HomeMy WebLinkAboutAppendix A_Palm Desert Cost EstimatePalm Desert Vision Zero Strategy - Conceptual Design
Prepared by Alta Planning + Design
4/1/2025
ITEM
GENERAL OVERHEAD RELATED CONSTRUCTION ITEMS
MOBILIZATION AND DEMOBILIZATION (10%)
TRAFFIC CONTROL (10%)
CLEARING AND GRUBBING
EROSION CONTROL
UTILITY ALLOWANCE FOR ADJUSTMENTS/PROTECTION/COORDINATION
CONSTRUCTION SURVEY AND STAKING
STORMWATER CONTROL, SWPP, & BMP IMPLEMENTATION
GENERAL CONSTRUCTION ITEMS
ROADWAY AND UNCLASSIFIED EXCAVATION
CONSTRUCT CONCRETE CURB
CONSTRUCT CONCRETE CURB & GUTTER
CONSTRUCT CONCRETE SIDEWALK
CONSTRUCT CONCRETE DRIVEWAY
CONSTRUCT ADA CURB RAMP
INSTALL LANDSCAPED MEDIAN
IRRIGATION IMPROVEMENTS
INSTALL BUS PULLOUT
INSTALL PEDESTRIAN RAILING
INSTALL LANE LINE STRIPE
INSTALL 1' WIDE STOP LINE
INSTALL RED CURB
INSTALL GREEN BACKED SHARROWS
INSTALL BIKE LANE SYMBOL AND ARROW MARKING
INSTALL GREEN PAVEMENT MARKING
INSTALL BIKE CONFLICT MARKINGS
INSTALL HIGH VISIBILITY CROSSWALK
INSTALL 'STOP' MARKING
INSTALL YIELD MARKINGS
INSTALL TURN ARROW PAVEMENT MARKING
INSTALL NEW SIGN AND POST
INSTALL SPEED FEEDBACK SIGN
INSTALL RRFB ASSEMBLY (SET OF 2)
INSTALL LEADING PEDESTRIAN INTERVAL
INSTALL SOLAR POWERED STREET LIGHT
INSTALL CURB EXTENSIONS WITH FLEXIBLE DELINEATOR POSTS
INSTALL SHADE STRUCTURE
INSTALL SWING GATE
INSTALL BIKE RACK
INSTALL 'KEEP CLEAR' MARKINGS
INSTALL SCHOOL CROSSING MARKING
SIGNAL MODIFICATION
ALTERNATIVE CONSTRUCTION ITEMS (NOT INCLUDED IN PROJECT COST)
INSTALL TRADITIONAL STREET LIGHT
ADDITIONAL COSTS
STOP WARRANT
SIGNAL WARRANT
CONSTRUCTION ENGINEERING
CONTINGENCY + CURRENT INFLATION RATE
PERMITTING*
PROJECT APPROVAL AND ENVIRONMENTAL DOCUMENTATION (PA&ED)
PLANS, SPECIFICATION AND ESTIMATES (PS&E)
BID SUPPORT/DSDC
*MAJOR PERMITTING CAN INCLUDE SCE, CITY, COUNTY, UTILITY CERTIFICATION, ETC.
% or MEASUREMENT
LS
LS
LS
LS
LS
LS
LS
LS
LF
LF
SF
EA
EA
SF
LS
EA
LF
LF
LF
LF
EA
EA
SF
SF
SF
EA
SF
SF
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
TOTAL AMOUNT FOR ALTERNATIVE CONSTRUCTION ITEMS =
% or MEASUREMENT
EA
EA
15% of SUBTOTAL
33% of SUBTOTAL & CONSTRUCTION ENGINEERING
TOTAL CONSTRUCTION COST =
5% of SUBTOTAL
8% of SUBTOTAL
5% of SUBTOTAL
2% of SUBTOTAL
TOTAL PROJECT COST =
1 mile lane is about a 1millin
tualitation standard sidewalk 300-400k
UNIT COST
1690200
1690200
169100
338100
721700
422600
422600
2469000
55
65
25
5000
10000
40
300000
60000
300
4
6
10
300
300
20
25
12
450
15
350
650
20000
55000
30000
9500
7500
70000
10000
1400
900
450
180000
45000
UNIT COST
2500
2500
3353500
8484200
1117900
1788500
1117900
447200
QUANTITY
1
1
1
1
1
1
1
1
3340
19780
127070
165
118
28406
1
1
700
52663
662
1956
0
72
6325
2864
60124
45
186
44
38
7
0
63
229
11
5
1
4
2
3
1
SUBTOTAL =
229
QUANTITY
7
4
1
1
1
1
1
1
ESTIMATE
1690200
1690200
169100
338100
721700
422600
422600
2469000
183700
1285700
3176750
825000
1180000
1136240
300000
60000
210000
210652
3972
19560
0
21600
126500
71600
721488
20250
2790
15400
24700
140000
0
1890000
2175500
82500
350000
10000
5600
1800
1350
180000
