwasher
157.0 1 One Compartment Sink
156.0 1 3-Comp. Utensil Sink
155.0 1 Convection Oven
138.0 1 1-Comp Prep Sink
137.0 1 Hand Sink - Wall Mounted
216.0 1 R/O Water System Formulator
135.0 2 Pour Over Unit
133.0 1 Rinse Sink - Undermount
128.0 1 Espresso AV 2 Group
127.0 1 Espresso Steam Unit
126.0 1 Pitcher Rinser / Drip Tray
124.0 1 Espresso AV 2 Group
122.1 1 Pitcher Rinser / Drip Tray
117.0 1 Cold Water Dispenser
116.0 1 Rinse Sink - Undermount
113.0 1 Filter Coffee Brewer
110.0 1 Ice Machine
106.0 1 Carbonator
102.0 1 Rinse Sink - Undermount
101.0 1 Hand Sink - Wall Mounted
Tag Qty.Item Description
KITCHEN EQUIPMENT SCHEDULE
1
1
1
1
1
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
80
73 MBH
73 MBH73 MBH
73 MBH
73 MBH
(E)3/4"ø G
(E)3/4"ø G(E)3/4"ø G
2
1
SHUT-OFF VALVE
(E)RTU-4
(455 LBS)
(E)RTU-1
(455 LBS)
(E)RTU-2
(455 LBS)
(E)RTU-5
(455 LBS)
(E)RTU-3
(455 LBS)
96.3 MBH
1 1
1
1
MAU-1
(1,617 LBS)
SHUT-OFF
VALVE (TYP.)
1"ø G
(E)3/4"ø G
(E)3/4"ø G
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
1/4" = 1'-0"
10
-
0
7
-
2
0
2
5
1
1
:
5
5
:
2
6
P2.1
PR
O
P
O
S
E
D
R
O
O
F
P
L
A
N
-
D
O
M
E
S
T
I
C
W
A
T
E
R
A
N
D
G
A
S
GENERAL NOTES
CODED NOTES
1. (E)3/4"⌀NG PIPE DOWN, REFER SHEET P2.0 FOR CONTINUATION.
2. (N)1"⌀NG PIPE DOWN, REFER SHEET P2.0 FOR CONTINUATION.
A. REFER TO SHEET P0.0 FOR GENERAL NOTES.
1/4" = 1'-0"1PROPOSED ROOF PLAN - DOMESTIC WATER AND GAS
81
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
10
-
0
7
-
2
0
2
5
1
1
:
5
5
:
3
8
P5.0
DE
T
A
I
L
S
-
P
L
U
M
B
I
N
G
82
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
2025-07-09
10
-
0
7
-
2
0
2
5
1
1
:
5
5
:
4
0
P6.0
SC
H
E
D
U
L
E
S
-
P
L
U
M
B
I
N
G
TOTAL GPM: 28
TOTAL WSFU: 48
Custom 0 - -
1/2"CW for Ice Maker, Coffee Maker, Tee Maker,….15 0.5 7.5
Trap Primer 0 0.25 -
Food Waste Grinder 0 - -
Floor Sink 7 - -
Floor Drain 12 - -
Hose Bibb, each additional 1 1 1
First Hose Bibb 1 2.5 2.5
Lawn Sprinkler, each head 0 1 -
Clinic Flushometer Valve 0 8 -
Water Closet, greater than 1.6 GPF Flushometer Valve 0 8 -
Water Closet, greater than 1.6 GPF Gravity Tank 0 5.5 -
Water Closet, 1.6 GPF Flushometer Valve 0 5 -
Water Closet, 1.6 GPF Flushometer Tank 2 2.5 5
Water Closet, 1.6 GPF Gravity Tank 0 2.5 -
Urinal, flush tank 0 2 -
Urinal, greater than 1.0 GPF Flushometer Valve 0 5 -
Urinal, 1.0 GPF Flushometer Valve 0 4 -
Mobile Home, each 0 - -
Wash Fountain 0 4 -
Shower, each head 0 2 -
Washup Sink, each set of faucets 8 2 16
3-Compartment Sink 1 3 3
Clinical Sink 0 3 -
Service Sink or Mop Basin 1 3 3
Laundry Sink 0 1.5 -
Kitchen Sink 3 1.5 4.5
Bar Sink 0 2 -
Lavatory 2 1 2
Drinking Fountain or Watercooler 1 0.5 0.5
Dishwasher 2 1.5 3
Dental Unit, cuspidor 0 1 -
Clothes Washer 0 4 -
Bidet 0 - -
Bathtub or Combination Bath/Shower 0 4 -
Appliances, Appurtenance, or Fixtures Public Total
Quantity WSFU
TOTAL SYSTEM WSFU
400 23 49 92 189 283 546 870 1540 3140
350 25 53 99 203 305 587 935 1650 3370
300 27 57 108 221 331 638 1020 1800 3670
250 30 63 119 244 366 704 1120 1980 4050
200 34 71 134 275 412 794 1270 2240 4560
175 37 77 144 296 443 854 1360 2410 4910
150 40 83 157 322 482 928 1480 2640 5330
125 44 92 173 355 532 1020 1630 2890 5890
100 50 104 195 400 600 1160 1840 3260 6640
90 52 110 207 424 635 1220 1950 3450 7030
80 56 117 220 452 677 1300 2080 3670 7490
70 60 126 237 486 728 1400 2230 3950 8050
60 65 137 257 528 791 1520 2430 4290 8760
50 72 151 284 583 873 1680 2680 4740 9660
40 81 170 320 657 985 1900 3020 5350 10900
30 95 199 374 768 1150 2220 3530 6250 12700
20 118 247 466 957 1430 2760 4400 7780 15900
10 172 360 678 1390 2090 4020 6400 11300 23100
LENGTH PIPE SIZE IN INCHES
NOMINAL ID 1/2 3/4 1 1-1/4 1-1/2 2 2-1/2 3 4
PIPE SIZE IN INCHES
MAXIMUM DELIVERY CAPACITY OF SCHEDULE 40 METALLIC PIPE CARRYING NATURAL GAS OF 0.6 SPECIFIC
GRAVITY BASED ON A PRESSURE DROP OF 0.5" WATER COLUMN, GAS PRESSURE : LESS THAN 2 PSI
CPC TABLE 1216.2 (1)
LOW PRESSURE NATURAL GAS PIPE SIZING TABLE
METERING FAUCETS 0.2 GALLONS/CYCLE
KITCHEN FAUCETS 1.8 GPM @60 PSI
LAVATORY FAUCETS - NON
RESIDENTIAL 0.5 GPM @60 PSI
WATER CLOSET 1.28 GALLONS/FLUSH
FIXTURE TYPE MAXIMUM FLOW RATE
MAXIMUM FIXTURE FLOW RATES
1 CONFIRM MAKE AND MODEL WITH ARCHITECT AND OWNERSHIP PRIOR TO ORDERING.
NOTES:
SB-1 SAMPLING BOX JENSEN 2432-Z SAMPLE BOX WITH PIPE CONNECTORS, WEIGHT: 1250 LBS, BOX DESIGN LOAD: H-20 TRAFFIC, 24" CAST IRON
FRAME & COVER WITH GASKET (GASTIGHT).1
GI-1 GREASE INTERCEPTOR JENSEN KJP1200GECE JP-1200 GALLON GREASE INTERCEPTOR, 1'-0" MIN. TO 6'-6" MAX. EARTH COVER, H-20 TRAFFIC RATED.1
TMV-1 THERMOSTATIC MIXING VALVE WATTS LFMMV-M1
A THERMOSTATIC MIXING VALVE (1/2”) HAVE A LEAD FREE* CAST COPPER SILICON ALLOY BODY. PROVIDE
ACCURATE TEMPERATURE CONTROL (±3°F) WITH LOW-PRESSURE DROP ACROSS THE RATED FLOW RANGE.
ASSE 1017, ASSE 1069, ASSE 1070 AND IAPMO CUPC LISTED.
1
FCO-1 FLOOR CLEANOUT ZURN Z1400-K
"LEVEL-TROL" ADJUSTABLE FLOOR CLEANOUT, DURA-COATED CAST IRON BODY WITH ANCHOR FLANGE, GAS
AND WATERTIGHT ABS TAPERED THREAD PLUG AND ROUND SCORIATED CAST IRON HEAVY-DUTY SECURED
TOP (SPECIFY FINISH Z, ZB, ZN, ZS) ADJUSTABLE TO FINISHED FLOOR.
1
WCO-1 WALL CLEANOUT ZURN Z1446 WALL CLEANOUT, DURA-COATED CAST IRON BODY, GAS AND WATERTIGHT ABS TAPERED THREAD PLUG, AND
ROUND, SMOOTH STAINLESS STEEL ACCESS COVER WITH SECURING SCREW.1
TP-1 TRAP PRIMER ZURN Z1022-XL TRAP PRIMER IS DESIGNED TO COMPLY WITH ANSI/ASSE STANDARD 1018.1
FS-1 FLOOR SINK J R SMITH 3150-12 J.R.SMITH NO, 3150-12, C.I., SQUARE TOP, ACID RESISTING ENAMELED INSIDE W/DOME STRAINER, H/B HALF
GRATE UNLESS OTHERWISE INDICATED SEEPAGE FLANGE.1
FD-1 FLOOR DRAIN J R SMITH 2005.000 FLOOR OR SHOWER DRAINS WITH ADJUSTABLE STRAINER HEADS. LOAD RATING: LIGHT DUTY HAVING A SAFE
LIVE (STATIC) LOAD LESS THAN 2000 LBS (900 KG) PER ASME A112.6.3 FLOOR DRAIN STANDARD.1
AMERICAN STANDARD 605B.105
AMERICAN STANDARD FAUCET MODEL 605B.105-0.5 GPM/1.9 L/MIN PRESSURE COMPENSATING
VANDAL-RESISTANT MULTI-LAMINAR SPRAY WITH CR-P2 LITHIUM BATTERY AND HOLDER, 605P.400-4" BRASS
DECK PLATE WITH 1/4" FXATION STUDS AND QUICK SPIN NUTS, 605XTMV1070-THERMOSTATIC MIXING VALVE. 20"
FLEXIBLE INLET HOSES WITH 3/8" COMPRESSION FTTINGS. ASSE 1070 CERTIFIED DOWN TO 0.35 GPM/1.3 L/MIN.
1
L-1 LAVATORY ADA COMPLIANT
AMERICAN STANDARD 355.012 LUCERNE™ WALL-HUNG LAVATORY, VITREOUS CHINA, FRONT OVERFOW, D-SHAPED BOWL, SELF-DRAINING
DECK AREA WITH CONTOURED BACK AND SIDE SPLASH SHIELDS, FAUCET LEDGE.1
WC-1 WATER CLOSET ADA
COMPLIANT AMERICAN STANDARD 2467.100
CADET FLOWISE™ RIGHT HEIGHT™ ELONGATED PRESSURE-ASSISTED TOILET 1.1 GPF/ 4.2 LPF, VITREOUS
CHINA, HIGH EFFICIENCY, ULTRA LOW-CONSUMPTION (1.1 GPF/4.2 LPF), EVERCLEAN® SURFACE, MEETS EPA
WATERSENSE® CRITERIA, CLOSE-COUPLED FLUSHOMETER TANK, ADA COMPLIANT.
1
MARK FIXTURE MANUFACTURER MODEL REMARKS NOTES
PLUMBING FIXTURES SCHEDULE
2 LWT SHALL BE SET TO 140 DEG F.
1 UNIT SHALL HAVE DROP PAN THAT IS TO BE DRAINED TO THE NEAREST FLOOR DRAIN OR MOP BASIN.
NOTES :
GWH-1 MECH. ROOM 100 199,000 261 97% 1-1/2"3/4 3"4.8 14 120/60/1 5 76-1/2 27-3/4 27-3/4 523 AO SMITH BTH-199(A) ALL
MINIMUM
(IN.WC.)
MAXIMIM
(IN.WC.)VOL/HZ/PH AMP HEIGHT WIDTH DEPTH
MARK LOCATION STORAGE
(GALLONS)
HEAT CAPACITY
(INPUT) BTU/HR
HEAT
RECOVERY
@100 F RISE
(USGPH)
THERMAL
EFFICIENC
Y OR UEF
HOT/COLD
CONNECTION
GAS
CONNECTION VENT
INLET GAS PRESSURE ELECTRICAL DATA DIMENSIONS IN INCHES
WEIGHT
(LBS)MAKE MODEL
NUMBER NOTES
GAS WATER HEATER SCHEDULE
Below 40 0.20-0.26 50 1.0 1.5 1.5 1.5 1.5
40-60 0.21-0.27 75 Nonres
0.5
Res
0.75
Nonres
0.5
Res
0.75 1.0 1.0 1.0
Space cooling systems (chilled water, refrigerant and brine)
105-140 0.22-0.28 100 1.0 1.5 2.0 2.0 2.0
141-200 0.25-0.29 125 1.5 1.5 2.0 2.0 2.0
201-250 0.27-0.30 150 2.5 2.5 2.5 3.0 3.0
251-350 0.29-0.32 200 3.0 4.0 4.5 4.5 4.5
Above 350 0.32-0.34 250 4.5 5.0 5.0 5.0 5.0
Space heating, hot water systems (steam, steam condensate and hot water) and service water heating systms (recirculating sections,
all piping in electric trace tape systems, and the first 8 feet of piping from the storage tank for nonrecirculating systems)
INSULATION THICKNESS REQUIRED (in inches)
< 1 1 to < 1.5 1.5 to < 4 4 to < 8 8 and largerFLUID
TEMPERATURE
RANGE, (°F)
CONDUCTIVITY RANGE
(in BTU-inch per hour per
square foot per °F)
INSULATION
MEAN RATING
TEMPERATURE
(°F)
NOMINAL PIPE DIAMETER (in inches)
TABLE 120.3-A PIPE INSULATION THICKNESS
PIPING INSULATION THICKNESS
TOTAL DFU: 26.5
Floor drain 4 2 8
Water Closet, 1.6 GPF Flushometer Valve 2 4 8
Lavatory 2 1 2
Rinse Sink 1 3 3
Hand sink 1 3 3
Drinking Fountain or Watercooler 1 0.5 0.5
Dishwasher 1 2 2
Appliances, Appurtenance, or Fixtures Public Total
Quantity DFU
TOTAL SYSTEM DFU (SANITARY)
TOTAL DFU: 53
Floor Sink 2 2 4
Floor drain 7 2 14
Three Compartment Sink 1 2 2
Prep sink or Rinse sink 4 3 12
Dishwasher 1 2 6
Kitchen Sink 3 2 6
Service Sink or Mop Basin 1 3 3
Hand Sink 3 2 6
Appliances, Appurtenance, or Fixtures Public Total
Quantity DFU
TOTAL SYSTEM DFU (GREASE WASTE)
1 RECIRCULATION PUMP WITH AUTOMATIC AND TIME CONTROL.
NOTES :
RCP-1 MECH ROOM 3/4"1/40 2 GPM @ 9 FT 3250 115/60/1 0.52 4 3-15/16 5-5/8 6 TACO 006-ST4 ALL
VOL/HZ/PH FLA (A) HEIGHT WIDTH DEPTH
MARK LOCATION CONNECTIO
N SIZE HP MAX GPM @ HEAD MOTOR
RPM
ELECTRICAL DATA DIMENSIONS IN INCHES WEIGHT (LB) MAKE MODEL
NUMBER NOTES
RECIRCULATION PUMP SCHEDULE
1 WATER CONNECTION 3/4" (MALE NPT).
NOTES :
ET-1 MECH. ROOM 6.4 12 18 150 17 AMTROL ST-12C-DD ALL
DIA. HEIGHT
MARK LOCATION
TANK
CAPACITY
(US GAL.)
DIMENSIONS IN
INCHES PRESSURE
(PSI)
WEIGHT
(LBS)MAKE MODEL
NUMBER NOTES
EXPANSION TANK SCHEDULE
12 70000
10 44200
8 24300
6 11900
5 7320
4 4050
3 1980
2 1/2 1120
2 704
1 1/2 366 Gas Type: Natural
1 1/4 244 Pipe Material: SCH. 40 BLACK STEEL
1 119 Pressure Drop: 0.5 IN W.C.
3/4 63 Inlet Pressure: < 2 PSI
1/2 30 Total Equivalent Length: 243.0 FT
PIPE SIZE (IN) CAPACITY (CFH)25% Fitting Length: 123.0 FT
SIZING PER TABLE 1216.2(1)Total Developed Length: 120.0 FT
TOTAL GAS LOAD: 877 CFH
182 COFFEE ROASTER 183.6
MAU-1 MAKE UP AIR UNIT 96.3
OVEN OVEN 33
GWH-1 WATER HEATER 199
(E)RTU-5 (E)RTU-5 73
(E)RTU-4 (E)RTU-4 73
(E)RTU-3 (E)RTU-3 73
(E)RTU-2 (E)RTU-2 73
(E)RTU-1 (E)RTU-1 73
Mark Equipment Load (CFH)
SYSTEM PARAMETERS
GAS LINE SIZING CALCS
4 1668 1668 840
3 1/2 1091 1091 585
3 666 719 406
2 1/2 329 455 245
2 132 254 119
1 1/2 35 103 46
1 1/4 14 56 28
1 -24 16
3/4 -10 8
1/2 -3 3
PIPE SIZE
(IN)
CW FLUSH
VALVE
(W.S.F.U.)
(8 FT/S MAX)
CW FLUSH
TANK
(W.S.F.U.)
(8 FT/S MAX)
HW FLUSH TANK
(W.S.F.U.)
(5 FT/S MAX)
SIZING CRITERIA:
ALLOWABLE FRICTION LOSS PER 100 FT:9.1 psi
Allowable Friction Loss Per 100 ft: 9.1 psi Total Equivalent Length: 312.5'
Pressure Available for Friction Loss:28.6 psi 25% Fitting Length: 62.5'
Residual Pressure @ Farthest Fixture:15.0 psi Total Developed Length: 250.0'
Pressure Loss Due to Elevation: 6.5 psi Static Head: 15.0'
Sub Meter: -
Water Sotener: -
Minimum Building Pressure 50.0 psi
-
-
Maximum Building Pressure: 65.0 psi Minimum Building Pressure: 50.0 psi
Water Meter Losses: 3.0 psi
Pressure Loss Through 1-inch BFP: 12.0 psi EXISTING
Maximum Site Pressure: 80.0 psi Minimum Site Pressure: 65.0 psi
HYDRAULIC CALCULATIONS:
Backflow Prevention Device: 1 EXISTING EXISTING
Pressure Reducing Valve:
SIZE (IN) MAKE MODEL
Piping Material: -X -
Copper Type K Copper Type L Other (Specify)
SYSTEM COMPONENTS
Water Meter Size (in):1
Flush Type:Tank
Maximum System GPM:56 GPM
Total System GPM:28 GPM
Total Fixture Units:48.00 WSFU
PRV Required:No
Water Meter:Yes
SYSTEM PARAMETERS
HYDRAULIC CALCULATIONS
1
1a
1a
1a
1a
83
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
10
-
0
7
-
2
0
2
5
1
1
:
5
5
:
4
3
P8.0
SP
E
C
I
F
I
C
A
T
I
O
N
S
-
P
L
U
M
B
I
N
G
84
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
10
-
0
7
-
2
0
2
5
1
1
:
5
5
:
4
6
P9.0
TI
T
L
E
2
4
-
P
L
U
M
B
I
N
G
85
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
20
2
5
-
0
7
-
1
0
1
1
:
3
0
:
5
1
P
M
M0.0
NG
JS
GE
N
E
R
A
L
I
N
F
O
R
M
A
T
I
O
N
-
M
E
C
H
A
N
I
C
A
L
86
(D)EF
(D)EF
1
1
1
1
1
1
2
2
(E)16"x16" SA
(E)16"x16" RA
(E)RETURN
AIR GRILLE
(E)16"x16" SA
(E)16"x16" RA
1
(E)16"x16" SA
(E)16"x16" RA
(E)16"x16" SA
(E)16"x16" RA
(E)16"x16" SA
(E)16"x16" RA
3
3 3
3
3
3
3
(E)(E)
(E)(E)
(E)(E)
(R)(R)
(R)(R)
(E)12"ø
(E)10"ø
(E)
(E)
4
4
4 4
44
4 4
4
4 4
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
1/4" = 1'-0"
20
2
5
-
0
7
-
1
0
1
1
:
3
0
:
5
2
P
M
MD1.0
DE
M
O
L
I
T
I
O
N
-
R
E
F
L
E
C
T
E
D
C
E
I
L
I
N
G
P
L
A
N
-
M
E
C
H
A
N
I
C
A
L
1/4" = 1'-0"1DEMOLITION - REFLECTED CEILING PLAN - MECHANICAL
GENERAL NOTES
CODED NOTES
1. EXISTING HVAC DUCTWORK, DIFFUSERS, GRILLES, CEILING AIR
DEVICES, DAMPERS ETC SHALL DEMOLISHED FROM THE EXISTING
TO DEMOLITION DISCONNECT POINT AS PER SHOWN ON FLOOR
PLAN.
2. EXISTING CEILING EXHAUST FAN SHALL DEMOLISHED WITH ALL
DUCTWORK AND DAMPERS ASSOCIATED WITH THEM.
3. ALL TEMPERATURE CONTROLS, SENSORS, DEVICES, AND WIRING
SHALL BE DEMOLISHED AND REPLACED WITH NEW. REFER TO M1.0
FOR NEW SCOPE OF WORK REQUIRED.
4. EXISTING DIFFUSERS IDENTIFIED WITH (E) OR (R) SHALL BE
REMOVED, STORED, AND PROTECTED FOR REUSE. REFER TO M1.0
FOR NEW SCOPE OF WORK REQUIRED.
A. REFER TO SHEET M0.0 FOR GENERAL NOTES.
B. ALL EQUIPMENT AND DUCTWORK SHOWN WITH THIN/LIGHT SOLID
LINES IS EXISTING TO REMAIN.
C. ALL EQUIPMENT AND DUCTWORK SHOWN WITH THICK/DARK
DASHED LINES IS EXISTING TO BE REMOVED OR RELOCATED.
D. RELEVANT EQUIPMENT AND DUCTWORK SHOWN IS BASED ON
EXISTING DRAWINGS AND FIELD SURVEY. NOT ALL EXISTING
EQUIPMENT AND DUCTWORK IS SHOWN. CONTRACTOR SHALL
FIELD VERIFY ALL CONDITIONS AFFECTED BY THIS RENOVATION
AND NOTIFY THE ENGINEER IF CONDITIONS ARE NOT AS
INDICATED.
E. OWNER SHALL HAVE FIRST RIGHT OF REFUSAL UPON REMOVAL
OF ALL SALVAGED ITEMS. OTHERWISE, REMOVE ALL DEMOLISHED
ITEMS FROM THE SITE.
F. REFER TO "NEW WORK" PLANS FOR DUCTWORK CONTINUATIONS
AND/OR REPLACEMENTS.
G. AFTER DUCTWORK REMOVAL, PATCH HOLES THROUGH WALLS
AND FLOORS TO MATCH SURROUNDING CONDITIONS.
H. REMOVE EXISTING DRYWALL/MASONRY WALLS AS REQUIRED TO
COMPLETE WORK. PATCH AND PAINT WALLS TO MATCH EXISTING
CONDITIONS.
I. THE MECHANICAL CONTRACTOR SHALL COORDINATE WITH
OTHER TRADES TO RELOCATE ANY PIPE, CONDUITS, DEVICES, OR
STRUCTURES THAT CONFLICT WITH PROVIDING A LARGER DUCT
OPENING THROUGH ROOF.
87
1 1 1
1 1
(E)RTU-1
(455 LBS)
(E)RTU-4
(455 LBS)
(E)RTU-2
(455 LBS)
(E)RTU-5
(455 LBS)
(E)RTU-3
(455 LBS)
22
2 2
3
1a
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
2025-07-09
1/4" = 1'-0"
20
2
5
-
0
7
-
1
0
1
1
:
3
0
:
5
2
P
M
MD1.1
DE
M
O
L
I
T
I
O
N
-
R
O
O
F
P
L
A
N
-
M
E
C
H
A
N
I
C
A
L
GENERAL NOTES
CODED NOTES
1. EXISTING SUPPLY AIR AND RETURN AIR DUCTS SHALL REMAIN.
REFER M1.0 FOR BELOW FLOOR DUCT ROUTING AND
CONTINUATION.
2. EXISTING OUTSIDE AIR INTAKE HOOD TO BE REBALANCE AND
REUSE AS PER SHOWN ON PROPOSED ROOF PLAN. REFER SHEET
M1.1 FOR MORE INFORMATION. TYPICAL FOR ALL RTUs.
3. DISCONNECT EXISTING INTAKE HOOD AND PREPARE FOR
RELOCATION EXTENSION, SEE M1.1 FOR ADDITIONAL
INFORMATION.
1/4" = 1'-0"1DEMOLITION - ROOF PLAN - MECHANICAL
A. REFER TO SHEET M0.0 FOR GENERAL NOTES.
B. ALL EQUIPMENT AND DUCTWORK SHOWN WITH THIN/LIGHT SOLID
LINES IS EXISTING TO REMAIN.
C. ALL EQUIPMENT AND DUCTWORK SHOWN WITH THICK/DARK
DASHED LINES IS EXISTING TO BE REMOVED OR RELOCATED.
D. RELEVANT EQUIPMENT AND DUCTWORK SHOWN IS BASED ON
EXISTING DRAWINGS AND FIELD SURVEY. NOT ALL EXISTING
EQUIPMENT AND DUCTWORK IS SHOWN. CONTRACTOR SHALL
FIELD VERIFY ALL CONDITIONS AFFECTED BY THIS RENOVATION
AND NOTIFY THE ENGINEER IF CONDITIONS ARE NOT AS
INDICATED.
E. OWNER SHALL HAVE FIRST RIGHT OF REFUSAL UPON REMOVAL
OF ALL SALVAGED ITEMS. OTHERWISE, REMOVE ALL DEMOLISHED
ITEMS FROM THE SITE.
F. REFER TO "NEW WORK" PLANS FOR DUCTWORK CONTINUATIONS
AND/OR REPLACEMENTS.
G. AFTER DUCTWORK REMOVAL, PATCH HOLES THROUGH WALLS
AND FLOORS TO MATCH SURROUNDING CONDITIONS.
H. REMOVE EXISTING DRYWALL/MASONRY WALLS AS REQUIRED TO
COMPLETE WORK. PATCH AND PAINT WALLS TO MATCH EXISTING
CONDITIONS.
I. THE MECHANICAL CONTRACTOR SHALL COORDINATE WITH
OTHER TRADES TO RELOCATE ANY PIPE, CONDUITS, DEVICES, OR
STRUCTURES THAT CONFLICT WITH PROVIDING A LARGER DUCT
OPENING THROUGH ROOF.
88
T
T
T
T
T
Adjacent Property
Office
Accessible
Entry
Kitchen
Toilet 2
Toilet 1
Entry
Retail
Entry
Seating
Retail
Coffee Bar QC Lab
Training/
Shipping & Recieving
Production/
Roasting Room
Hall
Pantry
Admin.
Mech.
(N)AC-1
(120 LBS)
H-1
(973 LBS)
EG-1-6"ø
75 CFM
SD-4-12"ø
300 CFM
14
"
x
1
4
"
10"ø
12"ø
SD-4-12"ø
300 CFM12"ø
10"ø
12"ø10"ø 10
"
ø
10
"
ø
SD-4-12"ø
275 CFM
SD-4-12"ø
275 CFM
SD-7-10"ø
275 CFM
SD-7-10"ø
275 CFM
12
"
ø
12"ø
14"ø
8"ø
SD-2-8"ø
150 CFM
SD-2-8"ø
150 CFM
(N)EF-1
(73 LBS)
EG-1-6"x6"
100 CFM
EG-1-6"x6"
100 CFM
14"ø
14"ø
12"
ø
6"ø
RG-4-12"x12"
505 CFM
RG-4-12"x12"
420 CFM
RG-4-12"x12"
420 CFM
12"ø
(E)16"x16" SA
(E)16"x16" RA
(E)16"x16" SA
(E)16"x16" RA
RG-3-10"x10"
235 CFM
RG-4-12"x12"
430 CFM
RG-4-12"x12"
430 CFM
12"ø
16"ø
(E)SD-10"ø
175 CFM
(E)SD-10"ø
175 CFM
(E)SD-10"ø
175 CFM
(E)SD-10"ø
175 CFM
14
"
x
1
4
"
10"ø
10"ø
(E)RG-48"x24"
1275 CFM / 1065 CFM
(E)16"x16" SA
(E)16"x16" RA
(E)SD-10"ø
200 CFM
10
"
ø
SD-5-14"ø
400 CFM
SD-5-14"ø
400 CFM
SG-1-12"x8"
225 CFM
SD-1-12"x8"
225 CFM
SG-1-12"x8"
225 CFM
SG-1-12"x8"
225 CFM
8"ø 12"ø
12"ø
8"ø
14"ø
6"ø
6"ø
6"ø
SD-1-6"ø
75 CFM
SD-1-6"ø
75 CFM
SD-1-6"ø
75 CFM
16
"
x
1
6
"
8"
ø
6"ø
(E)16"x16" SA
(E)16"x16" RA
RG-4-12"x12"
595 CFM / 500 CFM
RG-4-12"x12"
595 CFM / 500 CFM
12
"
ø
SD-3-10"ø
245 CFM
SD-3-10"ø
245 CFM
SD-3-10"ø
230 CFM SD-3-10"ø
230 CFM
SD-2-8"ø
150 CFM
SD-2-8"ø
150 CFM
RG-3-10"x10"
240 CFM
RG-2-8"x8"
205 CFM
SD-2-8"ø
130 CFM SD-2-8"ø
125 CFM
10
"
ø
10
"
ø
(E)16"x16" SA
(E)16"x16" RA
RG-4-12"x12"
515 CFM
RG-4-12"x12"
380 CFM
12"ø
12"ø
14
"
x
1
4
"
12"ø
10
"
ø
6"
ø
(E)RTU-1
(E)RTU-4
(E)RTU-5
(E)RTU-3
1
2
3
28"x12"
4 4
4
4
4
4
4
4
77
7 7
9
8
8
9
10
"
ø
(E)RTU-2
(E)RTU-3
(E)RTU-5
8
S
S
(E)RTU-2
S
5
5 5
5
5
5
5
5
5
5
5
10
10
10
10
6 6
10 10
1010
10
10
10
10
SD-1-6"ø
75 CFM
10
10
10
10
10
10
D
10 10
(E)12"ø
(E)10"ø
12"ø
12"ø
14"ø
12"ø
D
12"ø
12"ø
10"ø
8"ø
8"ø
EG-5-18"x10"
560 CFM
12"ø6"ø
12
"
ø
14"x14"
10"ø 10"ø
5
12"ø
16
"
x
1
6
"
8"ø
R
D
(E)SD-10"ø
150 CFM
(E)SD-10"ø
150 CFM
(E)SD-10"ø
150 CFM
(E)SD-10"ø
200 CFM
12"ø
12"ø
D
D
8"ø
10
"
ø
16
"
x
1
6
"
14"ø
20"x16"
(E)SD-10"ø
150 CFM
(E)SD-10"ø
200 CFM
14"ø
4
10"ø
12"ø
14
"
ø
12
"
ø
10
"
ø
8"ø
8"ø
8"ø12"ø
16"x16"
GWH-1
(523 LBS)
M
CO
CO
M 1a1a
1a11
1a
1a1a
1a
10"
ø
1a
12
13
13
1
3"ø
3"ø
R
1a
FSD
FSD
FSD
FSD
4
4
4
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
2025-07-09
1/4" = 1'-0"
20
2
5
-
0
7
-
1
1
1
2
:
2
3
:
0
5
A
M
M1.0
PR
O
P
O
S
E
D
R
E
F
L
E
C
T
E
D
C
E
I
L
I
N
G
P
L
A
N
-
M
E
C
H
A
N
I
C
A
L
1/4" = 1'-0"1PROPOSED REFLECTED CEILING PLAN MECHANICAL
GENERAL NOTES
CODED NOTES
1. 14"ø EXHAUST AIR DUCT FROM INLINE EXHAUST FAN (N)EF-1 AND
UP TO ROOF LEVEL. REFER SHEET M1.1 FOR CONTINUATION.
2. 20"x20" MAKE-UP AIR SUPPLY DUCT RUN FROM MAU-1 AND
TRANSITION TO 20"x16" ABOVE CEILING LEVEL. REFER SHEET M1.1
FOR CONTINUATION.
3. (14"ø / 16"ø FIELD VERIFY) KITCHEN EXHAUST AIR DUCT RUN FROM
KITCHEN HOOD H-1 UP TO ROOF LEVEL. REFER SHEET M1.1 FOR
CONTINUATION.
4. NEW SUPPLY AIR OR RETURN AIR DUCTS SHALL CONNECT WITH
EXISTING MAIN SUPPLY AIR OR RETURN AIR DUCTS AVAILABLE IN
CEILING DOWN FROM EXISTING RTU'S AVAILABLE ON ROOF.
CONTRACTOR TO FIELD VERIFY THE EXACT LOCATION OF EXISTING
DUCT SYSTEMS PRIOR OF INSTALLTION.
5. PROVIDE WITH TITUS AG-95 NECK MOUNTED OPPOSED BLADE
DAMPER INTEGRAL WITH TITUS RETURN AIR GRILLE.
6. PROVIDE WITH TITUS D-75 ROUND SLIDING BLADE NECK MOUNTED
DAMPER INTEGRAL WITH TITUS SUPPLY AIR ROUND DIFFUSER.
7. PROVIDE WITH TITUS AG-15-AA ALUMINUM OPPOSED BLADE
DAMPER INTEGRAL WITH TITUS SUPPLY AIR SIDE WALL GRILLE.
8. MOUNT NEW PROGRAMMABLE THERMOSTAT INTERLOCKED WITH
ASSOCIATED EXISTING PACKAGED ROOFTOP EQUIPMENT AT 48"
A.F.F IN THIS PROPOSED LOCATION. COORDINATE PLACEMENT
WITH ALL DECOR AND EQUIPMENT, FIELD VERIFY WITH OWNER'S
REPRESENTATIVE FOR THE FINAL LOCATION PRIOR TO
INSTALLATION.
9. WALL MOUNTED REMOTE ZONE TEMPERATURE SENSOR SHALL BE
MOUNTED AT 48" A.F.F. THE SENSING ELEMENTS SHALL BE WIRED
BACK TO THE RESPECTIVE PROGRAMMABLE THERMOSTAT IN THE
ADMIN OFFICE. COORDINATE PLACEMENT WITH DECOR AND
EQUIPMENT, FIELD VERIFY WITH THE OWNER'S REPRESENTATIVE
FOR THE FINAL LOCATION PRIOR TO INSTALLATION.
10. PROVIDE WITH TITUS D-75 NECK MOUNTED OPPOSED BLADE
DAMPER INTEGRAL WITH TITUS SUPPLY AIR CEILING DIFFUSER.
11. WALL MOUNTED REMOTE CARBON DIOXIDE SENSOR SHALL BE
MOUNTED 48" A.F.F. THE SENSING ELEMENTS SHALL BE WIRED
BACK TO THE RESPECTIVE PROGRAMMABLE THERMOSTAT IN THE
ADMIN OFFICE. COORDINATE PLACEMENT WITH DECOR AND
EQUIPMENT, FIELD VERIFY WITH THE OWNER'S REPRESENTATIVE
FOR THE FINAL LOCATION PRIOR TO INSTALLATION. THE CARBON
DIOXIDE SENSOR SHALL ALSO BE INTERLOCKED WITH OPERATION
OF FULLY MODULATING MOTORIZED DAMPER INSTALLED IN THE
RETURN DROP OF ASSOCIATED ROOFTOP UNIT.
12. 10"ø ROUND OUTSIDE AIR DUCT, 300 CFM SHALL CONNECT TO
RETURN AIR DUCT OF (E)RTU-3.
13. 3"ø INTAKE AIR CONNECTION AND 3"ø EXHAUST VENT
CONNECTION DUCT UP TO ROOF AND TERMINATE THRU
GOOSENECK.
A. REFER TO SHEET M0.0 FOR GENERAL NOTES.
B. ALL DUCT DIMENSIONS GIVEN ARE INSIDE DIMENSIONED.
C. COORDINATE ALL OPENINGS IN FLOORS, ROOF, AND WALLS WITH
THE GENERAL AND STRUCTURAL CONTRACTORS.
D. RUN ALL DUCTS AS HIGH AS POSSIBLE WITH RETURN AND
EXHAUST ABOVE SUPPLY AS OFTEN AS POSSIBLE.
E. PROVIDE VOLUME BALANCING DAMPERS UPSTREAM OF ALL AIR
INLET/OUTLETS UNLESS NOTED OTHERWISE.
F. PROVIDE TURNING VANES IN ALL SUPPLY AIR SQUARE THROATED
ELBOWS.
G. ALL RECTANGULAR SUPPLY AIR BRANCH CONNECTIONS SHALL BE
45° TAKE-OFF FITTINGS AND ROUND SUPPLY AIR BRANCH
CONNECTIONS SHALL BE BELLMOUTH FITTINGS.
H. FLEXIBLE DUCTS TO DIFFUSERS MAXIMUM LENGTH 5'-0". FLEXIBLE
DUCTS ARE NOT TO BE USED AS ELBOWS.
I. ALL EXHAUST DUCTWORK FROM THE EXTERIOR PENETRATION TO
THE BACK-DRAFT DAMPER SHALL BE EXTERNALLY INSULATED
WITH 1.5" FIBERGLASS DUCT WRAP WITH FSK JACKET (R-6
MINIMUM).
J. THERMOSTAT AND CONTROL WIRE IN EXPOSED AREAS SHALL BE
INSTALLED IN CONDUIT. CONDUIT SHALL BE PAINTED (COLOR
SELECTION BY ARCHITECT).
1a
1
89
KEF-1
(222 LBS)
R 10' - 0"
225 CFM / 435 CFM
OUTSIDE AIR
210 CFM / 400 CFM
OUTSIDE AIR
255 CFM
OUTSIDE AIR
305 CFM
OUTSIDE AIR
R 10' - 0"
(N)GV-1
(37 LBS)
1 1 1
1 1
(E)RTU-2
(455 LBS)
(E)RTU-5
(455 LBS)
(E)RTU-3
(455 LBS)
(E)RTU-4
(455 LBS)
(E)RTU-1
(455 LBS)
2
3
R 10' - 0"
R 10' - 0"
3
4
4
4
5
6
2400 CFM
MAKE-UP AIR
MAU-1
(1,617 LBS)
1a
7
8
8
1
1
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
2025-07-09
1/4" = 1'-0"
20
2
5
-
0
7
-
1
1
1
2
:
2
2
:
1
0
A
M
M1.1
PR
O
P
O
S
E
D
R
O
O
F
P
L
A
N
-
M
E
C
H
A
N
I
C
A
L
GENERAL NOTES
CODED NOTES
1. EXISTING SUPPLY AIR AND RETURN AIR DUCTS SHALL REMAIN.
REFER M1.0 FOR BELOW FLOOR DUCT ROUTING AND
CONTINUATION.
2. 14"ø EXHAUST AIR DUCT UP FROM (N)EF-1 AND TERMINATE TO
GRAVITY RELIEF VENTILATOR (N)GV-1.
3. NEW GENERAL EXHAUST FAN AND KITCHEN EXHAUST FAN SHALL
BE INSTALLED AND MAINTAIN 10'-0" OF CLEARANCE WITH ANY NEW
OR EXISTING FRESH AIR INTAKE.
4. NEW ROASTER VENT FROM BELOW ROASTING ROOM COFFEE
ROASTER AND TERMINATE THRU ROOF WITH STACK CAP (SHOWN
HERE FOR REFERANCE ONLY). REFER COFFEE ROASTER
INSTALLATION DRAWINGS PROVIDED FROM KITCHEN CONSULTANT
FOR MORE INFORMATION. MAINTAIN 10'-0" OF CLEARANCE WITH
ANY NEW OR EXISTING FRESH AIR INTAKE.
5. 20"x20" MAKE-UP AIR SUPPLY DUCT DOWN FROM MAU-1 TO BELOW
FLOOR. REFER SHEET M1.0 FOR CONTINUATION.
6. (14"ø / 16"ø FIELD VERIFY) KITCHEN EXHAUST AIR DUCT UP FROM
KITCHEN HOOD H-1 AND CONNECT TO EXHAUST FAN KEF-1. REFER
SHEET M1.0 FOR CONTINUATION.
7. EXISTING INTAKE HOOD FOR (E)RTU-3 TO BE BLANKED OFF WITH
INSULATED CAP AND SEALED WATER/AIR TIGHT.
8. 3"ø INTAKE AIR CONNECTION AND 3"ø EXHAUST VENT
CONNECTION DUCT DOWN TO BELOW FLOOR. REFER SHEET M1.0
FOR CONTINUATION.
1/4" = 1'-0"1PROPOSED ROOF PLAN - MECHANICAL
A. REFER TO SHEET M0.0 FOR GENERAL NOTES.
B. ALL DUCT DIMENSIONS GIVEN ARE INSIDE DIMENSIONED.
C. COORDINATE ALL OPENINGS IN FLOORS, ROOF, AND WALLS WITH
THE GENERAL AND STRUCTURAL CONTRACTORS.
D. RUN ALL DUCTS AS HIGH AS POSSIBLE WITH RETURN AND
EXHAUST ABOVE SUPPLY AS OFTEN AS POSSIBLE.
E. PROVIDE VOLUME BALANCING DAMPERS UPSTREAM OF ALL AIR
INLET/OUTLETS UNLESS NOTED OTHERWISE.
F. PROVIDE TURNING VANES IN ALL SUPPLY AIR SQUARE THROATED
ELBOWS.
G. ALL RECTANGULAR SUPPLY AIR BRANCH CONNECTIONS SHALL BE
45° TAKE-OFF FITTINGS AND ROUND SUPPLY AIR BRANCH
CONNECTIONS SHALL BE BELLMOUTH FITTINGS.
