Loading...
HomeMy WebLinkAbout02-22-77 ' , `,�"',� �rt AGENDA PALM DESERT DESIGN REVIEW BOARD FEBRUARY 22, 1977 5:30 PM - CITY HALL COUNCIL CHAMBERS 1. Approval of Minutes of Previous Meeting of February 8, 1977. 2. Case #: 58MF Nature of Project: Golf Cart Storage Building Location: East of Ironwood and San Luis Rey Zone: PR-7 Applican�: Shadow Mountain Golf Club Nature of Approval Sought: Amendment of Previously-Approved Condition ACt1011: Approved 3. Case #: 49C Nature of Project: Commercial Buildin, Location: Southwest corner of Highway 111 and San Pablo Extended Zone: C-1,S.P. Applicant: Krommenhoek for San Diego Federal Savings and Loan Nature of Approval Sought: Preliminary site, floor, and elevation plans. ACtIOn: Continued to March 8, 1977 4. Case #: 30C Nature of Project: Commercial Furniture Store Location: South side of Highway 111, west of Sage Lane Zone: C-1,S.P. Applicant: George Ritter for DeVoe Nature of Approval Sought: Final construction plans. Action: Approved. 5. Case #: 50C Nature of Project: Commercial Building Location: North side of E1 Paseo, west of Lantana Extended Zone: C-1,S.P. Applicant: George Ritter for Dr. Craine Nature of Approval Souc�ht: Preliminary site, floor, and elevation plans. ACt10n: Approved 6. Case #: 62MF Nature of Project: Studio and Offices for KMIR-TV Location: North side of Park View Drive, east of San Juan Zone: PR-7,S.P. Applicant: Wendell Veith for Desert Empire Television Corporation Nature of Approval Sought: Preliminary site, floor, and elevation plans. ACt10n: Rejected 7. Case # 56MF Nature of Project: 7-Unit Apartment Complex Location: East side of Ocotillo Drive, between Tumbleweed and Verba Santa Zone: R-3-20,000(3) ,S.P. Applicant: Jim Belknap Nature of Approval Sought: Final construction plans. ACtiOn: Approved . � �+rrw AGEN DA PALM DESERT DESIGN REVIEW BOARD FEBRUARY 22, 1977 8. Case #: 60MF Nature of Project: 8-Unit Apartment Complex Location: West side of Portola, south of Flagstone Lane Zone: R-3 Applicant: F. S. & L. Industries Nature of Approval Sought: Final Construction Plans ACt7011: Approved 9. Case #: 61MF Nature of Project: Duplex Location: Northeast corner of Pitahaya and Shadow Mountain Drive Zone: PR-6 Applicant: D. M. Homme Nature of Approval Sought: Preliminary site, floor, and elevation plans. Action: Approved � � � � ���'����� � �.�.�_ ��� ��,c�'._- -�_ �� o n - � - - .�5.�� ��� �- �i,f��° co�� a���'tll�. �����r�f� .,�,� ��=-�� `'��'�� � 45-275 PRIC�I..Y PC�ta� LANE, P�LM DESEFZT, CALlFORNIA 92260 TELEPHONE {714) 346-0611 DESIGN REVIE�ti' BOARD ACTION REPORT Date : February 22, 1977 REPORT ON: Corrmercial Building CASE NO. : 50C _ ZONE : C-1,S.P. � LOCATION: North side of E1 Paseo, west of Lantana Extended APPLICANT: George Ritter for Dr. Craine NATURE OF APPROVAL SOUGHT: Preliminary site, floor, and elevation plans DESIGN REVIEW BOARD ACTION: After reviewing the submitted plans and the presentations by the staff and by the applicant , the DRB approves this project , subject to the attached conditions. Date of Action: February 22, 1977 h4ot ion Made By: Johnson Seconded By: T9i nturn Vote : Approved 5-0 Reasons for Negative Vote (s) : (An appeaZ of the above action may be made in z�riting to the City CZerk of the Citz� of PaZm Desert �vithin fifteen (Z5) daz�s of the date of the decision.J � STAFF COMMENTS : On Planning Commission Agenda of March l, 1977. w I . ' � � � February 22, 1977 CONDITIONS OF APPROVAL CASE N0. 50C 1. ?he development of this project shall conform substantially to all development plans submitted in behalf of this case (Exhibits A & 6} , and as revised according to Planning Commission action. Any minor ' � changes require approval by the Director of Environmental Services. Any substantial change requires approval by the Planning Commission. 2. All requirements of any law, ordinance, or regulation of the State, City, and any other applicable government entity shall be complied with as a part of the development process. 3. This approval is applicable, subject to the development of this project, commencing within one year from approval date and being promptly completed. 