Loading...
HomeMy WebLinkAbout03-29-77 , �, • � `,,,�` ' AGENDA � PALM DESERT DESIGN REVIEW BOARD MARCH 29, 1977 5:00 PM - CITY HALL COUNCIL CHAMBERS 1. APPROVAL OF MINUTES OF PREVIOUS MEETING OF MARCH 8, 1977. Z. Case ��': 149SF Nature of Project: Single Family Residence Location: North of Ironwood Street and Goldenrod Zone: R-1-20,000 Applicant: DON OSTER for NEIL ADKINS Nature of Approval Sou�ht: Review of Grading Plan Action: APPROVED 3. Case ��: 49C Nature of Project: Savings and Loan Office Location: South of Highway 111 and west of San Pablo extended Zone: C-1,S.P. Applicant: SAN DIEGO FEDERAL SAVINGS & LOAN Nature of Approval Sought: Preliminary site, floor, and elevation plans Action: APPROVED 4. Case ��: 51C Nature of Project: Office and Retail Complex Location: Southwest corner of El Paseo and Lantana Zone: C-1 Applicant: HMS PLAZA WEST Nature of Approval Sought: Preliminary site, floor, and elevation plans Action: APPROVED 5. Case �r: 52C Nature of Project: Retail-Office Building Location: South side of Highway 111 between Portola and San Luis Rey Zone: C-1,S.P. Applicant: WILLIAM STEWART Nature of Approval Sought: Preliminary site and elevations Action: APPROVED 6. Case 4�: 42C Nature of Project: Retail-Office Complex Location: North side of Highway 111 west of De Anza Zone: C-1,S.P. Applicant: ROGER MEYER Nature of Approval Sought: Construction Plans Action: APPROVED 7. Case ��: 43C Nature of Project: Retail Complex - Plaza Taxco II Location: Southwest corner of Highway 111 and Sage Lane Zone: C-1,S.P. Applicant: CURT DUNHAM Nature of Approval Sought: Construction Plans Action: APPROVED r . � ' • � �"� � Agenda Palm Desert Design Review Board March 29, 1977 8. Case ��: 33MF Nature of Project: 80-Unit Condominiums Location: West of Monterey and 660 feet north of Park View Drive Zone: PR-7,S.P. Applicant: SUNRISE CORPORATION Nature of Approval Sought: Construction Plans Action: APPROVED 9. Case ��: 32MF Nature of Project: 13-Unit Apartment Complex Location: Southeast corner of Santa Rosa and San Pascual Zone: R-Z Applicant: RICHARD COFFIN Nature of Approval Sought: Time Extension Action: APPROVED 10. Case ��: 63MF Nature of Project: 18 Units Condominiums Location: E1 Hasson Circle Zone: PR-3 Applicant: MARRAKESH BUILDING AND COUNTRY CLUB Nature of Approval Sought: Construction Plans Action: APPROVED 11. Case ��: 64MF Nature of Project: Private Health Club Location: North of Alessandro and 420 feet east of Portola Zone: R-3(4) Applicant: STEPHEN HERMAN Nature of Approval Sought: Preliminary site, floor, and elevation plans Action: APPROVED 12. Case 4�: 187SF Nature of Project: Single Family Residence Location: Tama�isk, east of Desert Lily Zone: R-1-12,000 Applicant: ROBERT WILLARD Nature of Approval Sought: Revised roof material Action: DENIED 13. Case ��: 65MF Nature of Project: 70-Unit Final Phase of Portola Del Sol Location: East of Portola, North of Catalina Way extended Zone: PR-5,N Applicant: FRED RICE Nature of Approval Sought: Construction Plans Action: APPROVED • , � ;.--.