22356152
10305000
10305000
ESTIMATE
17500
10000
3353500
8484200
34221352
1117900
1788500
1117900
447200
38692852
← CUSTOM
%s
0.1
0.1
0.01
0.02
0.05
0.025
0.025
0.3
0.15
0.33
0.05
0.08
0.05
0.02
← STANDARD
%s
0.1
0.1
0.01
0.02
0.05
0.025
0.025
0.3
0.15
0.33
0.05
0.08
0.05
0.02
for each project
cost for 10% concept design
construction cost
/// TYPICAL PROJECT ELEMENTS ///
MOBILIZATION AND DEMOBILIZATION (10%)
TRAFFIC CONTROL (10%)
CLEARING AND GRUBBING
EROSION CONTROL
CONSTRUCTION ENGINEERING
CONTINGENCY + CURRENT INFLATION RATE
SOFT COSTS (DESIGN ENGINEERING)
PERMITTING*
PROJECT APPROVAL AND ENVIRONMENTAL DOCUMENTATION (PA&ED)
PLANS, SPECIFICATION AND ESTIMATES (PS&E)
BID SUPPORT/DSDC
ROW
UTILITY ALLOWANCE FOR ADJUSTMENTS/PROTECTION/COORDINATION
CONSTRUCTION SURVEY AND STAKING
STORMWATER CONTROL, SWPP, & BMP IMPLEMENTATION
ROADWAY AND UNCLASSIFIED EXCAVATION
ACCESS CONTROL
/// REMOVALS ///
SAWCUT PAVEMENT
REMOVE ASPHALT PAVEMENT
REMOVE CONCRETE PAVEMENT
REMOVE CONCRETE CURB
REMOVE CONCRETE CURB & GUTTER
REMOVE CONCRETE SIDEWALK
REMOVE CONCRETE MEDIAN
REMOVE LANDSCAPED MEDIAN
REMOVE CATCH BASIN
REMOVE SIGN
SALVAGE AND RELOCATE SIGN
REMOVE OVERHEAD SIGN AND FLASHER
REMOVE LANE LINE STRIPE
REMOVE PAVEMENT MARKING
RELOCATE FIRE HYDRANT
RELOCATE EXISTING SIGN & POST
REMOVE AND REPLACE STAIRS
REMOVE AND RESTORE LANDSCAPING
REMOVE AND RESTORE EXISTING FENCE
/// DRAINAGE ///
INSTALL UNDERGROUND PIPE/INLET DRAINAGE SYSTEM
INSTALL CATCH BASIN
INSTALL BIO-SWALE INFILTRATION
/// CIVIL ///
CONSTRUCT CONCRETE CURB
CONSTRUCT CONCRETE CURB & GUTTER
CONSTRUCT CONCRETE SIDEWALK
CONSTRUCT CONCRETE DRIVEWAY
CONSTRUCT CONCRETE PAVEMENT
CONSTRUCT CONCRETE MEDIAN
CONSTRUCT ASPHALT PAVEMENT
CONSTRUCT ASPHALT SPEED HUMP
CONSTRUCT ASPHALT RAISED CROSSWALK
CONSTRUCT ADA DETECTABLE WARNING SURFACE
CONSTRUCT ADA CURB RAMP
INSTALL LANDSCAPED MEDIAN
IRRIGATION IMPROVEMENTS
INSTALL BUS PULLOUT
INSTALL PEDESTRIAN RAILING
/// STRIPING ///
INSTALL LANE LINE STRIPE
INSTALL 1' WIDE STOP LINE
INSTALL RED CURB
INSTALL GREEN BACKED SHARROWS
INSTALL BIKE LANE SYMBOL AND ARROW MARKING
INSTALL GREEN PAVEMENT MARKING
INSTALL BIKE CONFLICT MARKINGS
INSTALL HIGH VISIBILITY CROSSWALK
INSTALL 'STOP' MARKING
INSTALL YIELD MARKINGS
INSTALL SCHOOL CROSSING MARKING
INSTALL 'KEEP CLEAR' MARKINGS
INSTALL TURN ARROW PAVEMENT MARKING
/// SIGNS ///
INSTALL NEW SIGN AND POST
INSTALL STOP AHEAD SIGN
INSTALL CROSSWALK SIGN
INSTALL SCHOOL ZONE SIGN
INSTALL 'STOP HERE FOR PEDESTRIANS' SIGN
INSTALL TURN RESTRICTION SIGN
INSTALL SPEED LIMIT SIGN
INSTALL 'BUMPS AHEAD' SIGN
INSTALL BIKE LANE SIGN
INSTALL BICYCLE WAYFINDING SIGN
INSTALL 'NO PARKING' SIGN
/// BEACONS, SIGNALS, LIGHTING ///
INSTALL SCHOOL SPEED SIGN WITH FLASHING BEACONS
INSTALL SCHOOL SPEED SIGN WITH FLASHING BEACONS AND SPEED FEEDBACK
INSTALL SPEED FEEDBACK SIGN
INSTALL RRFB ASSEMBLY (SET OF 2)
INSTALL TRAFFIC SIGNAL
INSTALL LEADING PEDESTRIAN INTERVAL
SIGNAL MODIFICATION
INSTALL SOLAR POWERED STREET LIGHT
/// OBJECTS ///
INSTALL RAISED PAVEMENT MARKER - WHITE