H. FLEXIBLE DUCTS TO DIFFUSERS MAXIMUM LENGTH 5'-0". FLEXIBLE
DUCTS ARE NOT TO BE USED AS ELBOWS.
I. ALL EXHAUST DUCTWORK FROM THE EXTERIOR PENETRATION TO
THE BACK-DRAFT DAMPER SHALL BE EXTERNALLY INSULATED
WITH 1.5" FIBERGLASS DUCT WRAP WITH FSK JACKET (R-6
MINIMUM).
J. THERMOSTAT AND CONTROL WIRE IN EXPOSED AREAS SHALL BE
INSTALLED IN CONDUIT. CONDUIT SHALL BE PAINTED (COLOR
SELECTION BY ARCHITECT).
K. EXISTING ROOFTOP UNITS TO REMAIN. AT THE START OF THE
PROJECT, PROVIDE EQUIPMENT CLEANING AND SERVICE TO
VERIFY GOOD OPERATING CONDITION. PROVIDE NEW AIR FILTERS
AT START OF PROJECT AND END. VERIFY DUCT MOUNTED SMOKE
DETECTORS IN PLACE AND OPERABLE, OTHERWISE, PROVIDE
NEW ONES.
1a
1
1a
90
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
20
2
5
-
0
7
-
1
0
1
1
:
3
1
:
0
2
P
M
M3.1
HO
O
D
D
E
T
A
I
L
S
A
N
D
S
C
H
E
D
U
L
E
S
-
M
E
C
H
A
N
I
C
A
L
91
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
20
2
5
-
0
7
-
1
0
1
1
:
3
1
:
0
7
P
M
M3.2
HO
O
D
D
E
T
A
I
L
S
A
N
D
S
C
H
E
D
U
L
E
S
-
M
E
C
H
A
N
I
C
A
L
92
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
20
2
5
-
0
7
-
1
0
1
1
:
3
1
:
1
3
P
M
M3.3
HO
O
D
D
E
T
A
I
L
S
A
N
D
S
C
H
E
D
U
L
E
S
-
M
E
C
H
A
N
I
C
A
L
93
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
20
2
5
-
0
7
-
1
0
1
1
:
3
1
:
1
8
P
M
M3.4
HO
O
D
D
E
T
A
I
L
S
A
N
D
S
C
H
E
D
U
L
E
S
-
M
E
C
H
A
N
I
C
A
L
94
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
20
2
5
-
0
7
-
1
0
1
1
:
3
1
:
2
4
P
M
M3.5
HO
O
D
D
E
T
A
I
L
S
A
N
D
S
C
H
E
D
U
L
E
S
-
M
E
C
H
A
N
I
C
A
L
95
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
20
2
5
-
0
7
-
1
0
1
1
:
3
1
:
3
0
P
M
M3.6
HO
O
D
D
E
T
A
I
L
S
A
N
D
S
C
H
E
D
U
L
E
S
-
M
E
C
H
A
N
I
C
A
L
96
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
LU
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
wi
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
2025-07-09
20
2
5
-
0
7
-
1
0
1
1
:
3
1
:
3
6
P
M
M5.0
DE
T
A
I
L
S
-
M
E
C
H
A
N
I
C
A
L
1
97
VENTILATION SCHEDULE
ROOM NAME SPACE TYPE SPACE AREA
(SF)
OCCUPANT
DENSITY
2022 CALIFORNIA MECHANICAL CODE 2022 CALIFORNIA ENERGY CODE
MAX. DESIGN
OUTSIDE AIR
FLOW
OUTSIDE AIR FLOW
PROVIDED (CFM)
SUPPLY AIR FLOW
(CFM)RATIO OF OA/SA (%)PEOPLE OA RATE
(CFM/PERSON)
AREA OA RATE
(CFM * SQ.FT.)
BREATHING ZONE
OUTSIDE AIR (CFM) PEOPLE RATE AREA RATE
(STANDARD)
(E)RTU-1
KITCHEN KITCHEN (COOKING)287 4 7.5 0.12 64.44 15 60 0.15 43.05 64.44 95 600 16%
PRODUCTION / SHIPPING & RECEIVING SHIPPING & RECEIVING 1059 2 10 0.12 147.08 15 30 0.15 158.85 158.85 160 1000 16%
TOTALS OF (E)RTU-1 1346 6 211.52 15 90 0.15 201.9 223.29 255 1600 16%
(E)RTU-2
RETAIL SEATING CAFETERIA / FAST FOOD DINING 866 29 7.5 0.18 373.38 15 435 0.15 129.9 435 435 1500 29%
TOTALS OF (E)RTU-2 866 29 373.38 15 435 0.15 129.9 435 435 1500 29%
(E)RTU-3
ADMIN OFFICE OFFICE SPACE 175 2 5 0.06 20.5 15 30 0.15 26.25 30 50 255 20%
COFFEE BAR BAR COCKTAIL LOUNGE 720 8 7.5 0.18 189.6 15 120 0.15 108 189.6 190 950 20%
TRAINING/ QC LAB KITCHENETTE 230 4 7.5 0.12 57.6 15 60 0.15 34.5 60 60 300 20%
TOTALS OF (E)RTU-3 1125 14 267.7 15 210 0.15 168.75 279.6 300 1505 20%
(E)RTU-4
PANTRY KITCHEN (COOKING)270 4 7.5 0.12 62.4 15 60 0.15 40.5 62.4 65 300 22%
ROASTING ROOM KITCHEN (COOKING)798 15 7.5 0.12 208.26 15 225 0.15 119.7 225 240 1100 22%
TOTALS OF (E)RTU-4 1068 19 270.66 15 285 0.15 160.2 287.4 305 1400 22%
(E)RTU-5
RETAIL ENTRY CAFETERIA / FAST FOOD DINING 523 25 7.5 0.18 281.64 15 375 0.5 261.5 375 375 1100 34%
HALL CORRIDOR 78 0 0 0.06 4.68 15 0 0.15 11.7 11.7 25 75 33%
MECH TELEPHONE CLOSET 64 0 0 0 0 0 0 0 0 0 0 75 0%
TOILET 1 RESTROOM 52 1 0 0 0 0 0 0 0 0 0 75 0%
TOILET 2 RESTROOM 52 1 0 0 0 0 0 0 0 0 0 75 0%
TOTALS OF (E)RTU-5 769 27 286.32 15 375 0.15 273.2 386.7 400 1400 29%
TOTAL AIR PROVIDED (CFM)1611.99 1695 7405 23%
EXHAUST FAN SCHEDULE
TAG TYPE
PERFORMANCE DATA MOTOR DATA ELECTRICAL DATA DIMENSION DATA
WEIGHT
(LBS)MAKE MODEL NOTESAIR
VOLUME
(CFM)
TOTAL SP
(IN WG.)FAN RPM OPERATING
POWER (HP)ENCLOSURE SIZE (HP)MOTOR RPM V/PH/HZ MCA MOCP FLA (AMPS)HEIGHT
(INCH)
WIDTH
(INCH)
LENGTH
(INCH)
(N)EF-1 DIRECT DRIVE CENTRIFUGAL INLINE FAN 835 1.25 1,752 0.38 ODP 3/4 1,950 115/1/60 13 25 10.5 21 21 23 73 GREENHECK SQ-130HP-VG ALL
NOTES
1. FURNISH WITH VARI-GREEN EC MOTOR WITH DRIVE (0-10VDC SIGNAL) FACTORY MOUNTED, WIRED, AND PROGRAMMED ON EXTERIOR OF FAN HOUSING.
2. FURNISH WITH JUNCTION BOX MOUNTED AND WIRED, NEMA-1 TOGGLE SWITCH SHIPPED SEPRATE.
3. FURNISH WITH INLINE DAMPER BD-330-PB-18x18, GRAVITY OPERATED, NOT COATED.
4. CONTRACTOR TO COORDINATE INTERLOCK CONTROLS WITH BUILDING OCCUPANCY SCHEDULE.
COORDINATION
CONTRACTORS SHALL PROVIDE COORDINATION DRAWINGS PRIOR TO
DISTRIBUTION OF SUBMITTALS AND ORDERING EQUIPMENT. COORDINATION
DRAWINGS SHALL SHOW CLEAR INDICATED OF COORDINATION WITH OTHER
TRADES, INCLUDING STRUCTURAL, CEILINGS, AND FIRE PROTECTION. ANY
CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER /
ARCHITECT /ENGINEER PRIOR TO ROUGH-IN OR ORDERING OF EQUIPMENT.
MAINTAIN MANUFACTURER RECOMMENCED CLEARANCES AND ACCESS TO
ALL REMOVABLE PANELS AND DOORS.
ALL FILTERS SHALL BE FULL SIZE AND STANDARD SIZE AND ACCESS SHALL
ALLOW FOR EASY REPLACEMENT OF FILTERS.
DUCT INSULATION TABLE
DUCT SERVICES MINIMUM INSULATION
THICKNESS (IN)
DENSITTY
(LB/CU.FT.)
"R" VALUE
(HR.SQ.FT. °
F/BTU)
INDOOR CONCEALED SUPPLY AIR AND RETURN AIR 1.5 1.5 4.2
INDOOR CONCEALED EXHAUST DUCT BETWEEN FLEXIBLE
CONNECTION AND PENETRATION OF BUILDING EXTERIOR 1.5 1.5 4.2
OUTDOOR EXPOSED DUCTING WILL REQUIRE FIELD APPLIED ALUMINUM JACKET. SEE SPECIFICATIONS FOR MORE
INFORMATION. MAY USE MINERAL FIBER BOARD/ FLEXIBLE ELASTOMERIC
GENERAL EQUIPMENT NOTES
ALL EQUIPMENT REQUIRING VFD'S OR STARTERS SHALL BE PROVIDED WITH THE
EQUIPMENT. VFD'S SHALL BE EQUIPPED WITH INTEGRAL DISCONNECTS. ANY OUTDOOR
VFD'S SHALL BE PROVIDE WITH NEMA 3R ENCLOSURE, COORDINATE WITH EC TO
PROVIDE POWER FOR THE ENCLOSURE (IF NEEDED).
UNLESS NOTED OTHERWISE, EQUIPMENT SHALL COME WITH INTEGRAL DISCONNECTS
AND SINGLE POINT ELECTRICAL CONNECTIONS.
COORDINATE ANY CHANGES OF EQUIPMENT LOCATIONS, SELECTIONS AND RFI'S WITH
THE ELECTRICAL AND PLUMBING CONTRACTORS AND OTHER TRADES
AIR CURTAIN SCHEDULE
TAG AIR FLOW
VOLUME (CFM)
AVG. VELOCITY
(FPM)UNIFORMITY (%)
POWER
RATINGS
(WATTS)
MOTOR
HP
NOZZLE
LENGTH
(IN)
ELECTRICAL DATA DIMENSION DATA
WEIGHT
(LBS)MAKE MODEL NOTES
V/PH/HZ FLA (AMPS)HEIGHT
(INCH)
WIDTH
(INCH)
LENGTH
(INCH)
(N)AC-1 2,758 2,206 84 1000 (2) 1/2 72 115/1/60 10.2 11 13 72 120 MARS N272-2UA-OB ALL
NOTES
1. PROVIDE WITH (2) 1/2 HP CONTINUOUS DUTY TEAO MOTORS (NEMA 1).
2. PROVIDE WITH TOP AND WALL MOUNTING HOLES.
3. PROVIDE WITH ADJUSTABLE AIR DIRECTIONAL VANES WITH 40° SWEEP FRONT TO BACK, COORDINATE COLOR SELECTION WITH ARCHITECT.
GRAVITY RELIEF VENTILATOR SCHEDULE
TAG APPLICATION
AIR
VOLUME
(CFM)
STATIC
PRESSURE (IN.
WG)
THROAT AREA
(SQFT)
THROAT
VELOCITY
(SQFT)
FREE AREA
(%)
FREE AREA
VELOCITY
(FT/MIN)
DIMENSION DATA
TOTAL
WEIGHT
(LBS)
MAKE MODEL NOTESHEIGHT
(INCH)
DEPTH
(INCH)
WIDTH
(INCH)
(N)GV-1 EXHAUST 835 0.064 1.12 746 36.2 481 11.75 29 29 37 GREENHECK GRSR-15 ALL
NOTES
1. PROVIDE WITH 14" H x 22" W x 22" L CURB FROM GREENHECK MODEL #GPI-22-A14.
2. PROVIDE WITH ALUMINUM BIRD SCREEN AND INSECT SCREEN.
AIR BALANCE SCHEDULE
UNIT
SUPPLY
AIR FLOW
(CFM)
RETURN
AIR FLOW
(CFM)
OUTDOOR
AIR FLOW
(CFM)
EXHAUST
AIR FLOW
(CFM)
PRESSURE
ZONE 1
(E)RTU-1 +1600 -1345 +255 -+255
MAU-1 -- +2100 -+2100
KEF-1 --- -2500 -2500
SUBTOTAL +1600 -1345 +2355 -2500 -145
ZONE 2
(E)RTU-2 +1500 -1065 +435 -+435
SUBTOTAL +1500 -1065 +435 -+435
ZONE 3
(E)RTU-3 +1505 -1205 +300 -+300
(N)EF-1 ----75 -75
SUBTOTAL +1505 -1205 +300 -75 +225
ZONE 4
(E)RTU-4 +1400 -1095 +305 -+305
(N)EF-1 ----560 -560
SUBTOTAL +1400 -1095 +305 -560 -255
ZONE 5
(E)RTU-5 +1400 -1000 +400 -+400
(N)EF-1 ----200 -200
SUBTOTAL +1400 -1000 +400 -200 +200
TOTAL +7405 -5710 +3795 -3335 +460
NOTES:
INTAKE EXCEEDS EXHAUST FOR BUILDING PRESSURIZATION.
LOCAL BALANCE IN THE KITCHEN IS -305 CFM.
KITCHEN HOOD REQUIRES AIR BALANCE REPORT FOR FINAL INSPECTION.
AIR DISTRIBUTION SCHEDULE
MARK SERVICE MAKE MODEL OVERALL SIZE NECK SIZE MAX CFM MAX NC MOUNTING
TYPE
BLOW
PATTERN THROW NOTES
SD-1 SUPPLY TITUS PCS-AA 24"x24" / 12"x12"6"ø 98 13 DROP FACE 4-WAY 2-4-8 ALL
SD-2 SUPPLY TITUS PCS-AA 24"x24" / 12"x12"8"ø 175 15 DROP FACE 4-WAY 2-5-10 ALL
SD-3 SUPPLY TITUS PCS-AA 24"x24" / 16"x16"10"ø 273 20 DROP FACE 4-WAY 2-5-14 ALL
SD-4 SUPPLY TITUS PCS-AA 24"x24"12"ø 393 21 DROP FACE 4-WAY 3-6-16 ALL
SD-5 SUPPLY TITUS PCS-AA 24"x24"14"ø 535 22 DROP FACE 4-WAY 3-7-19 ALL
SD-6 SUPPLY TITUS PCS-AA 24"x24"16"ø 698 23 DROP FACE 4-WAY 3-8-22 ALL
SD-7 SUPPLY TITUS TMRA 18"ø 10"ø 327 22 DUCT MOUNT N/A 4-6-11 1,4
SD-8 SUPPLY TITUS TMRA 22"ø 12"ø 470 23 DROP FACE N/A 4-7-13 1,4
SG-1 SUPPLY TITUS 300FL 14"x10"12"x8" 285 15 SIDE WALL N/A 14-22-31 1,4
RG-1 RETURN TITUS PAR 24"x24" / 12"x12" 6"x6"100 N/A DROP FACE N/A N/A ALL
RG-2 RETURN TITUS PAR 24"x24"8"x8" 222 14 DROP FACE N/A N/A ALL
RG-3 RETURN TITUS PAR 24"x24"10"x10" 347 17 DROP FACE N/A N/A ALL
RG-4 RETURN TITUS PAR 24"x24"12"x12" 600 24 DROP FACE N/A N/A ALL
RG-5 RETURN TITUS PAR 24"x24"15"x15" 938 26 DROP FACE N/A N/A ALL
RG-6 RETURN TITUS PAR 24"x24"18"x18" 1125 24 DROP FACE N/A N/A ALL
EG-1 EXHAUST TITUS PAR 24"x24" / 12"x12" 6"x6"100 N/A DROP FACE N/A N/A ALL
EG-2 EXHAUST TITUS PAR 24"x24"8"x8" 222 14 DROP FACE N/A N/A ALL
EG-3 EXHAUST TITUS PAR 24"x24"10"x10" 347 17 DROP FACE N/A N/A ALL
EG-4 EXHAUST TITUS PAR 24"x24"12"x12" 600 24 DROP FACE N/A N/A ALL
EG-5 EXHAUST TITUS 350RL 20"x12" 18"x10"666 20 SIDE WALL N/A N/A 1
NOTES
1. PROVIDE WITH VANES ADJUSTED FOR VERTICAL AIR PATTERN.
2. PROVIDE WITH 1/2"x1/2"x1/2" ALUMINUM CORE.
3. PROVIDE WITH 24"x24" FACE PLATE WITH ASSOCIATED 12"x12" DIFFUSER / GRILLE WHEN APPLICABLE.
4. PROVIDE MANUFACTURED INSULATED PAN ASSEMBLY FOR ALL SUPPLY AND VENTILATION AIR DIFFUSERS.
5. PROVIDE GYP. BOARD INSTALLATION KIT FOR AIR DEVICES INSTALLED IN DRYWALL CEILING.
ABBREVIATIONS: SD = SUPPLY AIR DIFFUSER, RG = RETURN AIR GRILLE, EG = EXHAUST AIR GRILLE, SG = SUPPLY AIR GRILLE
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
2025-07-09
20
2
5
-
0
7
-
1
1
1
2
:
3
5
:
5
1
A
M
M6.0
SC
H
E
D
U
L
E
S
-
M
E
C
H
A
N
I
C
A
L
1a
1a
98
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
20
2
5
-
0
7
-
1
0
1
1
:
3
1
:
4
2
P
M
M8.0
SP
E
C
I
F
I
C
A
T
I
O
N
S
-
M
E
C
H
A
N
I
C
A
L
99
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
20
2
5
-
0
7
-
1
0
1
1
:
3
1
:
4
9
P
M
M9.0
TI
T
L
E
2
4
-
M
E
C
H
A
N
I
C
A
L
100
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
20
2
5
-
0
7
-
1
0
1
1
:
3
1
:
5
5
P
M
M9.1
TI
T
L
E
2
4
-
M
E
C
H
A
N
I
C
A
L
101
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
2025-07-09
7/
1
0
/
2
0
2
5
1
0
:
0
1
:
5
4
A
M
E0.0
GE
N
E
R
A
L
I
N
F
O
R
M
A
T
I
O
N
-
EL
E
C
T
R
I
C
A
L
1a
102
NO
PA
R
K
I
N
G
CL
E
A
N
A
I
R
VE
H
I
C
L
E
FROM UTILITY
TRANSFORMER
A
K2
K1
B
1
MS
B
Adjacent Property
Office
Accessible
Entry Kitchen
Toilet 2
Toilet 1
Entry
RetailEntry
SeatingRetail
Coffee Bar
QC LabTraining/
Shipping & RecievingProduction/
Roasting Room
Hall
Pantry
Admin.
Mech.
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
2025-07-09
As indicated
7/
1
0
/
2
0
2
5
1
0
:
0
1
:
5
4
A
M
ES1.0
PR
O
P
O
S
E
D
S
I
T
E
P
L
A
N
-
EL
E
C
T
R
I
C
A
L
1/8" = 1'-0"1PROPOSED SITE PLAN - ELECTRICAL
GENERAL NOTES
A. REFER TO SHEET E0.0 FOR GENERAL NOTES.
CODED NOTES
1. COORDINATE TRANSFORMER SECONDARY FEEDERS/CONDUIT
WITH DRY UTILITY DRAWINGS/CONSULTANT.
4
103
Display / Sales Area
Hallway
Toilet
Utility
Dressing Rm.
Staging Area
Adjacent Property
(D) PANEL B
(D) PANEL A
(D) SERVICE PANEL
(D) METERS
2
1
1
1
1
1
1
3
3
4
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
2025-07-09
1/4" = 1'-0"
7/
1
0
/
2
0
2
5
1
0
:
0
1
:
5
5
A
M
ED1.0
DE
M
O
L
I
T
I
O
N
-
FI
R
S
T
F
L
O
O
R
P
L
A
N
-
EL
E
C
T
R
I
C
A
L
1/4" = 1'-0"ADEMOLITION - FIRST FLOOR PLAN - POWER
GENERAL NOTES
CODED NOTES
1. DISCONNECT AND REMOVE INCLUDING BUT NOT LIMITED TO
EXISTING RECEPTACLES, JUNCTION BOXES, DISCONNECT
SWITCHES, ELECTRICAL EQUIPMENT, ELECTRICAL DEVICES,
CONNECTIONS, WIRING, CONDUITS, ACCESSORIES IN THE ROOM.
UNLESS NOTED OTHERWISE.
2. EXISTING RECESSED PANEL ‘A’TO BE DEMOLISHED AND TO BE
REPLACED WITH A NEW SURFACE MOUNT PANEL REFER TO NEW
WORK PLAN E1.0 FOR NEW LOCATION. ALL THE EXISTING BRANCH
WIRES AND CONDUITS TO REMAIN AND TO BE EXTENDED UP TO
NEW LOCATION. DISCONNECT AND REMOVE EXISTING FEEDER
FROM THE EXISTING SERVICE PANEL AND TO BE RE-FED FROM
NEW SERVICE PANEL. REFER TO SHEETS E1.0 AND E6.0 FOR
ADDITIONAL INFORMATION.
3. DISCONNECT AND REMOVE EXISTING SERVICE PANEL AND
METERS. ALL ASSOCIATED FEEDERS, CONNECTIONS, CONDUITS TO
BE DEMOLISHED. COORDINATE DEMOLITION WORK WITH UTILITY
COMPANY AND ADHERE TO UTILITY STANDARDS AND
REQUIREMENTS.
4. DISCONNECT AND REMOVE INCLUDING BUT NOT LIMITED TO
ELECTRICAL PANEL, WIRES, CONDUITS, CONNECTIONS,
ACCESSORIES.
A. REFER SHEET E-0.0 FOR GENERAL NOTES.
B. EXISTING LAYOUT IS BASED ON AS-BUILT DOCUMENTS AND SITE
SURVEY DATA AVAILABLE. EC SHALL FIELD VERIFY EXISTING
CONDITION FOR ANY DEVIATION. ANY OTHER ELECTRICAL
EQUIPMENT, DEVICE, LIGHT FIXTURE NOT SHOWN ON LAYOUT
SHALL BE COORDINATED WITH OWNER PRIOR TO WORK.
C. EXISTING CONDUIT RUNS ARE NOT SHOWN, A FULL ATTEMPT
HAS BEEN MADE TO SHOW CERTAIN EXISTING CONDITIONS,
TAKEN FROM EXISTING RECORD DRAWINGS OR FIELD VERIFIED,
ON THIS PROJECT. THE DRAWINGS SHOWING LOCATION OF
EXISTING EQUIPMENT, OUTLETS, FIXTURES, QUANTITY, ETC., IN
EXISTING AREAS ARE APPROXIMATE ONLY. FIELD VERIFY
QUANTITIES, DEVICES, AND DEVICE LOCATIONS.
D. EXISTING ELECTRICAL WIRING THAT WILL NOT BE OBSOLETE
AND WHICH WILL BE DISTURBED DUE TO CONSTRUCTION
CHANGES REQUIRED BY THIS CONTRACT SHALL BE RESTORED
TO OPERATING CONDITION, AS REQUIRED OR DIRECTED.
WHERE REQUIRED, SHOWN AND/OR DIRECTED, OUTLETS AND
CONDUIT RUNS SHALL BE RELOCATED. EXTEND CONDUITS AND
PULL NEW WIRING, OR INSTALL JUNCTION BOXES AND SPLICE IN
NEW WIRING, OR REPLACE OLD WIRING WITH NEW WIRE(S)
WHERE NECESSARY.
E. PRESERVE CIRCUITING, SWITCHING AND CONTROL WIRING FOR
EXISTING FIXTURES TO REMAIN. FIELD VERIFY AND MAKE SAFE
EXISTING CIRCUITING AND CONTROL WIRING FOR CONNECTION
OF NEW AND RELOCATED LIGHTING FIXTURES IN THE AREA.
F. EXISTING CONDUIT TO BE ABANDONED SHALL BE REMOVED IF
EXPOSED, IN A CRAWL SPACE, OR IN AN ACCESSIBLE CEILING.
CUT, CAP, AND PLUG EXISTING CONDUIT INACCESSIBLE AREAS
OR WHERE IT IS NOT POSSIBLE TO BE REMOVED. REMOVE
EXISTING ELECTRICAL DEVICES, EQUIPMENT, BRANCH
CIRCUITS, AND FEEDERS IN THEIR ENTIRETY BACK TO THEIR
POINT OF ORIGIN UNLESS OTHERWISE INDICATED. TURN OFF
AND LABEL CIRCUIT BREAKERS AS SPARES FOR NEW WORK.
G. PROPER RESTORATION OF ALL EXISTING SURFACES REQUIRING
PATCHING, PLASTERING, PAINTING, OR OTHER REPAIR DUE TO
THE INSTALLATION OF ELECTRICAL WORK UNDER THE TERMS
OF THIS SPECIFICATION. CLOSE ALL OPENINGS REPAIR ALL
SURFACES, ETC.; AS REQUIRED. PROTECT EXISTING-TO-REMAIN
FLOORS, WALLS, AND PANELS.
H. ALL SALVAGED EXISTING ELECTRICAL EQUIPMENT SHALL BE
TURNED OVER TO THE OWNER. THE ELECTRICAL EQUIPMENT
INCLUDES THE FOLLOWING: LIGHTING FIXTURES, DISCONNECT
SWITCHES, SWITCHES, AND COPPER CONDUCTORS. ANY
ELECTRICAL DEVICES THAT ARE MOVED AND WHICH ARE NOT
REPLACED OR REUSED SHALL BE TURNED OVER TO THE
OWNER.
I. RECYCLE OR DISPOSE MATERIALS OFF-SITE AND INCLUDE ALL
COSTS IN BID. HANDLE ALL MATERIALS IN ACCORDANCE WITH
LEED REQUIREMENTS, ALL FEDERAL, STATE, AND LOCAL
REGULATIONS.
J. OUTLETS FROM WHICH FIXTURES, SWITCHES, RECEPTACLES,
OR OTHER ELECTRICAL DEVICES BEING OMITTED SHALL BE
REMOVED. IF IT IS NOT POSSIBLE TO REMOVE THE DEVICE,
PROVIDE BLANK COVER PLATES TO THE OUTLET BOX AND
REMOVE THE WIRING, WHERE EXISTING WALLS REMAIN INTACT.
K. PROVIDE CODE-COMPLIANT SUPPORT TO EXISTING-TO-REMAIN
UNSUPPORTED CONDUITS AND BOXES WHERE CEILINGS ARE
TO BE REMOVED. RE-ROUTE BRANCH CIRCUITS AND RELOCATE
JUNCTION BOXES AS REQUIRED TO FACILITATE INSTALLATION
OF NEW EQUIPMENT AND SYSTEM.
4
4
104
D
D
OS
OS
OS
OS
D D
OS
OS
D
D
D
(D)(D)(D)(D)
(D)(D)(D)
(D) (D) (D)
(D)(D)
(D)
(D)
(D)
(D)
(D)
(D)(D)
(D)(D)
(D)
(D)(D)
(D) (D)
(D)(D)
(D)(D)
(D)(D)
(D)
(R)(R)(R)(R)(R)(R)(R)
(R)(R)(R)(R)(R)(R)(R)
(R)(R)(R)(R)(R)(D)(D)
(D)(D)(D)(D)
(D)
(D)(D)(D)
(D)
(D)
(D)
(D)
(D)
(D)
(D)
(D)
(D)
(D)
(D)
(D)
(D)
(D)
(D)
(D)
(D)(D)(D)
(D)
(D)
(D)
(D)
(D)
(R)(R)
(R)(R)
(R)(R)
(D)
(D)
(D)
(D)(D)
(D)
(D)(D)
(D)(D)
(D)
(D)
(D)
Entry
(E)
(E)
(E)
(E)
(E)
(E)(E)(E)(E)(E)
(E)
(E)
(E)
(E)
(D)
1
1
1
1
2
1
1
1
(D)
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
1/4" = 1'-0"
7/
1
0
/
2
0
2
5
1
0
:
0
1
:
5
6
A
M
ED2.0
DE
M
O
L
I
T
I
O
N
-
RE
F
L
E
C
T
E
D
C
E
I
L
I
N
G
P
L
A
N
-
LI
G
H
T
I
N
G
1/4" = 1'-0"1DEMOLITION - REFLECTED CEILING PLAN - LIGHTING
GENERAL NOTES
CODED NOTES
1. DISCONNECT AND REMOVE, INCLUDING BUT NOT LIMITED TO
LIGHTING FIXTURES, LIGHTING CONTROLS, ACCESSORIES,
CONNECTIONS, CONDUITS, WIRING ASSOCIATED WITH EXISTING
LIGHTING FIXTURES LABELLED WITH (D) BACK TO SOURCE PANEL.
2. DISCONNECT, REMOVE AND RELOCATE EXISTING LIGHT FIXTURE
LABELLED WITH (R). DISCONNECT AND REMOVE ASSOCIATED
ACCESSORIES, CONNECTIONS, WIRES, CONDUITS BACK TO
SOURCE PANEL. REFER TO NEW WORK ON E2.0 FOR THE NEW
LOCATIONS, AFTER REMOVAL, STORE AND PROTECT FIXTURES
FOR RE-USE.
A. REFER SHEET E-0.0 FOR GENERAL NOTES.
B. EXISTING LAYOUT IS BASED ON AS-BUILT DOCUMENTS AND SITE
SURVEY DATA AVAILABLE. EC SHALL FIELD VERIFY EXISTING
CONDITION FOR ANY DEVIATION. ANY OTHER ELECTRICAL
EQUIPMENT, DEVICE, LIGHT FIXTURE NOT SHOWN ON LAYOUT
SHALL BE COORDINATED WITH OWNER PRIOR TO WORK.
C. EXISTING CONDUIT RUNS ARE NOT SHOWN, A FULL ATTEMPT
HAS BEEN MADE TO SHOW CERTAIN EXISTING CONDITIONS,
TAKEN FROM EXISTING RECORD DRAWINGS OR FIELD VERIFIED,
ON THIS PROJECT. THE DRAWINGS SHOWING LOCATION OF
EXISTING EQUIPMENT, OUTLETS, FIXTURES, QUANTITY, ETC., IN
EXISTING AREAS ARE APPROXIMATE ONLY. FIELD VERIFY
QUANTITIES, DEVICES, AND DEVICE LOCATIONS.
D. EXISTING ELECTRICAL WIRING THAT WILL NOT BE OBSOLETE
AND WHICH WILL BE DISTURBED DUE TO CONSTRUCTION
CHANGES REQUIRED BY THIS CONTRACT SHALL BE RESTORED
TO OPERATING CONDITION, AS REQUIRED OR DIRECTED.
WHERE REQUIRED, SHOWN AND/OR DIRECTED, OUTLETS AND
CONDUIT RUNS SHALL BE RELOCATED. EXTEND CONDUITS AND
PULL NEW WIRING, OR INSTALL JUNCTION BOXES AND SPLICE IN
NEW WIRING, OR REPLACE OLD WIRING WITH NEW WIRE(S)
WHERE NECESSARY.
E. PRESERVE CIRCUITING, SWITCHING AND CONTROL WIRING FOR
EXISTING FIXTURES TO REMAIN. FIELD VERIFY AND MAKE SAFE
EXISTING CIRCUITING AND CONTROL WIRING FOR CONNECTION
OF NEW AND RELOCATED LIGHTING FIXTURES IN THE AREA.
F. EXISTING CONDUIT TO BE ABANDONED SHALL BE REMOVED IF
EXPOSED, IN A CRAWL SPACE, OR IN AN ACCESSIBLE CEILING.
CUT, CAP, AND PLUG EXISTING CONDUIT INACCESSIBLE AREAS
OR WHERE IT IS NOT POSSIBLE TO BE REMOVED. REMOVE
EXISTING ELECTRICAL DEVICES, EQUIPMENT, BRANCH
CIRCUITS, AND FEEDERS IN THEIR ENTIRETY BACK TO THEIR
POINT OF ORIGIN UNLESS OTHERWISE INDICATED. TURN OFF
AND LABEL CIRCUIT BREAKERS AS SPARES FOR NEW WORK.
G. PROPER RESTORATION OF ALL EXISTING SURFACES REQUIRING
PATCHING, PLASTERING, PAINTING, OR OTHER REPAIR DUE TO
THE INSTALLATION OF ELECTRICAL WORK UNDER THE TERMS
OF THIS SPECIFICATION. CLOSE ALL OPENINGS REPAIR ALL
SURFACES, ETC.; AS REQUIRED. PROTECT EXISTING-TO-REMAIN
FLOORS, WALLS, AND PANELS.
H. ALL SALVAGED EXISTING ELECTRICAL EQUIPMENT SHALL BE
TURNED OVER TO THE OWNER. THE ELECTRICAL EQUIPMENT
INCLUDES THE FOLLOWING: LIGHTING FIXTURES, DISCONNECT
SWITCHES, SWITCHES, AND COPPER CONDUCTORS. ANY
ELECTRICAL DEVICES THAT ARE MOVED AND WHICH ARE NOT
REPLACED OR REUSED SHALL BE TURNED OVER TO THE
OWNER.
I. RECYCLE OR DISPOSE MATERIALS OFF-SITE AND INCLUDE ALL
COSTS IN BID. HANDLE ALL MATERIALS IN ACCORDANCE WITH
LEED REQUIREMENTS, ALL FEDERAL, STATE, AND LOCAL
REGULATIONS.
J. OUTLETS FROM WHICH FIXTURES, SWITCHES, RECEPTACLES,
OR OTHER ELECTRICAL DEVICES BEING OMITTED SHALL BE
REMOVED. IF IT IS NOT POSSIBLE TO REMOVE THE DEVICE,
PROVIDE BLANK COVER PLATES TO THE OUTLET BOX AND
REMOVE THE WIRING, WHERE EXISTING WALLS REMAIN INTACT.
K. PROVIDE CODE-COMPLIANT SUPPORT TO EXISTING-TO-REMAIN
UNSUPPORTED CONDUITS AND BOXES WHERE CEILINGS ARE
TO BE REMOVED. RE-ROUTE BRANCH CIRCUITS AND RELOCATE
JUNCTION BOXES AS REQUIRED TO FACILITATE INSTALLATION
OF NEW EQUIPMENT AND SYSTEM.
L. UNLESS NOTED OTHERWISE, ALL EXISTING LIGHTING FIXTURES
LABELLED AS (E) SHALL REMAIN IN PLACE. CONTRACTOR SHALL
MAKE SURE THAT ANY NEW WORK SHALL NOT AFFECT THE
EXISTING OPERATION OF EXISTING LIGHT FIXTURES.
105
J
J
Adjacent Property
Office
Accessible
Entry Kitchen
Toilet 2
Toilet 1
Entry
Retail
Entry
Seating
Retail
Coffee Bar
QC Lab
Training/
Shipping & Recieving
Production/
Roasting Room
Hall
Pantry
Admin.
Mech.
+26"
118
+16"135
+26"
134
+16"132
+26"
120
+18"
127
+18"
128
+18"
+18"
124
+18"+26"
120
+26"
118
+46"+46"
113
+46"
111
+16"
110 107
+16"
106 +16"
+46"+46"
104 +46"
+32"
+42"
142+42"
141
139
+16"
+42"
140
+16"
143145
146
+32"
153 +66"
147
+16"
152
+16"+48"
+42"163 +42"162
+16"
164 +16"
165 +16"166
+16"
158
+16"
192
+16"
193
+48"
+48"
+48"
+48"
169
+48"
+16"
+16"
197
+42"
+42"
+42"
+42"
+16"
204
+26"
208
+26"
210
212
+42"
+42"
213
+42"211
+16"
+16"
187
+16"
184
+16"178 175
+16"
214
+42"
+42"
K1K2A
+48"
169
K1-14
K1-16
K1-15,17
K1-18
K1-19
K1-20,22
K1-21,23
K1-25,27
K1-26
K1-28
K1-30,32
K1-31
K1-33
K1-34
K1-35
K1-36,38
K2-2
K1-37
K1-40
K1-39
K1-42K1-41K1-44
K1-43
K2-1,3
K2-4 K2-5
B-31
B-22
K1-46 K1-45
K1-48
K1-47 K1-12
K1-50,52
B-19 B-21
B-24
K1-10
K1-9,11
K1-8
K1-4,6
K1-3,5
K1-2
B-13
B-10
B-14,16 B-15
B-17
B-25
B-8
B -9
B -11
B -6
B -5
216
B
K1-13
182 B-27,29
195
B-26,28
K1 -1
K1 -24
K1 -29
(N
)
A
C
-1
B -34
B -36
MS
B
K2 -8(N)EF-1
+46"
103
K1-49
+40"
155 K2-6
1 1
1
2
HOOD
CONTROL
PANEL
30A-2P
3
30A-1P
30A-1P
216
K1-54
+42"+42"
+16"
+6"
120.1 120.1
210.1
186.3
186.2
186.1
194
+16"135
K1-51,53
4
GB 5
B -7
B -39
B -44
GWH-1
RCP-1
B -41
B -43
UNDER COUNTER
UNDER BENCH
B -12
B -46
6
8
K1 -7
B -23
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
2025-07-09
1/4" = 1'-0"
7/
1
0
/
2
0
2
5
1
0
:
0
1
:
5
8
A
M
E1.0
PR
O
P
O
S
E
D
F
I
R
S
T
F
L
O
O
R
P
L
A
N
-
PO
W
E
R
1/4" = 1'-0"1PROPOSED FIRST FLOOR PLAN - POWER
GENERAL NOTES
CODED NOTES
1. COORDINATE NEMA RATING WITH KITCHEN CONSULTANT
DRAWINGS PRIOR TO ROUGH-IN.
2. PROVIDE ALL CONTROL WIRING, CONDUIT, ACCESSORIES PER
HOOD SYSTEM DRAWINGS. COORDINATE LOCATION AND
INSTALLATION WITH HOOD/KITCHEN CONSULTANT.
3. COORDINATE LOCATION, MOUNTING WITH KITCHEN CONSULTANT
DRAWINGS PRIOR TO ROUGH-IN.
4. EXISTING "PANEL A" RELOCATED TO NEW LOCATION. RE-FEED
"PANEL A' FROM NEW SERVICE PANEL "MSB". INTERCEPT ALL
EXISTING BRANCH CIRCUITS FED FROM "PANEL A" AND EXTEND UP
TO NEW LOCATION. MAKE NECESSARY MODIFICATIONS TO HAVE
ALL EXISTING BRANCH CIRCUITS OPERATIONAL.
5. PROVIDE A SEPARATE GROUND BUS. FOR MORE INFORMATION SEE
DETAIL#8 ON SHEET E5.0.
6. ANY ELECTRICAL OUTLETS INSTALLED BACK TO BACK ON THE FIRE
RATED WALL SHALL HAVE MINIMUM 24" HORIZONTAL SEPERATION.
7. EXISTING RECESSED PANEL 'A' TO BE REPLACED WITH A NEW
SURFACE MOUNT PANEL. ALL THE EXISTING BRANCH WIRES,
CONDUITS ASSOCIATED WITH EXISTING PANEL 'A' TO BE EXTENDED
UP TO NEW THE LOCATION AS SHOWN. NEW PANEL TO BE RE-FED
FROM NEW SERVICE PANEL. REFER TO E6.0 FOR ADDITIONAL
INFORMATION.
8. NO ELECTRICAL CONNECTION TYPE INFORMATION (PLUG OR
DIRECT) AVAILABLE FOR THE EQUIPMENT. COORDINATE PLUG
TYPE/RATING WITH KITCHEN CONSULTANT/OWNER PRIOR TO
ROUGH-IN.
A. REFER TO SHEET E0.0 FOR GENERAL NOTES.
B. COORDINATE ELEVATION OF KITCHEN RECEPTACLES, JUNCTION
BOXES WITH KITCHEN CONSULTANT DRAWINGS PRIOR TO ROUGH
IN.
C. ALL RECEPTACLES IN KITCHEN/PREP AREAS SHALL BE GFCI PER
CEC 210.8.B.2. PROVIDE GFCI CIRCUIT BREAKER IN LIEU OF GFCI
RECEPTACLE WHERE THE RECEPTACLE IN NOT READILY
ACCESSIBLE TO COMPLY WITH CODE.
D. ALL DEVICES SHALL BE RECESSED IN WALL OR FLOOR MOUNTED,
NO POWER POLES ARE ALLOWED.
E. REFER TO KITCHEN EQUIPMENT SCHEDULE ON SHEET E6.0 FOR
ADDITIONAL INFORMATION.
F. COORDINATE WITH KITCHEN CONSULTANT DRAWINGS FOR
REQUIREMENT OF HARDWIRE (DIRECT) CONNECTION OR
RECEPTACLE CONNECTION (THAT CORRESPONDS WITH
EQUIPMENT PLUG) FOR THE KITCHEN EQUIPMENT.
KITCHEN EQUIP CIRCUIT LEGEND
###XX -YY
XX:PANEL NAME
YY:CIRCUIT NUMBER
###:KITCHEN EQUIPMENT ID
4
4
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a 1a 1a
1a
1a
1a
1a
106
KEF-1
B -18,20
WP WP
WP
B -30,32
(E)RTU-1(E)RTU-4
(E)RTU-2 (E)RTU-5 (E)RTU-3
100A-2P
1
B -33
MAU-1
2
2
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
1/4" = 1'-0"
7/
1
0
/
2
0
2
5
1
0
:
0
1
:
5
9
A
M
E1.1
PR
O
P
O
S
E
D
R
O
O
F
P
L
A
N
-
EL
E
C
T
R
I
C
A
L
GENERAL NOTES
CODED NOTES
A. REFER TO SHEET E0.0 FOR GENERAL NOTES.
B. COORDINATE WITH MEACHANICAL AND KITCHEN CONSULTANT
DRAWINGS PRIOR TO WORK.