�... �„r' `� _� � ��1�� O� � I1�1 'li 1�C@��I�'�'o - • 45-275 PRICKLY PEAR LANE, PALM DESERT,CAUFORNIA 92260 TELEPHONE �714) 346-0611 DESIGN REVIEW BOARD ACTION REPORT Date: M�rch 29, 1977 REPORT ON: Single Family Residence CASE NO. : 149SF ZONE: R-1-20,000 LOCATION: North of Ironwood Street and Goldenrod APPLICANT: DON OSTER for NEIL ADKINS NATURE OF APPROVAL SOUGHT: Review of Grading Plan DESIGN REVIEW BOARD ACTION: After reviewing the submitted plans and the presentations by the staff and by the applicant, the DRB APPROVES this project, subject to the attached con itions . Date of Action: 3/29/77 Motion Made By: Minturn Seconded By: Johnson VOtG: 4-0 (approval) Reasons for Ne ative Vote (s) : An appeal o the above action may be made in writing to the City Clerk of the City of Palm Desert within fifteen (15) days of the date of the decision. ) STAFF COMMENTS : : � `� "'�' March 29, 1977 STAFF REPORT To: Design Review Board Report On: Lot Grading for Single-Family Residence Applicant: NEIL ADKINS Case No. : 149SF I. REQUEST: That the Design Review Board review the grading requirements for a single- family residence located on the north side of Ironwood Street at the inter- section of Ironwood and Golden Rod Lane. II. STAFF RECOrIlKENDATION: That the Design Review Board require a grading plan in conformance to City Grading Standard 462 which will require most of the lot to drain toward Iron- wood Street. III. DISCUSSION: The subject lot is on the downhill side of Ironwood Street and lies directly in the path of Golden Rod Lane which forms a T-intersection in front of the parcel. The staff contends that the raised pad is needed to protect the re- sidential structure from stormwater damage and that it will not adversely af- fect views from adjacent homes. This will be demonstrated through photographs which will be presented at the meeting. 'A! i _� . •"��-�:` � - „,\ '�r/ �� f/��%�'4' �`. �� � � r �F �� { £ r:%, ,• ����' OO � � � �.� ���3��"0 ,�,�.,. �'�"'��� ` 45-275 PRICKLY PEAR LANE� PALM DESERT,CAUFORNIA 92260 s,._ TELEPHONE (7!4) 346-0611 March 8, 1977 Don Oster P. 0. Box 956 Palm Desert, California 92260 Re: Case No. 149SF Dear Mr. Oster: Your revised plans for a single-family residence on Lot 12, Block 0-3, on Ironwood Street, Case No. 1495F, have been approved subject to the attached conditions. These plans rnay now be taken to the Department of Building and Safety for plan check. Because of a possible conflict in requirements, please complete and return the attached waiver form, acknowledging that you have been advised that the subject property is affected by private deed restric- tions. If you have any questions concerning this matter, or wish to appeal any of the conditions of .approval, please contact the staff of the Planning Division. Very truly yours, C ,��'_?--�'�� ��\\�`,,,�=.�--..�--y PAUL A. WILLIAMS Director of Environmental Services City of Palm Desert, California PAW/mj Attachment (as noted) , . s, " � �. � OSTER MARCH 8, 1977 ' CONDITIONS OF APPROVAL CASE N0. 149SF 1. The development of this project shall conform substantially to all develop- ment plans submitted in behalf of this case (Exhibits A-E) , and as revised according to the Design Review Board Process. Any minor changes require ap- proval by the Director of Environmental Services. Any substantial change requires approval by the Design Review Board. 2. All requirements of any law, ordinance, or regulation of the State, City, and any other applicable government entity shall be complied with as a part of the development process. 3. This approval is applicable, sub�ect to the development of this project, com- m�ncing within one year from approval date and being pramptly completed. 4. Al1 service lines for utilities shall be placed underground. 5. No roof top air conditioning equipment shall be permitted. 6. Elevations are approved as shown. 