4. Any air conditioning equipment shall be fully concealed f rom view from any public rights-of-way and adjoining properties by landscaping or ar- chitecturally integrated means. 5. All service utility lines shall be placed underground, unless approvHd otherwise by the Director of Environmental Services. 6. The applicant shall provide a cash deposit for a pro rata share of the cost of undergrounding the overhead distribution lines along the rear of the subject property prior to issuance of a certificate of occu- pancy. 7. Curb, gutter, sidewalk or approved pathways, curb cuts, and tie-in paving shall be provided in conformance with City Standards and the requirements of the City Engineer. 8. Traffic control provisions shall be provided as required by the Director of Environmental Services. 9. Elevations are not approved as shown and shall be modified according to annotated changes. 10. A complete and detailed set of final construction drawings, including but not limited to signage, revised trash storage, parking lot lighting, land- scaping, and irrigation plans, shall be submitted for Design Review Board Process approval prior to submittal of plans for building permits. 11. The applicant shall submit to the City of Palm Desert a public easement covering the parking area of the subject Lot 12 prior to issuance of certificate of occupancy. 12. The property owner shall agree to join any assessment district formed that includes the subject property within its boundaries. 13. The easterly parking space adjacent to the alley shall be deleted as it is not in conformance to the Zoning Ordinance, which will leave a total of eighteen (18) spaces approved. r -�, 14. All projections into the public right-of-way shall conform to the Uniform Building Code and a five (5) foot setback shall be maintained for all � bearing walls and colurrms along the E1 Paseo frontage. � 15. An additional six (6) �nches of space shall be provided between the alley parking spaces and the north wall of the building. 16. The west wall of the building shall be treated with stucco and painted to match other �alls. AGREEMENT I accept and agree, prior to use of this permit or approval , to cpmply with all the conditions set forth, and understand that the Department of Building & Safety will not issue a building permit or allow occupancy on the use permitted until this signed confirmation has been received by the Department of Environmental Services. "'—""j"LTa'Ee J' pp i can s i gna ure . ' °+�"�"" wwr� George J. Ritfier Associates Architects A.I.A. February 24, 1977 � � City of Palm Desert I � I :� � , , ` i Planning Commission �� � ,� Prickley Pear Plaza � �/ r ;� s Palm Dsert, California 92260 ! � . Att: Paul Williams, Director of Environmental Services Re: N.W. DeVoe, Ltd. Case #30C Gentlemen: I am writing this letter in regard to the additional "Conditions of Approval " Case #30C as recommended by the Design Review Board to the Planning Commission during their meeting February 22, 1977. Item #16 - was revised to require 110 fe2t parking area at the rear of the property instead of 100 feet as originally approved. This recorr�nendation would require the removal of the rear 10 feet by 50 feet wide of the pro- posed building, a total of 500 square feet of building area. The applicant wishes tp appeal this recommendat�on requirement. We have secured preliminary design review approval with Conditions of Approval dated December 14, 1976. The building size and parking lot size was clearly defined in this approval and our final plans are in conformance with those conditions. To make any changes in building size would create a financial hardship and delay the start of construction. The tenent lease is settled, construction contracts are drawn, loan documents are approved and drawn, building permit fees are paid, fina] plans and specifications are approved,printed, and published, Palm Desert Property Owners approval has been secured, bid estimates have been given, color selection and tenent improvements have been designed. I feel the preliminary and final plans are consistant with the design intent of the existing and proposed core area plans and that no additional parking easement is indicated or required. I will attend the March 1, 1977 meeting to answer any questions in regard to this matter. Sincerely urs, + _ �� � �� � � �� � � "y ` :��` _._„�� �«�� �=`�'°" ` .,,-w— '"f_; 2 �� �, ; �`� George J. Ritter � Architect A.I.A. ENVIF�UP:tv1ENTAL SERYICES CITY OF PALM DESERT Copy:N.W. DeVoe, Ltd. GJR/c���igfiway Oer�e-Eleven,Paim Desert,California 92260 • Area Code 714 346-8661 . • .!