1/4" = 1'-0"1PROPOSED ROOF PLAN - ELECTRICAL
1. FACTORY INSTALLED DISCONNCECT SWITCH SHALL BE PROVIDED WITH KITCHEN
EXHAUST FAN. COORDINATE WITH KITCHEN CONSULTANT PRIOR TO WORK. IF
NOT PROVIDED, EC SHALL PROVIDE A 30A-1P DISCONNECT SWITCH.
2. SHOWN FOR REFERENCE ONLY, SEE M1.1 FOR MORE INFORMATION.
107
OS
D
OS
OS
OS
D
D
OS
OS
OS
D
OS OS OS
OS
OS
D
D
TC
D
D
PC
Adjacent Property
Office
Accessible
Entry
Kitchen
Toilet 2
Toilet 1
Entry
Retail
Entry
Seating
Retail
Coffee Bar
QC Lab
Training/
Shipping & Recieving
Production/
Roasting Room
Hall
Pantry
Admin.
Mech.
A A AA
A A
A A AAA
G G G
G
F
D
D
D D D
D
D
D D
D
D D D
D D D
D D D D
D D
D
D
C
C
C
C C C C
F
F
F
F
(R)(R)(R)(R)(R)(R)(R)(R)(R)(R)
(R)(R)(R)(R)(R)(R)(R)(R)(R)
(R)
(R)(R)
(R)
(R)(R)
H
H
H
H
D
D
D D D D
F
F
F F
E
E E
E
B B
C
N
a
aa
a
M
M
2
(E)
(E)
(E)
(E)
(E)
(E)(E)(E)(E)(E)
(E)
(E)
(E)
(E)
m
m
m
d
d
dd
d
d
d d
e
3
e
eeeee
b
e
e
e
e
e
eee
e e e e
e e e
j
f f
ff
3
4
4
4
4
4
4
4
4
4
4
g
g
g
g
a,b,c,d
e, f, g, j,
k, l
4
4
44
44
4
h,ih
h h
h
h
h
h
h
h
i
i
i i
i i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i i
ii
i
i
i
i
7 (TYP.)
5
k
EW1
5
k
5
k
5
k
5
k
N
N
N
N
N
N
N
N
N N N N
N
4
EW1j
m m m
EW1
6
l
l
l
l
5 k 5 k 5 k 5 k 5 k
1
b
b b
h,i
B -38
B -35
B -40
B -37
B -42
8
K
K
i
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
2025-07-09
1/4" = 1'-0"
7/
1
0
/
2
0
2
5
1
0
:
0
2
:
0
1
A
M
E2.0
PR
O
P
O
S
E
D
R
E
F
L
E
C
T
E
D
C
E
I
L
I
N
G
P
L
A
N
-
LI
G
H
T
I
N
G
1/4" = 1'-0"1PROPOSED REFLECTED CEILING PLAN - LIGHTING
GENERAL NOTES
CODED NOTES
1. EC SHALL PROVIDE NDTC LIGHTING CONTROL TIMECLOCK SWITCH
FOR THE KITCHEN AREA LIGHTING CONTROL. SEE DETAIL#1 ON
SHEET E5.1 FOR MORE INFORMATION. COORDINATE EXACT TIME
SCHEDULE REQUIREMENTS WITH OWNER.
2. LIGHT FIXTURES FURNISHED WITH EXHAUST HOOD. EQUIPMENT
MANUFACTURER SHALL BE RESPONSIBLE FOR PROVIDING
SUFFICIENT ILLUMINATION TO COMPLY WITH LOCAL
REQUIREMENTS. REFER TO MANUFACTURER'S WIRING DIAGRAMS
FOR CONNECTION INFORMATION AND CONNECT COMPLETE.
3. PROVIDE CONSTANT HOT CONDUCTOR AHEAD OF ANY SWITCHING
CONTROL FOR THE INTERNAL BATTERY PACK CHARGER.
4. CONNECT EMERGENCY FIXTURE AHEAD OF ANY LOCAL SWITCHING
CIRCUIT.
5. EXISTING CANOPY LIGHT FED VIA EXISTING PANEL 'A', CKT#13.
LIGHTS TO BE CONTROLLED VIA TIMECLCOK CONTROL SPECIFIED
IN CODED NOTE#1. MODIFY EXISTING WIRES TO ACCOMODATE
NEW RELAY PACK CONTROLLED VIA TIME CLOCK. REFER TO DETAL
#1 ON SHEET E5.1.
6. FROM THE AS-BUILTS AND AVAILABLE SITE SURVEY DATA IT IS
UNKNOWN FROM WHICH PANEL AND CIRCUIT THE EXISTING
EXTERIOR WALL LIGHT FED ARE FED FROM. FIELD VERIFY EXISTING
CIRCUIT PRIOR TO WORK. IF NOT FED FROM EXISTING PANEL 'A',
USE SPARE CIRCUIT FROM NEW PANEL 'B' TO FEED THE LIGHT.
LIGHTS TO BE CONTROLLED VIA TIMECLCOK CONTROL SPECIFIED
IN CODED NOTE#1. MODIFY EXISTING WIRES TO ACCOMODATE
NEW RELAY PACK CONTROLLED VIA TIME CLOCK. REFER TO DETAL
#1 ON SHEET E5.1.
7. EXISTING LIGHT FIXTURES BEING RELOCATED. CONNECT
RELOCATED LIGHTS TO NEW CIRCUIT AND CONTROLS AS SHOWN
ON THE NEW WORK PLAN. LIGHT FIXTURE WATTAGE IS TAKEN
FROM AS-BUILT DRAWINGS AND IS ASSUMED TO BE 56 WATTS.
8. PROVIDE PHOTOCELL FACING SOUTH, TO CONTROL BUILDING
EXTERIOR LIGHTING. AIM AND INSTALL PER MANUFACTURER'S
RECOMMENDATIONS. PHOTOCELL SHALL BE COMPATIBLE WITH
nLIGHT CONTROL SYSTEM. SEE DETAILS SHEET FOR ADDITIONAL
INFORMATION.
A. REFER TO SHEET E0.0 FOR GENERAL NOTES.
B. COORDINATE EXACT LIGHTING ZONE REQUIREMENT WITH OWNER
PRIOR TO WORK.
C. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR
EXACT LOCATIONS, MOUNTING HEIGHTS OF LIGHT FIXTURES AND
OTHER CEILING MOUNTED DEVICES.
D. COORDINATE FINAL LIGHT FIXTURE SELECTION FOR DIMMING
TYPE AND PROVIDE COMPATIBLE DIMMER SWITCH.
E. ALL EXISTING LIGHTING FIXTURES LABELLED AS (E) SHALL REMAIN
IN PLACE.
1a
1a
108
Statistics
Description Symbol Avg Max Min Max/Min Avg/Min
PANTRY & KITCHEN EXITS 3.1 fc 7.1 fc 0.6 fc 11.8:1 5.2:1
PRODUCTION/SHIPPING & RECEIVING EXITS 1.4 fc 1.5 fc 1.3 fc 1.2:1 1.1:1
RETAIL ENTRY/COFFEE BAR EXITS 1.0 fc 1.7 fc 0.6 fc 2.8:1 1.7:1
RETAIL ENTRY/HALL EXITS 2.8 fc 7.5 fc 1.5 fc 5.0:1 1.9:1
ROASTING ROOM EXITS 1.4 fc 1.5 fc 1.1 fc 1.4:1 1.3:1
1.1 1.1 1.2 1.3 1.3 1.4 1.4 1.3 1.3 1.3 1.4 1.4 1.4 1.4 1.4 1.4 1.3 1.4 1.5 1.5 1.5 1.5 1.5 1.4 1.3 1.4 1.5 1.5 1.5 1.5 1.5 1.4 1.3 1.4 1.4 1.4 1.4 1.4 1.3 1.2 1.3 1.3 1.3
1.2
1.1 1.1
1.5
1.6
1.7
1.8
2.6
3.9
4.3
6.07.56.95.13.72.82.3
2.3
1.5
1.5
1.61.71.71.71.71.71.71.71.7
0.6
0.6
0.6
0.60.70.7
0.8
0.8
0.8
0.8
0.8
0.80.80.80.90.90.90.90.90.80.80.90.9
0.9
0.80.80.80.80.80.80.80.80.80.8
0.9
0.9
1.0
1.1
1.21.31.3
1.4
1.5
1.6
1.7
1.71.71.71.71.71.7
1.4
1.4
1.5
1.5
1.4
1.4
1.4
1.4
1.4
1.4
1.4
1.3 1.3
0.6 0.7 0.8 1.0 1.3 1.8 2.5 3.4 4.5 5.4 5.8
6.1
6.8
6.6
5.7
5.96.15.44.33.22.31.71.20.90.80.60.6
0.6
0.6 0.7 0.8 1.0 1.3 1.8 2.6 3.7 5.1 6.4
6.5
5.3
1.7
1.7
1.6
Adjacent Property
Office
Accessible
Entry Kitchen
Toilet 2
Toilet 1
Entry
Retail
Entry
Seating
Retail
Coffee Bar
QC Lab
Training/
Shipping & Recieving
Production/
Roasting Room
Hall
Pantry
Admin.
Mech.
N
A
A
N N N N N N
N
N
N
N
N
N
N
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
1/4" = 1'-0"
7/
1
0
/
2
0
2
5
1
0
:
0
2
:
0
2
A
M
E4.0
PH
O
T
O
M
E
T
R
I
C
S
-
EL
E
C
T
R
I
C
A
L
1/4" = 1'-0"1PHOTOMETRICS - ELECTRICAL
GENERAL NOTES
CODED NOTES
1. NOT IN USE.
A. REFER TO SHEET E0.0 FOR GENERAL NOTES.
109
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
2025-07-09
7/
1
0
/
2
0
2
5
2
:
2
9
:
3
0
P
M
E5.0
DE
T
A
I
L
S
-
EL
E
C
T
R
I
C
A
L
1a
1a
1a
1a1a
1a
1a
110
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
2025-07-09
7/
1
0
/
2
0
2
5
2
:
3
0
:
2
0
P
M
E5.1
Checker
Author
DE
T
A
I
L
S
-
EL
E
C
T
R
I
C
A
L
1a
111
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
2025-07-09
7/
1
0
/
2
0
2
5
1
0
:
0
2
:
3
5
A
M
E6.0
SC
H
E
D
U
L
E
S
-
EL
E
C
T
R
I
C
A
L
KITCHEN EQUIPMENT SCHEDULE
NOTES:
1. COORDINATE FINAL ELECTRICAL DATA, CONNECTION TYPE, ROUGH-IN HEIGHT, NEMA RATING WITH KITCHEN CONSULTANT DRAWINGS.
213 1 --Water Boiler 5 gal w/aeration 240 1 22 5.28 PLUG 42"NEMA L6-30P/R
212 1 --Batch Brewer 240 1 14.6 3.50 PLUG 42"NEMA L6-20P/R
211 1 --Lab Grinder 120 1 -- 1.30 PLUG 42"NEMA 5-15P
210.1 1 --Espresso tamper 120 1 -- 0.07 PLUG 26"NEMA 5-15P
210 1 --Espresso grinder 120 1 -- 0.58 PLUG 26"NEMA 5-15P
208 1 --Espresso Machine 240 1 -- 4.60 PLUG 26"NEMA L6-30P/R
204 1 --Dishwasher 120 1 12 1.44 PLUG 16"NEMA 5-15P
QC LAB
197 1 x Reach In Solid Swing Door Refrigerator 120 1 6.9 0.83 PLUG 16"NEMA 5-15P
195 1 x Bulk Grinder 240 1 -- 2.20 ----FUTURE TBD
194 1 x Accumulator Table 120 1 5 0.60 PLUG 16"NEMA 5-15P
193 1 x Conveyor Band sealer 120 1 12 1.44 PLUG 16"NEMA 5-15P
192 1 x Weigh/Fill bag filler 120 1 2 0.24 PLUG 16"NEMA 5-15P
187 1 --FUTURE 120 1 15 1.80 PLUG 16" VERIFY NEMA RATING WITH KITCHEN CONSULTANT
186.3 1 --Roaster Label Printer 120 1 -- 0.18 PLUG 48"NEGLIGABLE LOAD - CONV OUTLET
186.2 1 --Roaster Laser printer 120 1 -- 0.18 PLUG 48"NEGLIGABLE LOAD - CONV OUTLET
186.1 1 --Roaster Workstation PC 120 1 -- 0.18 PLUG 48"NEGLIGABLE LOAD - CONV OUTLET
184 1 --Air Compressor - 20Gal, 4HP, with AAD & Dryer 240 1 14 3.36 PLUG 16"NEMA 6-15P
182 1 --Coffee Roaster 240 1 -- 7.50 DIRECT 6"SO DROP WITH STRAIN RELIEF & DISCONNECT
178 1 --Floor Scale - Receiving 120 1 -- 0.25 PLUG 16"NEGLIGABLE LOAD - CONV OUTLET
175 1 x Electric Lift Charger 120 1 12.5 1.50 PLUG --NEMA 5-15P
170.3 1 --Production Label Printer 120 1 -- -- PLUG 48" NEGLIGABLE LOAD - CONV OUTLET
170.2 1 --Production Laser printer 120 1 -- -- PLUG 48"NEGLIGABLE LOAD - CONV OUTLET
170.1 1 --Production Workstation PC 120 1 -- -- PLUG 48"NEGLIGABLE LOAD - CONV OUTLET
169 2 --Shipping Scale 120 1 -- 0.18 PLUG 48"NEGLIGABLE LOAD - CONV OUTLET
ROASTERY
166 1 --Ice Machine 120 1 8.8 1.06 PLUG 16"NEMA 5-15P
165 1 --Reach In Solid Swing Door Refrigerator 120 1 6.9 0.83 PLUG 16"NEMA 5-15P
164 1 --Reach In Solid Swing Door Freezer 120 1 3.7 0.44 PLUG 16"NEMA 5-15P
163 1 x Pastry Laminator 120 1 1 0.12 PLUG 42"NEMA 5-15P
162 1 --Stand Mixer (1/2 HP)120 1 9.8 1.18 PLUG 42"NEMA 5-15P
158 1 --Dishwasher 240 1 28 6.72 PLUG 16"NEMA 6-30P
155 1 --Convection Oven 120 1 1 0.12 PLUG 40"NEMA 5-15P
153 1 --HD Induction Range 240 1 24 5.76 PLUG 32"NEMA 6-30P
152 1 x Refrigerated Chefs Base 120 1 4.4 0.53 PLUG 16"NEMA 5-15P
147 1 x Cheese Melter 120 1 10 1.20 PLUG 66"NEMA 5-15P
146 1 x Meat Slicer 120 1 15 1.80 PLUG 42"NEMA 5-15P
145 2 x Rice/Grain Cooker 120 1 10.4 1.25 PLUG 42"NEMA 5-15P
143 1 --Salad Sandwich Prep Station 120 1 6.5 0.78 PLUG 16"NEMA 5-15P
142 1 x Waffle Iron 120 1 10 1.20 PLUG 42" NEMA 5-15P
141 1 x Sous vide cooker 120 1 -- 1.15 PLUG 42"NEMA 5-15P
140 1 --Conveyor Toaster 120 1 13.3 1.60 PLUG 42"NEMA 5-15P
139 1 x Worktop Refrigerator 120 1 4 0.48 PLUG 16"NEMA 5-15P
KITCHEN
216 1 --R/O Water System Formulator 120 1 6 0.72 PLUG 48"NEMA 5-15P (4 OUTLETS REQUIRED)
214 1 --Reach In Refrigerated Merchandiser 120 1 15 1.80 PLUG 16" VERIFY NEMA RATING WITH KITCHEN CONSULTANT
135 2 x Pour Over Unit 240 1 12 2.88 PLUG 16" VERIFY NEMA RATING WITH KITCHEN CONSULTANT
134 1 x Bulk Coffee Grinder 120 1 -- 1.30 PLUG 26"NEMA 5-15P
132 1 --Undercounter Refrigerator 120 1 2 0.24 PLUG 16"NEMA 5-15P
128 1 --Espresso AV 2 Group 240 1 11 2.64 PLUG 18" VERIFY NEMA RATING WITH KITCHEN CONSULTANT
127 1 --Espresso Steam Unit 240 1 14.4 3.46 PLUG 18" VERIFY NEMA RATING WITH KITCHEN CONSULTANT
124 1 --Espresso AV 2 Group 240 1 11 2.64 PLUG 18" VERIFY NEMA RATING WITH KITCHEN CONSULTANT
120.1 4 --Auto Tamper 120 1 -- 0.07 PLUG 26"NEMA 5-15P
120 4 --Espresso Grinder 120 1 -- 0.84 PLUG 26"NEMA 5-15P
118 2 --POS System Interface 120 1 -- 0.50 PLUG 26"NEMA 5-15P, 4 PLEX CONV OUTLET
113 1 --Filter Coffee Brewer 240 1 25.4 6.10 PLUG 46"NEMA L6-30P/R
111 1 --Bulk Coffee Grinder 120 1 -- 1.30 PLUG 46"NEMA 5-15P
110 1 --Ice Machine 120 1 5.2 0.62 PLUG 16"NEMA 5-15P
107 1 --Back Bar Refrigerator 120 1 3.2 0.38 PLUG 16"NEMA 5-15P (PROVIDE ACCESS DOOR)
106 1 --Carbonator 120 1 6.5 0.78 PLUG 16"NEMA 5-15P
104 1 x Combi Oven 240 1 20 4.80 PLUG 46"NEMA L6-20
103 1 x Soft Serve Machine 120 1 9 1.08 PLUG 46"NEMA 5-20P
COFFEE BAR
TAG QTY FUTURE KITCHEN EQUIPMENT VOLT PHASE AMPS KVA CONNECTION... ROUGH IN AFF REMARKS
KITCHEN EQUIPMENT SCHEDULE (ELECTRICAL)
1a
1a
112
LIGHTING FIXTURE SCHEDULE
TAG SYMBOL DESCRIPTION MANUFACTURER MODEL LUMENS MOUNTING FINISH LOCATION LAMP COLOR
TEMP CONTROLS WATTS VOLTS NOTES
A 2'X4' LIGHT TROFFER LITHONIA CPX-2X4-6000LM-80CRI-40K-SWL-MIN10-ZT-120 6000 RECESSED WHITE INDOOR LED 3500 0-10V 41.8 120 CONFIRM FINISH WITH ARCHITECT PRIOR TO SUBMIT
THE SHOP DRAWING.
B 2'X2' LIGHT TROFFER LITHONIA CPX-2X2-6000LM-80CRI-40K-SWL-MIN10-ZT-120 6000 RECESSED WHITE INDOOR LED 3500 0-10V 54.1 120 CONFIRM FINISH WITH ARCHITECT PRIOR TO SUBMIT
THE SHOP DRAWING.
C DECORATIVE PENDANT LIGHT BULBSQUARE JAPANESE MINIMALIST MATTE TEXTURE RESIN DOME 1-LIGHT PENDANT
LIGHT TBD PENDANT BLUE INDOOR LED TBD PHASE DIMMING 14 120
CONFIRM FINISH WITH ARCHITECT PRIOR TO SUBMIT
THE SHOP DRAWING. WATTS ARE ASSUMED FOR
E26 BASE LED BULB OF 1500LUMENS.
D TBD TBD TBD TBD TBD WHITE INDOOR LED TBD PHASE DIMMING 14 120
DETAILS AWAITED FROM INTERIOR DESIGNER.
WATTS ARE ASSUMED FOR E26 BASE LED BULB OF
1500LUMENS.
E TBD TBD TBD TBD TBD TBD TBD TBD TBD PHASE DIMMING 14 TBD
DETAILS AWAITED FROM INTERIOR DESIGNER.
WATTS ARE ASSUMED FOR E26 BASE LED BULB OF
1500LUMENS.
F CEILING SCONCE SCHOOL HOUSE
ELECTRIC ALABAX LARGE SURFACE MOUNT TBD TBD TBD TBD TBD TBD PHASE DIMMING 14 TBD CONFIRM FINISH WITH ARCHITECT PRIOR TO SUBMIT
THE SHOP DRAWING.
G 4' WRAPAROUND COOPER 4WSNLED-LD4-40SL-F-UNV-L840-CD1-U 4000 SURFACE WHITE INDOOR LED 4000K 0-10V 40 120 CONFIRM FINISH WITH ARCHITECT PRIOR TO SUBMIT
THE SHOP DRAWING.
H EXIT SIGN LITHONIA LQM S W RG MVOLT M6 --SURFACE WHITE INDOOR LED --EM 3 120 CONFIRM FINISH WITH ARCHITECT PRIOR TO SUBMIT
THE SHOP DRAWING.
L TRACK LIGHT WAC LIGHTING LUCIO 6010 10W 85CRI 600 TRACK WHITE INDOOR LED 3000K PHASE DIMMING 15 120 CONFIRM FINISH WITH ARCHITECT PRIOR TO SUBMIT
THE SHOP DRAWING.
M RECESSED LIGHT TBD TBD TBD TBD TBD TBD TBD TBD PHASE DIMMING 14 TBD
DETAILS AWAITED FROM INTERIOR DESIGNER.
WATTS ARE ASSUMED FOR E26 BASE LED BULB OF
1500LUMENS.
K VANITY WALL SCONCE TBD TBD TBD TBD TBD TBD TBD TBD PHASE DIMMING 14 TBD
DETAILS AWAITED FROM INTERIOR DESIGNER.
WATTS ARE ASSUMED FOR E26 BASE LED BULB OF
1500LUMENS.
N EMERGENCY CEILING PACK
LIGHT LITHONIA ELM6L 1100 WALL/CEILING WHITE INDOOR LED 5000K -11 120 CONFIRM FINISH WITH ARCHITECT PRIOR TO SUBMIT
THE SHOP DRAWING.
EW1 EMERGENCY CEILING PACK
LIGHT LITHONIA AFB-PEL-DWHGXD-UVOLT-N-SDRT-WT 225 WALL WHITE OUTDOOR LED 4000K -6.95 120 CONFIRM FINISH WITH ARCHITECT PRIOR TO SUBMIT
THE SHOP DRAWING.
NOTES:
1. PROVIDE ALL REQUIRED HARDWARE, CABLES. ETC., FOR A FULLY FUNCTIONAL INSTALLATION
2. REFER TO ARCHITECTURAL & LIGHTING PLANS AND SPECIFICATIONS FOR EXACT REQUIREMENTS, LOCATION & INSTALLATION
3. HALF OR FULL SHADED FIXTURES SHALL HAVE MINIMUM 90 MIN. INTEGRAL BATTERY WITH TEST SWITCH (UNLESS NOTED OTHERWISE).
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
7/
1
0
/
2
0
2
5
1
0
:
0
2
:
3
5
A
M
E6.1
SC
H
E
D
U
L
E
S
-
EL
E
C
T
R
I
C
A
L
LIGHTING SCHEDULE
113
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
2025-07-09
7/
1
0
/
2
0
2
5
1
0
:
0
2
:
3
8
A
M
E6.2
SC
H
E
D
U
L
E
S
-
EL
E
C
T
R
I
C
A
L
NOTES:
TOTAL 71392 VA 66.28% 47322 VA
NON-COINCIDENT 0% 0.0 VA
EQUIPMENT N - NON-COINCIDENT
KITCHEN 68772 VA 65.00% 44702 VA E - EQUIPMENT
MOTORS K - KITCHEN
HEATING M - MOTORS
AIR CONDITIONING H - HEATING TOTAL DEMNAD CURRENT 197 A
RECEPT (REMAINDER)0 VA 50%0 VA A - AIR CONDITIONING TOTAL CONNECTED CURRENT 297 A
RECEPT (FIRST 10 kVA)2620 VA 100% 2620 VA R - RECEPTACLE TOTAL DEMAND LOAD 47322 VA
LIGHTING L - LIGHTING TOTAL CONENCTED LOAD 71392 VA
LOAD DESCRIPTION CONNECTED LOAD D.F. DEMAND LOAD CODE PANEL TOTALS
Total Amps:286 A 309 A 0 A
Total Load:34.3 kVA 37.1 kVA 0.0 kVA
65 SPACE 1 -- ------ 1 SPACE 66
63 SPACE 1 -- ---- -- 1 SPACE 64
61 SPACE 1 -- ------ 1 SPACE 62
59 SPARE 1 20 0 0 20 1 SPARE 60
57 SPARE 1 20 0 0 20 1 SPARE 58
55 0 20 1 SPARE 56
53 1.4 0.7 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C K RO WATER SYSTEM (216) 54
51 POUR OVER UNIT (135)K 2-#12, 1-#12GND IN 3/4"C 2 20 1.4 3.4 52
49 SOFT SERVE MACHINE (103)K 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 1.1 3.4 40 2 2-#8, 1-#10GND IN 3/4"C K DISHWASHER (158)50
47 REACH IN REFRIGERATOR (165) K 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.8 0.4 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C K REACH IN - FREEZER (164) 48
45 STAND MIXER (162)K 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.2 0.1 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C K PASTRY LAMINATOR (163) 46
43 MEAT SLICER (146)K 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 1.8 1.3 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C K RICE/GRAIN COOKER (145) 44
41 SANDWICH PREP STATION (143) K 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.8 0.5 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C K WORKTOP REFRIGERATOR (139) 42
39 CONVEYOR TOASTER (140)K 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 1.6 1.2 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C K SOUS VIDE COOKER (141) 40
37 WAFFLE IRON (142)K 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 1.2 2.4 38
35 CARBONATOR (106)K 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.8 2.4 25 2 2-#10, 1-#10GND IN 3/4"C K COMBI OVEN (104)36
33 ICE MACHINE (110)K 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.6 0.4 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C K BACK BAR REFRIGERATOR (107) 34
31 BULK COFFEE GRINDER (111) K 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 1.3 3.1 32
29 RECEP - COFFEE BAR R 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.5 3.1 35 2 2-#8, 1-#10GND IN 3/4"C K FILTER COFFEE BREWER (113)30
27 1.3 0.5 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C R POS SYSTEM INTERFACE (118) 28
25 ESPRESSO AV 2 GROUP (124) K 2-#12, 1-#12GND IN 3/4"C 2 20 1.3 0.9 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C K ESPRESSO GRINDER (120 &120.1) 26
23 1.3 0.4 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C R RECEP - COFFEE BAR 24
21 ESPRESSO AV 2 GROUP (128) K 2-#12, 1-#12GND IN 3/4"C 2 20 1.3 1.7 22
19 ESPRESSO GRINDER (120/120.1) K 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.9 1.7 20 2 2-#12, 1-#12GND IN 3/4"C K ESPRESSO STEAM UNIT (127)20
17 1.4 0.2 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C K UC REFRIGERATOR (132) 18
15 POUR OVER UNIT (135)K 2-#12, 1-#12GND IN 3/4"C 2 20 1.4 1.3 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C K BULK COFFEE GRINDER (134) 16
13 RO WATER SYSTEM (216)K 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.7 0.5 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C R POS SYSTEM INTERFACE (118) 14
11 2.3 1.1 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C K ICE MACHINE (166) 12
9 ESPRESSO MACHINE (208)K 2-#12, 1-#12GND IN 3/4"C 2 20 2.3 1.4 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C K DISHWASHER (204) 10
7 RECEP - TRAINING/QC LAB R 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.4 0.7 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C K ESPRESSO GRINDER (210/210.1) 8
5 2.6 1.8 6
3 WATER BOILER (213) K 2-#12, 1-#12GND IN 3/4"C 2 20 2.6 1.8 20 2 2-#12, 1-#12GND IN 3/4"C K BATCH BREWER (212)4
1 RECEP - TRAINING/QC LAB R 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.4 1.3 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C K LAB GRINDER (211) 2
CKT CIRCUIT DESCRIPTION CODE FEEDER POLE TRIP
(A)
A
(KVA)
B
(KVA)
C
(KVA)
A
(KVA)
B
(KVA)
C
(KVA)
TRIP
(A)
POLE FEEDER CODE CIRCUIT DESCRIPTION CKT
MOUNTING:SURFACE ENCLOSURE:NEMA-1
SUPPLY FROM:B WIRES:3 MAINS:250 A, MLO
LOCATION:PRODUCTION/SHIPPING & RECEIVING PHASE:1 BUS RATING:400 A
PANEL NAME:K1 VOLTAGE:120/240V A.I.C. RATING:22 KAIC
NOTES:
TOTAL 8540 VA 72.63% 6203 VA
NON-COINCIDENT 0% 0.0 VA
EQUIPMENT 750 VA 100.00% 750 VA N - NON-COINCIDENT
KITCHEN 7790 VA 70.00% 5453 VA E - EQUIPMENT
MOTORS K - KITCHEN
HEATING M - MOTORS
AIR CONDITIONING H - HEATING TOTAL DEMNAD CURRENT 26 A
RECEPT (REMAINDER)0 VA 50%0 VA A - AIR CONDITIONING TOTAL CONNECTED CURRENT 36 A
RECEPT (FIRST 10 kVA)0 VA 100% 0 VA R - RECEPTACLE TOTAL DEMAND LOAD 6203 VA
LIGHTING L - LIGHTING TOTAL CONENCTED LOAD 8540 VA
LOAD DESCRIPTION CONNECTED LOAD D.F. DEMAND LOAD CODE PANEL TOTALS
Total Amps:31 A 40 A 0 A
Total Load:3.7 kVA 4.8 kVA 0.0 kVA
17 SPACE 1 -- ------ 1 SPACE 18
15 SPACE 1 -- ---- -- 1 SPACE 16
13 SPARE 1 20 0 0 20 1 SPARE 14
11 SPARE 1 20 0 0 20 1 SPARE 12
9 SPARE 1 20 0 0 20 1 SPARE 10
7 SPARE 1 20 0 0.8 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C E HOOD CONTROL PANEL 8
5 REFRIGERATED CHEFS BASE (152) K 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.5 0.1 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C K CONVECTION OVEN (155) 6
3 2.9 1.2 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C K CHEESE MELTER (147) 4
1 HD INDUCTION RANGE (153) K 2-#10, 1-#10GND IN 3/4"C 2 30 2.9 0.2 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C K RECP - KITCHEN 2
CKT CIRCUIT DESCRIPTION CODE FEEDER POLE TRIP
(A)
A
(KVA)
B
(KVA)
C
(KVA)
A
(KVA)
B
(KVA)
C
(KVA)
TRIP
(A)
POLE FEEDER CODE CIRCUIT DESCRIPTION CKT
MOUNTING:SURFACE ENCLOSURE:NEMA-1
SUPPLY FROM:B WIRES:3 MAINS:50 A, MLO
LOCATION:PRODUCTION/SHIPPING & RECEIVING PHASE:1 BUS RATING:100 A
PANEL NAME:K2 VOLTAGE:120/240V A.I.C. RATING:14 KAIC
NOTES:
TOTAL 132075 VA 64.34% 93978 VA
NON-COINCIDENT 0% 0.0 VA
EQUIPMENT 5570 VA 100.00% 5570 VA N - NON-COINCIDENT
KITCHEN 110257 VA 65.00% 71667 VA E - EQUIPMENT
MOTORS 1250 VA 100.00% 1250 VA K - KITCHEN
HEATING M - MOTORS
AIR CONDITIONING 1224 VA 100.00% 1224 VA H - HEATING TOTAL DEMNAD CURRENT 392 A
RECEPT (REMAINDER)600 VA 50% 300 VA A - AIR CONDITIONING TOTAL CONNECTED CURRENT 550 A
RECEPT (FIRST 10 kVA)10000 VA 100% 10000 VA R - RECEPTACLE TOTAL DEMAND LOAD 93978 VA
LIGHTING 3174 VA 125.00% 3967 VA L - LIGHTING TOTAL CONENCTED LOAD 132075 VA
LOAD DESCRIPTION CONNECTED LOAD D.F. DEMAND LOAD CODE PANEL TOTALS
Total Amps:540 A 561 A 0 A
Total Load:64.8 kVA 67.3 kVA 0.0 kVA
53 SPACE 1 -- ------ 1 SPACE 54
51 SPACE 1 -- -- -- -- 1 SPACE 52
49 SPACE 1 -- ------ 1 SPACE 50
47 SPARE 1 20 0 0 20 1 SPARE 48
45 SPARE 1 20 0 0.7 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C R RECEP- PRODUCTION SH. & RE. 46
43 RCP-1 E 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.1 1.1 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C R RECEPTACLES 44
41 GWH-1 E 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.6 0.6 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C L PRODUCTION/SHIPP. - LTGS 42
39 REC - RETAIL SEATING R 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.9 0.7 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C L KIT./PAN./MECH/R.R/OFF./LAB - LTGS 40
37 ROASTING ROOM - LTGS L 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 1 0.2 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C L COFFEE BAR - LTGS 38
35 HALL/RETAIL ENTRY/COF. BAR - LTGS L 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.7 1.3 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C M KITCHEN - EF-1 36
33 ROOF RECEPTACLE R 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.2 1.2 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C A KITCHEN - AC-1 34
31 ACCUMULATOR TABLE (194)R 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.6 1.7 32
29 3.8 1.7 30 2 2-#10, 1-#10GND IN 3/4"C K KEF-1 (ROOF)30
27 COFFEE ROASTER (182)K 2-#12, 1-#12GND IN 3/4"C 2 20 3.8 1.1 28
25 ELECTRIC LIFT CHARGER (175) E 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 1.5 1.1 20 2 2-#12, 1-#12GND IN 3/4"C K BULK GRINDER (195)26
23 SHIPPING SCALE (169)E 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.4 0.8 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C K REACH IN REFRIGERATOR (197) 24
21 CONVEYOR BAND SEALER (193) E 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 1.4 0.2 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C R RECP- PRODUCTION SHIPPING & RE. 22
19 WEIGH/FILL BAG FILLER (192) E 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.2 6.4 20
17 QUAD RECEP- ROASTING ROOM E 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.4 6.4 80 2 2-#3, 1-#8GND IN 1"C K MAU-1 (ROOF)18
15 FLOOR SCALE - RECEIVING (178) E 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.3 1.7 16
13 DCO - ROASTING ROOM R 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.2 1.7 20 2 2-#12, 1-#12GND IN 3/4"C K AIR COMPRESSOR (184)14
11 REC - TOILET & MECH R 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.4 0.7 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C R RECEP- PRODUCTION SH. & RE. 12
9 REC - RETAIL SEATING R 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 1.1 1.8 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C K ROASTED COFFEE (187) 10
7 REC - RETAIL SEATING R 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.9 1.8 35 1 1-#8, 1-#8, 1-#10GND IN 3/4"C K REACH IN REF. MERCH. (214) 8
5 REC - TRAINING/QC LAB R 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.4 0.7 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C R REC - ADMIN OFFICE 6
3 37.1 4.8 4
1 PANEL K1 SF REFER TO ONE LINE DIAGRAM 2 250 34.3 3.7 50 2 REFER TO ONE LINE DIAGRAM SF PANEL K2 2
CKT CIRCUIT DESCRIPTION CODE FEEDER POLE TRIP
(A)
A
(KVA)
B
(KVA)
C
(KVA)
A
(KVA)
B
(KVA)
C
(KVA)
TRIP
(A)
POLE FEEDER CODE CIRCUIT DESCRIPTION CKT
MOUNTING:SURFACE ENCLOSURE:NEMA-1
SUPPLY FROM:MSB WIRES:3 MAINS:500 A, MLO
LOCATION:PRODUCTION/SHIPPING & RECEIVING PHASE:1 BUS RATING:600 A
PANEL NAME:B VOLTAGE:120/240V A.I.C. RATING:22 KAIC
CODED NOTES
1. PROVIDE GROUND FAULT CIRCUIT INTERRUPTER BREAKER.
2. PROVIDE CIRCUIT BREAKER WITH SHUNT TRIP. EC SHALL
INTERLOCK SHUNT TRIP WITH THE HOOD FIRE SUPPRESSION
SYSTEM. COORDINATE WITH KITCHEN CONSULTANT AND HOOD
SYSTEM DRAWINGS FOR REQUIREMENT.
B
K1
K2
1
1
1
1
1
1
1
1
1
2
1a
1a
1a
1a
1a
1a
1
11
1
1
1a
1a
1a
1a
1a
114
M
M
M
600A
2P
500A
2P
NEW MAIN SWITCH BOARD "MSB"
600 AMP BUS
240/120V, 1-PHASE, 3W, 42KAIC
NEMA-3R
N
G
WATER
STEEL
2
#3/0 CU
#3/0 CU
500A
MLO
PANEL B
200A
MLO
PANEL A
200A
2P
SPARE
SPACE
PULL SECTION/
MAIN BREAKER SECTION
DISTRIBUTION SECTIONDISTRIBUTION SECTION
GAS LT
~
V.
D
.
=
15
'
0.
2
%
LT
~
V.
D
.
=
20
'
0.
2
%
UTILITY
TRANSFORMER
1
3
UTILITY
PRIMARY
4
500.3 200.3
600.3
200A
2P
5
250A
MLO
PANEL K1
100A
MLO
PANEL K2
250.3
LT~
V.D.=
10'
0.1%
LT~
V.D.=
12'
0.01%
50.3
100%
RATED
7
LOAD SUMMARY NEW SWITCHBOARD "MSB"
LOAD DESCRIPTION DEMAND LOAD
(KVA)
(E) PANEL A 35.4
PANEL B 92.2
TOTAL DEMAND LOAD 127.6
TOTAL AMPS@ 240V 532
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
2025-07-09
07
-
1
0
-
2
0
2
5
2
2
:
4
9
:
1
5
E7.0
ON
E
-LI
N
E
-
EL
E
C
T
R
I
C
A
L
12" = 1'-0"1ONE-LINE DIAGRAM & ELEVATION - ELECTRICAL
GENERAL NOTES
CODED NOTES
1. MINIMUM CONDUITS SHOWN, CONTRACTOR SHALL PROVIDE
ADDITIONAL CONDUITS AS NECESSARY TO MEET THE UTILITY
COMPANY'S MINIMUM REQUIREMENTS. SEE DRY UTILITY PLANS
FOR PROPOSED ROUTING AND ADDITION INFORMATION.
COORDINATE WITH SCE AND ADHERE TO THEIR REQUIREMENTS.
2. SYSTEM GROUNDING. LOCATE IN NEMA 3 ENCLOSURE ADJACENT
TO MAIN SWITCH BOARD. SEE SYSTEM GROUNDING DETAIL ON
DETAIL#8 SHEET -E5.0 FOR MORE INFORMATION.
3. PROVIDE ARC FLASH LABEL ON EQUIPMENT PER CEC 110.16. LABEL
SHALL INDICATED VOLTAGE, AVAILABLE FAULT CURRENT,
CLEARING TIME OF OCP, AND DATE LABEL WAS APPLIED.
4. EXISTING PANEL 'B' (125A) TO BE REMOVED AND REPLACED WITH
NEW PANEL 'B' RATED AT 500A. COORDINATE ALL DEMOLITION AND
INSTALLATION WORK WITH THE ELECTRICAL CONTRACTOR.
5. PROVIDE METER SECTION IN GEAR WITH INSTANT, HISTORICAL
TRACKING, AND PEAK KWH WITH USER DEFINED RATE PERIOD
(PER TITLE 24, TABLE 130.5A).
6. ELECTRICAL DEMAND LOAD FOR EXISTING PANEL 'A' SHOWN IS
FROM AVAILABLE AS-BUILT DOCUMENTS. EC SHALL FIELD VERIFY
DATA.
7. EXISTING RECESSED PANEL ‘A’TO BE DEMOLISHED AND TO BE
REPLACED WITH A NEW SURFACE MOUNT PANEL REFER TO NEW
WORK PLAN E1.0 FOR NEW LOCATION. DISCONNECT AND REMOVE
EXISTING FEEDER FROM THE EXISTING SERVICE PANEL AND RE-
FED FROM NEW SERVICE PANEL AS SHOWN.
A. REFER TO SHEET E0.0 FOR GENERAL NOTES.
B. THE CONTRACTOR SHALL VERIFY THE EQUIPMENT DIMENSIONS
AND CONFIRM IT WILL FIT WITH THE CODE REQUIRED
CLEARANCES PRIOR TO SUBMITTING FOR REVIEW AND PRIOR TO
ORDERING. CONFLICTS SHALL BE COORDINATED WITH THE GC,
ARCHITECT, AND ENGINEER PRIOR TO SUBMITTING FOR REVIEW.
C. ALL CONDUCTORS ARE BASED ON COPPER, THHN / THWN,
UNLESS NOTED OTHERWISE.
D. CONFIRM MANUFACTURER'S RECOMMENDED OVER CURRENT
PROTECTION PRIOR TO ORDERING EQUIPMENT.
E. CONTRACTOR SHALL PROVIDE A MAXIMUM AVAILABLE FAULT
CURRENT LABEL TO SERVICE ENTRANCE EQUIPMENT (CEC
110.20(A)).
F. EQUIPMENT SUPPLIER SHALL PROVIDE A ARCH FLASH STUDY AND
COORDINATION STUDY AS PART OF THE EQUIPMENT SUBMITTAL.
STUDIES SHALL BE PROVIDED TO ENGINEER OF RECORD FOR
APPROVAL AND BE SUBMITTED TO LOCAL BUILDING DEPARTMENT.
CONTRACTOR SHALL INCLUDE TIME FOR SUBMITTAL AND REVIEW
IN THEIR PROJECT SCHEDULE.
G. ALL UNDERGROUND GROUND CONNECTIONS SHALL BE
EXOTHERMIC, ABOVE GROUND MAY BE VIA COMPRESSION.