7. Curb, gutter, and tie-in paving shall be installed to the specifications of the City Engineer along the full frontage of the subject property on Ironwood Street prior to the issuance of a certificate of occupancy. 8. The applicant shall revise the landscape plan to provide for low walls and berms along the front property line to provide additional stormwater runoff protection. AGREEMENT I accept and agree, prior to use of this permit or approval, to comply with all the conditions set forth, and understand that the Department of Building and Safety will not issue a building permit or allow occupancy on the use permitted until this signed confirmation has been received by the Department of Environmental Services. '�'.�'� �' f.. .*.%� �1'!� � / � _. � �-- --`� ��" _ . (Date) (Applicant's Signature) � .. f� . � � �i� . �1.�.. � ..�..__.__ � .-.� . ( • -°' 'YIf�1�'� • �(S�[II 0/� � 4�_�..,J(� P��;T . ..711r. OR t0' iyp►�M LEE OCTAIL A ,,//����� C . S�F►CE�,-`_. SU��� 6�uN �� • � . 111� ' TME 1ON01TUDIN�L DRAIN40E S�OPE SEC CETAIL � SM�II !E NOT lESS TH4N 27. � ��_ !� DO'MIN, � � 30 MAX. ��pF►��I���� L M �.�' �. see oeui� 0 • �Z• .s• 6• ... • � cur s�ovc � ' � _ b0 MAX. S�6UNITE OH 3�CONCRETE� +� WITM 6/6- 10/ 10 WIRE MESM. _2 •h ,�z 4�:-l--,%�". . • TYPICAL CUT SLOPE DETAIL A � • TYPICAI PAVED BROW OITCH R004D EOGES OF FINISHED SURFACE AS RE�UIREO B1' SEE OETAtL C � � CITY E'7uINEER. SEE DETAIL B Z x 4LL FILL MUST BE COMV4CTED TO • MINIAIUM OF 90 X _ " OF TNE MnX�MUM DEN5ITT WITH THE ExCEP710N Of THE _ �'N% WTER S�OF THE SLOPE SURFACE WMI�H MAY 8E 6N�0 . � ROLLEO TO BS X OENSITT. L� �/ � 4, . .. . t � _ r�',! E� f„` � . P S 30�MAX. � PROJECT BHORY. SEE DETAIL B - - rsO�M toMP � ' /� M _ -III�sI1/r.����`/�;i2����1' M � Flll SLOPE . . � � 20�MA � � �r'r� UND S�RFp�E � REMOVE SOIL MANTLE � �.� GRO '� TO COMPETENT . N pT U�ypL 30�MA7(, I ��L __ — — "_ _ MA,ER��.. DETAi L C .r � N TYAICAL BERM AT TOP OF io� SLOPED BENCH s�± io' � ALl FILL SLOPES. � ' M�N. MIN. TYPICAL FILL SLOPE • jIc� MtNIMUM REOUIRED SETBAQC ' - M IN iEET a p C d � . � THE 1ON61TUDINAL CRAIN4GE SLOPf O-10 3� 2� '� S� SHALI BE NOT lESS TH4N 2 '1f. 11-30 (H/2)� S� (N/2)� 7� . _ � 3t AND OvER �S� 3� 16� 10� :� 4� MIN. . � � j4' . b d �. �// � ��-�.:e � �z�MiN . ' i-- - �� --- .I� CUT OR , -d • _ - ,'. . ' d N Flll SLOPE � � �� FACE OF F00?ING ' � � - 3�CUNITE OR 3�CONCRETE (CL B1� . 6� • � MITN 6/6-«10/�t0 wIRE MESH. N . MIN, � � DETAIL B 1� MIN. DEPTN ' � � �ENERAL NOTES TYPICAL TERRACE DRAIN REINFORCED CONCRETE PAVIN6 30MAX. L � ClASS 517-G-2500 " _, ALL SLOPE SURFACES TO BE PROTECTED SY APPROVED EROStON CONTROL. 3. MODIfICAT1pN5 TO STAHDARO$ AS SHOWN M�1Y BE MADE ONL7 UPON RECOtitr,!ENLI4TION OF TME SOIL ENGiNEER AND APPROVAL Of TME LITY ENGINEER. � C � C ��CE OF lUIlOiNG SETBACK N0. BY DATE R EVISION DATE � �°% GRADI N G QF SLOPES & SCALE� NONE �-���. REQUI RE D SETBACKS STAMDARD DWG. .� ��� � _ � CITY En;��r;EER ENGINEERING DEPT. CITY OF PALM DESERT 1 ` � ---- ••,�.''"—� • . . . , . ' `�' '�,,,�' ' °� TOP OF SGOPE . • TOP OF• SGOPLS TOE OF SL OPE- ' ' . . ~- L_ 1:�: y__ � / / �i�c./. � i � . A : � , �' i + ,� �� '� ,, , � . . . � � __ __ __ � { _ � � � � . o� � � �� � � � .� , -� . � . � �4�: �i ti��- .ti ^�: -.yr . . �i � . � ;���aliE4 :-''v . 1 � � --�-�--�.: � � 1 i ' ;:' 'o.eiYE �-::: . ��� . I 1 .j -;� :'. -; _ � :� - . . 1 1 � �;:.; _ "_. `- j .� . 1 � � . . . � � � � J ;.�� � ��� �; _�,�. . � . - V �: . . ! , .:i: . ' � �--""';------- ---- --_ � . L1Q.�3/JU,[]GE STQCJCTURE AS ,QEQUlQED . . . . aR,�i,uQ�E ��� �v .