/� �6�' � � �;'f' ��EI 1 F� . � `3V' �y ,Y��. � ;.{� C��.f��- cO�' � � 71� ��c�r�f� - �` �'�'� � � 45-275 PRICKLY PEAR LANE� PALM DESERT, CALIFORNIA 92260 � .�,. TELEPHONE (714) 346-0611 DESIGN REVIEW BOARD ACTION REPOR.T Date: February 22, 1977 REPORT ON: Commercial Furniture Store CASE NO. : 30C ZONE: C-1,S.P. LOCATION: South si de of Hi ghway 111, west of Sage Lane APPLICANT: George Ritter for DeVoe NATURE OF APPROVAL SOUGHT: Fi nal Construction P1 ans DESIGN REVIEW BOARD ACTION: After reviewing the submitted plans and the presentations by the staff and by the applicant, the DRB a�proves this project , subject to the attached conditions. Date of Action: Februar_v 22L1977 Motion Made By: Hobbs Seconded By: Minturn Vote : Approved 5-0 Reasons for Negative Vote (s) : (An appeaZ of the above action may be made in writing to the City CZerk of the City of PaZm Desert �.�ithin fifteen (Z5) days of the date of the decision.) � STAFF CObiMENTS: On Planning Commission Agenda of March 1, 1977. See attached DRB minutes. . � ' �' �' , February 22, 1977 . _.. . . � . . , _ , _ . : . ._.._ ..__ � CONDITIONS OF APPROVAL . � , . . ' . . �.....��. _ � CASE N0. 30C �� . . . � . : _. . : . . : : :; . . . ' . . 1. The development of this project shall .conform substantially to all development plans submitted in behalf of th�s case (Exhibits A-C), � and as revised according to the Design Review Board Process. Any minor changes require approval by the Director of Environmental Siervices. + ,; � 2. All requirements of any law, ordinance, or regulation of the State, City, and any other applicable government entity shall be complied with as part of the development process. 3. This approval is applicable, subject to� the development of this project, commencing within one year from approval date and being promptly completed, i 4. Any roof mounted, exhaust, or air conditioning equipment sha11 be fully � concealed from view from any public rights-of-way and adjoining properties � by architecturally integrated means as shown.� : � 5. The applicant shall post a cash deposit for the pro-rata share of the cost .� . �R of undergrounding the overhead utility ]ines at the rear of the subject . property' prior to occupan cy of the building. � _ 6. Sidewalk shall be provided in conformance.with City Standa rds along the Frontage Road. - - . . � 7. Final landscaping (with irrigation system) plans shall be provided to the � . Design Review Board for approval prior to the issuance of a building permit. , 8. A non-combustible trash storage area shall be .provided. 9. Lighting �of the parking areas and premises shall be provided as approved � by the Director of Environmental Services. � ' 10. . Signage sha11 be provided in accordance with signage plan to be submitted - to the Design Review Board and the Planning Commission for fina] approval . � s 11. Traffic control provisions shall be provided as required by the Director ` of Environmental Services. ' 12. Construction plans shall be submitted for approval to the City Fire � Marshall prior to the issuance of building permits. All conditions shall be made a part of the construction and no certificate of occupancy f shall be issued until completed. 13. A detailed grading plan shall b� submitted to the�City Engineer for approval . 14. The applicant shall agree to join any assessment district formed that includes the subject property within its boundaries. 