H. CONTRACTOR SHALL CONFIRM EQUIPMENT GEAR SIZE, REQUIRED
CLEARANCES, AND LOCATION PRIOR TO ISSUING SUBMITTALS
FOR REVIEW.
I. THE CONTRACTOR SHALL COORDINATE THE SPECIFIC
CONFIGURATION OF THE GEAR AND LOCATION OF THE PULL
SECTION WITH FIELD CONDITIONS AND THE UTILITY PRIOR TO
ORDERING THE GEAR. WHAT IS SHOWN ON THIS DRAWING IS
DIAGRAMMATIC.
6
4
4
1a
115
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
7/
1
0
/
2
0
2
5
1
0
:
0
3
:
0
5
A
M
E8.0
SP
E
C
I
F
I
C
A
T
I
O
N
S
-
EL
E
C
T
R
I
C
A
L
116
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
7/
1
0
/
2
0
2
5
1
0
:
0
3
:
1
1
A
M
E9.0
TI
T
L
E
2
4
-
EL
E
C
T
R
I
C
A
L
117
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
7/
1
0
/
2
0
2
5
1
0
:
0
3
:
1
4
A
M
E9.1
TI
T
L
E
2
4
-
EL
E
C
T
R
I
C
A
L
118
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
7/
1
0
/
2
0
2
5
1
0
:
0
3
:
2
0
A
M
E9.2
TI
T
L
E
2
4
-
EL
E
C
T
R
I
C
A
L
119
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
7/
1
0
/
2
0
2
5
1
0
:
0
3
:
2
6
A
M
E9.3
Checker
Author
TI
T
L
E
2
4
-
EL
E
C
T
R
I
C
A
L
120
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
7/
1
0
/
2
0
2
5
1
0
:
0
3
:
2
8
A
M
E9.4
Checker
Author
TI
T
L
E
2
4
-
EL
E
C
T
R
I
C
A
L
121
COFFEE COMPANY
DESERT KID
ROASTERY AND CAFE
44850 SAN PABLO
PALM DESERT, CA
DEVELOPMENT
122
COFFEE COMPANY
DESERT KID
ROASTERY AND CAFE
44850 SAN PABLO
PALM DESERT, CA
DEVELOPMENT
123
COFFEE COMPANY
DESERT KID
ROASTERY AND CAFE
44850 SAN PABLO
PALM DESERT, CA
DEVELOPMENT
124
COFFEE COMPANY
DESERT KID
ROASTERY AND CAFE
44850 SAN PABLO
PALM DESERT, CA
DEVELOPMENT
125
COFFEE COMPANY
DESERT KID
ROASTERY AND CAFE
44850 SAN PABLO
PALM DESERT, CA
DEVELOPMENT
126
COFFEE COMPANY
DESERT KID
ROASTERY AND CAFE
44850 SAN PABLO
PALM DESERT, CA
DEVELOPMENT
127
MENU BOARD
ESPRESSO
COTADO
CAPPUCINO
LATTE
MOCHA
FILTER COFFEE
TEA
HOT CHOCOLATE
COFFEE COMPANY
DESERT KID
ROASTERY AND CAFE
44850 SAN PABLO
PALM DESERT, CA
DEVELOPMENT
128
COFFEE COMPANY
DESERT KID
ROASTERY AND CAFE
44850 SAN PABLO
PALM DESERT, CA
DEVELOPMENT
129
COFFEE COMPANY
DESERT KID
ROASTERY AND CAFE
44850 SAN PABLO
PALM DESERT, CA
DEVELOPMENT
130
COFFEE COMPANY
DESERT KID
ROASTERY AND CAFE
44850 SAN PABLO
PALM DESERT, CA
DEVELOPMENT
131
COFFEE COMPANY
DESERT KID
ROASTERY AND CAFE
44850 SAN PABLO
PALM DESERT, CA
DEVELOPMENT
132
COFFEE COMPANY
DESERT KID
ROASTERY AND CAFE
44850 SAN PABLO
PALM DESERT, CA
DEVELOPMENT
133
MENU BOARD
ESPRESSO
COTADO
CAPPUCINO
LATTE
MOCHA
FILTER COFFEE
TEA
HOT CHOCOLATE
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I J
ID-1ID-1
134
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I J
ID-1ID-2
135
ID-3
BAR & BACK BAR
L01L02WD-01 shelving, see
Coffee Consultant
drawings for elevation,
see ID-1 for detail
WD-01
Bar
ST-03
Stone
Countertop
ST-02
Tile Bar Face
ST-01
Tile Wall
BACK BAR VIEW FROM BAR
TOWARD ROASTERY EXTERIOR VIEW 1 EXTERIOR VIEW 2
ST-02
Tile Wall
Slider window
Fixed window
WD-01
Wood
Countertop
WD-01
Wood Cabinetry
ST-01
Tile Wall
WD-01
Wood Retail
Wall & Shelving,
see drawing for
detail
WD-01
Wood Bench,
see drawing for
detail
136
5/5/2025
FINISHES SPECIFICATIONS
STONE & TILE
WOOD
PAINT
Tag Location QTY Item Manufacturer Item Description Size Finish Link
Tag Location QTY Item Manufacturer Item Description Size Finish
Tag Location QTY Item Manufacturer Product Type Color Finish
ST-01 Retail Wall & Back Bar Wall Tile Zia Tile Glazed Earth 2" x 6"
ST-02 Espresso Bar Face Tile Zia Tile Perpetual Check 4 3.875" H & 1.875" H
ST-03 Bar & Espresso Bar Stone Top By GC Soapstone 3/4" thick GC to submit samples
WD-01 Wood Throughout Red Oak By GC Red Oak Varies GC to submit samples
PT-01 Walls Throughout Paint Benjamin Moore Wall Paint OC-17 White Dove (TBC) Matte
PT-02 Ceiling & Trusses Paint Benjamin Moore Trim Paint OC-17 White Dove (TBC) Satin
PT-03 Roastery Window Frames Paint Per Manufacturer Per Manufacturer To match walls Per Manufacturer
PT-04 Training Room Window Frames Paint Per Manufacturer Per Manufacturer To match walls Per Manufacturer
PT-05 Bathroom Door Frames Paint Benjamin Moore Trim Paint OC-17 White Dove (TBC) Satin
PT-06 Bathroom Doors Paint Benjamin Moore Shop Applied Spray OC-17 White Dove (TBC) Satin
PT-07 Round Columns Paint By GC Type 5 Drywall Paint with Plaster Finish GC to submit samples
Spec
Spec
5/9/2025
F
in n siin i Finish
CH-01 Entry Left 6 Stools - Table Height 34"Table height 34"
CH-02A Entry Left 1 Corner bench Custom, by GC Red Oak
CH-02B Entry Left 1 Bench cushions
CH-03 Display Wall 12 Chairs
CH-04 Lounge 1 Sofa
CH-05 Lounge 2 Poufs
CH-06 Lounge 2 Armchairs
CH-07A South Window 1 Bench Custom, by GC Red Oak
CH-07B South Window 1 Bench cushions
CH-08 South Window 5 Chairs
CH-09 Espresso Bar 4 Stools - Table Height 34"Table height 34"
CH-10 Exterior 24 Chairs
TB-01 Display Wall 2 Table
TB-02 Lounge 2 Coffee Tables
TB-03 Lounge 2 Side Tables
TB-04 South Window 5 Bistro Tables
TB-05 Exterior 10 Tables
TB-06 Entry Left 2 Tables
RG-01 Lounge 1 Rug
SH-01 Shelving at Bar 2 Wood Shelf Custom, by GC Floating shelf Refer to Drawings Red Oak
SH-02 Shelving at Retail 6 Wood Shelf Custom, by GC Floating shelf 4'-4" Length, VIF Red Oak
SH-03 Shelving at Entry Left 1 Wood Shelf Custom, by GC Floating shelf 5'-1" Length, VIF
5/5/2025
LIGHTING SCHEDULE
Tag Location QTY Item Manufacturer Item Description Size Finish Link
L01 Throughout 26 Pendant Castell Castell 12" Globe LED Pendant 12" Diameter Black
L02 Above Main Bar 8 Pendant MOOIJANE Bohemia Pendant Lamp 15.7" Diameter, 8.3" H Amber Red
L03 Back Bar 10 Track Light WAC Summit L-Track 6" Tall 3000K LED Track Head
with Field Adjustable Beam Angle 6-1/8" H White
L04 Retail 2 Recessed Light
L05 Lounge 4 Ceiling Sconce Schoolhouse Electric Alabax Large Surface Mount Large - 8 1/4" Diameter,
7" H Juniper
L06 Entry to WC Hall 1 Ceiling Sconce Schoolhouse Electric Alabax Large Surface Mount Large - 8 1/4" Diameter,
7" H Juniper
L07 Hall to WC 2 Sconce / Pendant Schoolhouse Electric Alabax Large Surface Mount Large - 8 1/4" Diameter,
7" H Juniper
L08 Bathrooms 2 Ceiling Sconce Schoolhouse Electric Alabax Large Surface Mount Large - 8 1/4" Diameter,
7" H Juniper
L09 Bathrooms 2 Wall Sconce Rich Brillians Willing Crisp Sconce 5" Diameter Frosted Interior
L10 Roastery 4 Pendant Castell Castell 12" Globe LED Pendant 12" Diameter Black
L11 Roastery 4 Spotlight
Spec
Spec
Spec
Spec
Spec
Spec
Spec
Spec
Spec
ID-4
137
138
Jason K Finley
Jason K Finley
jfinley@palmdesert.gov
2025.08.11
13:27:40-07'00'
PLANNING CONDITION:
Prior to final inspection, the applicant
shall submit for approval the proposed
method of rooftop equipment
screening. Submittal shall include
updated elevations, roof plan, and all
applicable plan sheet revisions.
Screening shall consist of a single,
continuous enclosure made of solid
material, fully concealing all rooftop
equipment from view on all sides, and
designed to integrate cohesively with
the materials and architectural style of
the existing parapets.
TIMP25-0031
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
NAILING SCHEDULE TABLE
·
·
·
·
·
WOOD SHEAR AND DIAPHRAGMS:
WOOD CONSTRUCTION
·
·
·
·
·
GENERAL NOTES AND SPECIFICATIONS
WOOD WIND DESIGN
SEISMIC DESIGN
PARAMETERS DESIGN CBC 2022
·
·
·
·
·
·
BASIS OF DESIGN
CONCRETE FOUNDATION, FLOOR SLABS,
·
CONCRETE NOTES
·
·
·
·
·
·
·
·
·
·
·
·
·
·
ADDITIONAL NOTES
RESEARCH REPORT
·
STRUCTURAL OBSERVATION/ SIGNIFICANT CONSTRUCTION STAGES
(Only Checked items are required)
Firm or Individual to be responsible for the "Structural Observation":
Name: Licensed Architect:Registered Engineer:
Phone: Registration Number:
CONSTRUCTION
STAGE
Construction Type Elements/Connections to be observed
Foundation Footing, Stem Walls, Piers
Mat Foundation
Caisson, Pile, Grade beams
Stepping/Retaining
Foundation, Hillside Special
Anchors
Others:
Concrete
Masonry
Wood
Others:
Wall
Steel Moment Frame
Steel Braced Frame
Concrete Moment Frame
Masonry Moment Frame
Others:
Concrete
Steel Deck
Wood
Others:
Frame
Diaphragm
Others
Rebar Size & Placement
Shear Wall, Framing Connections
Plywood Sheathing & Roof Nailing
DECLARATION BY OWNER OR OWNER'S REPRESENTATIVE
I, the owner of the project the owner's representative, declare that the above listed firm or individual is hired by me
to be the Structural Observer.
Signature Date
DECLARATION BY ARCHITECT OR ENGINEER OF RECORD ( required if the Structural Observer is different
from the Architect or Engineer of Record)
I, the Architect or Engineer of Record for the project, declare that the above listed firm or individual is designated by
me to be responsible for the "Structural Observation').
Signature License No.Date
GENERAL NOTES FOR STRUCTURAL OBSERVATION:
ICC-ES REPORT #
S-1.0 GENERAL NOTES
S-2.0 FOUNDATION PLAN
S-2.1 ROOF FRAMING PLAN
S-3.0 FOUNDATION & FRAMING DETAILS
S-4.0 FRAMING DETAILS
SHEET INDEX
SPECIAL INSPECTIONS
S-3.1 FOUNDATION & FRAMING DETAILS
GENERAL NOTES
S-1.0
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I J
164
FOUNDATION NOTES
1. ALL HOLDOWNS & ANCHOR BOLTS SHALL BE SET IN PLACE BY TEMPLATE
PRIOR TO FOUNDATION INSPECTION.
2. ALL POSTS SHALL BE CONNECTED TO SILL PLATE WITH "A35" AT EA. SIDE
TYP. UNLESS HARDWARE IS NOTED ON PLAN.
3. ALL FOOTING SHALL HAVE F'c = 2500 PSI UNLESS NOTED OTHERWISE.
4. PLATE WASHERS ARE REQUIRED FOR ALL HOLDOWNS BRACKETS.
5. ALL BOLT HOLES SHALL BE DRILLED A MAXIMUM OF 1/16" OVERSIZED.
INSPECTOR TO VERIFY.
6. ALL HOLDOWN ANCHOR NUTS SHALL BE FINGER TIGHT AND 1/2 WRENCH
TURN JUST PRIOR TO COVERING THE WALL FRAMING.
7. HOLD-DOWN CONNECTOR BOLTS INTO WOOD FRAMING REQUIRE
APPROVED PLATE WASHERS.
8. CONNECTOR BOLTS INTO WOOD FRAMING REQUIRE STEEL PLATE
WASHERS IN ACCORDANCE AF&PA’S 2015 SPECIAL DESIGN PROVISIONS
FOR WIND AND SEISMIC (SDPWS-15)
9. FOUNDATION SILL SHALL BE NATURALLY DURABLE OR
PRESERVATIVE-TREATED WOOD. FIELD-CUT ENDS, NOTCHES AND DRILLED
HOLES OF PRESERVATIVE-TREATED WOOD SHALL BE FIELD-TREATED PER
AWPA M4.
10. CONTRACTOR TO VERIFY ALL DIMENSIONS & ELEVATIONS WITH
ARCHITECTURAL PLANS PRIOR TO STARTING ANY WORK.
11. ALL STUDS OVER 10 FEET TALL AND LESS THAN 15 FEET SHALL BE 2x6 OR
3x4 @ 16" O.C.
12. FASTENERS IN PRESERVATIVE TREATED WOOD OR FIRE RETARDANT
TREATED WOOD SHALL BE OF HOT ZINC COATED GALVANIZED STEEL OR
STAINLESS STEEL..
INDICATES SHEAR WALL TYPE, SEE SCHEDULE
INDICATES GRID LINE
INDICATES POST BELOW
INDICATES NEW WALL
LEGEND
INDICATES (N) FOOTING
INDICATES (E) FOOTING
A
SIZE
21" SQ
MARK
1
REINFORCEMENT
@ BOTTOM
FOOTING SCHEDULE
THICKNESS
24"(4) #5 EA. WAY
CONCRETE F'c
2500 PSI
DEPUTY INSP.
NO
INDICATES EXISTING WALL
A C
1
2
(E) CONC. SLAB
ON GRADE
15
'
-
7
"
5
5'
-
0
"
5
HDU
54X6
HDU
54X6
HDU
54X6
HDU
5
4X6
2
S3.0
2
S3.0
1
S3.0
3
S3.0TYP.
3
S3.0TYP.
3
S3.0TYP.
3
S3.0TYP.
1 1
11
6
S3.0
6
S3.0
5
S3.0
5
S3.0
SCALE: 1/4" = 1'-0"
FOUNDATION PLAN & 1st. FLOOR SHEAR WALLS ABOVE
(E) POST & FOOTING
(E) POST & FOOTING
B
14
'
-
6
"
5
5'
-
1
"
5
4'
-
0
"
5
7
S3.0
HDU
84X6
HDU
84X6
HDU
84X6
HDU
8
4X6
HDU
84X6
HDU
8
4X6
8
S3.0
8
S3.0
8
S3.0
7
S3.0
7
S3.0
16
S3.0
1
S3.0
Notes:
1.75"7"24" o.c.6" o.c. to Blkg.10d @ 12" o.c.10d @ 2" o.c.15/32" Struct I*
10d @ 2" o.c. 10d @ 12" o.c.See note 5.1.75"7"12" o.c.15/32" Struct I*
Both Sides
1/2" Dia. x 6" long lag @ 12" o.c.
2"1.75"3/8" Dia. x 6" long lag @ 8" o.c7"32" o.c.12" o.c. to Blkg.10d @ 12" o.c.10d @ 4" o.c.15/32" Struct I
15/32" Struct I 8" o.c. to Blkg.8d @ 2" o.c. 8d @ 12" o.c.24" o.c.3/8" Dia. x 6" long lag @ 6" o.c1.75"7"2"
Bolt
Embed.
Sheathing
Material
15/32" Struct I
15/32" Struct I
Wall ID Shear transfer,
Bottom sill and
Top Plate
A35/LTP4 @
24" o.c. to Blkg.
16" o.c. to Blkg.
8d @ 12" o.c.8d @ 6" o.c.
10d @ 6" o.c. 10d @ 12" o.c.
Panel Nailing
Edges Fields
48" o.c.
48" o.c.
Anchor Bolt
5 8" @
20d common nail @ 6" o.c.
20d common nail @ 6" o.c.
Sill-Plate Connection
1.75"7"
1.75"7"
Bolt Edge
Distance (N)
Footing
2"
2"
Min. Blkg.
Thk. below
Sill-Plate
2"
2"
15/32" Struct I 8" o.c. to Blkg.8d @ 3" o.c. 8d @ 12" o.c.24" o.c.3/8" Dia. x 6" long lag @ 6" o.c1.75"7"2"
15/32" Struct I*
Both Sides 8d @ 2" o.c. 8d @ 12" o.c.See note 5 16" o.c.1.75"7"2"
Shear
(lbs/ft)
YES
See note 4
NO
Special
Inspection
NO
YES
See note 4
YES
See note 4
YES
See note 4
YES
See note 4
YES
See note 4
715
392
477
1,221
2,442
1,024
771
2,049
LRFD - Shear Wall Schedule from Table 4.3A SDPWS-2021 (values multiplied by 0.5)
1/2" Dia. x 6" long lag @ 8" o.c.
1/2" Dia. x 6" long lag @ 6" o.c.
Bolt Edge
Distance (E)
Footing
1
2
3
4
5
6
7
8
1.5"
1.5"
3.5"
3.5"
3.5"
3.5"
3.5"
3.5"
1) This nailing schedule is for common nails only and all panels edges fastened to framing. Plywood can be installed either horizontally or vertically.
2) Shear Panels 3 to 8 requires 3X framing members at the bottom sill plate when resting on concrete, and behind vertical or horizontal panel edges. Also minimum 1/2" edge
nailing distance at panel ends and edges.
3) Use square plate washers 3" x 3" x 1/4" thk. for 5/8" diameter bolts.
4) Deputy inspection required where the fastener spacing of the sheathing is 4 - inches on center or less. Applies to shear panel 3, 4, 5, 6, 7 & 8.
5) For 2x4 stud walls:
-Use 4x blocking between joist when joist are perpendicular to wall or align a 4x continue member over the wall when joist are parallel to wall. Use LTP4 at 5" o.c. both sides.
For 2x6 stud walls:
-Use 4x blocking between joist when joist are perpendicular to wall or align a 4x continue member over the wall when joist are parallel to wall. Use LTP4 at 5" o.c. to connect
aligned faces of wall and blocking or continue member and use A35 at 5" o.c. to connect the non aligned face of blocking or continue member with the top of top plate.
*Framing at adjoining panel edges shall be nominal 3" or wider. nails shall be staggered in two lines along panel edges when nail spacing is 2" o.c., or when 10d common nails spaced 3" o.c. penetrate framing
more than 1-5/8".S-2.0
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I J
165
LOW ROOF/ FLOOR FRAMING NOTES
1. ROOF SHEATHING SHALL BE 1/2" PLYWOOD, CD-X P11 32/16, w/ 8d COMMON
NAILS @ 6", 12" O.C.
2. ALL SHEAR WALLS ARE FULL HEIGHT TO THE ROOF AND FLOOR
DIAPHRAGM.
3. ALL POSTS ARE 4 x 6 MINIMUM U.N.O.
4. ALL POSTS SHALL BE CONNECTED TO SILL PLATE WITH "A35" AT EA. SIDE
TYP. UNLESS HARDWARE IS NOTED ON PLAN.
5. ALL EXT. WALLS, SHEAR WALLS & BEARING WALLS EXCEEDING 10'-0" AND
LESS THAN 15'-0" HEIGHT SHALL BE 2x6 OR 3x4 @ 16" O.C.
6. ALL WOOD FRAMING MEMBERS U.N.O. SHALL BE:
2x MEMBER DF #2 OR BETTER
4x MEMBER DF #2 OR BETTER
2x STUDS DF #2 OR BETTER
7. ALL DIAPHRAGM AND SHEAR WALL NAILING SHALL UTILIZE COMMON NAILS
OR GALVANIZED BOX.
8. FASTENERS IN PRESERVATIVE TREATED WOOD OR FIRE RETARDANT
TREATED WOOD SHALL BE OF HOT ZINC COATED GALVANIZED STEEL OR
STAINLESS STEEL.
9. CITY LICENSED FABRICATOR REQUIRED FOR GLULAM BEAMS, VERSA LAM,
TJI & STRUCTURAL STEEL.
10. ROOF DIAPHRAGM NAILING TO BE INSPECTED BEFORE COVERING FACE
GRAIN OF PLYWOOD SHALL BE PERPENDICULAR TO SUPPORTS. PLYWOOD
SPANS SHALL CONFORM TABLE 2304.7
11. SHOP WELDS MUST BE PERFORMED IN A CITY LICENSED FABRICATOR
SHOP.
12. WELDING TO BE DONE BY WELDERS CERTIFIED BY THE CITY BUILDING
DEPARTMENT FOR STRUCTURAL STEEL.
13. CONTINUOUS DEPUTY INSPECTION BY A REGISTER DEPUTY INSPECTOR IS
REQUIRED FOR FIELD WELDING.
14. ALL WOOD BEAM SHALL BE CONNECTED TO POST WITH COLUMN CAP.
UNLESS HARDWARE IS NOTED ON PLAN.
15. ALL WOOD HEADER SHALL BE CONNECTED TO POST OR 2-2x TRIMED STUD
WITH POST CAP. UNLESS HARDWARE IS NOTED ON PLAN.
3
S-4.0
A
BEAM SCHEDULE (U.N.O.) - ROOF
BEAM
TYPE SIZE POST
SUPPORT REMARKS
6x10 D.F.#2HDR1 4x6 -
STL1 --
STL2 -
W6x9
W6x9
INDICATES SHEAR WALL TYPE, SEE SCHEDULE
INDICATES GRID LINE
INDICATES POST BELOW
INDICATES NEW WALL
LEGEND
HDR
STL
DENOTES HEADER
DENOTES STEEL BEAM
ABBREVIATIONS
ROOF RAFTERS (R.R.) - SIZE AND SPACING PER PLAN
INDICATES EXISTING WALL
HSS 4x4x1/8
(E) ROOF TRUSSES
A
1
2
15
'
-
3
"
5
5'
-
0
"
5
(E) HDR
(E
)
H
D
R
(E) HDR (E) HDR(E) HDR(E) HDR(E) HDR(E) HDR(E) HDR
(N) 4x6 HDR(N) 4x6 HDR
(N) 4x6 HDR
(N) 4x6 HDR
(N) 4x6 HDR
(E
)
H
D
R
(E
)
H
D
R
(E
)
H
D
R
(E
)
H
D
R
(E
)
H
D
R
HD
R
1
(E) POST
(E) POST
(E) POST
(E
)
R
O
O
F
T
R
U
S
S
E
S
FR
A
M
I
N
G
(N
)
4
x
6
H
D
R
(N
)
4
x
6
H
D
R
(N
)
4
x
6
H
D
R
(N
)
4
x
6
H
D
R
(N
)
4
x
6
H
D
R
DBL.
R.R.
2x8 R.R.
@ 16" O.C.
2x8 R.R.
@ 16" O.C.
2x8 R.R.
@ 16" O.C.
2x8 R.R.
@ 16" O.C.
STL1
STL1
ST
L
2
ST
L
2
POST P1
HSS 4x4x1/8
POST P1
HSS 4x4x1/8
POST P1
HSS 4x4x1/8
POST P1
HSS 4x4x1/8
4
S3.0
4
S3.0
4
S3.0
4
S3.0
13
S3.0
13
S3.0
13
S3.0
13
S3.0
18
S3.0
18
S3.0
18
S3.0
18
S3.0
18
S3.0
18
S3.0
9
S3.0
HVAC &
CONNECTION
PER MNFR.
HOOD VENT &
CONNECTION
PER MNFR.
14
S3.0
10
S3.0TYP.
10
S3.0TYP.
10
S3.0TYP.
10
S3.0TYP.
10
S3.0TYP.
10
S3.0TYP.
10
S3.0TYP.
10
S3.0TYP.
11
S3.0
12
S3.0
12
S3.0
12
S3.0
ROOF FRAMING PLAN & 1st. FLOOR SHEAR WALLS BELOW
SCALE: 1/4" = 1'-0"
14
'
-
6
"
5
5'
-
1
"
5
4'
-
0
"
5
2x8 R.R.
@ 16" O.C.
DBL. R.R.
DBL. R.R.
DB
L
.
R
.
R
.
DB
L
.
R
.
R
.
2x8 R.R.
@ 16" O.C.2x8 R.R.
@ 16" O.C.
11
S3.0
14
S3.0
14
S3.0
19
S3.0
19
S3.0
CB
(2
)
C
M
S
T
1
2
(2
)
C
M
S
T
1
2
(2
)
C
M
S
T
1
2
(2
)
C
M
S
T
1
2
(2
)
C
M
S
T
1
2
(2
)
C
M
S
T
1
2
20
S3.0
20
S3.0
20
S3.0
20
S3.0
20
S3.0
(E
)
B
E
A
M
(E
)
B
E
A
M
(E
)
B
E
A
M
(E) HDR
(E) 2x8
ROOF FRAMING
(E) 2x8
ROOF FRAMING
S-2.1
Notes:
1.75"7"24" o.c.6" o.c. to Blkg.10d @ 12" o.c.10d @ 2" o.c.15/32" Struct I*
10d @ 2" o.c. 10d @ 12" o.c.See note 5.1.75"7"12" o.c.15/32" Struct I*
Both Sides
1/2" Dia. x 6" long lag @ 12" o.c.
2"1.75"3/8" Dia. x 6" long lag @ 8" o.c7"32" o.c.12" o.c. to Blkg.10d @ 12" o.c.10d @ 4" o.c.15/32" Struct I
15/32" Struct I 8" o.c. to Blkg.8d @ 2" o.c. 8d @ 12" o.c.24" o.c.3/8" Dia. x 6" long lag @ 6" o.c1.75"7"2"
Bolt
Embed.
Sheathing
Material
15/32" Struct I
15/32" Struct I
Wall ID Shear transfer,
Bottom sill and
Top Plate
A35/LTP4 @
24" o.c. to Blkg.
16" o.c. to Blkg.
8d @ 12" o.c.8d @ 6" o.c.
10d @ 6" o.c. 10d @ 12" o.c.
Panel Nailing
Edges Fields
48" o.c.
48" o.c.
Anchor Bolt
5 8" @
20d common nail @ 6" o.c.
20d common nail @ 6" o.c.
Sill-Plate Connection
1.75"7"
1.75"7"
Bolt Edge
Distance (N)
Footing
2"
2"
Min. Blkg.
Thk. below
Sill-Plate
2"
2"
15/32" Struct I 8" o.c. to Blkg.8d @ 3" o.c. 8d @ 12" o.c.24" o.c.3/8" Dia. x 6" long lag @ 6" o.c1.75"7"2"
15/32" Struct I*
Both Sides
8d @ 2" o.c. 8d @ 12" o.c.See note 5 16" o.c.1.75"7"2"
Shear
(lbs/ft)
YES
See note 4
NO
Special
Inspection
NO
YES
See note 4
YES
See note 4
YES
See note 4
YES
See note 4
YES
See note 4
715
392
477
1,221
2,442
1,024
771
2,049
LRFD - Shear Wall Schedule from Table 4.3A SDPWS-2021 (values multiplied by 0.5)
1/2" Dia. x 6" long lag @ 8" o.c.
1/2" Dia. x 6" long lag @ 6" o.c.
Bolt Edge
Distance (E)
Footing
1
2
3
4
5
6
7
8
1.5"
1.5"
3.5"
3.5"
3.5"
3.5"
3.5"
3.5"
1) This nailing schedule is for common nails only and all panels edges fastened to framing. Plywood can be installed either horizontally or vertically.
2) Shear Panels 3 to 8 requires 3X framing members at the bottom sill plate when resting on concrete, and behind vertical or horizontal panel edges. Also minimum 1/2" edge
nailing distance at panel ends and edges.
3) Use square plate washers 3" x 3" x 1/4" thk. for 5/8" diameter bolts.
4) Deputy inspection required where the fastener spacing of the sheathing is 4 - inches on center or less. Applies to shear panel 3, 4, 5, 6, 7 & 8.
5) For 2x4 stud walls:
-Use 4x blocking between joist when joist are perpendicular to wall or align a 4x continue member over the wall when joist are parallel to wall. Use LTP4 at 5" o.c. both sides.
For 2x6 stud walls:
-Use 4x blocking between joist when joist are perpendicular to wall or align a 4x continue member over the wall when joist are parallel to wall. Use LTP4 at 5" o.c. to connect
aligned faces of wall and blocking or continue member and use A35 at 5" o.c. to connect the non aligned face of blocking or continue member with the top of top plate.
*Framing at adjoining panel edges shall be nominal 3" or wider. nails shall be staggered in two lines along panel edges when nail spacing is 2" o.c., or when 10d common nails spaced 3" o.c. penetrate framing
more than 1-5/8".
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I J
166
E.N.
1.75"
MIN.
SEE PLAN
SE
E
P
L
A
N
4"4"
3"
C
L
R
(4)1
2" DIA. THREADED ROD. SIMPSON
SET-XP EPOXY
ESR #2508
6"
4"x4"x1
8"
STEEL COLUMN
1/2" THK.
STEEL PLATE
10"
10
"
1/2" THK.
STEEL PLATE
4"x4"x1
8"
STEEL COLUMN
1/4
1/4
(4)1
2" DIA. THREADED ROD. SIMPSON
SET-XP EPOXY
ESR #2508
E70
E70
STEEL BEAM
PER PLAN
1/2"THICK STL.
PLATE W/4-5/8"Ø
M. BOLTS
1/8
1/4" STIFFENER
PLATE BOTH
SIDES
ELEVATION
PLATE DETAIL
A
HSS 4x4x1/8
STEEL COLUMN
SPLICE WHERE
OCCURS
NOTE:
HOT DIP GALVANIZE EXPOSED
STEEL MEMBERS OR USE RED
PAINT TO PROTECT AGAINST
CORROSION
3" x 2" x 3/8" THK.
x 3" HT. ANGLE
TOP VIEW
(2) 5/8" DIA. BOLT
A307
1/4" GAP
11/16"
HOLE TYP.
STEEL BEAM
PER PLAN
STEEL BEAM
PER PLAN
SIDE VIEWANGLE
1"
1"
1"
3"
3" x 2" x 3/8" THK.
x 3" HT. ANGLE
CONT. WOOD FILLER
EA. SIDE W/ 3/4"Ø
THRU BOLTS @ 16" O.C.
STAGG.
B.N.
SHTG
PER PLAN
HANGERS (TYP.)
FOR SIZE AND LOCATIONS OF
MECHANICAL AND ARCH'L PLANS
NOTE: SEE PLUMBING, ELECTRICAL
LSTA24
TYP.
'JB' OR 'U'
PER PLAN
OR BEAM
DOUBLE JOIST
OPENINGS.
OR
P
E
R
P
L
A
N
4'
-
0
"
M
A
X
.
PARALLEL PERPENDICULAR
POST PER PLAN W/
SIMPSON "HUC"
CONCEALED HANGER
HEADER PER PLAN
DOUBLE PLATE
STUDS
PER PLAN
HEADER BEAM
PER PLAN
(E) DOUBLE
PLATE
SIMPSON "A35"
EA.
2-2x TRIMMER
2x KING
STUD
(E) STUD
12" MIN
24
"
4"4"E.N.
℄ WALL & FTN'G
EM
B
E
D
M
E
N
T
12" MIN
24
"
4"4"E.N.
℄ WALL & FTN'G
E.N.
B.N.
112"
11
2"
112 "
6"LAP PER 6
S-3.1
EXISTING NEW
POST PER PLAN
2x4 BOTTOM CHORD
STRAP PER PLAN
~
6"
M
I
N
.
NOTES:
1. THREADED ROD SHALL BE ASTM A307 OR A36.
2. TIGHTEN ALL BOLTS PRIOR TO COVERING.
3. BOLT HOLES IN POST TO BE 1/16" LARGER THAN
BOLT. INSPECTOR TO VERIFY.
S-3.0
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I J 167
45°
45
°
6d
3"M
I
N
.
45°
SEE SCHED. (24" MIN.)
CONCRETE
48d (24"MIN.)
CONC. BLOCK
D = 6d #3 THROUGH #8
D = 8d #9 THROUGH #11
D = 10d #14 THROUGH #18
STANDARD BEND
7"
M
I
N
.
EM
B
E
D
M
E
N
T
112"d
12
d
d
4d
3"MIN.
D
NOTES:
1. ALL SPLICES SHALL BE CLASS B TENSION LAP SPLICES U.N.O.
2. LENGTHS SHOWN ARE FOR GRADE 60 UNCOATED BARS.
3. LENGTHS SHOWN ARE IN INCHES.
4. INCREASE LENGTHS 30% FOR LIGHT WEIGHT CONC. & AT FOUR BAR BUNDLES
(WHERE 2 BARS LAP WITH 2 OTHER BARS) INDIVIDUAL BARS WITHIN A BUNDLE
SHALL NOT OVERLAP.
5. TOP BARS - HORIZONTAL BARS PLACED WITH MORE THAN 12" OF FRESH CONC.
CAST BELOW THEM.
6. INCREASE LENGTHS 50% WHERE a < db OR WHERE b < db FOR BEAMS & COL.S OR
WHERE b < 2db FOR OTHER ELEMENTS.
7. FOR #14 & #18 BARS, USE MECHANICAL SPLICE IN ACCORDANCE WITH CBC
REQUIREMENTS.
TENSION LAP SPLICE SCHEDULE
WHERE: "a" IS THE CLEAR COVER
"b" IS THE CLEAR SPACING
"db" IS THE BAR DIA.
"db"
"b"
"a"
"a
"
CLOSED TIE
LAP SPLICE
ALTERNATE CLOSED TIE
ANCHOR BOLT
STANDARD HOOK
42" LENGTH
(21" EACH SIDE OF DAMAGED ZONE)
S-3.1
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I J
168
WALL SHEATHING
ROOF / FLOOR SHEATHING
TYPICAL BORING & NOTCHING AT
SHEAR WALL PLATE DETAIL
40% D (MAX.)
BORING & NOTCHING DETAIL
TYPICAL FLOOR & ROOF JOIST
JOIST SPAN BETWEEN CL. OF BEARING WALLS
1/3 SPAN
2"
M
I
N
.
1/3 SPAN
"Y
"
"X
"
D/
D
E
P
T
H
1/3 SPAN
TYPICAL STUD WALL
FRAMING DETAIL
WIDTH=D
NON-BEARING
5 8" MIN.
60% D (MAX.)
60
%
D
PARTITION
WIDTH=D
BORED HOLE
60
%
D
25% D (MAX.)
40% D (MAX.)
5 8" MIN.
1 1/4"x16 GA. STRAP W/ 6-10d
COMM. NAILS EA. END @EA.
PLATE (STRAP NOT REQ'D FOR
SILL PLATE)
114" x 16 GA. STRAP W/ 8-10d
COMM. NAILS EA. END @EA.
PLATE (STRAP NOT REQ'D FOR
SILL PLATE)
114" x 16 GA. STRAP W/ 11-10d
COMM. NAILS EA. END @ EA.
PLATE (STRAP NOT REQ'D FOR
SILL PLATE)
114" Ø MAX.
BORED
HOLE
NOTCHES 6'-0"
O.C. MIN.
2x4 DBL. TOP PLATE 2x4 OR 3x4 SILL
PLATE (SIM.)
2"Ø MAX.
BORED
HOLE
3"Ø MAX.
BORED
HOLE
2x6 DBL. TOP PLATE 2x6 OR 3x6 SILL
PLATE (SIM.)
2x8 DBL. TOP PLATE 2x8 OR 3x8 SILL
PLATE (SIM.)
BORED HOLE
SEE SCHED.
NON-BEARING
WALL
16" MIN. BETWEEN HOLE
&/OR NOTCH
NOTCH & HOLES
PERMITTED
NOTCH & HOLES
PERMITTED
DOUBLE STUDS EA. SIDE
OF OPENING MORE THAN
4'-0" IN WIDTH
PLYWOOD EDGE NAIL'G
FULL HT. @PLYWOOD
SHEAR WALLS
10-16d NAILS MIN. BETWEEN
SPLICES UNLESS SHOWN
OTHERWISE ON THE PLANS
2-8d NAILS EA.
SIDE
1-2x PL. 4'-0" MAX.
2-2x PL. OVER 4'-0"
HDR. BM.
PER PLAN
SILL BOLTING
(TYP.)NOTCH IN
STUD
NOTCH IN
STUD
EXTERIOR & BEARING
PARTITION
LSTI73
712"
~~
4'-0 SPLICE W/ 16d @ 3" O.C. STAGG
(TYP.) U.N.O.
SPLICE LENGTH
312"MIN.2"MIN.312"MIN.
VA
R
I
E
S
~
24" MIN.
~
12"
MI
N
.
312"
MAX.10"MIN.10"MIN.
112"M
I
N
.
NOTCHES 6'-0"
O.C. MIN.
2"
MA
X
.
512"
MAX.12"MIN.12"MIN.
212"M
I
N
.
2"
MA
X
.
512"
MAX.12"MIN.12"MIN.
312"M
I
N
.
NOTCHES 6'-0"
O.C. MIN.
2x CRIPPLE
2-10d
NAILS
16d NAILS @12"
3-16d
NAILS
10
'
-
0
"
M
A
X
.
10
'
-
0
"
M
A
X
.
48"LAP
2-16d
NAILS @ 16"
3-16d
NAILS
A
B
S-4.0
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I J
169
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
10
-
0
7
-
2
0
2
5
1
2
:
4
4
:
4
2
P0.0
NG
SB
GE
N
E
R
A
L
I
N
F
O
R
M
A
T
I
O
N
-
P
L
U
M
B
I
N
G
170
NO
PA
R
K
I
N
G
CL
E
A
N
A
I
R
VE
H
I
C
L
E
a l e s s a n d r o d r i v e
160.00'
S 89 17' 50" E
140.23'
N 89 17' 50" W
65.00'
N 00
02' 00" E
45.23'
N 00
02' 00" E
s
a
n
p
a
b
l
o
a
v
e
.
C1
1
2
3
(E)1"ø G
5
44"ø S
4"ø GR
FCO-1
FCO-1
8
7
6
6
I.E.= -3' - 3"
I.E.= -2' - 11"
GI-1
SB-1
(E)1 1/2"ø CW
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
2025-07-09
As indicated
10
-
0
7
-
2
0
2
5
1
1
:
5
5
:
1
3
PS1.0
PR
O
P
O
S
E
D
S
I
T
E
P
L
A
N
-
P
L
U
M
B
I
N
G
1/8" = 1'-0"1PROPOSED SITE PLAN - PLUMBING
GENERAL NOTES
A. REFER TO SHEET P0.0 FOR GENERAL NOTES.
CODED NOTES
1. APPROXIMATE LOCATION OF THE EXISTING 1'' NG PIPE.
CONTRACTOR SHALL VERIFY EXACT LOCATION, SIZE, AND
CONDITION IN THE FILED.
2. APPROXIMATE LOCATION OF THE EXISTING 1-1/2" CW INCOMING
SERVICE PIPE. CONTRACTOR SHALL VERIFY EXACT LOCATION,
SIZE, AND CONDITION IN THE FIELD.
3. DEMOLISH (E)3"⌀SANITARY PIPE AND REPLACE WITH NEW 4"⌀
SANITARY MAIN, REFER TO AS-BUILT DRAWINGS FOR EXACT
LOCATION, SIZE AND CONTINUATIONS OF EXISTING SANITARY.
4. NEW 4"⌀SANITARY PIPING SHALL REPLACE EXISTING 3"⌀
CURRENTLY INSTALLED BELOW GRADE TO SITE MAIN.
CONTRACTOR TO FIELD VERIFY EXISTING SANITARY SITE MAIN
SIZE, LOCATION, AND INVERT ELEVATION PRIOR TO CONNECTION.
5. 4"⌀GREASE WASTE PIPE CONTINUE TO CONNECT GREASE
INTERCEPTOR AND SAMPLING BOX, CONTRACTOR TO VERIFY
GREASE INTERCEPTOR AND SAMPLING BOX LOCATION AND INVERT
ELEVATION AND NEW SANITARY PIPE SIZE, LOCATION AND INVERT
BEFORE CONNECTION.
6. 4"⌀SANITARY AND GREASE WASTE PIPE, REFER SHEET P1.0 FOR
CONTINUATION.
7.1-1/2"⌀CW PIPE, REFER SHEET P2.0 FOR CONTINUATION.
8.(E)1"⌀NG PIPE, REFER SHEET P2.0 FOR CONTINUATION.
1a
1a
1a
1a
1a
171
Display / Sales Area
Hallway
Toilet
Utility
Dressing Rm.