- . _ . � . � . � .. - . . - - � . TOP OF FOO T�,UG W,a L G . . . �;'pi . LEVEL • -� ' . . F/.V/SH GR40E ' • • STREET . � ' o � � � y4" �• M��� '" - ----------1—�--- .^ . _ - _ _ � „�-� . SEE STD G-J , _ SEC TID�! Q -� � . . _ NOTES� ' /. UNLESS OTiUERW/SE APPROVED BY C/TY ENGINEER ALL D,PA/�YAG� MUST ,BE CaNDUCTEO TO STREET. . 2. NON-EROSlVE DRRINAGE SURFACE REQU/RED W�IE�QE FL O W /S COL L ECTED. � DATE _ � �� � SCA�E= NONE � TYPICAL LaT . �RADf NG ��j�-;f STANDARD CITY ENG�NEER DWG. ENGiNEERING DEPT. CITY oF PALM DESERT G — 2 3 � �, �, y . ��f�� CO� �Il�i ��c��c 'f� 45-275 PRICKLY PEAR LANE, PALM DESERT,CALIFORNIA 92260 TELEPHONE (714) 346-0611 DESIGN REVIEW BOARD ACTION REPORT Date : March 29z 1977 REPORT ON: Savings and Loan Of f ice CASE NO. : 49C ZONE: C-1,S.P. LOCATION: South of Highway 111 and west of San Pablo extended APPLICANT: S� DIEGO FEDERAL SAVINGS & LOAN NATURE OF APPROVAL SOUGHT: Preliminary site, floor, and elevation plans DESIGN REVIEW BOARD ACTION: After reviewing the submitted plans and the presentations by the staff and by the applicant, the DRB APPROVES this project, subject to the attached con itions. Date of Action: 3/29/77 Motion Made By: Minturn Seconded By: Johnson VOte: 4-0 (approval) � Reasons for Ne ative Vote (s) : An appeal o the above action may be made in writing to the City Clerk of the City of Palm Desert within fifteen (15) days of the date of the decision. ) STAFF CONLNiENTS: On the Planning Commission Agenda of April 5, 1977. . M�ircli 2�, 1977 ' � ' �„W,< `'�„` CONDITIONS OF APPROVAI. ' CAS� N0. 49C 1• The development of this project shall conform substantially to all de�velop- ment plans sulimitted in behalf of this case (�xhibits G-M), and as revised according to the Design Review Board process. Any minor changes require approval by the Director of Lnvironmental Services. Any substantial change requires approval by the Planning Conunission. 2. All requirements of any law, ordinance, or re�ulation of the State, City, and any other applicable government entity shall be coYnplied with as part of the development process. ' 3. This approval is applicable, subject to the development of this project, com- mencing within one year from approval date and being promptly completed. 4. Any roof mounted, exhaust, or air conditioning equipment shall be fully con- cealed from view from any public rights-of-way and adjoining p'roperties by architecturally integrated means as shown. 5. Al1 utility service lines shall be placed underground. 6. Curb, gutter, sidewalk or approved pathways, curb cuts, and tie-in paving shall be provided in conformance wTith City Standards for the fol.lowin�: a) The applicant sha11 install curb, gutter, and 6 foot sidewalk along the frontage road of Highway 111, along S�n Pablo, and north of the parking lot. The frontage road west of the site shall be 32 feet curb to curb. 7. I'inal landscaping (with irrigation system) plans indicating plant sizes and heights shall be provided to the Design Review Board for approval prior to issuance of a building permit. , 8. Parking lot 1 ighting and signage shall be provided in accordance with final construction plans to be submitted to tYie Design Review Board and the Plan- ning Commission for final approval. Signage shall be limited to t�•�o (2) buildiri� signs, a 24-hour teller sign, a time-temperature sign on the north elevation, a four (#)'�square foot drive-teller sign, and a four (�)�jsquare foot customer parking sign. No signage shall be permitted on the fountain. 9. Traffic control provisions shall be provided as required by the Traffic Engineer. 