15. The applicant shall grant to the City of Palm Desert, easement rights over the parking lot area of the project site. � !6. The parking lot layout shall be revised to conform with a 90° parking layout & shall be approved by Staff encompassing the total 100 feet. AGREEMENT . I ac�ept and agree, prior to use of this permit or approval , to comply with all the conditions set forth, and understand that the Department of Buiiding and Safety F will not issue a permit or allow occupancy on the use permitted until this signed e confirmation has been received by the Department� of Environmental Services. � - ate pp �cant s ignature ,.. �� � .,�.,__,.. ' -�° -�'��;���`�,: �"�` '� -==_�` `�:,-. 3 � '� � `� � ` � �` ��,`t.'�. �' . �t�� --.,�.e�'� � c�� �;�TL�. ����cr�f� t �ti �� ,� -;�.�_, C�_ �p ����!�.,;•-st � r 45-275 PRICk�LY PEAR LAN�t PALM DESERT, CA�lFORhtiA 92260 P TEL�PHONE (7!4) 346-06I1 DESIGN REVIEW �0/�RD ACTION I�EPORT Date : February 22, 1977 REPORT ON: 7-Uni t Apartment Compl ex CASE NO. : 56MF . ZONE : R-3-20,000(3),S.P. LOCATION: East side of Ocotillo Drive, between Turr�leweed and Verba Santa APPLICANT: Jim Belknap NATURE OF APPROVAL SOUGHT: Fi nal con structi on pl ans. DESIGN REVIEW BOARD ACTION: After reviewing the submitted plans and the presentations by the staff and by thP applicant , the DRB approves this project , subject to the attached conditions. Date of Act ion: February 22, 1977 Mot ion Made By: Hobbs Seconded By: Johnson Vote: Approved 5-0 Reasons for Negative Voi;e (s) : (An appeaZ of the al�ove action may be made in u�riting to the City CZerk of the Cit� of PaZm Desert �vi�Ghin fifteen (1,5) daz�s of` the date of the decision. ) � STAFF COh4MENTS : On Planning Commission Agenda of March 1, 1977 ., .. • � � February 22, 1977 . CONDITIONS OF APPROVAL CASE N0. 56MF 1. The development of this project shall conform substantially to all development plans submitted in behalf of this case (Exhibits H-V) , and as revised according to Planning Commission action. Any minor changes require approval by the Director of Environmental Services. + ; Any substantial change requires approval by the Planning Commission. �` � 2. All requirements of any law, ordinance, or regulation of the State, � City, and any other applieable government entity shall be complied with as a part of the development process. 3. This approval is applicable, subject to the development of this project, commencing within one year from approval date and being promptly completed. 4. All service lines for utilities shall be placed underground. � 5. Curb, gutter, sidewalk, curb cuts, and tie-in paving shall be provided on Ocotillo Drive in conformance with City Standards and the require- ments of the City Engineer. 6. Storage facilities shall be provided in all carports. 7. A masonry trash enclosure shall be provided south of the driveway entrance and integrated into the design of the adjacent perimeter wall. Enclosure design shall conform to all requirements of Ordinance 88. 8. A minimum ten (10) foot setback shall be provided between the carport structures and any adjacent building. ,-- 9. A joint use agreement, in a form acceptable to the City Attorney, shall be ' provided to the Director of Environmental Services prior to the issuance of building permits. 10. Revise colors in the 6-,units on Highway 74. Landscape revisions as noted on Exhi6i.t J. AGREEMENT I accept and agree, prior to use of this permit or approval , to comply with � - all the conditions set forth, and understand that the Department of BuiTding and Safety will not issue a building permit or allow occupancy on the use permitted until this signed confirmation has been received by the Department ; of Environmental Services. Date Applicant s Signature � � � `:r.� _ "�'� ._ � ;,; ��i.f��' cO�" � � ��. 