INSTALL RAISED PAVEMENT MARKER - YELLOW
INSTALL RAISED PAVEMENT MARKER - WHITE (REFLECTIVE)
INSTALL RAISED PAVEMENT MARKER - YELLOW (REFLECTIVE)
INSTALL CURB EXTENSIONS WITH FLEXIBLE DELINEATOR POSTS
INSTALL SHADE STRUCTURE
INSTALL SWING GATE
INSTALL BIKE RACK
/// ANALYSES ///
STOP WARRANT
SIGNAL WARRANT
MEASUREMENT
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
EA
MEASUREMENT
LF
SF
SF
LF
LF
SF
SF
SF
EA
EA
EA
EA
LF
SF
EA
EA
EA
SF
LF
MEASUREMENT
LF
EA
SF
MEASUREMENT
LF
LF
SF
EA
SF
SF
TON
EA
EA
SF
EA
SF
LS
EA
LF
MEASUREMENT
LF
LF
LF
EA
EA
SF
SF
SF
EA
SF
EA
EA
SF
MEASUREMENT
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
MEASUREMENT
EA
EA
EA
EA
EA
EA
EA
EA
MEASUREMENT
HUND
HUND
HUND
HUND
EA
EA
EA
EA
MEASUREMENT
EA
EA
ASSUMED %
0.1
0.1
0.01
0.02
0.15
0.33
0.15
0.05
100000
500000
50000
0.05
0.05
0.025
0.025
0.3
6000
COST/UNIT
COST/UNIT
COST/UNIT
55
65
25
5000
10000
40
300000
60000
300
COST/UNIT
4
6
10
300
300
20
25
12
450
15
450
900
350
COST/UNIT
650
600
600
600
600
600
600
600
600
600
600
COST/UNIT
20000
55000
500000
180000
9500
COST/UNIT
5000
70000
10000
1400
COST/UNIT
2500
2500
NOTES
CONSTRUCT CONCRETE CURB
CONSTRUCT CONCRETE CURB & GUTTER
CONSTRUCT CONCRETE SIDEWALK
CONSTRUCT CONCRETE DRIVEWAY
CONSTRUCT ADA CURB RAMP
INSTALL LANDSCAPED MEDIAN
IRRIGATION IMPROVEMENTS
INSTALL BUS PULLOUT
INSTALL PEDESTRIAN RAILING
INSTALL LANE LINE STRIPE
INSTALL 1' WIDE STOP LINE
INSTALL RED CURB
INSTALL GREEN BACKED SHARROWS
INSTALL BIKE LANE SYMBOL AND ARROW MARKING
INSTALL GREEN PAVEMENT MARKING
INSTALL BIKE CONFLICT MARKINGS
INSTALL HIGH VISIBILITY CROSSWALK
INSTALL 'STOP' MARKING
INSTALL YIELD MARKINGS
INSTALL TURN ARROW PAVEMENT MARKING
INSTALL NEW SIGN AND POST
INSTALL SPEED FEEDBACK SIGN
INSTALL RRFB ASSEMBLY (SET OF 2)
INSTALL LEADING PEDESTRIAN INTERVAL
INSTALL SOLAR POWERED STREET LIGHT
INSTALL CURB EXTENSIONS WITH FLEXIBLE DELINEATOR POSTS
INSTALL SHADE STRUCTURE
INSTALL SWING GATE
INSTALL BIKE RACK
STOP WARRANT
SIGNAL WARRANT
INSTALL 'KEEP CLEAR' MARKINGS
INSTALL SCHOOL CROSSING MARKINGS
SIGNAL MODIFICATIONS
Measurement
LF
LF
SF
EA
EA
SF
LS
EA
LF
LF
LF
LF
EA
EA
SF
SF
SF
EA
SF
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
Abraham Lincoln School
3340
1670
21127
16
9
13768
407
71
120
999
2
30
9
6
8
62
1
2
Colonel Mitchell Paige
4
4
James Earl
3
20
375
4
32
1
1
George Washington Charter
13121
60070
148
24
2564
259
660
9
240
5746
17
1
11
1
4
Gerald R. Ford Elementary
2962
8
1
96
2
27
2
Palm Desert High School
803
14165
32
14638
9332
183
25
1224
15695
16
10
14
6
48
1
4
2
Ronald Reagan Elementary
4
23900
15
1060
38
5625
740
7777
1
22
3
7
12
1
1
3
The Joslyn Center
868
8669
21
15840
107
700
660
7831
7
39
2
6
6
18
1
1
Washington Street /
Avenue of the States
3118
18027
1
12
620
27
6609
2
99
8
8
8
1
1
Fred Waring Drive /
Town Center Way
200
2050
1
5940
18
1
8
1
Additional 16 projects from LRSP
700
9150
7
12
18.6
1
TOTAL
3340
19780
127070
165
118
28406
1
1
700
52663
662
1956
0
72
6325
2864
60124
45
186
44
38
7
0
63
229
11
5
1
4
7
4
2
3
1