10. Construction plans shall be submitted for approval to the City Fire ;�farshall prior to issuance of building permits. All canditions shall be made a part of construction and no certificate of occupancy shall b e issued until com- pleted. 11. A detailed grading plan shall be submitted to the Department of Building and Safety for approval.. 12. The applicant shall agree to join an_y assessment district formed that includes the subject property within its boundariesa 13. The applicant shall grant to the City of Palm Desert, easement rights over the parking lot area of the project site. 14. Final site approval and location of improvements shall be contingent on ap- proval of a parcel map for the San Pablo Extension project. Any ctianges shall requir.e approval of the Director of Environmental Services. 15. A four (4) foot slumpstone wall si lar in design to the existing wall around El Paseo Square) shall be install � around the east, north, �nd west sides of the customer parking area. ' r' . • . � � Conditions of Approval Case No. 49C March 29, 1977 16. A complete and detailed set of final coustruction plans, including signage, parkin� lot lighting, landscapi.ng, and irrigation plans shall be submitted for the Design Review Board process approval prior to submittal of pl.ans for building permits. 17. Stucco color to match existing El Paseo Square buildings shall be used. AGREEMENT I accept and agree, prior to use of this permit or approval, to comply with all the conditions set forth, and understand that the Department of Building & Safety will not issue a building permit or allow occupancy on the use permitted until this signed confirmation has been received by the Department of Environmental Services. (Date) (Applicant's Signature) --L- . • � ,�,� , -�- ����j' O� �I1.�]i . �C�3�@I�'�'v 45-275 PRICKLY PEAR LANE� PALM DESERT,CALIFORNIA 92260 TELEPHONE (714) 346-0611 DESIGN REVIEW BOARD ACTION REPORT Date: March 29, 1977 REPORT ON: Office and Retail Complex CASE NO. : 51C ZONE: C-1 LOCATION: Southwest corner of El Paseo and Lantana APPLICANT: HMS PLAZA WEST NATURE OF APPROVAL SOUGHT• Preliminary site, floor, and elevation plans DESIGN REVIEW BOARD ACTION: After reviewing the submitted plans and the presentations by the staff and by the applicant, the DRB APPROVES this project, subject to the attached con itions . Date of Action: 3/29/77 Motion Made By: williams Seconded By: Hobbs VOte: 4-0 (approval) � Reasons for Ne ative Vote (s) : An appeal o the above action may be made in writing to the City Clerk of the City of Palm Desert within fifteen (15) days of the date of the decision. ) STAFF COMMENTS: On the Planning Comanission Agenda of April 5, 1977. _ March 'l9, 1977 � CONI)TTTONS Or Al?PIZOVAl� � . - CAST: N0. 51C 1. The development of this project shall conform substanL-ially to all deve�_op-� ment plans submitte_d in bchall' of this case (Exhibi.ts C & D) , and as �:ej�i.sed accordin�; to the Design Review Board process. Any minor changes requir.�� ap- proval by the Director of �ilvir.onmental Services. Any subst��ritial cl�azi�;e re-- quires aPproval by the Pl.anning Commission. 2. All requir.ements of any law, ordinance, or regulation of the State, Ci.ty, an.d any other. applicable government �ntity s11a11 be complied with as part of the deve.lopment process. 3. This approval is applicable, subject to the development of this project, com- mencing within one year from approval date and being promptly completed. 