Staging Area
Adjacent Property
WASHER
(D)L-1
(D)WC-1
(D)2"ø S
(D)2"ø S
(D)2"ø V
(D)2"ø V
1
(D)3"ø S
2"⌀VENT
UP
(D)3"⌀S
(D)3"⌀S
(D)3"⌀S
2
2
2
2
2
(D)3"⌀S
2
(D)2"⌀VTR3
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
1/4" = 1'-0"
10
-
0
7
-
2
0
2
5
1
1
:
5
5
:
1
4
PD1.0
DE
M
O
L
I
T
I
O
N
-
F
L
O
O
R
P
L
A
N
-
S
A
N
I
T
A
R
Y
A
N
D
V
E
N
T
1/4" = 1'-0"ADEMOLITION - FLOOR PLAN - SANITARY AND VENT
GENERAL NOTES
A. REFER TO SHEET P0.0 FOR GENERAL NOTES.
1. (E)3"⌀SANITARY PIPE DEMOLISHED AND REPLACED WITH (N)4"⌀
SANITARY MAIN, REFER SHEET PS1.0 FOR CONTINUATION.
2. ALL EXISTING SANITARY AND VENT PIPE DEMOLISHED.
3. DEMOLISH EXISTING VENT THROUGH ROOF, CONTRACTOR SHALL
PREPARE EXISTING OPENING FOR NEW VENT, SEE SHEET P1.1 FOR
MORE INFORMATION.
CODED NOTES
172
Display / Sales Area
Hallway
Toilet
Utility
Dressing Rm.
Staging Area
Adjacent Property
WASHER
(D)L-1
(D)WC-1
(D)3/4"ø HW
(D)1/2"ø CW
(D)1/2"ø HW
(D)1/2"ø CW
(D)1/2"ø CW
(E)1"ø G
(D)3/4"ø CW
(D)3/4"ø HW (D)GWH
199 MBH
(D)1"ø CW
1
2
3
(E)GAS METER
(D)1 1/4"ø G
4
4
4
4
(E)HB-1
(E)HB-1(E)1/2"ø CW
(E)1/2"ø CW
(D)1/2"ø G
3 3 3
3
(D)2"ø G
(E)3/4"ø G
(E)1 1/2"ø G
(E)1 1/2"ø G
(E)3/4"ø G
(E)1 1/2"ø G
(E)3/4"ø G (E)3/4"ø G
(E)1 1/2"ø G (E)1 1/2"ø G
(E)3/4"ø G
(E)1 1/4"ø G
(D)DRYER
35 MBH
5
6
(E)2"ø G
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
2025-07-09
1/4" = 1'-0"
10
-
0
7
-
2
0
2
5
1
1
:
5
5
:
1
4
PD2.0
DE
M
O
L
I
T
I
O
N
-
F
L
O
O
R
P
L
A
N
-
D
O
M
E
S
T
I
C
W
A
T
E
R
&
G
A
S
1/4" = 1'-0"ADEMOLITION - FLOOR PLAN - DOMESTIC WATER AND GAS
GENERAL NOTES
A. REFER TO SHEET P0.0 FOR GENERAL NOTES.
1. (E)1"⌀CW PIPE DEMOLISHED UP TO THIS POINT, REFER SHEET
PS1.0 FOR (E)1-1/2"⌀COLD WATER MAIN.
2. (E)1"⌀NG PIPE CONTINUE, REFER SHEET PS1.0 FOR
CONTINUATION.
3. (E)3/4"⌀NG PIPE UP TO ROOF, REFER SHEET PD2.1 FOR
CONTINUATION.
4. ALL EXISTING DOMESTIC HOT AND COLD WATER PIPING, GAS
PIPING, FIXTURES, EQUIPMENT, SUPPORTS, AND ACCESSORIES IN
THIS AREA SHALL BE DEMOLISHED BACK TO SOURCE.
5. DEMOLISH EXISTING 2"⌀PIPE ELBOW, REFER SHEET P2.0 FOR NEW
1-1/2"⌀NG PIPE CONNECTION.
6. CONTRACTOR TO COORDINATE REPLACEMENT UPGRADE FOR
UTILITY METER WITH LOCAL UTILITY COMPANY, SEE P6.0 FOR
TOTAL CFH CAPACITY REQUIRED.
CODED NOTES
1
1
1a
1a1a
1a
173
(E)3/4"ø G (E)3/4"ø G (E)3/4"ø G
1
73 MBH
73 MBH73 MBH
73 MBH
73 MBH
(E)RTU-4
(455 LBS)
(E)RTU-1
(455 LBS)
(E)RTU-3
(455 LBS)(E)RTU-5
(455 LBS)
(E)RTU-2
(455 LBS)
1
1 1 1
(E)3/4"ø G(E)3/4"ø G
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
1/4" = 1'-0"
10
-
0
7
-
2
0
2
5
1
1
:
5
5
:
1
5
PD2.1
DE
M
O
L
I
T
I
O
N
-
R
O
O
F
P
L
A
N
-
D
O
M
E
S
T
I
C
W
A
T
E
R
&
G
A
S
GENERAL NOTES
A. REFER TO SHEET P0.0 FOR GENERAL NOTES.
CODED NOTES
1. (E)3/4"⌀NG PIPE DOWN, REFER SHEET PD2.0 FOR CONTINUATION.
1/4" = 1'-0"1DEMOLITION - ROOF PLAN - DOMESTIC WATER AND GAS
174
Adjacent Property
Office
Accessible
Entry Kitchen
Toilet 2
Toilet 1
Entry
Retail
Entry
Seating
Retail
Coffee Bar
QC Lab
Training/
Shipping & Recieving
Production/
Roasting Room
Hall
Pantry
Admin.
Mech.
L-1
WC-1
2"ø S
1 1/2"ø S
4"ø S
4"ø S
4"ø S
4"ø S
2"ø S
2"ø V
3"ø S
2"ø V
1 1/2"ø V
1 1/2"ø S
3"ø GR
3"ø GR
4"ø GR
3"ø GR
2"ø V
2"ø V
3"ø GR
3"ø GR
3"ø GR
3"ø GR
4"ø GR
2"ø V
3"ø GR
2"ø V
2"ø V
2"ø V
3"ø GR
3"ø GR
3"ø GR
3"ø GR
4"ø GR
4"ø GR
4"ø GR
3"ø GR3"ø GR
3"ø GR
1 1/2"ø GR
1 1/2"ø GR
1 1/2"ø GR
1 1/2"ø GR
1 1/2"ø GRFD-1
L-1
WC-1
FD-1
FD-1
FD-1 FD-1
FD-1
FD-1
FD-1
FD-1
FD-1
FD-1
FCO-1
FCO-1
FCO-1
FCO-1
1/4" / 1'-0"
1/4" / 1'-0"
1/
4
"
/
1
'
-
0
"
1/
4
"
/
1
'
-
0
"
1/
4
"
/
1
'
-
0
"
2"⌀VENT UP
3"⌀VENT UP
2"⌀VENT UP
2"ø V
2"ø V
2"ø V
2"ø V2"ø V
4"ø S
3"ø S
3"ø S
3"ø S
4"ø S
2"ø V
2"ø V
2"⌀AAV
2"⌀AAV
190
101
102
106
108
125
141
135
133
216
138 137
158
157
156
159
160
166
196
204 205 207
122 124 127 128 126 1
2
FS-1
FS-1
FS-1
FS-1
FS-1
FS-1
FS-1
WCO-1
WCO-1
WCO-1
WCO-1
3
1/4"
/ 1
'-0"
FCO-1
3"ø S
4"ø S
(E)4"ø S
FS-1
3"ø GR
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
2025-07-09
1/4" = 1'-0"
10
-
0
7
-
2
0
2
5
1
2
:
5
1
:
5
7
P1.0
PR
O
P
O
S
E
D
F
L
O
O
R
P
L
A
N
-
S
A
N
I
T
A
R
Y
A
N
D
V
E
N
T
1/4" = 1'-0"1PROPOSED FLOOR PLAN - SANITARY AND VENT
GENERAL NOTES
CODED NOTES
1. 4"⌀SANITARY PIPE, REFER SHEET PS1.0 FOR CONTINUATION.
2. 4"⌀GREASE WASTE PIPE, REFER SHEET PS1.0 FOR
CONTINUATION.
3. 1"⌀CONDENSATE DRAIN PIPE FROM ROOF, REFER SHEET P1.1 FOR
CONTINUATION.
A. REFER TO SHEET P0.0 FOR GENERAL NOTES.
216.0 1 R/O Water System Formulator
207.0 1 Pitcher Rinser 6x9 w/spinjet
205.0 1 Rinse Sink - Undermount
204.0 1 Dishwasher
196.0 1 Mop Sink Cabinet
190.0 1 Hand Sink - Wall Mounted
166.0 1 Ice Machine
160.0 1 1-Comp Prep Sink
159.0 1 Hand Sink - Wall Mounted
158.0 1 Dishwasher
157.0 1 One Compartment Sink
156.0 1 3-Comp. Utensil Sink
141.0 1 Sous vide cooker
138.0 1 1-Comp Prep Sink
137.0 1 Hand Sink - Wall Mounted
216.0 1 R/O Water System Formulator
135.0 2 Pour Over Unit
133.0 1 Rinse Sink - Undermount
128.0 1 Espresso AV 2 Group
127.0 1 Espresso Steam Unit
126.0 1 Pitcher Rinser / Drip Tray
125.0 1 Ice Bin
124.0 1 Espresso AV 2 Group
122.1 1 Pitcher Rinser / Drip Tray
116.0 1 Rinse Sink - Undermount
108.0 1 Iced Beverage Tap system
102.0 1 Rinse Sink - Undermount
101.0 1 Hand Sink - Wall Mounted
Tag Qty.Item Description
KITCHEN EQUIPMENT SCHEDULE
1a
1a
1a
1a
175
R 10' - 0"
R 10' - 0"
R 10' - 0"
2"⌀VTR
3"⌀VTR2"⌀VTR
1"ø CD
1"ø CD
CO
CO
1/8" / 1'-0"
1
(E)RTU-1
(455 LBS)
(E)RTU-4
(455 LBS)
(E)RTU-2
(455 LBS)(E)RTU-5
(455 LBS)
(E)RTU-3
(455 LBS)
1/
8
"
/
1
'
-
0
"
MAU-1
(1,617 LBS)
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
2025-07-09
1/4" = 1'-0"
10
-
0
7
-
2
0
2
5
1
1
:
5
5
:
2
1
P1.1
PR
O
P
O
S
E
D
R
O
O
F
P
L
A
N
-
S
A
N
I
T
A
R
Y
A
N
D
V
E
N
T
GENERAL NOTES
CODED NOTES
1. 1"⌀CONDENSATE DRAIN PIPE DOWN, TERMINATE AT THE TAIL
PIECE OF LAV/SINK WITH FIXED AIR GAP SIMILAR TO JR SMITH 3955.
A. REFER TO SHEET P0.0 FOR GENERAL NOTES.
1/4" = 1'-0"1PROPOSED ROOF PLAN - SANITARY AND VENT
1
176
Adjacent Property
Office
Accessible
Entry
Kitchen
Toilet 2
Toilet 1
Entry
Retail
Entry
Seating
Retail
Coffee Bar
QC Lab
Training/
Shipping & Recieving
Production/
Roasting Room
Hall
Pantry
Admin.
Mech.
WC-1
L-1
WC-1
L-1
1/2"ø HWR
1/2"ø HW
1/2"ø CW
3/4"ø CW
1/2"ø CW
1/2"ø HW
1/2"ø HWR
3/4"ø CW
3/4"ø CW
1/2"ø HWR
1/2"ø HW
1/2"ø CW
1"ø CW
3/4"ø HW
3/4"ø HWR
3/4"ø HW
3/4"ø CW
1/2"ø HW
1/2"ø HWR
1/2"ø CW
1/2"ø HW
1/2"ø HWR
1/2"ø HW
1/2"ø CW
1/2"ø HWR
1/2"ø HWR
1/2"ø HW
1/2"ø CW
1"ø CW
1"ø HW
3/4"ø HWR
3/4"ø CW
3/4"ø HW
3/4"ø HWR
1/2"ø FW
1/2"ø CW
1/2"ø HW
1/2"ø HWR
1/2"ø CW
1/2"ø HW
1/2"ø HWR
1/2"ø FW
1/2"ø CW
1/2"ø HWR
1/2"ø HW
1/2"ø HWR
1/2"ø HW
1/2"ø FW
1/2"ø CW
1/2"ø FW
1/2"ø FW
3/4"ø FW3/4"ø FW
3/4"ø CW
3/4"ø HW
1/2"ø HWR
3/4"ø FW
3/4"ø CW
1/2"ø HW
1/2"ø HWR
3/4"ø HWR
1"ø HW
1"ø CW
3/4"ø FW
1/2"ø FW
1/2"ø FW
1/2"ø CW
1/2"ø FW
1/2"ø CW
1/2"ø FW
3/4"ø CW
3/4"ø FW
1/2"ø FW
1/2"ø FW
1/2"ø FW3/4"ø CW
3/4"ø FW
1 1/4"ø CW
3/4"ø HWR
1 1/4"ø HW
1/2"ø HWR
1/2"ø HW
1/2"ø CW
1/2"ø FW
1/2"ø HWR
1/2"ø HW
1/2"ø CW
1/2"ø CW
1/2"ø HW
1/2"ø FW
1/2"ø CW
1/2"ø HWR
1/2"ø HWR
1/2"ø HW
1/2"ø HW
1/2"ø HWR
190
1 1/4"ø G
3/4"ø G
196
156
157
159
138
137
158
101
102
106
110
113
122
117
116
124
207
126 127
128
133
135
216
160
166
204
205
208
212
213
1/2"ø CW
1/2"ø CW
1/2"ø FW
1/2"ø FW
3/4"ø FW
3/4"ø HWR
1
4
5
(E)1"ø G2
3
(E)GAS METER
1 1/2"ø CW
1 1/2"ø CW
1 1/2"ø CW
1/2"ø FW
1/2"ø CW
1/2"ø HW 1/2"ø FW
3/4"ø FW
1/2"ø HW
3/4"ø CW
3/4"ø FW
3/4"ø FW
3/4"ø CW
1/2"ø HW
1/2"ø HWR
3/4"ø HWR
3/4"ø HW
1"ø CW
3/4"ø FW
3/4"ø CW
3/4"ø HW
3/4"ø HWR
1/2"ø HWR
1/2"ø HW
1/2"ø CW
3/4"ø HWR
1 1/4"ø HW
1 1/2"ø CW
3/4"ø FW
TMV-1
TMV-1
TMV-1
TMV-1
TMV-1
ET-1
1/2"⌀TP
1/2"⌀TP FD-1
FD-1
FD-1
FD-1
FD-1
FD-1
FD-1FD-1
FD-1
FD-1
1/2"⌀TP
1/2"⌀TP
1/2"⌀TP
1/2"⌀TP
1/2"⌀TP
1/2"⌀TP 1/2"⌀TP
1/2"⌀TP
GWH-1
199 MBH
155
33 MBH
FD-1 RCP-1
1/2"ø CW
(E)HB-1
(E)HB-1 (E)1/2"ø CW
(E)1/2"ø CW
END CAP
3 3 3
3
6
(E)2"ø G
(E)1 1/2"ø G
(E)3/4"ø G
(E)1 1/2"ø G
1 1/4"ø G
3/4"ø G
1 1/4"ø G
(E)3/4"ø G
1 1/2"ø G
(E)1 1/2"ø G
1 1/2"ø G
8
7
2 1/2"ø G
182
183.6 MBH
1 1/4"ø G
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
2025-07-09
1/4" = 1'-0"
10
-
0
7
-
2
0
2
5
1
2
:
5
1
:
3
2
P2.0
PR
O
P
O
S
E
D
F
L
O
O
R
P
L
A
N
-
D
O
M
E
S
T
I
C
W
A
T
E
R
A
N
D
G
A
S
1/4" = 1'-0"1PROPOSED FLOOR PLAN - DOMESTIC WATER AND GAS
GENERAL NOTES
CODED NOTES
1. 1-1/2"⌀CW PIPE, REFER SHEET PS1.0 FOR CONTINUATION.
2. (E)1"⌀NG PIPE CONTINUE, REFER SHEET PS1.0 FOR
CONTINUATION.
3. (E)3/4"⌀NG PIPE UP TO ROOF, REFER SHEET P2.1 FOR
CONTINUATION.
4. (N)3/4"⌀NG PIPE DOWN TO CONVECTION OVEN(155.0).
5. (N)1-1/4"⌀NG PIPE DOWN TO GAS WATER HEATER(GWH-1).
6. (N)1"⌀NG PIPE UP TO ROOF, REFER SHEET P2.1 FOR
CONTINUATION.
7. CONTRACTOR TO COORDINATE REPLACEMENT UPGRADE FOR
UTILITY METER WITH LOCAL UTILITY COMPANY, SEE P6.0 FOR
TOTAL CFH CAPACITY REQUIRED.
8. REFER TO M1.0 AND M1.1 FOR WATER HEATER COMBUSTION AIR
DESIGN REQUIREMENTS.
A. REFER TO SHEET P0.0 FOR GENERAL NOTES.
213.0 1 Water Boiler 5 gal w/aeration
212.0 1 Batch Brewer
208.0 1 Espresso Machine
207.0 1 Pitcher Rinser 6x9 w/spinjet
205.0 1 Rinse Sink - Undermount
204.0 1 Dishwasher
196.0 1 Mop Sink Cabinet
190.0 1 Hand Sink - Wall Mounted
182.0 1 Coffee Roaster
166.0 1 Ice Machine
160.0 1 1-Comp Prep Sink
159.0 1 Hand Sink - Wall Mounted
158.0 1 Dishwasher
157.0 1 One Compartment Sink
156.0 1 3-Comp. Utensil Sink
155.0 1 Convection Oven
138.0 1 1-Comp Prep Sink
137.0 1 Hand Sink - Wall Mounted
216.0 1 R/O Water System Formulator
135.0 2 Pour Over Unit
133.0 1 Rinse Sink - Undermount
128.0 1 Espresso AV 2 Group
127.0 1 Espresso Steam Unit
126.0 1 Pitcher Rinser / Drip Tray
124.0 1 Espresso AV 2 Group
122.1 1 Pitcher Rinser / Drip Tray
117.0 1 Cold Water Dispenser
116.0 1 Rinse Sink - Undermount
113.0 1 Filter Coffee Brewer
110.0 1 Ice Machine
106.0 1 Carbonator
102.0 1 Rinse Sink - Undermount
101.0 1 Hand Sink - Wall Mounted
Tag Qty.Item Description
KITCHEN EQUIPMENT SCHEDULE
1
1
1
1
1
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
177
73 MBH
73 MBH73 MBH
73 MBH
73 MBH
(E)3/4"ø G
(E)3/4"ø G(E)3/4"ø G
2
1
SHUT-OFF VALVE
(E)RTU-4
(455 LBS)
(E)RTU-1
(455 LBS)
(E)RTU-2
(455 LBS)
(E)RTU-5
(455 LBS)
(E)RTU-3
(455 LBS)
96.3 MBH
1 1
1
1
MAU-1
(1,617 LBS)
SHUT-OFF
VALVE (TYP.)
1"ø G
(E)3/4"ø G
(E)3/4"ø G
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
1/4" = 1'-0"
10
-
0
7
-
2
0
2
5
1
1
:
5
5
:
2
6
P2.1
PR
O
P
O
S
E
D
R
O
O
F
P
L
A
N
-
D
O
M
E
S
T
I
C
W
A
T
E
R
A
N
D
G
A
S
GENERAL NOTES
CODED NOTES
1. (E)3/4"⌀NG PIPE DOWN, REFER SHEET P2.0 FOR CONTINUATION.
2. (N)1"⌀NG PIPE DOWN, REFER SHEET P2.0 FOR CONTINUATION.
A. REFER TO SHEET P0.0 FOR GENERAL NOTES.
1/4" = 1'-0"1PROPOSED ROOF PLAN - DOMESTIC WATER AND GAS
178
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
10
-
0
7
-
2
0
2
5
1
1
:
5
5
:
3
8
P5.0
DE
T
A
I
L
S
-
P
L
U
M
B
I
N
G
179
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
2025-07-09
10
-
0
7
-
2
0
2
5
1
1
:
5
5
:
4
0
P6.0
SC
H
E
D
U
L
E
S
-
P
L
U
M
B
I
N
G
TOTAL GPM: 28
TOTAL WSFU: 48
Custom 0 - -
1/2"CW for Ice Maker, Coffee Maker, Tee Maker,….15 0.5 7.5
Trap Primer 0 0.25 -
Food Waste Grinder 0 - -
Floor Sink 7 - -
Floor Drain 12 - -
Hose Bibb, each additional 1 1 1
First Hose Bibb 1 2.5 2.5
Lawn Sprinkler, each head 0 1 -
Clinic Flushometer Valve 0 8 -
Water Closet, greater than 1.6 GPF Flushometer Valve 0 8 -
Water Closet, greater than 1.6 GPF Gravity Tank 0 5.5 -
Water Closet, 1.6 GPF Flushometer Valve 0 5 -
Water Closet, 1.6 GPF Flushometer Tank 2 2.5 5
Water Closet, 1.6 GPF Gravity Tank 0 2.5 -
Urinal, flush tank 0 2 -
Urinal, greater than 1.0 GPF Flushometer Valve 0 5 -
Urinal, 1.0 GPF Flushometer Valve 0 4 -
Mobile Home, each 0 - -
Wash Fountain 0 4 -
Shower, each head 0 2 -
Washup Sink, each set of faucets 8 2 16
3-Compartment Sink 1 3 3
Clinical Sink 0 3 -
Service Sink or Mop Basin 1 3 3
Laundry Sink 0 1.5 -
Kitchen Sink 3 1.5 4.5
Bar Sink 0 2 -
Lavatory 2 1 2
Drinking Fountain or Watercooler 1 0.5 0.5
Dishwasher 2 1.5 3
Dental Unit, cuspidor 0 1 -
Clothes Washer 0 4 -
Bidet 0 - -
Bathtub or Combination Bath/Shower 0 4 -
Appliances, Appurtenance, or Fixtures Public Total
Quantity WSFU
TOTAL SYSTEM WSFU
400 23 49 92 189 283 546 870 1540 3140
350 25 53 99 203 305 587 935 1650 3370
300 27 57 108 221 331 638 1020 1800 3670
250 30 63 119 244 366 704 1120 1980 4050
200 34 71 134 275 412 794 1270 2240 4560
175 37 77 144 296 443 854 1360 2410 4910
150 40 83 157 322 482 928 1480 2640 5330
125 44 92 173 355 532 1020 1630 2890 5890
100 50 104 195 400 600 1160 1840 3260 6640
90 52 110 207 424 635 1220 1950 3450 7030
80 56 117 220 452 677 1300 2080 3670 7490
70 60 126 237 486 728 1400 2230 3950 8050
60 65 137 257 528 791 1520 2430 4290 8760
50 72 151 284 583 873 1680 2680 4740 9660
40 81 170 320 657 985 1900 3020 5350 10900
30 95 199 374 768 1150 2220 3530 6250 12700
20 118 247 466 957 1430 2760 4400 7780 15900
10 172 360 678 1390 2090 4020 6400 11300 23100
LENGTH PIPE SIZE IN INCHES
NOMINAL ID 1/2 3/4 1 1-1/4 1-1/2 2 2-1/2 3 4
PIPE SIZE IN INCHES
MAXIMUM DELIVERY CAPACITY OF SCHEDULE 40 METALLIC PIPE CARRYING NATURAL GAS OF 0.6 SPECIFIC
GRAVITY BASED ON A PRESSURE DROP OF 0.5" WATER COLUMN, GAS PRESSURE : LESS THAN 2 PSI
CPC TABLE 1216.2 (1)
LOW PRESSURE NATURAL GAS PIPE SIZING TABLE
METERING FAUCETS 0.2 GALLONS/CYCLE
KITCHEN FAUCETS 1.8 GPM @60 PSI
LAVATORY FAUCETS - NON
RESIDENTIAL 0.5 GPM @60 PSI
WATER CLOSET 1.28 GALLONS/FLUSH
FIXTURE TYPE MAXIMUM FLOW RATE
MAXIMUM FIXTURE FLOW RATES
1 CONFIRM MAKE AND MODEL WITH ARCHITECT AND OWNERSHIP PRIOR TO ORDERING.
NOTES:
SB-1 SAMPLING BOX JENSEN 2432-Z SAMPLE BOX WITH PIPE CONNECTORS, WEIGHT: 1250 LBS, BOX DESIGN LOAD: H-20 TRAFFIC, 24" CAST IRON
FRAME & COVER WITH GASKET (GASTIGHT).1
GI-1 GREASE INTERCEPTOR JENSEN KJP1200GECE JP-1200 GALLON GREASE INTERCEPTOR, 1'-0" MIN. TO 6'-6" MAX. EARTH COVER, H-20 TRAFFIC RATED.1
TMV-1 THERMOSTATIC MIXING VALVE WATTS LFMMV-M1
A THERMOSTATIC MIXING VALVE (1/2”) HAVE A LEAD FREE* CAST COPPER SILICON ALLOY BODY. PROVIDE
ACCURATE TEMPERATURE CONTROL (±3°F) WITH LOW-PRESSURE DROP ACROSS THE RATED FLOW RANGE.
ASSE 1017, ASSE 1069, ASSE 1070 AND IAPMO CUPC LISTED.
1
FCO-1 FLOOR CLEANOUT ZURN Z1400-K
"LEVEL-TROL" ADJUSTABLE FLOOR CLEANOUT, DURA-COATED CAST IRON BODY WITH ANCHOR FLANGE, GAS
AND WATERTIGHT ABS TAPERED THREAD PLUG AND ROUND SCORIATED CAST IRON HEAVY-DUTY SECURED
TOP (SPECIFY FINISH Z, ZB, ZN, ZS) ADJUSTABLE TO FINISHED FLOOR.
1
WCO-1 WALL CLEANOUT ZURN Z1446 WALL CLEANOUT, DURA-COATED CAST IRON BODY, GAS AND WATERTIGHT ABS TAPERED THREAD PLUG, AND
ROUND, SMOOTH STAINLESS STEEL ACCESS COVER WITH SECURING SCREW.1
TP-1 TRAP PRIMER ZURN Z1022-XL TRAP PRIMER IS DESIGNED TO COMPLY WITH ANSI/ASSE STANDARD 1018.1
FS-1 FLOOR SINK J R SMITH 3150-12 J.R.SMITH NO, 3150-12, C.I., SQUARE TOP, ACID RESISTING ENAMELED INSIDE W/DOME STRAINER, H/B HALF
GRATE UNLESS OTHERWISE INDICATED SEEPAGE FLANGE.1
FD-1 FLOOR DRAIN J R SMITH 2005.000 FLOOR OR SHOWER DRAINS WITH ADJUSTABLE STRAINER HEADS. LOAD RATING: LIGHT DUTY HAVING A SAFE
LIVE (STATIC) LOAD LESS THAN 2000 LBS (900 KG) PER ASME A112.6.3 FLOOR DRAIN STANDARD.1
AMERICAN STANDARD 605B.105
AMERICAN STANDARD FAUCET MODEL 605B.105-0.5 GPM/1.9 L/MIN PRESSURE COMPENSATING
VANDAL-RESISTANT MULTI-LAMINAR SPRAY WITH CR-P2 LITHIUM BATTERY AND HOLDER, 605P.400-4" BRASS
DECK PLATE WITH 1/4" FXATION STUDS AND QUICK SPIN NUTS, 605XTMV1070-THERMOSTATIC MIXING VALVE. 20"
FLEXIBLE INLET HOSES WITH 3/8" COMPRESSION FTTINGS. ASSE 1070 CERTIFIED DOWN TO 0.35 GPM/1.3 L/MIN.
1
L-1 LAVATORY ADA COMPLIANT
AMERICAN STANDARD 355.012 LUCERNE™ WALL-HUNG LAVATORY, VITREOUS CHINA, FRONT OVERFOW, D-SHAPED BOWL, SELF-DRAINING
DECK AREA WITH CONTOURED BACK AND SIDE SPLASH SHIELDS, FAUCET LEDGE.1
WC-1 WATER CLOSET ADA
COMPLIANT AMERICAN STANDARD 2467.100
CADET FLOWISE™ RIGHT HEIGHT™ ELONGATED PRESSURE-ASSISTED TOILET 1.1 GPF/ 4.2 LPF, VITREOUS
CHINA, HIGH EFFICIENCY, ULTRA LOW-CONSUMPTION (1.1 GPF/4.2 LPF), EVERCLEAN® SURFACE, MEETS EPA
WATERSENSE® CRITERIA, CLOSE-COUPLED FLUSHOMETER TANK, ADA COMPLIANT.
1
MARK FIXTURE MANUFACTURER MODEL REMARKS NOTES
PLUMBING FIXTURES SCHEDULE
2 LWT SHALL BE SET TO 140 DEG F.
1 UNIT SHALL HAVE DROP PAN THAT IS TO BE DRAINED TO THE NEAREST FLOOR DRAIN OR MOP BASIN.
NOTES :
GWH-1 MECH. ROOM 100 199,000 261 97% 1-1/2"3/4 3"4.8 14 120/60/1 5 76-1/2 27-3/4 27-3/4 523 AO SMITH BTH-199(A) ALL
MINIMUM
(IN.WC.)
MAXIMIM
(IN.WC.)VOL/HZ/PH AMP HEIGHT WIDTH DEPTH
MARK LOCATION STORAGE
(GALLONS)
HEAT CAPACITY
(INPUT) BTU/HR
HEAT
RECOVERY
@100 F RISE
(USGPH)
THERMAL
EFFICIENC
Y OR UEF
HOT/COLD
CONNECTION
GAS
CONNECTION VENT
INLET GAS PRESSURE ELECTRICAL DATA DIMENSIONS IN INCHES
WEIGHT
(LBS)MAKE MODEL
NUMBER NOTES
GAS WATER HEATER SCHEDULE
Below 40 0.20-0.26 50 1.0 1.5 1.5 1.5 1.5
40-60 0.21-0.27 75 Nonres
0.5
Res
0.75
Nonres
0.5
Res
0.75 1.0 1.0 1.0
Space cooling systems (chilled water, refrigerant and brine)
105-140 0.22-0.28 100 1.0 1.5 2.0 2.0 2.0
141-200 0.25-0.29 125 1.5 1.5 2.0 2.0 2.0
201-250 0.27-0.30 150 2.5 2.5 2.5 3.0 3.0
251-350 0.29-0.32 200 3.0 4.0 4.5 4.5 4.5
Above 350 0.32-0.34 250 4.5 5.0 5.0 5.0 5.0
Space heating, hot water systems (steam, steam condensate and hot water) and service water heating systms (recirculating sections,
all piping in electric trace tape systems, and the first 8 feet of piping from the storage tank for nonrecirculating systems)
INSULATION THICKNESS REQUIRED (in inches)
< 1 1 to < 1.5 1.5 to < 4 4 to < 8 8 and largerFLUID
TEMPERATURE
RANGE, (°F)
CONDUCTIVITY RANGE
(in BTU-inch per hour per
square foot per °F)
INSULATION
MEAN RATING
TEMPERATURE
(°F)
NOMINAL PIPE DIAMETER (in inches)
TABLE 120.3-A PIPE INSULATION THICKNESS
PIPING INSULATION THICKNESS
TOTAL DFU: 26.5
Floor drain 4 2 8
Water Closet, 1.6 GPF Flushometer Valve 2 4 8
Lavatory 2 1 2
Rinse Sink 1 3 3
Hand sink 1 3 3
Drinking Fountain or Watercooler 1 0.5 0.5
Dishwasher 1 2 2
Appliances, Appurtenance, or Fixtures Public Total
Quantity DFU
TOTAL SYSTEM DFU (SANITARY)
TOTAL DFU: 53
Floor Sink 2 2 4
Floor drain 7 2 14
Three Compartment Sink 1 2 2
Prep sink or Rinse sink 4 3 12
Dishwasher 1 2 6
Kitchen Sink 3 2 6
Service Sink or Mop Basin 1 3 3
Hand Sink 3 2 6
Appliances, Appurtenance, or Fixtures Public Total
Quantity DFU
TOTAL SYSTEM DFU (GREASE WASTE)
1 RECIRCULATION PUMP WITH AUTOMATIC AND TIME CONTROL.
NOTES :
RCP-1 MECH ROOM 3/4"1/40 2 GPM @ 9 FT 3250 115/60/1 0.52 4 3-15/16 5-5/8 6 TACO 006-ST4 ALL
VOL/HZ/PH FLA (A) HEIGHT WIDTH DEPTH
MARK LOCATION CONNECTIO
N SIZE HP MAX GPM @ HEAD MOTOR
RPM
ELECTRICAL DATA DIMENSIONS IN INCHES WEIGHT (LB) MAKE MODEL
NUMBER NOTES
RECIRCULATION PUMP SCHEDULE
1 WATER CONNECTION 3/4" (MALE NPT).
NOTES :
ET-1 MECH. ROOM 6.4 12 18 150 17 AMTROL ST-12C-DD ALL
DIA. HEIGHT
MARK LOCATION
TANK
CAPACITY
(US GAL.)
DIMENSIONS IN
INCHES PRESSURE
(PSI)
WEIGHT
(LBS)MAKE MODEL
NUMBER NOTES
EXPANSION TANK SCHEDULE
12 70000
10 44200
8 24300
6 11900
5 7320
4 4050
3 1980
2 1/2 1120
2 704
1 1/2 366 Gas Type: Natural
1 1/4 244 Pipe Material: SCH. 40 BLACK STEEL
1 119 Pressure Drop: 0.5 IN W.C.
3/4 63 Inlet Pressure: < 2 PSI
1/2 30 Total Equivalent Length: 243.0 FT
PIPE SIZE (IN) CAPACITY (CFH)25% Fitting Length: 123.0 FT
SIZING PER TABLE 1216.2(1)Total Developed Length: 120.0 FT
TOTAL GAS LOAD: 877 CFH
182 COFFEE ROASTER 183.6
MAU-1 MAKE UP AIR UNIT 96.3
OVEN OVEN 33
GWH-1 WATER HEATER 199
(E)RTU-5 (E)RTU-5 73
(E)RTU-4 (E)RTU-4 73
(E)RTU-3 (E)RTU-3 73
(E)RTU-2 (E)RTU-2 73
(E)RTU-1 (E)RTU-1 73
Mark Equipment Load (CFH)
SYSTEM PARAMETERS
GAS LINE SIZING CALCS
4 1668 1668 840
3 1/2 1091 1091 585
3 666 719 406
2 1/2 329 455 245
2 132 254 119
1 1/2 35 103 46
1 1/4 14 56 28
1 -24 16
3/4 -10 8
1/2 -3 3
PIPE SIZE
(IN)
CW FLUSH
VALVE
(W.S.F.U.)
(8 FT/S MAX)
CW FLUSH
TANK
(W.S.F.U.)
(8 FT/S MAX)
HW FLUSH TANK
(W.S.F.U.)
(5 FT/S MAX)
SIZING CRITERIA:
ALLOWABLE FRICTION LOSS PER 100 FT:9.1 psi
Allowable Friction Loss Per 100 ft: 9.1 psi Total Equivalent Length: 312.5'
Pressure Available for Friction Loss:28.6 psi 25% Fitting Length: 62.5'
Residual Pressure @ Farthest Fixture:15.0 psi Total Developed Length: 250.0'
Pressure Loss Due to Elevation: 6.5 psi Static Head: 15.0'
Sub Meter: -
Water Sotener: -
Minimum Building Pressure 50.0 psi
-
-
Maximum Building Pressure: 65.0 psi Minimum Building Pressure: 50.0 psi
Water Meter Losses: 3.0 psi
Pressure Loss Through 1-inch BFP: 12.0 psi EXISTING
Maximum Site Pressure: 80.0 psi Minimum Site Pressure: 65.0 psi
HYDRAULIC CALCULATIONS:
Backflow Prevention Device: 1 EXISTING EXISTING
Pressure Reducing Valve:
SIZE (IN) MAKE MODEL
Piping Material: -X -
Copper Type K Copper Type L Other (Specify)
SYSTEM COMPONENTS
Water Meter Size (in):1
Flush Type:Tank
Maximum System GPM:56 GPM
Total System GPM:28 GPM
Total Fixture Units:48.00 WSFU
PRV Required:No
Water Meter:Yes
SYSTEM PARAMETERS
HYDRAULIC CALCULATIONS
1
1a
1a
1a
1a
180
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
10
-
0
7
-
2
0
2
5
1
1
:
5
5
:
4
3
P8.0
SP
E
C
I
F
I
C
A
T
I
O
N
S
-
P
L
U
M
B
I
N
G
181
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
10
-
0
7
-
2
0
2
5
1
1
:
5
5
:
4
6
P9.0
TI
T
L
E
2
4
-
P
L
U
M
B
I
N
G
182
1 1 1
1 1
(E)RTU-1
(455 LBS)
(E)RTU-4
(455 LBS)
(E)RTU-2
(455 LBS)
(E)RTU-5
(455 LBS)
(E)RTU-3
(455 LBS)
22
2 2
3
1a
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
2025-07-09
1/4" = 1'-0"
20
2
5
-
0
7
-
1
0
1
1
:
3
0
:
5
2
P
M
MD1.1
DE
M
O
L
I
T
I
O
N
-
R
O
O
F
P
L
A
N
-
M
E
C
H
A
N
I
C
A
L
GENERAL NOTES
CODED NOTES
1. EXISTING SUPPLY AIR AND RETURN AIR DUCTS SHALL REMAIN.
REFER M1.0 FOR BELOW FLOOR DUCT ROUTING AND
CONTINUATION.
2. EXISTING OUTSIDE AIR INTAKE HOOD TO BE REBALANCE AND
REUSE AS PER SHOWN ON PROPOSED ROOF PLAN. REFER SHEET
M1.1 FOR MORE INFORMATION. TYPICAL FOR ALL RTUs.
3. DISCONNECT EXISTING INTAKE HOOD AND PREPARE FOR
RELOCATION EXTENSION, SEE M1.1 FOR ADDITIONAL
INFORMATION.
1/4" = 1'-0"1DEMOLITION - ROOF PLAN - MECHANICAL
A. REFER TO SHEET M0.0 FOR GENERAL NOTES.
B. ALL EQUIPMENT AND DUCTWORK SHOWN WITH THIN/LIGHT SOLID
LINES IS EXISTING TO REMAIN.
C. ALL EQUIPMENT AND DUCTWORK SHOWN WITH THICK/DARK
DASHED LINES IS EXISTING TO BE REMOVED OR RELOCATED.
D. RELEVANT EQUIPMENT AND DUCTWORK SHOWN IS BASED ON
EXISTING DRAWINGS AND FIELD SURVEY. NOT ALL EXISTING
EQUIPMENT AND DUCTWORK IS SHOWN. CONTRACTOR SHALL
FIELD VERIFY ALL CONDITIONS AFFECTED BY THIS RENOVATION
AND NOTIFY THE ENGINEER IF CONDITIONS ARE NOT AS
INDICATED.
E. OWNER SHALL HAVE FIRST RIGHT OF REFUSAL UPON REMOVAL
OF ALL SALVAGED ITEMS. OTHERWISE, REMOVE ALL DEMOLISHED
ITEMS FROM THE SITE.
F. REFER TO "NEW WORK" PLANS FOR DUCTWORK CONTINUATIONS
AND/OR REPLACEMENTS.
G. AFTER DUCTWORK REMOVAL, PATCH HOLES THROUGH WALLS
AND FLOORS TO MATCH SURROUNDING CONDITIONS.
H. REMOVE EXISTING DRYWALL/MASONRY WALLS AS REQUIRED TO
COMPLETE WORK. PATCH AND PAINT WALLS TO MATCH EXISTING
CONDITIONS.
I. THE MECHANICAL CONTRACTOR SHALL COORDINATE WITH
OTHER TRADES TO RELOCATE ANY PIPE, CONDUITS, DEVICES, OR
STRUCTURES THAT CONFLICT WITH PROVIDING A LARGER DUCT
OPENING THROUGH ROOF.
183
T
T
T
T
T
Adjacent Property
Office
Accessible
Entry
Kitchen
Toilet 2
Toilet 1
Entry
Retail
Entry
Seating
Retail
Coffee Bar QC Lab
Training/
Shipping & Recieving
Production/
Roasting Room
Hall
Pantry
Admin.
Mech.