5���c@r�f� � , ��- • � 45-275 PRICKLY PEAR LANE, PALhR DESERT, CALIFORNIA 92260 TELEPHONE (714) 346-06E1 DESIGN REVIEW BOARD ACTION REPORT Date : February 22, 1977 REPORT ON: Gol f Cart Storage Bui 1 di ng CASE NO. : 58MF ZONE: PR-7 LOCATION: East of Ironwood and San Luis Rey APPLICANT: Shadow Mountai n Gol f Cl ub NATURE OF APPROVAL 80UGHT: Amendment of Previously-Approved Condition DESIGN REVIEW BOARD ACTION: After reviewing the submitted plans and the presentations by the staff and by the applicant, the DRB approves this project , subject to the attached conditions. Date of Action: February 22, 1977 Motion Made By: Hobbs Seconded By: Minturn Vote: Approved 5-0 Reasons for Negative Vote (s) : (An appeat of the abave action may be made in writing to the Citr� CZerk of the City of Palm Desert u�ithin fifteen (ZS) d.ays of the date nf the decision.) � STAFF COMMENTS: On Planning Commission Agenda of March 1, 1977 � . ' '�rw" ",�,` � February 22, 1977 CONDITIONS OF APPROVAL CASE N0. 58MF � 1. The development of this project shall conform substantially to all development plans submitted in behalf of this case (Exhibits C & D) , and as revised according to Planning Commission action. Any minor changes require approval by the Director of Environmental Services. Any substantial change requires approval by the Planning Corr�nission. 2. All requirements of any law, ordinance, or regulation of the State, . City, and any other applicable government entity shall be complied with as a part of the development process. 3. This approval is applicable, subject to the development of this project, commencing within one year from approval date and being promptly completed. 4. All utility service lines shall be placed underground. 5. Add oleanders along south and west walls to screen storage building. 6. The building shall be shifted to the north to permit the maximum landscape area south of the building, consistent with the required turning radius at the northwest corner of the building. 7. . Building shall have two (2) vehicle doors which will be located on east and west ends of the structure. AGREEMENT I accept and agree, prior to use of this permit or approval , to comply with all the conditions set forth, and understand that the Department of Building and Safety will not issue a building permit or allow occupancy on the use permitted until this signed confirmation has been received by the Department of Environmental Services. Date Applicant s Signature r�'�1� ,+F��°":_: � � -�-.c„`L F� �!`�{`� f��' �\�,� �1-���� �� ��,'t��' �� _�s��.��.�u . ���GI�'� ' :�r,\'s�'' � r�} ��� `''��,;�-:'.:����� 45-275 PRICKLY PEAR LANE, PALfi4 DES£RT', C,4LIFORNIA 92260 - s;:i. < TELEPNONE (714) 346-061! � DESIGN REVIEW BOARD ACTION REPORT Date : February 22, 1977 REPORT ON: g-Unit Apartment Complex CASE N0. : 60MF ZONE: R-3 � LOCATION: West si de of Portol a, south of F1 agstone Lane APPLICANT: F. S. and L. Industries NATURE Or APPROVAL SOUGHT: Final construction plans � DESIGN REVIEW BOARD ACTION: After reviewing the submitted plans and the presentations by the staff and by the applicant , the DRB approves this project , subject to the attached conditions. Date of Action: February 22, 1977 2�otion Made By: Hobbs - Seconded By: Minturn Vote: Approved 5-0 Reasons far Negative Vote (s) : (An appeaZ of the above action m,ay be made in writing ta the City CZerk of the Cit� of PaZm Desert u�ithin fifteen (Z5) days of the date of the decision.l � STAFF CObiMENTS: On P1 anni ng Commi ssion Agenda of March 1, 1977 • � � _ , . ' ,�` , �`bruary 22, 1977 . . CONDITIONS OF APPROVAL CASE N0. 60MF 1. The development of this project shall conform substantially to the requirements of Variance 03-76 and to all development plans submitted in behalf of this case (Exhibits A-H) , and as revised according to Planning Commission action. Any minor changes require approval by the Direct�or of Environmental Services. Any substantial change requires approval by the Planning Commiss9on. 2. All requirements of any law, ordinance, or regulation of the State, City, and any other applicable government entity shall be complied � with as a part of the development process. 3. This approval is applicable, subject to the development of this project, comnencing within one year from approval date and being promptly completed. 