4. Any roof motulted, exhaust, or air conditioning equipment shall be fully con- cealed from view from any public rights-of-way and adjoining properties by architecturally integrated means as shown. 5. A11 utility service and distribution lines shall be placed underground. 6. Curb, gutter, sidecaalk or approved pathways, curb cuts, and tie-in paving shall be provided in conformance with City Standards for the following: a) The applicant shall install curU, gutter, and sidewalk along the full frontage of E1 Paseo, Lantana, aud Larrea. b) An opening in the median str.ip on E1 Paseo opposite the northwest driveway. 7. Final landscaping (with irrigation system) plans indicating plant sizes and heights shall be provided to the Design Review B�ard for approval prior to is- suance oi a building permit. 8. Lighting of parking areas and premises shall be provided as approved by the Director of Environmental Services. 9. Signage shall be provided in accordance with signage plan to be submitted to the Desi.gn Review Board and the Planning Commission for final approval. 10. Traffic control provi;ions shall be provided as required by the Traffic Engineera 11. Overhangs shall be provided for all windocos on the west ele�ation. 12. Construction plans shall be submitted for approval to the City Fire Marshall prior to issuance of building permits. All conditions shall be made a part of construction and no certificate of occupancy shall be issued until completed. 13. A detailed grading plan shall be submitted to the City Engineer for approval. 14. The applicant shall agree to join any� assessment district formed that includes the subject property within its boundaries. . 15. The applicant shall grant to the City of Palm Desert, easemei�t rights over the parking lot area of the project site. 16. The landscape plan shall provide for a minimum of �` box trees throughout the entire project. ��.�' 17. All parking spaces shall conform to minimum City requirements. No parking space shall be within six (6) feet of any street property line. 18. A three (3) foot wall shall be installed along the boundary of the project where - the site is opposite from a residential district. AGREEMENT � I accept and agree, prior to use of thi:> >�<,rmit or approval, to comply with al.l the conditions set fortti, and understand �' _:he Department of Building and Saf�ty will not issue a building permit or allow c>�-;: :_ _ .�Zcy on the use permitted until t1i.Cs signed confirmation has been received by the I�epartmeni: of Environmental Services. (Date) (Applicant�s Signature) ' • `^--`' '�� +�" ,,�""'"`' ;�lrr ,r�:��..» l�:r .�., � ,��, — ��,'L'��J' O� � � �.� ��G—�I��'o • , ,i, ��,..,' - l� � � 45-275 PRICKLY PEAR LANE� PA�M DESERT,CAUFORNiA 92260 TELEPHONE (714) 346-0611 � DESIGN REVIEW BOARD ACTION REPORT � Date : March 29, 1977 REPORT ON: Retail/Office Building � CASE NO. : 52c ZONE: �-1,s.P, LOCATION: South side of Iiighway 111 between Portola and San Luis Rey APPLI CANT: WILLIAM STEWART NATURE OF APPROVAL SOUGHT• Preliminary site and elevations DESIGN REVIEW BOARD ACTION: � After reviewing the submitted plans and the presentations by the staff and by the applicant , the DRB APPROVES this project , subject to the attached conditions. Date of Action: 3/29/77 Mot ion Made By: Johnson � SeCollded By: Minturn VOt6: 4-0 (approval) Reasons for Negative Vote (s} : � (An c�peaZ of the above action may be made in �riting to the City CZerk of the Cit� of PaZm �Desert zvithin fifteen (ZS) d.ays of the date of the . decision.) • STAFF CObiMENTS: On the Planning Commission Agenda of April 5, 1977. M�irci� 29, 1.977 , . . +�r.w '"r'�+' . CONllITIONS Or APPItOVAL CAS1: N0. 