(N)AC-1
(120 LBS)
H-1
(973 LBS)
EG-1-6"ø
75 CFM
SD-4-12"ø
300 CFM
14
"
x
1
4
"
10"ø
12"ø
SD-4-12"ø
300 CFM12"ø
10"ø
12"ø10"ø 10
"
ø
10
"
ø
SD-4-12"ø
275 CFM
SD-4-12"ø
275 CFM
SD-7-10"ø
275 CFM
SD-7-10"ø
275 CFM
12
"
ø
12"ø
14"ø
8"ø
SD-2-8"ø
150 CFM
SD-2-8"ø
150 CFM
(N)EF-1
(73 LBS)
EG-1-6"x6"
100 CFM
EG-1-6"x6"
100 CFM
14"ø
14"ø
12"
ø
6"ø
RG-4-12"x12"
505 CFM
RG-4-12"x12"
420 CFM
RG-4-12"x12"
420 CFM
12"ø
(E)16"x16" SA
(E)16"x16" RA
(E)16"x16" SA
(E)16"x16" RA
RG-3-10"x10"
235 CFM
RG-4-12"x12"
430 CFM
RG-4-12"x12"
430 CFM
12"ø
16"ø
(E)SD-10"ø
175 CFM
(E)SD-10"ø
175 CFM
(E)SD-10"ø
175 CFM
(E)SD-10"ø
175 CFM
14
"
x
1
4
"
10"ø
10"ø
(E)RG-48"x24"
1275 CFM / 1065 CFM
(E)16"x16" SA
(E)16"x16" RA
(E)SD-10"ø
200 CFM
10
"
ø
SD-5-14"ø
400 CFM
SD-5-14"ø
400 CFM
SG-1-12"x8"
225 CFM
SD-1-12"x8"
225 CFM
SG-1-12"x8"
225 CFM
SG-1-12"x8"
225 CFM
8"ø 12"ø
12"ø
8"ø
14"ø
6"ø
6"ø
6"ø
SD-1-6"ø
75 CFM
SD-1-6"ø
75 CFM
SD-1-6"ø
75 CFM
16
"
x
1
6
"
8"
ø
6"ø
(E)16"x16" SA
(E)16"x16" RA
RG-4-12"x12"
595 CFM / 500 CFM
RG-4-12"x12"
595 CFM / 500 CFM
12
"
ø
SD-3-10"ø
245 CFM
SD-3-10"ø
245 CFM
SD-3-10"ø
230 CFM SD-3-10"ø
230 CFM
SD-2-8"ø
150 CFM
SD-2-8"ø
150 CFM
RG-3-10"x10"
240 CFM
RG-2-8"x8"
205 CFM
SD-2-8"ø
130 CFM SD-2-8"ø
125 CFM
10
"
ø
10
"
ø
(E)16"x16" SA
(E)16"x16" RA
RG-4-12"x12"
515 CFM
RG-4-12"x12"
380 CFM
12"ø
12"ø
14
"
x
1
4
"
12"ø
10
"
ø
6"
ø
(E)RTU-1
(E)RTU-4
(E)RTU-5
(E)RTU-3
1
2
3
28"x12"
4 4
4
4
4
4
4
4
77
7 7
9
8
8
9
10
"
ø
(E)RTU-2
(E)RTU-3
(E)RTU-5
8
S
S
(E)RTU-2
S
5
5 5
5
5
5
5
5
5
5
5
10
10
10
10
6 6
10 10
1010
10
10
10
10
SD-1-6"ø
75 CFM
10
10
10
10
10
10
D
10 10
(E)12"ø
(E)10"ø
12"ø
12"ø
14"ø
12"ø
D
12"ø
12"ø
10"ø
8"ø
8"ø
EG-5-18"x10"
560 CFM
12"ø6"ø
12
"
ø
14"x14"
10"ø 10"ø
5
12"ø
16
"
x
1
6
"
8"ø
R
D
(E)SD-10"ø
150 CFM
(E)SD-10"ø
150 CFM
(E)SD-10"ø
150 CFM
(E)SD-10"ø
200 CFM
12"ø
12"ø
D
D
8"ø
10
"
ø
16
"
x
1
6
"
14"ø
20"x16"
(E)SD-10"ø
150 CFM
(E)SD-10"ø
200 CFM
14"ø
4
10"ø
12"ø
14
"
ø
12
"
ø
10
"
ø
8"ø
8"ø
8"ø12"ø
16"x16"
GWH-1
(523 LBS)
M
CO
CO
M 1a1a
1a11
1a
1a1a
1a
10"
ø
1a
12
13
13
1
3"ø
3"ø
R
1a
FSD
FSD
FSD
FSD
4
4
4
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
2025-07-09
1/4" = 1'-0"
20
2
5
-
0
7
-
1
1
1
2
:
2
3
:
0
5
A
M
M1.0
PR
O
P
O
S
E
D
R
E
F
L
E
C
T
E
D
C
E
I
L
I
N
G
P
L
A
N
-
M
E
C
H
A
N
I
C
A
L
1/4" = 1'-0"1PROPOSED REFLECTED CEILING PLAN MECHANICAL
GENERAL NOTES
CODED NOTES
1. 14"ø EXHAUST AIR DUCT FROM INLINE EXHAUST FAN (N)EF-1 AND
UP TO ROOF LEVEL. REFER SHEET M1.1 FOR CONTINUATION.
2. 20"x20" MAKE-UP AIR SUPPLY DUCT RUN FROM MAU-1 AND
TRANSITION TO 20"x16" ABOVE CEILING LEVEL. REFER SHEET M1.1
FOR CONTINUATION.
3. (14"ø / 16"ø FIELD VERIFY) KITCHEN EXHAUST AIR DUCT RUN FROM
KITCHEN HOOD H-1 UP TO ROOF LEVEL. REFER SHEET M1.1 FOR
CONTINUATION.
4. NEW SUPPLY AIR OR RETURN AIR DUCTS SHALL CONNECT WITH
EXISTING MAIN SUPPLY AIR OR RETURN AIR DUCTS AVAILABLE IN
CEILING DOWN FROM EXISTING RTU'S AVAILABLE ON ROOF.
CONTRACTOR TO FIELD VERIFY THE EXACT LOCATION OF EXISTING
DUCT SYSTEMS PRIOR OF INSTALLTION.
5. PROVIDE WITH TITUS AG-95 NECK MOUNTED OPPOSED BLADE
DAMPER INTEGRAL WITH TITUS RETURN AIR GRILLE.
6. PROVIDE WITH TITUS D-75 ROUND SLIDING BLADE NECK MOUNTED
DAMPER INTEGRAL WITH TITUS SUPPLY AIR ROUND DIFFUSER.
7. PROVIDE WITH TITUS AG-15-AA ALUMINUM OPPOSED BLADE
DAMPER INTEGRAL WITH TITUS SUPPLY AIR SIDE WALL GRILLE.
8. MOUNT NEW PROGRAMMABLE THERMOSTAT INTERLOCKED WITH
ASSOCIATED EXISTING PACKAGED ROOFTOP EQUIPMENT AT 48"
A.F.F IN THIS PROPOSED LOCATION. COORDINATE PLACEMENT
WITH ALL DECOR AND EQUIPMENT, FIELD VERIFY WITH OWNER'S
REPRESENTATIVE FOR THE FINAL LOCATION PRIOR TO
INSTALLATION.
9. WALL MOUNTED REMOTE ZONE TEMPERATURE SENSOR SHALL BE
MOUNTED AT 48" A.F.F. THE SENSING ELEMENTS SHALL BE WIRED
BACK TO THE RESPECTIVE PROGRAMMABLE THERMOSTAT IN THE
ADMIN OFFICE. COORDINATE PLACEMENT WITH DECOR AND
EQUIPMENT, FIELD VERIFY WITH THE OWNER'S REPRESENTATIVE
FOR THE FINAL LOCATION PRIOR TO INSTALLATION.
10. PROVIDE WITH TITUS D-75 NECK MOUNTED OPPOSED BLADE
DAMPER INTEGRAL WITH TITUS SUPPLY AIR CEILING DIFFUSER.
11. WALL MOUNTED REMOTE CARBON DIOXIDE SENSOR SHALL BE
MOUNTED 48" A.F.F. THE SENSING ELEMENTS SHALL BE WIRED
BACK TO THE RESPECTIVE PROGRAMMABLE THERMOSTAT IN THE
ADMIN OFFICE. COORDINATE PLACEMENT WITH DECOR AND
EQUIPMENT, FIELD VERIFY WITH THE OWNER'S REPRESENTATIVE
FOR THE FINAL LOCATION PRIOR TO INSTALLATION. THE CARBON
DIOXIDE SENSOR SHALL ALSO BE INTERLOCKED WITH OPERATION
OF FULLY MODULATING MOTORIZED DAMPER INSTALLED IN THE
RETURN DROP OF ASSOCIATED ROOFTOP UNIT.
12. 10"ø ROUND OUTSIDE AIR DUCT, 300 CFM SHALL CONNECT TO
RETURN AIR DUCT OF (E)RTU-3.
13. 3"ø INTAKE AIR CONNECTION AND 3"ø EXHAUST VENT
CONNECTION DUCT UP TO ROOF AND TERMINATE THRU
GOOSENECK.
A. REFER TO SHEET M0.0 FOR GENERAL NOTES.
B. ALL DUCT DIMENSIONS GIVEN ARE INSIDE DIMENSIONED.
C. COORDINATE ALL OPENINGS IN FLOORS, ROOF, AND WALLS WITH
THE GENERAL AND STRUCTURAL CONTRACTORS.
D. RUN ALL DUCTS AS HIGH AS POSSIBLE WITH RETURN AND
EXHAUST ABOVE SUPPLY AS OFTEN AS POSSIBLE.
E. PROVIDE VOLUME BALANCING DAMPERS UPSTREAM OF ALL AIR
INLET/OUTLETS UNLESS NOTED OTHERWISE.
F. PROVIDE TURNING VANES IN ALL SUPPLY AIR SQUARE THROATED
ELBOWS.
G. ALL RECTANGULAR SUPPLY AIR BRANCH CONNECTIONS SHALL BE
45° TAKE-OFF FITTINGS AND ROUND SUPPLY AIR BRANCH
CONNECTIONS SHALL BE BELLMOUTH FITTINGS.
H. FLEXIBLE DUCTS TO DIFFUSERS MAXIMUM LENGTH 5'-0". FLEXIBLE
DUCTS ARE NOT TO BE USED AS ELBOWS.
I. ALL EXHAUST DUCTWORK FROM THE EXTERIOR PENETRATION TO
THE BACK-DRAFT DAMPER SHALL BE EXTERNALLY INSULATED
WITH 1.5" FIBERGLASS DUCT WRAP WITH FSK JACKET (R-6
MINIMUM).
J. THERMOSTAT AND CONTROL WIRE IN EXPOSED AREAS SHALL BE
INSTALLED IN CONDUIT. CONDUIT SHALL BE PAINTED (COLOR
SELECTION BY ARCHITECT).
1a
1
184
KEF-1
(222 LBS)
R 10' - 0"
225 CFM / 435 CFM
OUTSIDE AIR
210 CFM / 400 CFM
OUTSIDE AIR
255 CFM
OUTSIDE AIR
305 CFM
OUTSIDE AIR
R 10' - 0"
(N)GV-1
(37 LBS)
1 1 1
1 1
(E)RTU-2
(455 LBS)
(E)RTU-5
(455 LBS)
(E)RTU-3
(455 LBS)
(E)RTU-4
(455 LBS)
(E)RTU-1
(455 LBS)
2
3
R 10' - 0"
R 10' - 0"
3
4
4
4
5
6
2400 CFM
MAKE-UP AIR
MAU-1
(1,617 LBS)
1a
7
8
8
1
1
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
2025-07-09
1/4" = 1'-0"
20
2
5
-
0
7
-
1
1
1
2
:
2
2
:
1
0
A
M
M1.1
PR
O
P
O
S
E
D
R
O
O
F
P
L
A
N
-
M
E
C
H
A
N
I
C
A
L
GENERAL NOTES
CODED NOTES
1. EXISTING SUPPLY AIR AND RETURN AIR DUCTS SHALL REMAIN.
REFER M1.0 FOR BELOW FLOOR DUCT ROUTING AND
CONTINUATION.
2. 14"ø EXHAUST AIR DUCT UP FROM (N)EF-1 AND TERMINATE TO
GRAVITY RELIEF VENTILATOR (N)GV-1.
3. NEW GENERAL EXHAUST FAN AND KITCHEN EXHAUST FAN SHALL
BE INSTALLED AND MAINTAIN 10'-0" OF CLEARANCE WITH ANY NEW
OR EXISTING FRESH AIR INTAKE.
4. NEW ROASTER VENT FROM BELOW ROASTING ROOM COFFEE
ROASTER AND TERMINATE THRU ROOF WITH STACK CAP (SHOWN
HERE FOR REFERANCE ONLY). REFER COFFEE ROASTER
INSTALLATION DRAWINGS PROVIDED FROM KITCHEN CONSULTANT
FOR MORE INFORMATION. MAINTAIN 10'-0" OF CLEARANCE WITH
ANY NEW OR EXISTING FRESH AIR INTAKE.
5. 20"x20" MAKE-UP AIR SUPPLY DUCT DOWN FROM MAU-1 TO BELOW
FLOOR. REFER SHEET M1.0 FOR CONTINUATION.
6. (14"ø / 16"ø FIELD VERIFY) KITCHEN EXHAUST AIR DUCT UP FROM
KITCHEN HOOD H-1 AND CONNECT TO EXHAUST FAN KEF-1. REFER
SHEET M1.0 FOR CONTINUATION.
7. EXISTING INTAKE HOOD FOR (E)RTU-3 TO BE BLANKED OFF WITH
INSULATED CAP AND SEALED WATER/AIR TIGHT.
8. 3"ø INTAKE AIR CONNECTION AND 3"ø EXHAUST VENT
CONNECTION DUCT DOWN TO BELOW FLOOR. REFER SHEET M1.0
FOR CONTINUATION.
1/4" = 1'-0"1PROPOSED ROOF PLAN - MECHANICAL
A. REFER TO SHEET M0.0 FOR GENERAL NOTES.
B. ALL DUCT DIMENSIONS GIVEN ARE INSIDE DIMENSIONED.
C. COORDINATE ALL OPENINGS IN FLOORS, ROOF, AND WALLS WITH
THE GENERAL AND STRUCTURAL CONTRACTORS.
D. RUN ALL DUCTS AS HIGH AS POSSIBLE WITH RETURN AND
EXHAUST ABOVE SUPPLY AS OFTEN AS POSSIBLE.
E. PROVIDE VOLUME BALANCING DAMPERS UPSTREAM OF ALL AIR
INLET/OUTLETS UNLESS NOTED OTHERWISE.
F. PROVIDE TURNING VANES IN ALL SUPPLY AIR SQUARE THROATED
ELBOWS.
G. ALL RECTANGULAR SUPPLY AIR BRANCH CONNECTIONS SHALL BE
45° TAKE-OFF FITTINGS AND ROUND SUPPLY AIR BRANCH
CONNECTIONS SHALL BE BELLMOUTH FITTINGS.
H. FLEXIBLE DUCTS TO DIFFUSERS MAXIMUM LENGTH 5'-0". FLEXIBLE
DUCTS ARE NOT TO BE USED AS ELBOWS.
I. ALL EXHAUST DUCTWORK FROM THE EXTERIOR PENETRATION TO
THE BACK-DRAFT DAMPER SHALL BE EXTERNALLY INSULATED
WITH 1.5" FIBERGLASS DUCT WRAP WITH FSK JACKET (R-6
MINIMUM).
J. THERMOSTAT AND CONTROL WIRE IN EXPOSED AREAS SHALL BE
INSTALLED IN CONDUIT. CONDUIT SHALL BE PAINTED (COLOR
SELECTION BY ARCHITECT).
K. EXISTING ROOFTOP UNITS TO REMAIN. AT THE START OF THE
PROJECT, PROVIDE EQUIPMENT CLEANING AND SERVICE TO
VERIFY GOOD OPERATING CONDITION. PROVIDE NEW AIR FILTERS
AT START OF PROJECT AND END. VERIFY DUCT MOUNTED SMOKE
DETECTORS IN PLACE AND OPERABLE, OTHERWISE, PROVIDE
NEW ONES.
1a
1
1a
185
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
20
2
5
-
0
7
-
1
0
1
1
:
3
1
:
0
2
P
M
M3.1
HO
O
D
D
E
T
A
I
L
S
A
N
D
S
C
H
E
D
U
L
E
S
-
M
E
C
H
A
N
I
C
A
L
186
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
20
2
5
-
0
7
-
1
0
1
1
:
3
1
:
0
7
P
M
M3.2
HO
O
D
D
E
T
A
I
L
S
A
N
D
S
C
H
E
D
U
L
E
S
-
M
E
C
H
A
N
I
C
A
L
187
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
20
2
5
-
0
7
-
1
0
1
1
:
3
1
:
1
3
P
M
M3.3
HO
O
D
D
E
T
A
I
L
S
A
N
D
S
C
H
E
D
U
L
E
S
-
M
E
C
H
A
N
I
C
A
L
188
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
20
2
5
-
0
7
-
1
0
1
1
:
3
1
:
1
8
P
M
M3.4
HO
O
D
D
E
T
A
I
L
S
A
N
D
S
C
H
E
D
U
L
E
S
-
M
E
C
H
A
N
I
C
A
L
189
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
20
2
5
-
0
7
-
1
0
1
1
:
3
1
:
2
4
P
M
M3.5
HO
O
D
D
E
T
A
I
L
S
A
N
D
S
C
H
E
D
U
L
E
S
-
M
E
C
H
A
N
I
C
A
L
190
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
20
2
5
-
0
7
-
1
0
1
1
:
3
1
:
3
0
P
M
M3.6
HO
O
D
D
E
T
A
I
L
S
A
N
D
S
C
H
E
D
U
L
E
S
-
M
E
C
H
A
N
I
C
A
L
191
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
LU
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
wi
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
2025-07-09
20
2
5
-
0
7
-
1
0
1
1
:
3
1
:
3
6
P
M
M5.0
DE
T
A
I
L
S
-
M
E
C
H
A
N
I
C
A
L
1
192
VENTILATION SCHEDULE
ROOM NAME SPACE TYPE SPACE AREA
(SF)
OCCUPANT
DENSITY
2022 CALIFORNIA MECHANICAL CODE 2022 CALIFORNIA ENERGY CODE
MAX. DESIGN
OUTSIDE AIR
FLOW
OUTSIDE AIR FLOW
PROVIDED (CFM)
SUPPLY AIR FLOW
(CFM)RATIO OF OA/SA (%)PEOPLE OA RATE
(CFM/PERSON)
AREA OA RATE
(CFM * SQ.FT.)
BREATHING ZONE
OUTSIDE AIR (CFM) PEOPLE RATE AREA RATE
(STANDARD)
(E)RTU-1
KITCHEN KITCHEN (COOKING)287 4 7.5 0.12 64.44 15 60 0.15 43.05 64.44 95 600 16%
PRODUCTION / SHIPPING & RECEIVING SHIPPING & RECEIVING 1059 2 10 0.12 147.08 15 30 0.15 158.85 158.85 160 1000 16%
TOTALS OF (E)RTU-1 1346 6 211.52 15 90 0.15 201.9 223.29 255 1600 16%
(E)RTU-2
RETAIL SEATING CAFETERIA / FAST FOOD DINING 866 29 7.5 0.18 373.38 15 435 0.15 129.9 435 435 1500 29%
TOTALS OF (E)RTU-2 866 29 373.38 15 435 0.15 129.9 435 435 1500 29%
(E)RTU-3
ADMIN OFFICE OFFICE SPACE 175 2 5 0.06 20.5 15 30 0.15 26.25 30 50 255 20%
COFFEE BAR BAR COCKTAIL LOUNGE 720 8 7.5 0.18 189.6 15 120 0.15 108 189.6 190 950 20%
TRAINING/ QC LAB KITCHENETTE 230 4 7.5 0.12 57.6 15 60 0.15 34.5 60 60 300 20%
TOTALS OF (E)RTU-3 1125 14 267.7 15 210 0.15 168.75 279.6 300 1505 20%
(E)RTU-4
PANTRY KITCHEN (COOKING)270 4 7.5 0.12 62.4 15 60 0.15 40.5 62.4 65 300 22%
ROASTING ROOM KITCHEN (COOKING)798 15 7.5 0.12 208.26 15 225 0.15 119.7 225 240 1100 22%
TOTALS OF (E)RTU-4 1068 19 270.66 15 285 0.15 160.2 287.4 305 1400 22%
(E)RTU-5
RETAIL ENTRY CAFETERIA / FAST FOOD DINING 523 25 7.5 0.18 281.64 15 375 0.5 261.5 375 375 1100 34%
HALL CORRIDOR 78 0 0 0.06 4.68 15 0 0.15 11.7 11.7 25 75 33%
MECH TELEPHONE CLOSET 64 0 0 0 0 0 0 0 0 0 0 75 0%
TOILET 1 RESTROOM 52 1 0 0 0 0 0 0 0 0 0 75 0%
TOILET 2 RESTROOM 52 1 0 0 0 0 0 0 0 0 0 75 0%
TOTALS OF (E)RTU-5 769 27 286.32 15 375 0.15 273.2 386.7 400 1400 29%
TOTAL AIR PROVIDED (CFM)1611.99 1695 7405 23%
EXHAUST FAN SCHEDULE
TAG TYPE
PERFORMANCE DATA MOTOR DATA ELECTRICAL DATA DIMENSION DATA
WEIGHT
(LBS)MAKE MODEL NOTESAIR
VOLUME
(CFM)
TOTAL SP
(IN WG.)FAN RPM OPERATING
POWER (HP)ENCLOSURE SIZE (HP)MOTOR RPM V/PH/HZ MCA MOCP FLA (AMPS)HEIGHT
(INCH)
WIDTH
(INCH)
LENGTH
(INCH)
(N)EF-1 DIRECT DRIVE CENTRIFUGAL INLINE FAN 835 1.25 1,752 0.38 ODP 3/4 1,950 115/1/60 13 25 10.5 21 21 23 73 GREENHECK SQ-130HP-VG ALL
NOTES
1. FURNISH WITH VARI-GREEN EC MOTOR WITH DRIVE (0-10VDC SIGNAL) FACTORY MOUNTED, WIRED, AND PROGRAMMED ON EXTERIOR OF FAN HOUSING.
2. FURNISH WITH JUNCTION BOX MOUNTED AND WIRED, NEMA-1 TOGGLE SWITCH SHIPPED SEPRATE.
3. FURNISH WITH INLINE DAMPER BD-330-PB-18x18, GRAVITY OPERATED, NOT COATED.
4. CONTRACTOR TO COORDINATE INTERLOCK CONTROLS WITH BUILDING OCCUPANCY SCHEDULE.
COORDINATION
CONTRACTORS SHALL PROVIDE COORDINATION DRAWINGS PRIOR TO
DISTRIBUTION OF SUBMITTALS AND ORDERING EQUIPMENT. COORDINATION
DRAWINGS SHALL SHOW CLEAR INDICATED OF COORDINATION WITH OTHER
TRADES, INCLUDING STRUCTURAL, CEILINGS, AND FIRE PROTECTION. ANY
CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER /
ARCHITECT /ENGINEER PRIOR TO ROUGH-IN OR ORDERING OF EQUIPMENT.
MAINTAIN MANUFACTURER RECOMMENCED CLEARANCES AND ACCESS TO
ALL REMOVABLE PANELS AND DOORS.
ALL FILTERS SHALL BE FULL SIZE AND STANDARD SIZE AND ACCESS SHALL
ALLOW FOR EASY REPLACEMENT OF FILTERS.
DUCT INSULATION TABLE
DUCT SERVICES MINIMUM INSULATION
THICKNESS (IN)
DENSITTY
(LB/CU.FT.)
"R" VALUE
(HR.SQ.FT. °
F/BTU)
INDOOR CONCEALED SUPPLY AIR AND RETURN AIR 1.5 1.5 4.2
INDOOR CONCEALED EXHAUST DUCT BETWEEN FLEXIBLE
CONNECTION AND PENETRATION OF BUILDING EXTERIOR 1.5 1.5 4.2
OUTDOOR EXPOSED DUCTING WILL REQUIRE FIELD APPLIED ALUMINUM JACKET. SEE SPECIFICATIONS FOR MORE
INFORMATION. MAY USE MINERAL FIBER BOARD/ FLEXIBLE ELASTOMERIC
GENERAL EQUIPMENT NOTES
ALL EQUIPMENT REQUIRING VFD'S OR STARTERS SHALL BE PROVIDED WITH THE
EQUIPMENT. VFD'S SHALL BE EQUIPPED WITH INTEGRAL DISCONNECTS. ANY OUTDOOR
VFD'S SHALL BE PROVIDE WITH NEMA 3R ENCLOSURE, COORDINATE WITH EC TO
PROVIDE POWER FOR THE ENCLOSURE (IF NEEDED).
UNLESS NOTED OTHERWISE, EQUIPMENT SHALL COME WITH INTEGRAL DISCONNECTS
AND SINGLE POINT ELECTRICAL CONNECTIONS.
COORDINATE ANY CHANGES OF EQUIPMENT LOCATIONS, SELECTIONS AND RFI'S WITH
THE ELECTRICAL AND PLUMBING CONTRACTORS AND OTHER TRADES
AIR CURTAIN SCHEDULE
TAG AIR FLOW
VOLUME (CFM)
AVG. VELOCITY
(FPM)UNIFORMITY (%)
POWER
RATINGS
(WATTS)
MOTOR
HP
NOZZLE
LENGTH
(IN)
ELECTRICAL DATA DIMENSION DATA
WEIGHT
(LBS)MAKE MODEL NOTES
V/PH/HZ FLA (AMPS)HEIGHT
(INCH)
WIDTH
(INCH)
LENGTH
(INCH)
(N)AC-1 2,758 2,206 84 1000 (2) 1/2 72 115/1/60 10.2 11 13 72 120 MARS N272-2UA-OB ALL
NOTES
1. PROVIDE WITH (2) 1/2 HP CONTINUOUS DUTY TEAO MOTORS (NEMA 1).
2. PROVIDE WITH TOP AND WALL MOUNTING HOLES.
3. PROVIDE WITH ADJUSTABLE AIR DIRECTIONAL VANES WITH 40° SWEEP FRONT TO BACK, COORDINATE COLOR SELECTION WITH ARCHITECT.
GRAVITY RELIEF VENTILATOR SCHEDULE
TAG APPLICATION
AIR
VOLUME
(CFM)
STATIC
PRESSURE (IN.
WG)
THROAT AREA
(SQFT)
THROAT
VELOCITY
(SQFT)
FREE AREA
(%)
FREE AREA
VELOCITY
(FT/MIN)
DIMENSION DATA
TOTAL
WEIGHT
(LBS)
MAKE MODEL NOTESHEIGHT
(INCH)
DEPTH
(INCH)
WIDTH
(INCH)
(N)GV-1 EXHAUST 835 0.064 1.12 746 36.2 481 11.75 29 29 37 GREENHECK GRSR-15 ALL
NOTES
1. PROVIDE WITH 14" H x 22" W x 22" L CURB FROM GREENHECK MODEL #GPI-22-A14.
2. PROVIDE WITH ALUMINUM BIRD SCREEN AND INSECT SCREEN.
AIR BALANCE SCHEDULE
UNIT
SUPPLY
AIR FLOW
(CFM)
RETURN
AIR FLOW
(CFM)
OUTDOOR
AIR FLOW
(CFM)
EXHAUST
AIR FLOW
(CFM)
PRESSURE
ZONE 1
(E)RTU-1 +1600 -1345 +255 -+255
MAU-1 -- +2100 -+2100
KEF-1 --- -2500 -2500
SUBTOTAL +1600 -1345 +2355 -2500 -145
ZONE 2
(E)RTU-2 +1500 -1065 +435 -+435
SUBTOTAL +1500 -1065 +435 -+435
ZONE 3
(E)RTU-3 +1505 -1205 +300 -+300
(N)EF-1 ----75 -75
SUBTOTAL +1505 -1205 +300 -75 +225
ZONE 4
(E)RTU-4 +1400 -1095 +305 -+305
(N)EF-1 ----560 -560
SUBTOTAL +1400 -1095 +305 -560 -255
ZONE 5
(E)RTU-5 +1400 -1000 +400 -+400
(N)EF-1 ----200 -200
SUBTOTAL +1400 -1000 +400 -200 +200
TOTAL +7405 -5710 +3795 -3335 +460
NOTES:
INTAKE EXCEEDS EXHAUST FOR BUILDING PRESSURIZATION.
LOCAL BALANCE IN THE KITCHEN IS -305 CFM.
KITCHEN HOOD REQUIRES AIR BALANCE REPORT FOR FINAL INSPECTION.
AIR DISTRIBUTION SCHEDULE
MARK SERVICE MAKE MODEL OVERALL SIZE NECK SIZE MAX CFM MAX NC MOUNTING
TYPE
BLOW
PATTERN THROW NOTES
SD-1 SUPPLY TITUS PCS-AA 24"x24" / 12"x12"6"ø 98 13 DROP FACE 4-WAY 2-4-8 ALL
SD-2 SUPPLY TITUS PCS-AA 24"x24" / 12"x12"8"ø 175 15 DROP FACE 4-WAY 2-5-10 ALL
SD-3 SUPPLY TITUS PCS-AA 24"x24" / 16"x16"10"ø 273 20 DROP FACE 4-WAY 2-5-14 ALL
SD-4 SUPPLY TITUS PCS-AA 24"x24"12"ø 393 21 DROP FACE 4-WAY 3-6-16 ALL
SD-5 SUPPLY TITUS PCS-AA 24"x24"14"ø 535 22 DROP FACE 4-WAY 3-7-19 ALL
SD-6 SUPPLY TITUS PCS-AA 24"x24"16"ø 698 23 DROP FACE 4-WAY 3-8-22 ALL
SD-7 SUPPLY TITUS TMRA 18"ø 10"ø 327 22 DUCT MOUNT N/A 4-6-11 1,4
SD-8 SUPPLY TITUS TMRA 22"ø 12"ø 470 23 DROP FACE N/A 4-7-13 1,4
SG-1 SUPPLY TITUS 300FL 14"x10"12"x8" 285 15 SIDE WALL N/A 14-22-31 1,4
RG-1 RETURN TITUS PAR 24"x24" / 12"x12" 6"x6"100 N/A DROP FACE N/A N/A ALL
RG-2 RETURN TITUS PAR 24"x24"8"x8" 222 14 DROP FACE N/A N/A ALL
RG-3 RETURN TITUS PAR 24"x24"10"x10" 347 17 DROP FACE N/A N/A ALL
RG-4 RETURN TITUS PAR 24"x24"12"x12" 600 24 DROP FACE N/A N/A ALL
RG-5 RETURN TITUS PAR 24"x24"15"x15" 938 26 DROP FACE N/A N/A ALL
RG-6 RETURN TITUS PAR 24"x24"18"x18" 1125 24 DROP FACE N/A N/A ALL
EG-1 EXHAUST TITUS PAR 24"x24" / 12"x12" 6"x6"100 N/A DROP FACE N/A N/A ALL
EG-2 EXHAUST TITUS PAR 24"x24"8"x8" 222 14 DROP FACE N/A N/A ALL
EG-3 EXHAUST TITUS PAR 24"x24"10"x10" 347 17 DROP FACE N/A N/A ALL
EG-4 EXHAUST TITUS PAR 24"x24"12"x12" 600 24 DROP FACE N/A N/A ALL
EG-5 EXHAUST TITUS 350RL 20"x12" 18"x10"666 20 SIDE WALL N/A N/A 1
NOTES
1. PROVIDE WITH VANES ADJUSTED FOR VERTICAL AIR PATTERN.
2. PROVIDE WITH 1/2"x1/2"x1/2" ALUMINUM CORE.
3. PROVIDE WITH 24"x24" FACE PLATE WITH ASSOCIATED 12"x12" DIFFUSER / GRILLE WHEN APPLICABLE.
4. PROVIDE MANUFACTURED INSULATED PAN ASSEMBLY FOR ALL SUPPLY AND VENTILATION AIR DIFFUSERS.
5. PROVIDE GYP. BOARD INSTALLATION KIT FOR AIR DEVICES INSTALLED IN DRYWALL CEILING.
ABBREVIATIONS: SD = SUPPLY AIR DIFFUSER, RG = RETURN AIR GRILLE, EG = EXHAUST AIR GRILLE, SG = SUPPLY AIR GRILLE
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
2025-07-09
20
2
5
-
0
7
-
1
1
1
2
:
3
5
:
5
1
A
M
M6.0
SC
H
E
D
U
L
E
S
-
M
E
C
H
A
N
I
C
A
L
1a
1a
193
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
20
2
5
-
0
7
-
1
0
1
1
:
3
1
:
4
2
P
M
M8.0
SP
E
C
I
F
I
C
A
T
I
O
N
S
-
M
E
C
H
A
N
I
C
A
L
194
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
20
2
5
-
0
7
-
1
0
1
1
:
3
1
:
4
9
P
M
M9.0
TI
T
L
E
2
4
-
M
E
C
H
A
N
I
C
A
L
195
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
20
2
5
-
0
7
-
1
0
1
1
:
3
1
:
5
5
P
M
M9.1
TI
T
L
E
2
4
-
M
E
C
H
A
N
I
C
A
L
196
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
2025-07-09
7/
1
0
/
2
0
2
5
1
0
:
0
1
:
5
4
A
M
E0.0
GE
N
E
R
A
L
I
N
F
O
R
M
A
T
I
O
N
-
EL
E
C
T
R
I
C
A
L
1a
197
NO
PA
R
K
I
N
G
CL
E
A
N
A
I
R
VE
H
I
C
L
E
FROM UTILITY
TRANSFORMER
A
K2
K1
B
1
MS
B
Adjacent Property
Office
Accessible
Entry Kitchen
Toilet 2
Toilet 1
Entry
RetailEntry
SeatingRetail
Coffee Bar
QC LabTraining/
Shipping & RecievingProduction/
Roasting Room
Hall
Pantry
Admin.
Mech.
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
2025-07-09
As indicated
7/
1
0
/
2
0
2
5
1
0
:
0
1
:
5
4
A
M
ES1.0
PR
O
P
O
S
E
D
S
I
T
E
P
L
A
N
-
EL
E
C
T
R
I
C
A
L
1/8" = 1'-0"1PROPOSED SITE PLAN - ELECTRICAL
GENERAL NOTES
A. REFER TO SHEET E0.0 FOR GENERAL NOTES.
CODED NOTES
1. COORDINATE TRANSFORMER SECONDARY FEEDERS/CONDUIT
WITH DRY UTILITY DRAWINGS/CONSULTANT.
4
198
Display / Sales Area
Hallway
Toilet
Utility
Dressing Rm.
Staging Area
Adjacent Property
(D) PANEL B
(D) PANEL A
(D) SERVICE PANEL
(D) METERS
2
1
1
1
1
1
1
3
3
4
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
2025-07-09
1/4" = 1'-0"
7/
1
0
/
2
0
2
5
1
0
:
0
1
:
5
5
A
M
ED1.0
DE
M
O
L
I
T
I
O
N
-
FI
R
S
T
F
L
O
O
R
P
L
A
N
-
EL
E
C
T
R
I
C
A
L
1/4" = 1'-0"ADEMOLITION - FIRST FLOOR PLAN - POWER
GENERAL NOTES
CODED NOTES
1. DISCONNECT AND REMOVE INCLUDING BUT NOT LIMITED TO
EXISTING RECEPTACLES, JUNCTION BOXES, DISCONNECT
SWITCHES, ELECTRICAL EQUIPMENT, ELECTRICAL DEVICES,
CONNECTIONS, WIRING, CONDUITS, ACCESSORIES IN THE ROOM.
UNLESS NOTED OTHERWISE.
2. EXISTING RECESSED PANEL ‘A’TO BE DEMOLISHED AND TO BE
REPLACED WITH A NEW SURFACE MOUNT PANEL REFER TO NEW
WORK PLAN E1.0 FOR NEW LOCATION. ALL THE EXISTING BRANCH
WIRES AND CONDUITS TO REMAIN AND TO BE EXTENDED UP TO
NEW LOCATION. DISCONNECT AND REMOVE EXISTING FEEDER
FROM THE EXISTING SERVICE PANEL AND TO BE RE-FED FROM
NEW SERVICE PANEL. REFER TO SHEETS E1.0 AND E6.0 FOR
ADDITIONAL INFORMATION.
3. DISCONNECT AND REMOVE EXISTING SERVICE PANEL AND
METERS. ALL ASSOCIATED FEEDERS, CONNECTIONS, CONDUITS TO
BE DEMOLISHED. COORDINATE DEMOLITION WORK WITH UTILITY
COMPANY AND ADHERE TO UTILITY STANDARDS AND
REQUIREMENTS.
4. DISCONNECT AND REMOVE INCLUDING BUT NOT LIMITED TO
ELECTRICAL PANEL, WIRES, CONDUITS, CONNECTIONS,
ACCESSORIES.
A. REFER SHEET E-0.0 FOR GENERAL NOTES.
B. EXISTING LAYOUT IS BASED ON AS-BUILT DOCUMENTS AND SITE
SURVEY DATA AVAILABLE. EC SHALL FIELD VERIFY EXISTING
CONDITION FOR ANY DEVIATION. ANY OTHER ELECTRICAL
EQUIPMENT, DEVICE, LIGHT FIXTURE NOT SHOWN ON LAYOUT
SHALL BE COORDINATED WITH OWNER PRIOR TO WORK.
C. EXISTING CONDUIT RUNS ARE NOT SHOWN, A FULL ATTEMPT
HAS BEEN MADE TO SHOW CERTAIN EXISTING CONDITIONS,
TAKEN FROM EXISTING RECORD DRAWINGS OR FIELD VERIFIED,
ON THIS PROJECT. THE DRAWINGS SHOWING LOCATION OF
EXISTING EQUIPMENT, OUTLETS, FIXTURES, QUANTITY, ETC., IN
EXISTING AREAS ARE APPROXIMATE ONLY. FIELD VERIFY
QUANTITIES, DEVICES, AND DEVICE LOCATIONS.
D. EXISTING ELECTRICAL WIRING THAT WILL NOT BE OBSOLETE
AND WHICH WILL BE DISTURBED DUE TO CONSTRUCTION
CHANGES REQUIRED BY THIS CONTRACT SHALL BE RESTORED
TO OPERATING CONDITION, AS REQUIRED OR DIRECTED.
WHERE REQUIRED, SHOWN AND/OR DIRECTED, OUTLETS AND
CONDUIT RUNS SHALL BE RELOCATED. EXTEND CONDUITS AND
PULL NEW WIRING, OR INSTALL JUNCTION BOXES AND SPLICE IN
NEW WIRING, OR REPLACE OLD WIRING WITH NEW WIRE(S)
WHERE NECESSARY.
E. PRESERVE CIRCUITING, SWITCHING AND CONTROL WIRING FOR
EXISTING FIXTURES TO REMAIN. FIELD VERIFY AND MAKE SAFE
EXISTING CIRCUITING AND CONTROL WIRING FOR CONNECTION
OF NEW AND RELOCATED LIGHTING FIXTURES IN THE AREA.
F. EXISTING CONDUIT TO BE ABANDONED SHALL BE REMOVED IF
EXPOSED, IN A CRAWL SPACE, OR IN AN ACCESSIBLE CEILING.
CUT, CAP, AND PLUG EXISTING CONDUIT INACCESSIBLE AREAS
OR WHERE IT IS NOT POSSIBLE TO BE REMOVED. REMOVE
EXISTING ELECTRICAL DEVICES, EQUIPMENT, BRANCH
CIRCUITS, AND FEEDERS IN THEIR ENTIRETY BACK TO THEIR
POINT OF ORIGIN UNLESS OTHERWISE INDICATED. TURN OFF
AND LABEL CIRCUIT BREAKERS AS SPARES FOR NEW WORK.
G. PROPER RESTORATION OF ALL EXISTING SURFACES REQUIRING
PATCHING, PLASTERING, PAINTING, OR OTHER REPAIR DUE TO
THE INSTALLATION OF ELECTRICAL WORK UNDER THE TERMS
OF THIS SPECIFICATION. CLOSE ALL OPENINGS REPAIR ALL
SURFACES, ETC.; AS REQUIRED. PROTECT EXISTING-TO-REMAIN
FLOORS, WALLS, AND PANELS.
H. ALL SALVAGED EXISTING ELECTRICAL EQUIPMENT SHALL BE
TURNED OVER TO THE OWNER. THE ELECTRICAL EQUIPMENT
INCLUDES THE FOLLOWING: LIGHTING FIXTURES, DISCONNECT
SWITCHES, SWITCHES, AND COPPER CONDUCTORS. ANY
ELECTRICAL DEVICES THAT ARE MOVED AND WHICH ARE NOT
REPLACED OR REUSED SHALL BE TURNED OVER TO THE
OWNER.
I. RECYCLE OR DISPOSE MATERIALS OFF-SITE AND INCLUDE ALL
COSTS IN BID. HANDLE ALL MATERIALS IN ACCORDANCE WITH
LEED REQUIREMENTS, ALL FEDERAL, STATE, AND LOCAL
REGULATIONS.
J. OUTLETS FROM WHICH FIXTURES, SWITCHES, RECEPTACLES,
OR OTHER ELECTRICAL DEVICES BEING OMITTED SHALL BE
REMOVED. IF IT IS NOT POSSIBLE TO REMOVE THE DEVICE,
PROVIDE BLANK COVER PLATES TO THE OUTLET BOX AND
REMOVE THE WIRING, WHERE EXISTING WALLS REMAIN INTACT.
K. PROVIDE CODE-COMPLIANT SUPPORT TO EXISTING-TO-REMAIN
UNSUPPORTED CONDUITS AND BOXES WHERE CEILINGS ARE
TO BE REMOVED. RE-ROUTE BRANCH CIRCUITS AND RELOCATE
JUNCTION BOXES AS REQUIRED TO FACILITATE INSTALLATION
OF NEW EQUIPMENT AND SYSTEM.
4
4
199
D
D
OS
OS
OS
OS
D D
OS
OS
D
D
D
(D)(D)(D)(D)
(D)(D)(D)
(D) (D) (D)
(D)(D)
(D)
(D)
(D)
(D)
(D)
(D)(D)
(D)(D)
(D)
(D)(D)
(D) (D)
(D)(D)
(D)(D)
(D)(D)
(D)
(R)(R)(R)(R)(R)(R)(R)
(R)(R)(R)(R)(R)(R)(R)
(R)(R)(R)(R)(R)(D)(D)
(D)(D)(D)(D)
(D)
(D)(D)(D)
(D)
(D)
(D)
(D)
(D)
(D)
(D)
(D)
(D)
(D)
(D)
(D)
(D)
(D)
(D)
(D)
(D)(D)(D)
(D)
(D)
(D)
(D)
(D)
(R)(R)
(R)(R)
(R)(R)
(D)
(D)
(D)
(D)(D)
(D)
(D)(D)
(D)(D)
(D)
(D)
(D)
Entry
(E)
(E)
(E)
(E)
(E)
(E)(E)(E)(E)(E)
(E)
(E)
(E)
(E)
(D)
1
1
1
1
2
1
1
1
(D)
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
1/4" = 1'-0"
7/
1
0
/
2
0
2
5
1
0
:
0
1
:
5
6
A
M
ED2.0
DE
M
O
L
I
T
I
O
N
-
RE
F
L
E
C
T
E
D
C
E
I
L
I
N
G
P
L
A
N
-
LI
G
H
T
I
N
G
1/4" = 1'-0"1DEMOLITION - REFLECTED CEILING PLAN - LIGHTING
GENERAL NOTES
CODED NOTES
1. DISCONNECT AND REMOVE, INCLUDING BUT NOT LIMITED TO
LIGHTING FIXTURES, LIGHTING CONTROLS, ACCESSORIES,
CONNECTIONS, CONDUITS, WIRING ASSOCIATED WITH EXISTING
LIGHTING FIXTURES LABELLED WITH (D) BACK TO SOURCE PANEL.