4. All air conditioning compressors shall be fully concealed from view from any public rights-of-way and adjoining properties by landscaping or archi- tecturally integrated rr�ans. 5. All service utility lines shall be placed underground. 6. Curb, gutter, curb cuts, and tie-in paving shall be provided in conformance with City Standards and the requirements of the City Engineer. 7. Landscaping (with irrigation system) shall be provided as modified for installation prior to final inspections. 8. A non-combustible trash storage area shall be provided as shown on the modified site plan. , 9. Lighting of parking areas and premises shall be provided for as approved by the�Director of Environmental Services. 10. Traffic control provisions sha11 be provided as required by the Director of Environmental Services. 11. Elevations are approved as shown. 12. Storage facilities shall be provided in all carports. 13. An eight (8) foot setback shall be provided on the south boundary of Lot 16. • 14. Delete the Italian Cyprus from the landscape plan and replace with two 24-inch box trees per lot, using Rhus Lancia, Brazilian Pepper, or African Sumac. AGREEMENT , , I accept and agree, prior to use of this permit or approval , to comply with all � the conditions set forth, and understand that the Department of Building and Safety will not issue a building permit or allow occupancy on the use permitted i until this signed confirmation has been received by the Department of Environ- . mental Services. Date App icant s S�gnature �,,�..�. _ .,�,. . �,,, . .�„'"', ,� � ,fJ- � � ��, {� ��+.�:-�,a�,i J�r� .. � �� � �' � ��t;� �� ' . �,��� ,��� ��f��r co� ����1.�. �c.���r�f� '��` � � 45-275 PRICKI�Y PEAR LANE, PALM DES�RT, CALfFORNiA 92260 �C;%:; ��,;. , j� � . , � TELEPHONE (714) 346-061! DESIGN REVIEW. L�OARD ACTION REPOIi.T Date : February 22, 1977 REPORT ON: Duplex project CASE NO. : 61MF ZONE : PR-6 LOCATION: Northeast corner of Pi tahaya and Shadow Mountai n Dri ve APPLl CANT: D. M. Homme NATURE OF APPROVAL SOUGHT: Preliminary site, floor, & elevation plans DESIGN REVIEW BOARD ACTION: After reviewing the submitted plans and the presentations by the staff and by the applicant , the DR8 approves this project , subject to the attached conditions. Date of Action: February 22, 1977 Motion Made By: Leung � Seconded By: Johnson Vote: Approved 5-0 . Reasons for Negative Vote (s) : (An czppeaZ of the above action maz� be made in writing to the Citz� CZerk of the Citz� of PaZm Desert �vithin fifteen (Z5) da?�s of the date of the decision.l � STAFF COMMENTS: On Planning Commission Agenda of March 1, 1977 � � f • - '�w'"� ;,,�„ ' February 22, 1977 CONDITIONS OF APPROVAL CASE N0. 61MF 1. The development of this project shall conform substantially to all development plans submitted in behalf of this case (Exhibits A-D) , and as revised according to Planning Commission action. Any minor ; changes require approval by the Director of Environmental Se rvices. 2. All requirements of any law, ordinance, or regulation of the State, City, and any other applicable government entity shall be complied with as a part of the development process. 3. This approval is applicable, subject to the development of this project, corranencing within one year from approval date and being promptly completed. 4. There shall be no roof mounted air conditioning equipment. All air con- ditioning compressors shall be fully concealed from view from any public rights-of-way and adjoining properties. 5. All service utility lines shall be placed underground. 6. Curb, gutter, curb cuts, and tie-in paving shall be provided in conformance with City Standards and the requirements of the City Engineer. 7. Traffic control provisions shall be provided as required by the Director of Environmental Services. 8. Elevations are approved as shown. 9. Prior to submittal for building permits, the applicant shall submit final construction drawings for Design Review Board Process approval including . but not limited to detailed landscaping, irrigation, trash storage, fencing, exterior lighting, and amenities plans. 10. This approval shall be invalid unless a modified Development Plan is adopted. 