52C 1. Tiie developme�it of this pr.oject sha11 conf.orm substantial.7_y to a11 devel.opment plans submitted in behalf. of tti9_s case (LxliibiL- A) , and as revised accorclin�; to the Desi�;n P.e.view I3oard pr.ocess. Any minor changes requir.e aPproval. by tt�e Director of �nvironmental Serv�.ces. Any substantial chan�e requixes aPl:�roval Uy the Planning Conu�iission. 2. A7.1 requirem�nts of any law, ordinance, or regulation of the State, City, and any other applicable government entity shall be complied with as part of the development process. 3. This approval is appiicable, subject to the development of this project, com- mencing within one year from approva� date and being pr_omptly completed. . 4. Any roof mounted, exhaust, or air conditioning equipment shall be fully concealed from view from any public rights-of-way and adjoining properties by architecturally integrated means as shown. 5. All utility service and distribution lines shall be Placed underground. 6. Curb, gutter, sidewalk or approved pathways, curb cuts, and tie-in paving shall lae provided in eonformance with City Standards for the following: a) The applicant shall install curb, gutter, and sidewalk along the full frontage of Lots 6 & 7 �n Palm Desert Drive. 7. Final landscaping (with irrigation system) plans indicating plant sizes and heights shall be provided to the Design Review Board for approval prior to issuance of a building permit and shall be installed and maintained by the applicant. 8. Lighting of parking areas and premises shall be provided as approved by the Director of Environmental Services. 9. Signage shall be provided in accordance with signage plan to be submitted to the Design Review Board and the Planning Commission for f inal approval. 10. Traffic control provisions shall be provided as required by the Traffic �ngineere 11. Elevations are approved as shown. 12. Construction plans shall be submitted for approval to the City Fire Marshall prior to issuance of building permits. All conditions shall be made a part o{ construetion and no certificate of occupancy shall be issued until completed. 13. A detailed grading plan shall be submitted to the City Engineer for approval. 14. The applicant shall agree to join any' assessment district formed that includes the subject property within its boundaries. _ 15. The applicant shall grant to the City of Palm Desert, easement rights over the parking lot area of the project site, 16. Parking lot improvements shall include Lots 6 & 7 and complete plans for this total site shall be submitted to the Design Review Board process for approval. The final layout of the parking lot shall conform to the Prototype Block design. The driveway from the frontage road shall extend through to the alley. 17. A complete and detailed color/material sample board shall be submitted along with construction plans for Design Review Board process approval prior to submittal for ' building plan check. 18. The landscape plan shal�. provide for a minimum of 20" box trees throughout the entire project. � 19. Ttie trash enclosure shall be designed to minimum specifications as contained in City Ordinances 56 and 88. 