2. DISCONNECT, REMOVE AND RELOCATE EXISTING LIGHT FIXTURE
LABELLED WITH (R). DISCONNECT AND REMOVE ASSOCIATED
ACCESSORIES, CONNECTIONS, WIRES, CONDUITS BACK TO
SOURCE PANEL. REFER TO NEW WORK ON E2.0 FOR THE NEW
LOCATIONS, AFTER REMOVAL, STORE AND PROTECT FIXTURES
FOR RE-USE.
A. REFER SHEET E-0.0 FOR GENERAL NOTES.
B. EXISTING LAYOUT IS BASED ON AS-BUILT DOCUMENTS AND SITE
SURVEY DATA AVAILABLE. EC SHALL FIELD VERIFY EXISTING
CONDITION FOR ANY DEVIATION. ANY OTHER ELECTRICAL
EQUIPMENT, DEVICE, LIGHT FIXTURE NOT SHOWN ON LAYOUT
SHALL BE COORDINATED WITH OWNER PRIOR TO WORK.
C. EXISTING CONDUIT RUNS ARE NOT SHOWN, A FULL ATTEMPT
HAS BEEN MADE TO SHOW CERTAIN EXISTING CONDITIONS,
TAKEN FROM EXISTING RECORD DRAWINGS OR FIELD VERIFIED,
ON THIS PROJECT. THE DRAWINGS SHOWING LOCATION OF
EXISTING EQUIPMENT, OUTLETS, FIXTURES, QUANTITY, ETC., IN
EXISTING AREAS ARE APPROXIMATE ONLY. FIELD VERIFY
QUANTITIES, DEVICES, AND DEVICE LOCATIONS.
D. EXISTING ELECTRICAL WIRING THAT WILL NOT BE OBSOLETE
AND WHICH WILL BE DISTURBED DUE TO CONSTRUCTION
CHANGES REQUIRED BY THIS CONTRACT SHALL BE RESTORED
TO OPERATING CONDITION, AS REQUIRED OR DIRECTED.
WHERE REQUIRED, SHOWN AND/OR DIRECTED, OUTLETS AND
CONDUIT RUNS SHALL BE RELOCATED. EXTEND CONDUITS AND
PULL NEW WIRING, OR INSTALL JUNCTION BOXES AND SPLICE IN
NEW WIRING, OR REPLACE OLD WIRING WITH NEW WIRE(S)
WHERE NECESSARY.
E. PRESERVE CIRCUITING, SWITCHING AND CONTROL WIRING FOR
EXISTING FIXTURES TO REMAIN. FIELD VERIFY AND MAKE SAFE
EXISTING CIRCUITING AND CONTROL WIRING FOR CONNECTION
OF NEW AND RELOCATED LIGHTING FIXTURES IN THE AREA.
F. EXISTING CONDUIT TO BE ABANDONED SHALL BE REMOVED IF
EXPOSED, IN A CRAWL SPACE, OR IN AN ACCESSIBLE CEILING.
CUT, CAP, AND PLUG EXISTING CONDUIT INACCESSIBLE AREAS
OR WHERE IT IS NOT POSSIBLE TO BE REMOVED. REMOVE
EXISTING ELECTRICAL DEVICES, EQUIPMENT, BRANCH
CIRCUITS, AND FEEDERS IN THEIR ENTIRETY BACK TO THEIR
POINT OF ORIGIN UNLESS OTHERWISE INDICATED. TURN OFF
AND LABEL CIRCUIT BREAKERS AS SPARES FOR NEW WORK.
G. PROPER RESTORATION OF ALL EXISTING SURFACES REQUIRING
PATCHING, PLASTERING, PAINTING, OR OTHER REPAIR DUE TO
THE INSTALLATION OF ELECTRICAL WORK UNDER THE TERMS
OF THIS SPECIFICATION. CLOSE ALL OPENINGS REPAIR ALL
SURFACES, ETC.; AS REQUIRED. PROTECT EXISTING-TO-REMAIN
FLOORS, WALLS, AND PANELS.
H. ALL SALVAGED EXISTING ELECTRICAL EQUIPMENT SHALL BE
TURNED OVER TO THE OWNER. THE ELECTRICAL EQUIPMENT
INCLUDES THE FOLLOWING: LIGHTING FIXTURES, DISCONNECT
SWITCHES, SWITCHES, AND COPPER CONDUCTORS. ANY
ELECTRICAL DEVICES THAT ARE MOVED AND WHICH ARE NOT
REPLACED OR REUSED SHALL BE TURNED OVER TO THE
OWNER.
I. RECYCLE OR DISPOSE MATERIALS OFF-SITE AND INCLUDE ALL
COSTS IN BID. HANDLE ALL MATERIALS IN ACCORDANCE WITH
LEED REQUIREMENTS, ALL FEDERAL, STATE, AND LOCAL
REGULATIONS.
J. OUTLETS FROM WHICH FIXTURES, SWITCHES, RECEPTACLES,
OR OTHER ELECTRICAL DEVICES BEING OMITTED SHALL BE
REMOVED. IF IT IS NOT POSSIBLE TO REMOVE THE DEVICE,
PROVIDE BLANK COVER PLATES TO THE OUTLET BOX AND
REMOVE THE WIRING, WHERE EXISTING WALLS REMAIN INTACT.
K. PROVIDE CODE-COMPLIANT SUPPORT TO EXISTING-TO-REMAIN
UNSUPPORTED CONDUITS AND BOXES WHERE CEILINGS ARE
TO BE REMOVED. RE-ROUTE BRANCH CIRCUITS AND RELOCATE
JUNCTION BOXES AS REQUIRED TO FACILITATE INSTALLATION
OF NEW EQUIPMENT AND SYSTEM.
L. UNLESS NOTED OTHERWISE, ALL EXISTING LIGHTING FIXTURES
LABELLED AS (E) SHALL REMAIN IN PLACE. CONTRACTOR SHALL
MAKE SURE THAT ANY NEW WORK SHALL NOT AFFECT THE
EXISTING OPERATION OF EXISTING LIGHT FIXTURES.
200
J
J
Adjacent Property
Office
Accessible
Entry Kitchen
Toilet 2
Toilet 1
Entry
Retail
Entry
Seating
Retail
Coffee Bar
QC Lab
Training/
Shipping & Recieving
Production/
Roasting Room
Hall
Pantry
Admin.
Mech.
+26"
118
+16"135
+26"
134
+16"132
+26"
120
+18"
127
+18"
128
+18"
+18"
124
+18"+26"
120
+26"
118
+46"+46"
113
+46"
111
+16"
110 107
+16"
106 +16"
+46"+46"
104 +46"
+32"
+42"
142+42"
141
139
+16"
+42"
140
+16"
143145
146
+32"
153 +66"
147
+16"
152
+16"+48"
+42"163 +42"162
+16"
164 +16"
165 +16"166
+16"
158
+16"
192
+16"
193
+48"
+48"
+48"
+48"
169
+48"
+16"
+16"
197
+42"
+42"
+42"
+42"
+16"
204
+26"
208
+26"
210
212
+42"
+42"
213
+42"211
+16"
+16"
187
+16"
184
+16"178 175
+16"
214
+42"
+42"
K1K2A
+48"
169
K1-14
K1-16
K1-15,17
K1-18
K1-19
K1-20,22
K1-21,23
K1-25,27
K1-26
K1-28
K1-30,32
K1-31
K1-33
K1-34
K1-35
K1-36,38
K2-2
K1-37
K1-40
K1-39
K1-42K1-41K1-44
K1-43
K2-1,3
K2-4 K2-5
B-31
B-22
K1-46 K1-45
K1-48
K1-47 K1-12
K1-50,52
B-19 B-21
B-24
K1-10
K1-9,11
K1-8
K1-4,6
K1-3,5
K1-2
B-13
B-10
B-14,16 B-15
B-17
B-25
B-8
B -9
B -11
B -6
B -5
216
B
K1-13
182 B-27,29
195
B-26,28
K1 -1
K1 -24
K1 -29
(N
)
A
C
-1
B -34
B -36
MS
B
K2 -8(N)EF-1
+46"
103
K1-49
+40"
155 K2-6
1 1
1
2
HOOD
CONTROL
PANEL
30A-2P
3
30A-1P
30A-1P
216
K1-54
+42"+42"
+16"
+6"
120.1 120.1
210.1
186.3
186.2
186.1
194
+16"135
K1-51,53
4
GB 5
B -7
B -39
B -44
GWH-1
RCP-1
B -41
B -43
UNDER COUNTER
UNDER BENCH
B -12
B -46
6
8
K1 -7
B -23
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
2025-07-09
1/4" = 1'-0"
7/
1
0
/
2
0
2
5
1
0
:
0
1
:
5
8
A
M
E1.0
PR
O
P
O
S
E
D
F
I
R
S
T
F
L
O
O
R
P
L
A
N
-
PO
W
E
R
1/4" = 1'-0"1PROPOSED FIRST FLOOR PLAN - POWER
GENERAL NOTES
CODED NOTES
1. COORDINATE NEMA RATING WITH KITCHEN CONSULTANT
DRAWINGS PRIOR TO ROUGH-IN.
2. PROVIDE ALL CONTROL WIRING, CONDUIT, ACCESSORIES PER
HOOD SYSTEM DRAWINGS. COORDINATE LOCATION AND
INSTALLATION WITH HOOD/KITCHEN CONSULTANT.
3. COORDINATE LOCATION, MOUNTING WITH KITCHEN CONSULTANT
DRAWINGS PRIOR TO ROUGH-IN.
4. EXISTING "PANEL A" RELOCATED TO NEW LOCATION. RE-FEED
"PANEL A' FROM NEW SERVICE PANEL "MSB". INTERCEPT ALL
EXISTING BRANCH CIRCUITS FED FROM "PANEL A" AND EXTEND UP
TO NEW LOCATION. MAKE NECESSARY MODIFICATIONS TO HAVE
ALL EXISTING BRANCH CIRCUITS OPERATIONAL.
5. PROVIDE A SEPARATE GROUND BUS. FOR MORE INFORMATION SEE
DETAIL#8 ON SHEET E5.0.
6. ANY ELECTRICAL OUTLETS INSTALLED BACK TO BACK ON THE FIRE
RATED WALL SHALL HAVE MINIMUM 24" HORIZONTAL SEPERATION.
7. EXISTING RECESSED PANEL 'A' TO BE REPLACED WITH A NEW
SURFACE MOUNT PANEL. ALL THE EXISTING BRANCH WIRES,
CONDUITS ASSOCIATED WITH EXISTING PANEL 'A' TO BE EXTENDED
UP TO NEW THE LOCATION AS SHOWN. NEW PANEL TO BE RE-FED
FROM NEW SERVICE PANEL. REFER TO E6.0 FOR ADDITIONAL
INFORMATION.
8. NO ELECTRICAL CONNECTION TYPE INFORMATION (PLUG OR
DIRECT) AVAILABLE FOR THE EQUIPMENT. COORDINATE PLUG
TYPE/RATING WITH KITCHEN CONSULTANT/OWNER PRIOR TO
ROUGH-IN.
A. REFER TO SHEET E0.0 FOR GENERAL NOTES.
B. COORDINATE ELEVATION OF KITCHEN RECEPTACLES, JUNCTION
BOXES WITH KITCHEN CONSULTANT DRAWINGS PRIOR TO ROUGH
IN.
C. ALL RECEPTACLES IN KITCHEN/PREP AREAS SHALL BE GFCI PER
CEC 210.8.B.2. PROVIDE GFCI CIRCUIT BREAKER IN LIEU OF GFCI
RECEPTACLE WHERE THE RECEPTACLE IN NOT READILY
ACCESSIBLE TO COMPLY WITH CODE.
D. ALL DEVICES SHALL BE RECESSED IN WALL OR FLOOR MOUNTED,
NO POWER POLES ARE ALLOWED.
E. REFER TO KITCHEN EQUIPMENT SCHEDULE ON SHEET E6.0 FOR
ADDITIONAL INFORMATION.
F. COORDINATE WITH KITCHEN CONSULTANT DRAWINGS FOR
REQUIREMENT OF HARDWIRE (DIRECT) CONNECTION OR
RECEPTACLE CONNECTION (THAT CORRESPONDS WITH
EQUIPMENT PLUG) FOR THE KITCHEN EQUIPMENT.
KITCHEN EQUIP CIRCUIT LEGEND
###XX -YY
XX:PANEL NAME
YY:CIRCUIT NUMBER
###:KITCHEN EQUIPMENT ID
4
4
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a 1a 1a
1a
1a
1a
1a
201
KEF-1
B -18,20
WP WP
WP
B -30,32
(E)RTU-1(E)RTU-4
(E)RTU-2 (E)RTU-5 (E)RTU-3
100A-2P
1
B -33
MAU-1
2
2
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
1/4" = 1'-0"
7/
1
0
/
2
0
2
5
1
0
:
0
1
:
5
9
A
M
E1.1
PR
O
P
O
S
E
D
R
O
O
F
P
L
A
N
-
EL
E
C
T
R
I
C
A
L
GENERAL NOTES
CODED NOTES
A. REFER TO SHEET E0.0 FOR GENERAL NOTES.
B. COORDINATE WITH MEACHANICAL AND KITCHEN CONSULTANT
DRAWINGS PRIOR TO WORK.
1/4" = 1'-0"1PROPOSED ROOF PLAN - ELECTRICAL
1. FACTORY INSTALLED DISCONNCECT SWITCH SHALL BE PROVIDED WITH KITCHEN
EXHAUST FAN. COORDINATE WITH KITCHEN CONSULTANT PRIOR TO WORK. IF
NOT PROVIDED, EC SHALL PROVIDE A 30A-1P DISCONNECT SWITCH.
2. SHOWN FOR REFERENCE ONLY, SEE M1.1 FOR MORE INFORMATION.
202
OS
D
OS
OS
OS
D
D
OS
OS
OS
D
OS OS OS
OS
OS
D
D
TC
D
D
PC
Adjacent Property
Office
Accessible
Entry
Kitchen
Toilet 2
Toilet 1
Entry
Retail
Entry
Seating
Retail
Coffee Bar
QC Lab
Training/
Shipping & Recieving
Production/
Roasting Room
Hall
Pantry
Admin.
Mech.
A A AA
A A
A A AAA
G G G
G
F
D
D
D D D
D
D
D D
D
D D D
D D D
D D D D
D D
D
D
C
C
C
C C C C
F
F
F
F
(R)(R)(R)(R)(R)(R)(R)(R)(R)(R)
(R)(R)(R)(R)(R)(R)(R)(R)(R)
(R)
(R)(R)
(R)
(R)(R)
H
H
H
H
D
D
D D D D
F
F
F F
E
E E
E
B B
C
N
a
aa
a
M
M
2
(E)
(E)
(E)
(E)
(E)
(E)(E)(E)(E)(E)
(E)
(E)
(E)
(E)
m
m
m
d
d
dd
d
d
d d
e
3
e
eeeee
b
e
e
e
e
e
eee
e e e e
e e e
j
f f
ff
3
4
4
4
4
4
4
4
4
4
4
g
g
g
g
a,b,c,d
e, f, g, j,
k, l
4
4
44
44
4
h,ih
h h
h
h
h
h
h
h
i
i
i i
i i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i i
ii
i
i
i
i
7 (TYP.)
5
k
EW1
5
k
5
k
5
k
5
k
N
N
N
N
N
N
N
N
N N N N
N
4
EW1j
m m m
EW1
6
l
l
l
l
5 k 5 k 5 k 5 k 5 k
1
b
b b
h,i
B -38
B -35
B -40
B -37
B -42
8
K
K
i
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
2025-07-09
1/4" = 1'-0"
7/
1
0
/
2
0
2
5
1
0
:
0
2
:
0
1
A
M
E2.0
PR
O
P
O
S
E
D
R
E
F
L
E
C
T
E
D
C
E
I
L
I
N
G
P
L
A
N
-
LI
G
H
T
I
N
G
1/4" = 1'-0"1PROPOSED REFLECTED CEILING PLAN - LIGHTING
GENERAL NOTES
CODED NOTES
1. EC SHALL PROVIDE NDTC LIGHTING CONTROL TIMECLOCK SWITCH
FOR THE KITCHEN AREA LIGHTING CONTROL. SEE DETAIL#1 ON
SHEET E5.1 FOR MORE INFORMATION. COORDINATE EXACT TIME
SCHEDULE REQUIREMENTS WITH OWNER.
2. LIGHT FIXTURES FURNISHED WITH EXHAUST HOOD. EQUIPMENT
MANUFACTURER SHALL BE RESPONSIBLE FOR PROVIDING
SUFFICIENT ILLUMINATION TO COMPLY WITH LOCAL
REQUIREMENTS. REFER TO MANUFACTURER'S WIRING DIAGRAMS
FOR CONNECTION INFORMATION AND CONNECT COMPLETE.
3. PROVIDE CONSTANT HOT CONDUCTOR AHEAD OF ANY SWITCHING
CONTROL FOR THE INTERNAL BATTERY PACK CHARGER.
4. CONNECT EMERGENCY FIXTURE AHEAD OF ANY LOCAL SWITCHING
CIRCUIT.
5. EXISTING CANOPY LIGHT FED VIA EXISTING PANEL 'A', CKT#13.
LIGHTS TO BE CONTROLLED VIA TIMECLCOK CONTROL SPECIFIED
IN CODED NOTE#1. MODIFY EXISTING WIRES TO ACCOMODATE
NEW RELAY PACK CONTROLLED VIA TIME CLOCK. REFER TO DETAL
#1 ON SHEET E5.1.
6. FROM THE AS-BUILTS AND AVAILABLE SITE SURVEY DATA IT IS
UNKNOWN FROM WHICH PANEL AND CIRCUIT THE EXISTING
EXTERIOR WALL LIGHT FED ARE FED FROM. FIELD VERIFY EXISTING
CIRCUIT PRIOR TO WORK. IF NOT FED FROM EXISTING PANEL 'A',
USE SPARE CIRCUIT FROM NEW PANEL 'B' TO FEED THE LIGHT.
LIGHTS TO BE CONTROLLED VIA TIMECLCOK CONTROL SPECIFIED
IN CODED NOTE#1. MODIFY EXISTING WIRES TO ACCOMODATE
NEW RELAY PACK CONTROLLED VIA TIME CLOCK. REFER TO DETAL
#1 ON SHEET E5.1.
7. EXISTING LIGHT FIXTURES BEING RELOCATED. CONNECT
RELOCATED LIGHTS TO NEW CIRCUIT AND CONTROLS AS SHOWN
ON THE NEW WORK PLAN. LIGHT FIXTURE WATTAGE IS TAKEN
FROM AS-BUILT DRAWINGS AND IS ASSUMED TO BE 56 WATTS.
8. PROVIDE PHOTOCELL FACING SOUTH, TO CONTROL BUILDING
EXTERIOR LIGHTING. AIM AND INSTALL PER MANUFACTURER'S
RECOMMENDATIONS. PHOTOCELL SHALL BE COMPATIBLE WITH
nLIGHT CONTROL SYSTEM. SEE DETAILS SHEET FOR ADDITIONAL
INFORMATION.
A. REFER TO SHEET E0.0 FOR GENERAL NOTES.
B. COORDINATE EXACT LIGHTING ZONE REQUIREMENT WITH OWNER
PRIOR TO WORK.
C. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR
EXACT LOCATIONS, MOUNTING HEIGHTS OF LIGHT FIXTURES AND
OTHER CEILING MOUNTED DEVICES.
D. COORDINATE FINAL LIGHT FIXTURE SELECTION FOR DIMMING
TYPE AND PROVIDE COMPATIBLE DIMMER SWITCH.
E. ALL EXISTING LIGHTING FIXTURES LABELLED AS (E) SHALL REMAIN
IN PLACE.
1a
1a
203
Statistics
Description Symbol Avg Max Min Max/Min Avg/Min
PANTRY & KITCHEN EXITS 3.1 fc 7.1 fc 0.6 fc 11.8:1 5.2:1
PRODUCTION/SHIPPING & RECEIVING EXITS 1.4 fc 1.5 fc 1.3 fc 1.2:1 1.1:1
RETAIL ENTRY/COFFEE BAR EXITS 1.0 fc 1.7 fc 0.6 fc 2.8:1 1.7:1
RETAIL ENTRY/HALL EXITS 2.8 fc 7.5 fc 1.5 fc 5.0:1 1.9:1
ROASTING ROOM EXITS 1.4 fc 1.5 fc 1.1 fc 1.4:1 1.3:1
1.1 1.1 1.2 1.3 1.3 1.4 1.4 1.3 1.3 1.3 1.4 1.4 1.4 1.4 1.4 1.4 1.3 1.4 1.5 1.5 1.5 1.5 1.5 1.4 1.3 1.4 1.5 1.5 1.5 1.5 1.5 1.4 1.3 1.4 1.4 1.4 1.4 1.4 1.3 1.2 1.3 1.3 1.3
1.2
1.1 1.1
1.5
1.6
1.7
1.8
2.6
3.9
4.3
6.07.56.95.13.72.82.3
2.3
1.5
1.5
1.61.71.71.71.71.71.71.71.7
0.6
0.6
0.6
0.60.70.7
0.8
0.8
0.8
0.8
0.8
0.80.80.80.90.90.90.90.90.80.80.90.9
0.9
0.80.80.80.80.80.80.80.80.80.8
0.9
0.9
1.0
1.1
1.21.31.3
1.4
1.5
1.6
1.7
1.71.71.71.71.71.7
1.4
1.4
1.5
1.5
1.4
1.4
1.4
1.4
1.4
1.4
1.4
1.3 1.3
0.6 0.7 0.8 1.0 1.3 1.8 2.5 3.4 4.5 5.4 5.8
6.1
6.8
6.6
5.7
5.96.15.44.33.22.31.71.20.90.80.60.6
0.6
0.6 0.7 0.8 1.0 1.3 1.8 2.6 3.7 5.1 6.4
6.5
5.3
1.7
1.7
1.6
Adjacent Property
Office
Accessible
Entry Kitchen
Toilet 2
Toilet 1
Entry
Retail
Entry
Seating
Retail
Coffee Bar
QC Lab
Training/
Shipping & Recieving
Production/
Roasting Room
Hall
Pantry
Admin.
Mech.
N
A
A
N N N N N N
N
N
N
N
N
N
N
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
1/4" = 1'-0"
7/
1
0
/
2
0
2
5
1
0
:
0
2
:
0
2
A
M
E4.0
PH
O
T
O
M
E
T
R
I
C
S
-
EL
E
C
T
R
I
C
A
L
1/4" = 1'-0"1PHOTOMETRICS - ELECTRICAL
GENERAL NOTES
CODED NOTES
1. NOT IN USE.
A. REFER TO SHEET E0.0 FOR GENERAL NOTES.
204
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
2025-07-09
7/
1
0
/
2
0
2
5
2
:
2
9
:
3
0
P
M
E5.0
DE
T
A
I
L
S
-
EL
E
C
T
R
I
C
A
L
1a
1a
1a
1a1a
1a
1a
205
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
2025-07-09
7/
1
0
/
2
0
2
5
2
:
3
0
:
2
0
P
M
E5.1
Checker
Author
DE
T
A
I
L
S
-
EL
E
C
T
R
I
C
A
L
1a
206
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
2025-07-09
7/
1
0
/
2
0
2
5
1
0
:
0
2
:
3
5
A
M
E6.0
SC
H
E
D
U
L
E
S
-
EL
E
C
T
R
I
C
A
L
KITCHEN EQUIPMENT SCHEDULE
NOTES:
1. COORDINATE FINAL ELECTRICAL DATA, CONNECTION TYPE, ROUGH-IN HEIGHT, NEMA RATING WITH KITCHEN CONSULTANT DRAWINGS.
213 1 --Water Boiler 5 gal w/aeration 240 1 22 5.28 PLUG 42"NEMA L6-30P/R
212 1 --Batch Brewer 240 1 14.6 3.50 PLUG 42"NEMA L6-20P/R
211 1 --Lab Grinder 120 1 -- 1.30 PLUG 42"NEMA 5-15P
210.1 1 --Espresso tamper 120 1 -- 0.07 PLUG 26"NEMA 5-15P
210 1 --Espresso grinder 120 1 -- 0.58 PLUG 26"NEMA 5-15P
208 1 --Espresso Machine 240 1 -- 4.60 PLUG 26"NEMA L6-30P/R
204 1 --Dishwasher 120 1 12 1.44 PLUG 16"NEMA 5-15P
QC LAB
197 1 x Reach In Solid Swing Door Refrigerator 120 1 6.9 0.83 PLUG 16"NEMA 5-15P
195 1 x Bulk Grinder 240 1 -- 2.20 ----FUTURE TBD
194 1 x Accumulator Table 120 1 5 0.60 PLUG 16"NEMA 5-15P
193 1 x Conveyor Band sealer 120 1 12 1.44 PLUG 16"NEMA 5-15P
192 1 x Weigh/Fill bag filler 120 1 2 0.24 PLUG 16"NEMA 5-15P
187 1 --FUTURE 120 1 15 1.80 PLUG 16" VERIFY NEMA RATING WITH KITCHEN CONSULTANT
186.3 1 --Roaster Label Printer 120 1 -- 0.18 PLUG 48"NEGLIGABLE LOAD - CONV OUTLET
186.2 1 --Roaster Laser printer 120 1 -- 0.18 PLUG 48"NEGLIGABLE LOAD - CONV OUTLET
186.1 1 --Roaster Workstation PC 120 1 -- 0.18 PLUG 48"NEGLIGABLE LOAD - CONV OUTLET
184 1 --Air Compressor - 20Gal, 4HP, with AAD & Dryer 240 1 14 3.36 PLUG 16"NEMA 6-15P
182 1 --Coffee Roaster 240 1 -- 7.50 DIRECT 6"SO DROP WITH STRAIN RELIEF & DISCONNECT
178 1 --Floor Scale - Receiving 120 1 -- 0.25 PLUG 16"NEGLIGABLE LOAD - CONV OUTLET
175 1 x Electric Lift Charger 120 1 12.5 1.50 PLUG --NEMA 5-15P
170.3 1 --Production Label Printer 120 1 -- -- PLUG 48" NEGLIGABLE LOAD - CONV OUTLET
170.2 1 --Production Laser printer 120 1 -- -- PLUG 48"NEGLIGABLE LOAD - CONV OUTLET
170.1 1 --Production Workstation PC 120 1 -- -- PLUG 48"NEGLIGABLE LOAD - CONV OUTLET
169 2 --Shipping Scale 120 1 -- 0.18 PLUG 48"NEGLIGABLE LOAD - CONV OUTLET
ROASTERY
166 1 --Ice Machine 120 1 8.8 1.06 PLUG 16"NEMA 5-15P
165 1 --Reach In Solid Swing Door Refrigerator 120 1 6.9 0.83 PLUG 16"NEMA 5-15P
164 1 --Reach In Solid Swing Door Freezer 120 1 3.7 0.44 PLUG 16"NEMA 5-15P
163 1 x Pastry Laminator 120 1 1 0.12 PLUG 42"NEMA 5-15P
162 1 --Stand Mixer (1/2 HP)120 1 9.8 1.18 PLUG 42"NEMA 5-15P
158 1 --Dishwasher 240 1 28 6.72 PLUG 16"NEMA 6-30P
155 1 --Convection Oven 120 1 1 0.12 PLUG 40"NEMA 5-15P
153 1 --HD Induction Range 240 1 24 5.76 PLUG 32"NEMA 6-30P
152 1 x Refrigerated Chefs Base 120 1 4.4 0.53 PLUG 16"NEMA 5-15P
147 1 x Cheese Melter 120 1 10 1.20 PLUG 66"NEMA 5-15P
146 1 x Meat Slicer 120 1 15 1.80 PLUG 42"NEMA 5-15P
145 2 x Rice/Grain Cooker 120 1 10.4 1.25 PLUG 42"NEMA 5-15P
143 1 --Salad Sandwich Prep Station 120 1 6.5 0.78 PLUG 16"NEMA 5-15P
142 1 x Waffle Iron 120 1 10 1.20 PLUG 42" NEMA 5-15P
141 1 x Sous vide cooker 120 1 -- 1.15 PLUG 42"NEMA 5-15P
140 1 --Conveyor Toaster 120 1 13.3 1.60 PLUG 42"NEMA 5-15P
139 1 x Worktop Refrigerator 120 1 4 0.48 PLUG 16"NEMA 5-15P
KITCHEN
216 1 --R/O Water System Formulator 120 1 6 0.72 PLUG 48"NEMA 5-15P (4 OUTLETS REQUIRED)
214 1 --Reach In Refrigerated Merchandiser 120 1 15 1.80 PLUG 16" VERIFY NEMA RATING WITH KITCHEN CONSULTANT
135 2 x Pour Over Unit 240 1 12 2.88 PLUG 16" VERIFY NEMA RATING WITH KITCHEN CONSULTANT
134 1 x Bulk Coffee Grinder 120 1 -- 1.30 PLUG 26"NEMA 5-15P
132 1 --Undercounter Refrigerator 120 1 2 0.24 PLUG 16"NEMA 5-15P
128 1 --Espresso AV 2 Group 240 1 11 2.64 PLUG 18" VERIFY NEMA RATING WITH KITCHEN CONSULTANT
127 1 --Espresso Steam Unit 240 1 14.4 3.46 PLUG 18" VERIFY NEMA RATING WITH KITCHEN CONSULTANT
124 1 --Espresso AV 2 Group 240 1 11 2.64 PLUG 18" VERIFY NEMA RATING WITH KITCHEN CONSULTANT
120.1 4 --Auto Tamper 120 1 -- 0.07 PLUG 26"NEMA 5-15P
120 4 --Espresso Grinder 120 1 -- 0.84 PLUG 26"NEMA 5-15P
118 2 --POS System Interface 120 1 -- 0.50 PLUG 26"NEMA 5-15P, 4 PLEX CONV OUTLET
113 1 --Filter Coffee Brewer 240 1 25.4 6.10 PLUG 46"NEMA L6-30P/R
111 1 --Bulk Coffee Grinder 120 1 -- 1.30 PLUG 46"NEMA 5-15P
110 1 --Ice Machine 120 1 5.2 0.62 PLUG 16"NEMA 5-15P
107 1 --Back Bar Refrigerator 120 1 3.2 0.38 PLUG 16"NEMA 5-15P (PROVIDE ACCESS DOOR)
106 1 --Carbonator 120 1 6.5 0.78 PLUG 16"NEMA 5-15P
104 1 x Combi Oven 240 1 20 4.80 PLUG 46"NEMA L6-20
103 1 x Soft Serve Machine 120 1 9 1.08 PLUG 46"NEMA 5-20P
COFFEE BAR
TAG QTY FUTURE KITCHEN EQUIPMENT VOLT PHASE AMPS KVA CONNECTION... ROUGH IN AFF REMARKS
KITCHEN EQUIPMENT SCHEDULE (ELECTRICAL)
1a
1a
207
LIGHTING FIXTURE SCHEDULE
TAG SYMBOL DESCRIPTION MANUFACTURER MODEL LUMENS MOUNTING FINISH LOCATION LAMP COLOR
TEMP CONTROLS WATTS VOLTS NOTES
A 2'X4' LIGHT TROFFER LITHONIA CPX-2X4-6000LM-80CRI-40K-SWL-MIN10-ZT-120 6000 RECESSED WHITE INDOOR LED 3500 0-10V 41.8 120 CONFIRM FINISH WITH ARCHITECT PRIOR TO SUBMIT
THE SHOP DRAWING.
B 2'X2' LIGHT TROFFER LITHONIA CPX-2X2-6000LM-80CRI-40K-SWL-MIN10-ZT-120 6000 RECESSED WHITE INDOOR LED 3500 0-10V 54.1 120 CONFIRM FINISH WITH ARCHITECT PRIOR TO SUBMIT
THE SHOP DRAWING.
C DECORATIVE PENDANT LIGHT BULBSQUARE JAPANESE MINIMALIST MATTE TEXTURE RESIN DOME 1-LIGHT PENDANT
LIGHT TBD PENDANT BLUE INDOOR LED TBD PHASE DIMMING 14 120
CONFIRM FINISH WITH ARCHITECT PRIOR TO SUBMIT
THE SHOP DRAWING. WATTS ARE ASSUMED FOR
E26 BASE LED BULB OF 1500LUMENS.
D TBD TBD TBD TBD TBD WHITE INDOOR LED TBD PHASE DIMMING 14 120
DETAILS AWAITED FROM INTERIOR DESIGNER.
WATTS ARE ASSUMED FOR E26 BASE LED BULB OF
1500LUMENS.
E TBD TBD TBD TBD TBD TBD TBD TBD TBD PHASE DIMMING 14 TBD
DETAILS AWAITED FROM INTERIOR DESIGNER.
WATTS ARE ASSUMED FOR E26 BASE LED BULB OF
1500LUMENS.
F CEILING SCONCE SCHOOL HOUSE
ELECTRIC ALABAX LARGE SURFACE MOUNT TBD TBD TBD TBD TBD TBD PHASE DIMMING 14 TBD CONFIRM FINISH WITH ARCHITECT PRIOR TO SUBMIT
THE SHOP DRAWING.
G 4' WRAPAROUND COOPER 4WSNLED-LD4-40SL-F-UNV-L840-CD1-U 4000 SURFACE WHITE INDOOR LED 4000K 0-10V 40 120 CONFIRM FINISH WITH ARCHITECT PRIOR TO SUBMIT
THE SHOP DRAWING.
H EXIT SIGN LITHONIA LQM S W RG MVOLT M6 --SURFACE WHITE INDOOR LED --EM 3 120 CONFIRM FINISH WITH ARCHITECT PRIOR TO SUBMIT
THE SHOP DRAWING.
L TRACK LIGHT WAC LIGHTING LUCIO 6010 10W 85CRI 600 TRACK WHITE INDOOR LED 3000K PHASE DIMMING 15 120 CONFIRM FINISH WITH ARCHITECT PRIOR TO SUBMIT
THE SHOP DRAWING.
M RECESSED LIGHT TBD TBD TBD TBD TBD TBD TBD TBD PHASE DIMMING 14 TBD
DETAILS AWAITED FROM INTERIOR DESIGNER.
WATTS ARE ASSUMED FOR E26 BASE LED BULB OF
1500LUMENS.
K VANITY WALL SCONCE TBD TBD TBD TBD TBD TBD TBD TBD PHASE DIMMING 14 TBD
DETAILS AWAITED FROM INTERIOR DESIGNER.
WATTS ARE ASSUMED FOR E26 BASE LED BULB OF
1500LUMENS.
N EMERGENCY CEILING PACK
LIGHT LITHONIA ELM6L 1100 WALL/CEILING WHITE INDOOR LED 5000K -11 120 CONFIRM FINISH WITH ARCHITECT PRIOR TO SUBMIT
THE SHOP DRAWING.
EW1 EMERGENCY CEILING PACK
LIGHT LITHONIA AFB-PEL-DWHGXD-UVOLT-N-SDRT-WT 225 WALL WHITE OUTDOOR LED 4000K -6.95 120 CONFIRM FINISH WITH ARCHITECT PRIOR TO SUBMIT
THE SHOP DRAWING.
NOTES:
1. PROVIDE ALL REQUIRED HARDWARE, CABLES. ETC., FOR A FULLY FUNCTIONAL INSTALLATION
2. REFER TO ARCHITECTURAL & LIGHTING PLANS AND SPECIFICATIONS FOR EXACT REQUIREMENTS, LOCATION & INSTALLATION
3. HALF OR FULL SHADED FIXTURES SHALL HAVE MINIMUM 90 MIN. INTEGRAL BATTERY WITH TEST SWITCH (UNLESS NOTED OTHERWISE).
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
7/
1
0
/
2
0
2
5
1
0
:
0
2
:
3
5
A
M
E6.1
SC
H
E
D
U
L
E
S
-
EL
E
C
T
R
I
C
A
L
LIGHTING SCHEDULE
208
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
2025-07-09
7/
1
0
/
2
0
2
5
1
0
:
0
2
:
3
8
A
M
E6.2
SC
H
E
D
U
L
E
S
-
EL
E
C
T
R
I
C
A
L
NOTES:
TOTAL 71392 VA 66.28% 47322 VA
NON-COINCIDENT 0% 0.0 VA
EQUIPMENT N - NON-COINCIDENT
KITCHEN 68772 VA 65.00% 44702 VA E - EQUIPMENT
MOTORS K - KITCHEN
HEATING M - MOTORS
AIR CONDITIONING H - HEATING TOTAL DEMNAD CURRENT 197 A
RECEPT (REMAINDER)0 VA 50%0 VA A - AIR CONDITIONING TOTAL CONNECTED CURRENT 297 A
RECEPT (FIRST 10 kVA)2620 VA 100% 2620 VA R - RECEPTACLE TOTAL DEMAND LOAD 47322 VA
LIGHTING L - LIGHTING TOTAL CONENCTED LOAD 71392 VA
LOAD DESCRIPTION CONNECTED LOAD D.F. DEMAND LOAD CODE PANEL TOTALS
Total Amps:286 A 309 A 0 A
Total Load:34.3 kVA 37.1 kVA 0.0 kVA
65 SPACE 1 -- ------ 1 SPACE 66
63 SPACE 1 -- ---- -- 1 SPACE 64
61 SPACE 1 -- ------ 1 SPACE 62
59 SPARE 1 20 0 0 20 1 SPARE 60
57 SPARE 1 20 0 0 20 1 SPARE 58
55 0 20 1 SPARE 56
53 1.4 0.7 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C K RO WATER SYSTEM (216) 54
51 POUR OVER UNIT (135)K 2-#12, 1-#12GND IN 3/4"C 2 20 1.4 3.4 52
49 SOFT SERVE MACHINE (103)K 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 1.1 3.4 40 2 2-#8, 1-#10GND IN 3/4"C K DISHWASHER (158)50
47 REACH IN REFRIGERATOR (165) K 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.8 0.4 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C K REACH IN - FREEZER (164) 48
45 STAND MIXER (162)K 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.2 0.1 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C K PASTRY LAMINATOR (163) 46
43 MEAT SLICER (146)K 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 1.8 1.3 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C K RICE/GRAIN COOKER (145) 44
41 SANDWICH PREP STATION (143) K 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.8 0.5 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C K WORKTOP REFRIGERATOR (139) 42
39 CONVEYOR TOASTER (140)K 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 1.6 1.2 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C K SOUS VIDE COOKER (141) 40
37 WAFFLE IRON (142)K 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 1.2 2.4 38
35 CARBONATOR (106)K 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.8 2.4 25 2 2-#10, 1-#10GND IN 3/4"C K COMBI OVEN (104)36
33 ICE MACHINE (110)K 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.6 0.4 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C K BACK BAR REFRIGERATOR (107) 34
31 BULK COFFEE GRINDER (111) K 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 1.3 3.1 32
29 RECEP - COFFEE BAR R 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.5 3.1 35 2 2-#8, 1-#10GND IN 3/4"C K FILTER COFFEE BREWER (113)30
27 1.3 0.5 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C R POS SYSTEM INTERFACE (118) 28
25 ESPRESSO AV 2 GROUP (124) K 2-#12, 1-#12GND IN 3/4"C 2 20 1.3 0.9 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C K ESPRESSO GRINDER (120 &120.1) 26
23 1.3 0.4 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C R RECEP - COFFEE BAR 24
21 ESPRESSO AV 2 GROUP (128) K 2-#12, 1-#12GND IN 3/4"C 2 20 1.3 1.7 22
19 ESPRESSO GRINDER (120/120.1) K 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.9 1.7 20 2 2-#12, 1-#12GND IN 3/4"C K ESPRESSO STEAM UNIT (127)20
17 1.4 0.2 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C K UC REFRIGERATOR (132) 18
15 POUR OVER UNIT (135)K 2-#12, 1-#12GND IN 3/4"C 2 20 1.4 1.3 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C K BULK COFFEE GRINDER (134) 16
13 RO WATER SYSTEM (216)K 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.7 0.5 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C R POS SYSTEM INTERFACE (118) 14
11 2.3 1.1 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C K ICE MACHINE (166) 12
9 ESPRESSO MACHINE (208)K 2-#12, 1-#12GND IN 3/4"C 2 20 2.3 1.4 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C K DISHWASHER (204) 10
7 RECEP - TRAINING/QC LAB R 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.4 0.7 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C K ESPRESSO GRINDER (210/210.1) 8
5 2.6 1.8 6
3 WATER BOILER (213) K 2-#12, 1-#12GND IN 3/4"C 2 20 2.6 1.8 20 2 2-#12, 1-#12GND IN 3/4"C K BATCH BREWER (212)4
1 RECEP - TRAINING/QC LAB R 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.4 1.3 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C K LAB GRINDER (211) 2
CKT CIRCUIT DESCRIPTION CODE FEEDER POLE TRIP
(A)
A
(KVA)
B
(KVA)
C
(KVA)
A
(KVA)
B
(KVA)
C
(KVA)
TRIP
(A)
POLE FEEDER CODE CIRCUIT DESCRIPTION CKT
MOUNTING:SURFACE ENCLOSURE:NEMA-1
SUPPLY FROM:B WIRES:3 MAINS:250 A, MLO
LOCATION:PRODUCTION/SHIPPING & RECEIVING PHASE:1 BUS RATING:400 A
PANEL NAME:K1 VOLTAGE:120/240V A.I.C. RATING:22 KAIC
NOTES:
TOTAL 8540 VA 72.63% 6203 VA
NON-COINCIDENT 0% 0.0 VA
EQUIPMENT 750 VA 100.00% 750 VA N - NON-COINCIDENT
KITCHEN 7790 VA 70.00% 5453 VA E - EQUIPMENT
MOTORS K - KITCHEN
HEATING M - MOTORS
AIR CONDITIONING H - HEATING TOTAL DEMNAD CURRENT 26 A
RECEPT (REMAINDER)0 VA 50%0 VA A - AIR CONDITIONING TOTAL CONNECTED CURRENT 36 A
RECEPT (FIRST 10 kVA)0 VA 100% 0 VA R - RECEPTACLE TOTAL DEMAND LOAD 6203 VA
LIGHTING L - LIGHTING TOTAL CONENCTED LOAD 8540 VA
LOAD DESCRIPTION CONNECTED LOAD D.F. DEMAND LOAD CODE PANEL TOTALS
Total Amps:31 A 40 A 0 A
Total Load:3.7 kVA 4.8 kVA 0.0 kVA
17 SPACE 1 -- ------ 1 SPACE 18
15 SPACE 1 -- ---- -- 1 SPACE 16
13 SPARE 1 20 0 0 20 1 SPARE 14
11 SPARE 1 20 0 0 20 1 SPARE 12
9 SPARE 1 20 0 0 20 1 SPARE 10
7 SPARE 1 20 0 0.8 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C E HOOD CONTROL PANEL 8
5 REFRIGERATED CHEFS BASE (152) K 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.5 0.1 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C K CONVECTION OVEN (155) 6
3 2.9 1.2 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C K CHEESE MELTER (147) 4
1 HD INDUCTION RANGE (153) K 2-#10, 1-#10GND IN 3/4"C 2 30 2.9 0.2 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C K RECP - KITCHEN 2
CKT CIRCUIT DESCRIPTION CODE FEEDER POLE TRIP
(A)
A
(KVA)
B
(KVA)
C
(KVA)
A
(KVA)
B
(KVA)
C
(KVA)
TRIP
(A)
POLE FEEDER CODE CIRCUIT DESCRIPTION CKT
MOUNTING:SURFACE ENCLOSURE:NEMA-1
SUPPLY FROM:B WIRES:3 MAINS:50 A, MLO
LOCATION:PRODUCTION/SHIPPING & RECEIVING PHASE:1 BUS RATING:100 A
PANEL NAME:K2 VOLTAGE:120/240V A.I.C. RATING:14 KAIC
NOTES:
TOTAL 132075 VA 64.34% 93978 VA
NON-COINCIDENT 0% 0.0 VA
EQUIPMENT 5570 VA 100.00% 5570 VA N - NON-COINCIDENT
KITCHEN 110257 VA 65.00% 71667 VA E - EQUIPMENT
MOTORS 1250 VA 100.00% 1250 VA K - KITCHEN
HEATING M - MOTORS
AIR CONDITIONING 1224 VA 100.00% 1224 VA H - HEATING TOTAL DEMNAD CURRENT 392 A
RECEPT (REMAINDER)600 VA 50% 300 VA A - AIR CONDITIONING TOTAL CONNECTED CURRENT 550 A
RECEPT (FIRST 10 kVA)10000 VA 100% 10000 VA R - RECEPTACLE TOTAL DEMAND LOAD 93978 VA
LIGHTING 3174 VA 125.00% 3967 VA L - LIGHTING TOTAL CONENCTED LOAD 132075 VA
LOAD DESCRIPTION CONNECTED LOAD D.F. DEMAND LOAD CODE PANEL TOTALS
Total Amps:540 A 561 A 0 A
Total Load:64.8 kVA 67.3 kVA 0.0 kVA
53 SPACE 1 -- ------ 1 SPACE 54
51 SPACE 1 -- -- -- -- 1 SPACE 52
49 SPACE 1 -- ------ 1 SPACE 50
47 SPARE 1 20 0 0 20 1 SPARE 48
45 SPARE 1 20 0 0.7 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C R RECEP- PRODUCTION SH. & RE. 46
43 RCP-1 E 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.1 1.1 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C R RECEPTACLES 44
41 GWH-1 E 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.6 0.6 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C L PRODUCTION/SHIPP. - LTGS 42
39 REC - RETAIL SEATING R 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.9 0.7 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C L KIT./PAN./MECH/R.R/OFF./LAB - LTGS 40
37 ROASTING ROOM - LTGS L 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 1 0.2 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C L COFFEE BAR - LTGS 38
35 HALL/RETAIL ENTRY/COF. BAR - LTGS L 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.7 1.3 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C M KITCHEN - EF-1 36
33 ROOF RECEPTACLE R 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.2 1.2 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C A KITCHEN - AC-1 34
31 ACCUMULATOR TABLE (194)R 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.6 1.7 32
29 3.8 1.7 30 2 2-#10, 1-#10GND IN 3/4"C K KEF-1 (ROOF)30
27 COFFEE ROASTER (182)K 2-#12, 1-#12GND IN 3/4"C 2 20 3.8 1.1 28
25 ELECTRIC LIFT CHARGER (175) E 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 1.5 1.1 20 2 2-#12, 1-#12GND IN 3/4"C K BULK GRINDER (195)26
23 SHIPPING SCALE (169)E 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.4 0.8 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C K REACH IN REFRIGERATOR (197) 24
21 CONVEYOR BAND SEALER (193) E 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 1.4 0.2 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C R RECP- PRODUCTION SHIPPING & RE. 22
19 WEIGH/FILL BAG FILLER (192) E 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.2 6.4 20
17 QUAD RECEP- ROASTING ROOM E 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.4 6.4 80 2 2-#3, 1-#8GND IN 1"C K MAU-1 (ROOF)18
15 FLOOR SCALE - RECEIVING (178) E 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.3 1.7 16
13 DCO - ROASTING ROOM R 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.2 1.7 20 2 2-#12, 1-#12GND IN 3/4"C K AIR COMPRESSOR (184)14
11 REC - TOILET & MECH R 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.4 0.7 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C R RECEP- PRODUCTION SH. & RE. 12
9 REC - RETAIL SEATING R 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 1.1 1.8 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C K ROASTED COFFEE (187) 10
7 REC - RETAIL SEATING R 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.9 1.8 35 1 1-#8, 1-#8, 1-#10GND IN 3/4"C K REACH IN REF. MERCH. (214) 8
5 REC - TRAINING/QC LAB R 1-#12, 1-#12, 1-#12GND IN 3/4"C 1 20 0.4 0.7 20 1 1-#12, 1-#12, 1-#12GND IN 3/4"C R REC - ADMIN OFFICE 6
3 37.1 4.8 4
1 PANEL K1 SF REFER TO ONE LINE DIAGRAM 2 250 34.3 3.7 50 2 REFER TO ONE LINE DIAGRAM SF PANEL K2 2
CKT CIRCUIT DESCRIPTION CODE FEEDER POLE TRIP
(A)
A
(KVA)
B
(KVA)
C
(KVA)
A
(KVA)
B
(KVA)
C
(KVA)
TRIP
(A)
POLE FEEDER CODE CIRCUIT DESCRIPTION CKT
MOUNTING:SURFACE ENCLOSURE:NEMA-1
SUPPLY FROM:MSB WIRES:3 MAINS:500 A, MLO
LOCATION:PRODUCTION/SHIPPING & RECEIVING PHASE:1 BUS RATING:600 A
PANEL NAME:B VOLTAGE:120/240V A.I.C. RATING:22 KAIC
CODED NOTES
1. PROVIDE GROUND FAULT CIRCUIT INTERRUPTER BREAKER.
2. PROVIDE CIRCUIT BREAKER WITH SHUNT TRIP. EC SHALL
INTERLOCK SHUNT TRIP WITH THE HOOD FIRE SUPPRESSION
SYSTEM. COORDINATE WITH KITCHEN CONSULTANT AND HOOD
SYSTEM DRAWINGS FOR REQUIREMENT.
B
K1
K2
1
1
1
1
1
1
1
1
1
2
1a
1a
1a
1a
1a
1a
1
11
1
1
1a
1a
1a
1a
1a
209
M
M
M
600A
2P
500A
2P
NEW MAIN SWITCH BOARD "MSB"
600 AMP BUS
240/120V, 1-PHASE, 3W, 42KAIC
NEMA-3R
N
G
WATER
STEEL
2
#3/0 CU
#3/0 CU
500A
MLO
PANEL B
200A
MLO
PANEL A
200A
2P
SPARE
SPACE
PULL SECTION/
MAIN BREAKER SECTION
DISTRIBUTION SECTIONDISTRIBUTION SECTION
GAS LT
~
V.
D
.
=
15
'
0.
2
%
LT
~
V.
D
.
=
20
'
0.
2
%
UTILITY
TRANSFORMER
1
3
UTILITY
PRIMARY
4
500.3 200.3
600.3
200A
2P
5
250A
MLO
PANEL K1
100A
MLO
PANEL K2
250.3
LT~
V.D.=
10'
0.1%
LT~
V.D.=
12'
0.01%
50.3
100%
RATED
7
LOAD SUMMARY NEW SWITCHBOARD "MSB"
LOAD DESCRIPTION DEMAND LOAD
(KVA)
(E) PANEL A 35.4
PANEL B 92.2
TOTAL DEMAND LOAD 127.6
TOTAL AMPS@ 240V 532
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
2025-07-09
07
-
1
0
-
2
0
2
5
2
2
:
4
9
:
1
5
E7.0
ON
E
-LI
N
E
-
EL
E
C
T
R
I
C
A
L
12" = 1'-0"1ONE-LINE DIAGRAM & ELEVATION - ELECTRICAL
GENERAL NOTES
CODED NOTES
1. MINIMUM CONDUITS SHOWN, CONTRACTOR SHALL PROVIDE
ADDITIONAL CONDUITS AS NECESSARY TO MEET THE UTILITY
COMPANY'S MINIMUM REQUIREMENTS. SEE DRY UTILITY PLANS
FOR PROPOSED ROUTING AND ADDITION INFORMATION.
COORDINATE WITH SCE AND ADHERE TO THEIR REQUIREMENTS.
2. SYSTEM GROUNDING. LOCATE IN NEMA 3 ENCLOSURE ADJACENT
TO MAIN SWITCH BOARD. SEE SYSTEM GROUNDING DETAIL ON
DETAIL#8 SHEET -E5.0 FOR MORE INFORMATION.
3. PROVIDE ARC FLASH LABEL ON EQUIPMENT PER CEC 110.16. LABEL
SHALL INDICATED VOLTAGE, AVAILABLE FAULT CURRENT,
CLEARING TIME OF OCP, AND DATE LABEL WAS APPLIED.
4. EXISTING PANEL 'B' (125A) TO BE REMOVED AND REPLACED WITH
NEW PANEL 'B' RATED AT 500A. COORDINATE ALL DEMOLITION AND
INSTALLATION WORK WITH THE ELECTRICAL CONTRACTOR.
5. PROVIDE METER SECTION IN GEAR WITH INSTANT, HISTORICAL
TRACKING, AND PEAK KWH WITH USER DEFINED RATE PERIOD
(PER TITLE 24, TABLE 130.5A).
6. ELECTRICAL DEMAND LOAD FOR EXISTING PANEL 'A' SHOWN IS
FROM AVAILABLE AS-BUILT DOCUMENTS. EC SHALL FIELD VERIFY
DATA.
7. EXISTING RECESSED PANEL ‘A’TO BE DEMOLISHED AND TO BE
REPLACED WITH A NEW SURFACE MOUNT PANEL REFER TO NEW
WORK PLAN E1.0 FOR NEW LOCATION. DISCONNECT AND REMOVE
EXISTING FEEDER FROM THE EXISTING SERVICE PANEL AND RE-
FED FROM NEW SERVICE PANEL AS SHOWN.
A. REFER TO SHEET E0.0 FOR GENERAL NOTES.
B. THE CONTRACTOR SHALL VERIFY THE EQUIPMENT DIMENSIONS
AND CONFIRM IT WILL FIT WITH THE CODE REQUIRED
CLEARANCES PRIOR TO SUBMITTING FOR REVIEW AND PRIOR TO
ORDERING. CONFLICTS SHALL BE COORDINATED WITH THE GC,
ARCHITECT, AND ENGINEER PRIOR TO SUBMITTING FOR REVIEW.
C. ALL CONDUCTORS ARE BASED ON COPPER, THHN / THWN,
UNLESS NOTED OTHERWISE.
D. CONFIRM MANUFACTURER'S RECOMMENDED OVER CURRENT
PROTECTION PRIOR TO ORDERING EQUIPMENT.
E. CONTRACTOR SHALL PROVIDE A MAXIMUM AVAILABLE FAULT
CURRENT LABEL TO SERVICE ENTRANCE EQUIPMENT (CEC
110.20(A)).
F. EQUIPMENT SUPPLIER SHALL PROVIDE A ARCH FLASH STUDY AND
COORDINATION STUDY AS PART OF THE EQUIPMENT SUBMITTAL.
STUDIES SHALL BE PROVIDED TO ENGINEER OF RECORD FOR
APPROVAL AND BE SUBMITTED TO LOCAL BUILDING DEPARTMENT.
CONTRACTOR SHALL INCLUDE TIME FOR SUBMITTAL AND REVIEW
IN THEIR PROJECT SCHEDULE.
G. ALL UNDERGROUND GROUND CONNECTIONS SHALL BE
EXOTHERMIC, ABOVE GROUND MAY BE VIA COMPRESSION.
H. CONTRACTOR SHALL CONFIRM EQUIPMENT GEAR SIZE, REQUIRED
CLEARANCES, AND LOCATION PRIOR TO ISSUING SUBMITTALS
FOR REVIEW.
I. THE CONTRACTOR SHALL COORDINATE THE SPECIFIC
CONFIGURATION OF THE GEAR AND LOCATION OF THE PULL
SECTION WITH FIELD CONDITIONS AND THE UTILITY PRIOR TO
ORDERING THE GEAR. WHAT IS SHOWN ON THIS DRAWING IS
DIAGRAMMATIC.
6
4
4
1a
210
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
7/
1
0
/
2
0
2
5
1
0
:
0
3
:
0
5
A
M
E8.0
SP
E
C
I
F
I
C
A
T
I
O
N
S
-
EL
E
C
T
R
I
C
A
L
211
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
7/
1
0
/
2
0
2
5
1
0
:
0
3
:
1
1
A
M
E9.0
TI
T
L
E
2
4
-
EL
E
C
T
R
I
C
A
L
212
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
7/
1
0
/
2
0
2
5
1
0
:
0
3
:
1
4
A
M
E9.1
TI
T
L
E
2
4
-
EL
E
C
T
R
I
C
A
L
213
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
NOT TO SCALE
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
7/
1
0
/
2
0
2
5
1
0
:
0
3
:
2
0
A
M
E9.2
TI
T
L
E
2
4
-
EL
E
C
T
R
I
C
A
L
214
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
7/
1
0
/
2
0
2
5
1
0
:
0
3
:
2
6
A
M
E9.3
Checker
Author
TI
T
L
E
2
4
-
EL
E
C
T
R
I
C
A
L
215
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I JPl
o
t
t
e
d
:
A
C
o
f
f
e
e
S
h
o
p
Te
n
a
n
t
I
m
p
r
o
v
e
m
e
n
t
f
o
r
Pa
l
m
D
e
s
e
r
t
,
C
A
9
2
2
6
0
AP
N
N
o
.
:
6
2
7
-
1
5
1
-
0
0
5
-
3
44
8
5
0
S
a
n
P
a
b
l
o
A
v
e
De
s
e
r
t
K
i
d
,
L
L
C
*
*
*
U
n
l
e
s
s
t
h
i
s
d
o
c
u
m
e
n
t
i
s
a
B
L
A
C
K
L
I
N
E
p
r
i
n
t
o
n
B
L
U
E
b
a
c
k
g
r
o
u
n
d
i
t
i
s
N
O
T
t
o
b
e
u
s
e
d
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
*
*
*
Th
i
s
d
r
a
w
i
n
g
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
p
a
r
t
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
e
d
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
t
h
e
A
r
c
h
i
t
e
c
t
.
I
d
e
n
t
i
f
y
i
n
g
m
a
r
k
s
a
n
d
s
y
m
b
o
l
s
h
a
v
e
b
e
e
n
i
n
c
o
r
p
o
r
a
t
e
d
t
o
m
a
i
n
t
a
i
n
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
t
h
i
s
r
e
q
u
i
r
e
m
e
n
t
.
DRAWN
CHECKED
DATE
SCALE
2407.00
JOB NO.
SHEET NO.
ww
w
.
a
l
p
h
a
m
e
p
.
n
e
t
BYREVISIONS
COPYRIGHT 2025
1 July, 2025
1a
2
3
July, 2025
July, 2025
July, 2025
B.S.
I.H.
P.D.
H.D.
4 July, 2025 F.D.
7/
1
0
/
2
0
2
5
1
0
:
0
3
:
2
8
A
M
E9.4
Checker
Author
TI
T
L
E
2
4
-
EL
E
C
T
R
I
C
A
L
216
COFFEE COMPANY
DESERT KID
ROASTERY AND CAFE
44850 SAN PABLO
PALM DESERT, CA
DEVELOPMENT
217
COFFEE COMPANY
DESERT KID
ROASTERY AND CAFE
44850 SAN PABLO
PALM DESERT, CA
DEVELOPMENT
218
COFFEE COMPANY
DESERT KID
ROASTERY AND CAFE
44850 SAN PABLO
PALM DESERT, CA
DEVELOPMENT
219
COFFEE COMPANY
DESERT KID
ROASTERY AND CAFE
44850 SAN PABLO
PALM DESERT, CA
DEVELOPMENT
220
COFFEE COMPANY
DESERT KID
ROASTERY AND CAFE
44850 SAN PABLO
PALM DESERT, CA
DEVELOPMENT
221
COFFEE COMPANY
DESERT KID
ROASTERY AND CAFE
44850 SAN PABLO
PALM DESERT, CA
DEVELOPMENT
222
MENU BOARD
ESPRESSO
COTADO
CAPPUCINO
LATTE
MOCHA
FILTER COFFEE
TEA
HOT CHOCOLATE
COFFEE COMPANY
DESERT KID
ROASTERY AND CAFE
44850 SAN PABLO
PALM DESERT, CA
DEVELOPMENT
223
COFFEE COMPANY
DESERT KID
ROASTERY AND CAFE
44850 SAN PABLO
PALM DESERT, CA
DEVELOPMENT
224
COFFEE COMPANY
DESERT KID
ROASTERY AND CAFE
44850 SAN PABLO
PALM DESERT, CA
DEVELOPMENT
225
COFFEE COMPANY
DESERT KID
ROASTERY AND CAFE
44850 SAN PABLO
PALM DESERT, CA
DEVELOPMENT
226
COFFEE COMPANY
DESERT KID
ROASTERY AND CAFE
44850 SAN PABLO
PALM DESERT, CA
DEVELOPMENT
227
COFFEE COMPANY
DESERT KID
ROASTERY AND CAFE
44850 SAN PABLO
PALM DESERT, CA
DEVELOPMENT
228
MENU BOARD
ESPRESSO
COTADO
CAPPUCINO
LATTE
MOCHA
FILTER COFFEE
TEA
HOT CHOCOLATE
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I J
ID-1ID-1
229
A
7
6
5
4
3
2
1
A
8
B C D E F G H I J
1
8
7
6
5
4
3
2
B C D E F G H I J
ID-1ID-2
230
ID-3
BAR & BACK BAR
L01L02WD-01 shelving, see
Coffee Consultant
drawings for elevation,
see ID-1 for detail
WD-01
Bar
ST-03
Stone
Countertop
ST-02
Tile Bar Face
ST-01
Tile Wall
BACK BAR VIEW FROM BAR
TOWARD ROASTERY EXTERIOR VIEW 1 EXTERIOR VIEW 2
ST-02
Tile Wall
Slider window
Fixed window
WD-01
Wood
Countertop
WD-01
Wood Cabinetry
ST-01
Tile Wall
WD-01
Wood Retail
Wall & Shelving,
see drawing for
detail
WD-01
Wood Bench,
see drawing for
detail
231
FINISHES SPECIFICATIONS
STONE & TILE
WOOD
PAINT
Tag Location QTY Item Manufacturer Item Description Size Finish Link
Tag Location QTY Item Manufacturer Item Description Size Finish
Tag Location QTY Item Manufacturer Product Type Color Finish
ST-01 Retail Wall & Back Bar Wall Tile Zia Tile Glazed Earth 2" x 6"
ST-02 Espresso Bar Face Tile Zia Tile Perpetual Check 4 3.875" H & 1.875" H
ST-03 Bar & Espresso Bar Stone Top By GC Soapstone 3/4" thick GC to submit samples
WD-01 Wood Throughout Red Oak By GC Red Oak Varies GC to submit samples
PT-01 Walls Throughout Paint Benjamin Moore Wall Paint OC-17 White Dove (TBC) Matte
PT-02 Ceiling & Trusses Paint Benjamin Moore Trim Paint OC-17 White Dove (TBC) Satin
PT-03 Roastery Window Frames Paint Per Manufacturer Per Manufacturer To match walls Per Manufacturer
PT-04 Training Room Window Frames Paint Per Manufacturer Per Manufacturer To match walls Per Manufacturer
PT-05 Bathroom Door Frames Paint Benjamin Moore Trim Paint OC-17 White Dove (TBC) Satin
PT-06 Bathroom Doors Paint Benjamin Moore Shop Applied Spray OC-17 White Dove (TBC) Satin
PT-07 Round Columns Paint By GC Type 5 Drywall Paint with Plaster Finish GC to submit samples
Spec
Spec
5/9/2025
F
in n siin i Finish
CH-01 Entry Left 6 Stools - Table Height 34"Table height 34"
CH-02A Entry Left 1 Corner bench Custom, by GC Red Oak
CH-02B Entry Left 1 Bench cushions
CH-03 Display Wall 12 Chairs
CH-04 Lounge 1 Sofa
CH-05 Lounge 2 Poufs
CH-06 Lounge 2 Armchairs
CH-07A South Window 1 Bench Custom, by GC Red Oak
CH-07B South Window 1 Bench cushions
CH-08 South Window 5 Chairs
CH-09 Espresso Bar 4 Stools - Table Height 34"Table height 34"
CH-10 Exterior 24 Chairs
TB-01 Display Wall 2 Table
TB-02 Lounge 2 Coffee Tables
TB-03 Lounge 2 Side Tables
TB-04 South Window 5 Bistro Tables
TB-05 Exterior 10 Tables
TB-06 Entry Left 2 Tables
RG-01 Lounge 1 Rug
SH-01 Shelving at Bar 2 Wood Shelf Custom, by GC Floating shelf Refer to Drawings Red Oak
SH-02 Shelving at Retail 6 Wood Shelf Custom, by GC Floating shelf 4'-4" Length, VIF Red Oak
SH-03 Shelving at Entry Left 1 Wood Shelf Custom, by GC Floating shelf 5'-1" Length, VIF
5/5/2025
LIGHTING SCHEDULE
Tag Location QTY Item Manufacturer Item Description Size Finish Link
L01 Throughout 26 Pendant Castell Castell 12" Globe LED Pendant 12" Diameter Black
L02 Above Main Bar 8 Pendant MOOIJANE Bohemia Pendant Lamp 15.7" Diameter, 8.3" H Amber Red
L03 Back Bar 10 Track Light WAC Summit L-Track 6" Tall 3000K LED Track Head
with Field Adjustable Beam Angle 6-1/8" H White
L04 Retail 2 Recessed Light
L05 Lounge 4 Ceiling Sconce Schoolhouse Electric Alabax Large Surface Mount Large - 8 1/4" Diameter,
7" H Juniper
L06 Entry to WC Hall 1 Ceiling Sconce Schoolhouse Electric Alabax Large Surface Mount Large - 8 1/4" Diameter,
7" H Juniper
L07 Hall to WC 2 Sconce / Pendant Schoolhouse Electric Alabax Large Surface Mount Large - 8 1/4" Diameter,
7" H Juniper
L08 Bathrooms 2 Ceiling Sconce Schoolhouse Electric Alabax Large Surface Mount Large - 8 1/4" Diameter,
7" H Juniper
L09 Bathrooms 2 Wall Sconce Rich Brillians Willing Crisp Sconce 5" Diameter Frosted Interior
L10 Roastery 4 Pendant Castell Castell 12" Globe LED Pendant 12" Diameter Black
L11 Roastery 4 Spotlight
Spec
Spec
Spec
Spec
Spec
Spec
Spec
Spec
Spec
ID-4
232
CITY OF PALM DESERT
ZONING ADMINISTRATOR
NOTICE OF DECISION
DATE: October 23, 2024
APPLICANT: Desert Kid Coffee
PROPERTY ADDRESS: 44850 San Pablo Avenue
CASE NO: Administrative Use Permit (AUP) 24-0005
Notice is hereby given that the Zoning Administrator has received and approved a request
by Desert Kid Coffee (Applicant) for an AUP to operate a restaurant (coffee roasting
facility selling food and drinks. The business is proposed within an existing commercial
building and will utilize the entirety of the 5,404 square feet for roasting, seating, coffee
bar, kitchen, bathrooms, and offices.
The property is zoned Downtown Overlay (D.O.). Palm Desert Municipal Code (PDMC)
Chapter 25.18.040 Land Use and Permit Requirements , states that restaurants may be
permitted subject to the approval of an Administrative Use Permit (AUP) pursuant to PDMC
Section 25.64.040.
Business Operation:
The proposed use is a coffee roasting facility mostly selling coffee drinks with a kitchen area
for food. Based off the sale of food and number of seats proposed, the use is classified as a
restaurant. The kitchen will provide light food items such as pastries and sandwiches.
Hours of Operation/Staff:
The business will operate as follows (subject to change):
-Monday through Sunday: 6:00 am – 8:00 pm
-Approximately 10 employees
CEQA:
The Zoning Administrator has reviewed the proposed project for compliance with the
California Environmental Quality Act (CEQA) and has determined that the project qualifies as
a Class 1 Categorical Exemption pursuant to 15301 – Existing Facilities of the State CEQA
Guidelines.
233
AUP24-0005 Desert Kid Coffee
October 23, 2024
Page 3 of 3
Findings:
The Zoning Administrator, under provisions of Section 25.64.040 of the PDMC, has approved
the said use based upon the following findings required in Section 25.64.040.D:
1.The proposed use is allowed within the applicable zoning district and complies with
all other applicable provisions of this zoning code, municipal code, general plan,
and any applicable specific plans or City regulations/standards.
The property is zoned Downtown Overlay (D.O.). Palm Desert Municipal Code (PDMC)
Chapter 25.18.040 Land Use and Permit Requirements, states that restaurants may be
permitted subject to the approval of an Administrative Use Permit (AUP) pursuant to
PDMC Section 25.64.040. The site is developed as a suite within a multitenant
commercial building in the Downtown area. It is improved with adjacent sidewalk,
landscaping, and six (6) parking spaces. The existing site complies with applicable zoning
code requirements for height, setbacks, land use compatibility, parking, and lot coverage.
The business requires 5 parking spaces, at a ratio of 3 spaces per 1,000 square feet, only
accounting for 1,620 square feet of restaurant space. The parking spaces are available
within the existing commercial center. The commercial center was developed with ample
parking for existing multi-tenant buildings. The proposed use complies with all applicable
provisions of the zoning code, including parking, and land use compatibility with the
existing businesses. The project will be conditioned to add additional bicycle parking to
encourage bicycle access to and from the site as alternative means of parking.
The subject property is designated Downtown per the General Plan Land Use Element.
The proposed restaurant use is compatible with the type of uses within the downtown and
is similar to the surrounding uses within the area. The property does not have any
applicable specific plans or any other City regulations/standards.
2.The site is physically suited for the type, density, and intensity of the proposed use,
including access, utilities, and the absence of physical constraints, and can be
conditioned to meet all related performance criteria and development standards.
The site is consistent with the purpose and intent of the City’s Zoning Ordinance. The
project is located within an existing commercial area with sufficient parking, both private
and public. The site is adequately separated from any sensitive land uses. The site has
been previously designed to meet access, utilities, setbacks, lot coverage, building height,
land use, and parking requirements for nonresidential uses. Furthermore, the proposed
project does not pose a conflict regarding land use and can be conditioned to meet all
related performance criteria and development standards within the City’s Zoning
Ordinance.
3.Granting the permit would not be detrimental to the public interest, health, safety,
convenience, or welfare, or materially injurious to persons, property, or
improvements in the vicinity in which the project is located.
234
AUP24-0005 Desert Kid Coffee
October 23, 2024
Page 3 of 3
The proposed use will occur within the confines of the building leased space. Therefore,
the use would not be detrimental to the public interest, health, safety, welfare, and
materially injurious to properties in the vicinity.
BASED ON THE FINDINGS ABOVE, THE ZONING ADMINISTRATOR hereby approves
AUP24-0004. In accordance with Section 25.60.060.C. of the PDMC, a notice of decision
shall be provided to the applicant, interested parties, and property owners within 300 feet of
the property.
Any interested person may appeal certain actions of the Zoning Administrator in accordance
with Section 25.60.080. All appeals shall be submitted in writing, identifying the determination
or action being appealed and specifically stating the basis or grounds of the appeal. Appeals
shall be filed within 15 calendar days following the date of determination or action. The 15-
day appeal period for this decision concludes November 8, 2024.
Any concerns, comments, or appeals may be filed at:
City of Palm Desert
Development Service Department
73510 Fred Waring Drive
Palm Desert, CA 92260
Hours: 8:00 a.m. to 5:00 p.m. Monday through Friday (closed on major holidays). You may
contact Principal Planner, Carlos Flores at cflores@palmdesert.gov and/or at 760-776-6478.
Sincerely,
Carlos Flores
CARLOS FLORES, AICP, ZONING ADMINISTRATOR
235
CONDITIONS OF APPROVAL
CASE NO. AUP 24-0005
Development Services Department:
1. The use and operation shall conform substantially with approved exhibits on file
with the Department of Development Services, except as modified by conditions
herein.
2.The project site shall be developed and maintained in conformance with the
approved plans and exhibits on file with the City. Any variation from the approved
plans must be reviewed and approved by the Department of Development
Services prior to building permit issuance and may require review and approval by
the Zoning Administration, Planning Commission and/or City Council.
3.The Applicant agrees that in the event of any administrative, legal, or equitable
action instituted by a third party challenging the validity of any of the procedures
leading to the adoption of these Project Approvals for the Project, or the Project
Approvals themselves, the Developer and City each shall have the right, in their
sole discretion, to elect whether or not to defend such action. Developer, at its sole
expense, shall defend, indemnify, and hold harmless the City (including its agents,
officers, and employees) from any such action, claim, or proceeding with counsel
chosen by the City, subject to the Developer’s approval of counsel, which shall not
be unreasonably denied, and at the Developer’s sole expense. If the City is aware
of such an action or proceeding, it shall promptly notify the Developer and
cooperate in the defense. The Developer, upon such notification, shall deposit with
City sufficient funds in the judgment of the City Finance Director to cover the
expense of defending such action without any offset or claim against said deposit
to assure that the City expends no City funds. If both Parties elect to defend, the
Parties hereby agree to affirmatively cooperate in defending said action and to
execute a joint defense and confidentiality agreement in order to share and protect
the information under the joint defense privilege recognized under applicable law.
As part of the cooperation in defending an action, City and Developer shall
coordinate their defense in order to make the most efficient use of legal counsel
and to share and protect information. Developer and City shall each have sole
discretion to terminate its defense at any time. The City shall not settle any third-
party litigation of Project Approvals without the Developer’s consent, which
consent shall not be unreasonably withheld, conditioned, or delayed unless the
Developer materially breaches this indemnification requirement.
4. The use and operation shall comply with the City of Palm Desert’s noise
ordinances.
5.All signage shall comply with PDMC 25.56. Both temporary and permanent signs
are to be approved by the Development Services Director.
236
6. The applicant shall install additional bicycle racks adjacent to the project site, to
the satisfaction of the Planning division, prior to operation.
7.All exterior lighting shall be fully shielded and directed downwards and is subject
to approval by the Development Services Department. Luminaries with total lamp
lumens above 16,000 lumens shall not be used.
8.Operation of the roasting machinery shall not cause an impact to the general
welfare, public health, or safety to any adjacent properties, employees, or
customers.
9.This permit is non-transferable to any successor in interest. Any sale, re-
assignment, or transfer shall render this permit null and void.
10. Should parking shortages or other parking-related issues arise, the Applicant shall
institute appropriate operational mitigation measures. Proposed mitigation must be
reviewed by the Development Services Development.
11. Any renovations to the floor plan attached shall require an amendment to this
Administrative Use Permit. Expansion of the eating area will require a
reexamination of the available parking and may require additional parking.
12. The Applicant shall comply with all applicable local, state and federal laws and
regulations.
13. The Applicant shall not conduct any constriction in the interior or exterior without
securing permit approval from the City’s building division.
14. The Applicant shall secure all necessary approvals from Riverside County for
operations, including the County of Riverside Health Department.
15. City staff may conduct an inspection of the business at any time to ensure
compliance with this Administrative Use Permit.
16. The Applicant shall print out the approval and conditions of approval to have on
premises and available at all times.
END OF CONDITIONS
237
238
239
240
241
242
243
244
Page 1 of 6
ARCHITECTURAL REVIEW COMMISSION
CITY OF PALM DESERT
STAFF REPORT
MEETING DATE: October 14, 2025
PREPARED BY: Sijifredo Fernandez, Senior Planner
SUBJECT: CONSIDERATION OF A REQUEST FOR APPROVAL OF A HEIGHT
EXCEPTION TO PERMIT THE DEVELOPMENT OF A NEW SINGLE-
FAMILY RESIDENCE LOCATED AT 47600 SILVER SPUR TRAIL
RECOMMENDATION:
Staff recommends that the Architectural Review Commission (ARC) determine that the findings
required for approval have been met and approve the Residential Height Exception subject to
the following conditions:
1. The single family home shall conform to the plans and elevations submitted and approved
by ARC, including the maximum building height of 17 feet 6 inches measured from
finished grade.
2. The maximum building height shall not exceed 17 feet 6 inches as approved. Any future
increase in height shall require separate review and approval by ARC.
3. The exterior materials and color palette shall be consistent with the approved Desert
Contemporary design, utilizing neutral earth tones.
4. The structure shall maintain all required setbacks and site design standards per the R-1
Residential Single Family zoning requirements, ensuring no encroachment on
neighboring properties.
BACKGROUND/ANALYSIS:
Toni Ringlein of GHA (Applicant) is requesting approval of a single-family home height exception
to allow the construction of a 4,119 square -foot single-family residence with a maximum height
of 17 feet 6 inches measured from finished grade. The subject property is a vacant 0.31 -acre lot
located at the northwest corner of Sun Corral Trail and Portola Avenue, within the R -1
Residential Single Family zoning district.
On August 27, 2025, the City of Palm Desert received a building permit application for a new
single-family residence with a proposed height of 19 feet 2 inches, which exceeded the base
zoning height limit of 15 feet. With Architectural Review Commission (ARC) approval, the
maximum allowable height can be increased to 18 feet. Subsequently, the applicant revised the
design to reduce the maximum height from 19 feet 2 inches to 17 feet 6 inches to comply with
the development standards.
Project Description:
A. Property Description
245
Architectural Review Commission
City of Palm Desert
(MISC25-0026 St. Jude Dream Home)
Page 2 of 6
The subject property is a vacant 0.31 -acre lot located northwest corner of Sun Corral Trail and
Portola Avenue, within the R-1 - Residential Single Family zoning district.
B. Zoning, General Plan and Adjacent Uses
Table 1 – Adjacent Land Use and Designations
Existing Uses General Plan Zoning
Project
Site
Multi-Tenant Retail Buildings
R-1 - Residential Single Family
North Residential and Commercial
Office
R-1 - Residential Single Family
South Multifamily Residential
Buildings
P.R.-6 - Planned Residential
East Existing Single Family
R-1 - Residential Single Family
West Vacant Lot
R-1 - Residential Single Family
246
Architectural Review Commission
City of Palm Desert
(MISC25-0026 St. Jude Dream Home)
Page 3 of 6
C. Project Description
The applicant is requesting a height exception to allow the construction of a 4,119 square -foot
single-family residence with a maximum height of 17 feet 6 inches measured from finished grade.
The architectural style of the proposed home is best described a s Desert Contemporary. The
structure incorporates a combination of flat rooflines and a pitched Spanish tile roof, blending
contemporary forms with Spanish influences. The exterior is finished in a neutral color palette
consisting of earth tones and natural textures.
Pursuant to Section Table 25.10-3: Residential Zoning District Development Standards of the
Palm Desert Municipal Code (PDMC), the maximum permitted height for structures within the
R-1 zoning district is 15 feet. However, the Architectural Review Commission (ARC) is
authorized to grant height exceptions allowing residences to reach a maximum height of up to
18 feet. Such exceptions are considered based on the design merit of the propose d home and
its compatibility with the surrounding neighborhood character.
Site Plan
247
Architectural Review Commission
City of Palm Desert
(MISC25-0026 St. Jude Dream Home)
Page 4 of 6
Architecture
248
Architectural Review Commission
City of Palm Desert
(MISC25-0026 St. Jude Dream Home)
Page 5 of 6
ANALYSIS:
General Plan, Land Use, and Zoning
The Project Site is an existing single-family residence zoned as Single-Family Residential
District (R-1) and designated Conventional Suburban Neighborhood under the General Plan
Land Use Element, which aims to provide low intensity neighborhood developmen t with a limited
variety of housing choices (Chapter 3-8, General Plan).
ZONING ANALYSIS
The Project is subject to the following findings from PDMC § 25.68.040, as summarized below:
1. That the proposed development conforms to any legally adopted develop ment standards.
Complies: The proposed development conforms to all legally adopted development
standards provisions set forth by the Palm Desert Municipal Code (PDMC) for Single-
Family Residential District (R-1), including regulations for setbacks, allowable residential
uses, and design requirements, as outlined in the Zoning Analysis above.
2. That the design and location of the proposed development and its relationship to
neighboring existing or proposed developments and traffic is such that it will not im pair
the desirability of investment or occupation in the neighborhood; and that it will not
unreasonably interfere with the use and enjoyment of neighboring existing or proposed
developments and that it will not create traffic hazards or congestion.
Complies: The proposed development is consistent with the surrounding residential
character and is not expected to impact on the desirability of the neighborhood. It
maintains required setbacks and does not introduce traffic hazards or congestion. The
project will not interfere with the use or enjoyment of neighboring properties.
3. That the design and location of the proposed development is in keeping with the character
of the surrounding neighborhood and is not detrimental to the harmonious, orderly, and
attractive development contemplated by this title and the General Plan of the City.
249
Architectural Review Commission
City of Palm Desert
(MISC25-0026 St. Jude Dream Home)
Page 6 of 6
Complies: The proposed height exception has been evaluated in the context of the
surrounding neighborhood and is found to be consistent with the existing character and
development pattern in the area. The design minimizes visual impacts through thoughtful
massing, roof articulation, and setbacks. Therefore, the proposed development is not
detrimental to the harmonious, orderly, and attractive development envisioned by the
City’s Zoning Code and General Plan.
4. That the design and location of the proposed development would provide a desirable
environment for its occupants, as well as for its neighbors and that it is aesthetically of
good composition, materials, textures, and colors.
Complies: The proposed development includes a design that incorporates quality
materials, appropriate textures, and a neutral color palette that is compatible with the
surrounding neighborhood. The location and orientation of the structure are consistent
with adjacent properties, and the additional height has been designed to maintain
appropriate scale and proportion.
5. That the proposed use conforms to all the requirements of the zone in which it is located
and all other applicable requirements.
Complies: The proposed use conforms to all land use and development requirements of
the R-1 zoning district set forth by the Palm Desert Municipal Code. This includes full
conformance to regulations for setbacks, allowable residential uses, and design
requirements.
6. That the overall development of the land shall be designed to ensure the protection of the
public health, safety, and general welfare.
Complies: The proposed single family home has been designed in accordance with
applicable regulations and standards intended to protect public health, safety, and
general welfare. The project will be subject to all required reviews and permitting
processes to ensure compliance with building, zoning, and safety codes. No evidence
has been presented indicating that the height exception would result in conditions
detrimental to the community. No adverse impacts to public infrastructure, emergency
access, or surrounding properties are anticipated.
ATTACHMENTS:
1. Plan Set
2. Landscaping Plans
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
Advisory Body Name:Architectural Review Commission (ARC)
Prepared By:Monique Lomeli
Report Date:October 8, 2025
PD Municipal Code
2.34.100:Six unexcused absences from regular meetings in any twelve-month period shall constitute an automatic resignation of members holding office on boards that meet twice monthly.
Member Name Status 22-Oct 12-Nov 26-Nov 10-Dec 24-Dec 14-Jan 28-Jan 11-Feb 25-Feb 11-Mar 25-Mar 8-Apr 22-Apr 13-May 27-May 10-Jun 25-Jun 8-Jul 22-Jul 12-Aug 26-Aug 9-Sep
Excused
Count
Unexcused
Count
Total
Absences
Blakeley, James Edward Active P P NM P NM NM P P NM P P P NM P P NM P NM NM P P P 0 0 0
Colvard, Dean Wallace Active P P NM P NM NM P P NM P P P NM P P NM P NM NM P P P 0 0 0
Gregory, Geoff Active NM NM P E P 0 0 0
Latkovic, Nicholas Active P P NM E NM NM P P NM P E E NM P P NM P NM NM E P P 3 0 3
McIntosh, James Active E E NM P NM NM E P NM P P E NM P P NM P NM NM P P P 4 0 4
Sanchez, Francisco Active P P NM P NM NM P P NM P P P NM P P NM P NM NM P P P 0 0 0
Vuksic, John Active P P NM P NM NM P P NM P P E NM P E NM P NM NM P P P 2 0 2
P - Present
E - Excused
A - Absent/Unexcused
R - Remote
NM - No Meeting
2025
285