11. An additional specimen-size tree shall be added near the driveway in front of each dwelling unit. � � AGREEMENT I accept and agree, prior to use of this permit or approval , to comply with all the conditions set forth, and understand that the Department of Building � and Safety will not issue a building permit or allow occupancy on the use permitted until this signed confirmation has been received by the Departmerrt of Environmental Services, j � � � Date App icant s Signature ° � � � ____._.�_ _ � i t� � � .. ' � F � f;` ' f; �a � �,,.� �� . � � � P�� \� '. • �,�r��l A� �::�',��� `+ .. � ���5 � .t`,��` M�%'� ��'�a1`sf O� ����.�`LI�i. ���I��'v ' � `_���. ��� �:� �`��`��--s�.��� 45-275 PRICtSLY PEQR LAP�E, PALM DESERT, �AUFORNIA 92260 TELEPtiONE �?!4) 346-0611 DESIGN R�VIr�"�- L�OARD ACTION REPORT Date : February 22. 1977 REPORT ON: Studio Offices and Television Studio for KMIR-TV CASE NO. : 62MF ZONE : pR-7,S.P. LOCATIDN: North side of Park View Drive, west of Monterey Avenue APPLICANT: Wendell Veith for Desert Empire Television Corporation NATURE OF APPROVAL SOUGHT: Preliminary site, floor, and elevation plans. DESIGN REVIEW BOARD ACTION: After reviewing the submitted plans and the presentations by the staff and by the applicant , the DR.B rejects this project , subject to the attached conditions. Date of Action: February 22, 1977 Mot ion Made By: Hobbs Seconded By: Leung Vote : Rejected 5-0 . Reasons for Negative Vote (s) : (An appeaZ of the above action may be made in mritinc� to the Citz� CZerk of the Ci�z� of FaZm Desert arithin fifteen (Z5) days of the date o,�f the decision.l � See 'attached minutes STAFF COb2MENTS: See attached mi nutes . - � � ' February 22, 1977 CONDITIONS OF APPROVAL CASE N0. 62MF 1. The development of this project shall conform substantially to all requirements of Case No. CUP 08-76 as amended and to all development plans submitted in behalf of this case (Exhibits A-D) , and as revised according to Planning Commission action. Any minor changes require approval by the Director of Environmental Services. Any substantial change requires approval by the Planning Commission. ;�,,,, 2. All requirements of any law, ordinance, or regulation of the State, City, and any other applicable government entity shall be complied with as a part of the development process. 3. This approval is applicable, subject to the development of this project, cor�nencing within one year from approval date and being promptly completed. 4. Any roof mounted, exhaust, or air conditioning equipment shall be fully concealed from view from any public rights-of-way and adjoining properties by architecturally integrated means. 5. All utility service lines shall be placed underground. 6. Curb, gutter, street lights, sidewalk or approved pathways, bikeway, curb cuts, and tie-in paving shall be provided in conformance with City Standards and the requirements of the City Engineer. 7. The landscaping plan as shown is not approved. 8. Traffic control provisions shall be provided as required by the Director of Environmental Services. 9. Elevations are approved as shown, to be modified according to annotated changes. � 10. The applicant shall provide a total of forty-nine (49) parking spaces, including several handicapped spaces. 11. Final construction drawings, including but not limited to revised land- scaping, irrigation, exterior lighting, fencing, trash storage, color and material sample board, parking lot lighting, storage and loading, and signage plans, shall be submitted for Design Review Board Process approval prior to submittal of plans for building permits. 12. The landscaping plan shall include treatment of the equestrian trail along the northerly property line. �� AGREEMENT �+ I accept and agree, prior to use of this permit or approval , to comply with all the condit�ons set forth, and understand that the Department of Building and Safety will not issue a building permit or allow occupancy on the use permitted until this signed confirmation has been received by the Department of Environmental Services. ate pp icant s Signature � i' �� � � . • �'�' - ,,� �� � � ' - �- �.�-�, �, :;"����` CC��,f��- co� ��Z�.rt� �c���r�� - �, �>-�,. �; `:`=;�;�;�,- 45-275 PRICKLY PEAR LANE, PALM DESERT, CALlFORNIA 92260 TELEPHONE (7!4) 346-0611 DESIGN REVIEW BOARD ACTION REPOR.T Date : Februar_v 22, 1977 REPORT ON: Commercial Buil!ding CASE NO. : 49C ZONE: C-1,S.P. LOCATION: Southwest corner of Highway 111 and San Pablo extended APPLICANT: Kromrnenhoek for San Diego Federal Savings & Loan NATURE OF APPROVAL SOUGHT: Preliminary site, floor, & elevation plans DESIGN REVIEW BOARD ACTION: After reviewing the submitted plans and the presentations by the staff and by the applicant, the DRB continues to 3/8/77 this pro j ect . �3��&42S�x�p4�c��x�c����x�c�t�cbl�dxis�xv�cX Date of Action: February 22, 1977 Mot ion Made By: Hobbs Seconded By: Minturn Vote: Approved 5-0 Reasons for Negative Vote (s} : (An appeaZ of the above action may be made in writing to the City Clerk of the City of PaZm Desert zvithin fifteen (ZS) d.ays of the date of the decision.) � STAFF CObiMENTS: See attached mi nutes. - �"' `� February 22, 1977 CONDITIONS OF APPROVAL CASE N0. 49C 1. The development of this project shall conform substantially to all development plans submitted in behalf of this case (Exhibits A-G) , and as revised according to Planning Commission action. Any minor changes require approval by the Director of Environmental Services. Any substantial change requires approval by the Planning Commission, � 2. All requirements of any law, ordinance, or regulation of the State, City, and any other applicable government entity shall be complied with as a part of the development process. 3. This approval is applicable, subject to the development of this project, commencing within one year from approval date and being promptly completed. 4. Any roof mounted, exhaust, or air conditioning equipment shall be fully concealed from view from any public rights-of-way and adjoining properties by architecturally integrated means as shown. 5. All utility service lines shall be placed underground. 6. Curb, gutter, sidewalk or approved pathways, curb cuts , and tie-in paving shall be provided in conformance with City Standards and all requirements of the City Engineer. 7. Traffic control provisions shall be provided as required by the Director of Environmental Services. 8. Elevations are approved as shown. 9. One additional parking space, making a total of nine(9) , shall be provided on the final construction plans. � 10. Nautical flagpole is not approved. 11. Preliminary sign plan is not approved. Maximum s7gnage based on two (2) street and parking lot frontages, as per new Sign Ordinance. 12. Red mission tile and stucco color to match existing E1 Paseo Square buildings shall be used. 13. Final site approval and location of improvements shall be contingent on approval of a parcel map for the San Pable Extension project. Any changes shall require approval of the Director of Environmental Services. 14. A block wall , similar in design to the existing wall around E1 Paseo Square shall be installed around the perimeter of the parking lot and the southerly landscape area. 15. A complete and detailed set of final construction plans, including but not limited to revised color and material sample board, signage, trash storage, parking lot lighting, landscaping, and irrigation plans, shall be submitted for Design Review Board Process approval prior to submittal of plans for building permits. 16. The applicant shall provide the City of Palm Desert a public easement for � use of the parking facilities of the project. 17. The property owner shall agree to join any assessment district formed that inc'ludes the subject property within its boundaries. AGREEMENT I accept and agree, prior to use of this permit or approval to comply with all the conditions set forth, and understand that the Department of Building & Safety will not issue a building permit or allow occupancy on the use permitted until this signed confirmation has been received by the Depa rtment of Environmental Services. Date Applicant s Signature