20. Wheel stops sl�all be removed and sidewalk or planter areas expanded. _1_ . • . �, �+ Mar.ch 29, 19"/7 Conditions of Approval Case No. 52C AGRFEMI:NT I accept and agree, prior to use of this permit or appr.oval, to comply with all the conditions set forth, and understand that the DeparLment of I3uilding and Safety will not issue a building permiL or allow occupancy on the use permitted until this signed confirmatian has been received by the Department of Environmental Services. (llaLe) (Applicant's Signature) _?_ . �^ .�� � � 0. ,�:'� �. y� � �-.:,:� �»�' �# _ ���. M,Y,' ��.'�� O� .� � ILS�. �C��@Ii�'�'v � :• - �� 45-275 PRICKLY PEAR LA(�E, PALM DESERT,CAUFORNIA 92260 TELEPNONE (714) 346-0611 DESIGN REVIEW BOARD ACTION REPORT � . Date : March 29, 1977 REPURT ON: Retail/Office Complex � CASE NO. : 42C ZONE: C-1,S.P. LOCATION: North side of Highway 1'll west of De Anza APPLI CANT: ROGER MEYER NATURE OF APPROVAL SOUGHT: Construction Plans DESI�N REVIEW BOARD ACTION: � . After reviewing the submitted plans and the presentations by the staff and by the applicant , the DRB APPROVES this project , subject to the attached conditions. Date of Act ion: 3/29/77 Motion Made By: Johnson � Seconded By: Minturn VOte: 4-0 (approval) Reasons for Negative Vote (s) : (An appeaZ of the above action may be mac,ie in writing to the Citz� CZerk of the Citz� of PaZm Desert rvithin fifteen (ZS) d�.ys of the date o,f the decision.) � STAFF COhiMENTS : On the Planning Commission Agenda of April 5, 1977. , � , �„ Marct� 29, 1977 � CASL N0. 42C Ad ustments to Construction Plans 1. Remove wheel stops and add mor.e side�aalk at rear of building. -�; :-i ,� . _ � ;t�_•t:... 2. Add wall to east property line adjacent to parlcing area. 3. Additioizal Iandscaping needed adjacent to front and rear of. buildin�. 4. Add street trees (ficus retusa) 30 feet on center on Highway 111 ,, frontage. (�:L�-, �-,;_��,._?� 5. Increase size of tree in courtyard. 6. Landscape berm or 3 foot wa11 in planter area adjacent to Alessandro. 7. Add trees in parlcing area and along Atessandro per 7o11ing Ordinance - 1 tree per 5 parking spaces. �i�e /�.L.::f �1 l:.{,;, ; %." � ,'..r/; ' �:�x� _ t � � ,__ �, , . �� .. __ . ��-;�- t�: r.� r ����, . � / ,l . � ��,-.., ;� �r` �°� , : � � � •� �' -' � ��.1�✓ U� � a �1�L1. ��@�'�o ' '��t. �n.� a� � 45-275 PRICKLY PEAR LANE, PACM DESERT,CALIFORNIA 92260 TELEPHONE (714) 346-0611 DESIGN REVIEW BOARD ACTION REPORT � Date : March 29, 1977 REPORT ON: Retail Complex - Plaza Taxco II � CASE NO. : 43C ZONE: C-1,s.P. LOGATION: Southwest corner of Highway 111 and Sage Lane APPLI CANT: CURT DUNHAM NATURE OF APPROVAL SOUGHT: Construction Plans . DESIGN REVIEW BOARD ACTION: After reviewing the submitted plans and the presentations by the staff and by the applicant , the liR.B APPROVES this project , subject to the attached conditions. Date of Act ion: 3/29/77 Mot ion Made By: � williams � SeConded By: Minturn VOtE: 4-0 (approval) ' Reasons for Negative Vote (s) : (An appeaZ o f the above action may be made in zuriting to the City CZerk of the Citz� of Palm Desert zaithin fifteen (ZS) da�s of the date of the decision.) � STAFF COhiMENTS: On the Planning Commission Agenda of April 5, 1977. . . ;�,, �` Marcli 29, 1977 � cnsL r�o. 43c A_d,Zustments to Construction 1'laris ;1�:; 1. Tncrease. tree sizes in parking lot and courtyard to minimum of �" box or lar�ci: 2. Add some trees to planter area south of Building 5 to shade caindows from swi. � 3. Add more trees to interior courtyard area. - ,=.�y, . , . - _ r < < <. ._ .. .., _ . - �,, � , 1 � �e, ,.)/,y���� " jf ,�. .,,� �,,//i,�� � .t,� yt, 7� tcr ,' j t,�[�f /`_ 1,-�.. w✓ p � / � f'� �1��P��A., � � . ��� ' ' ^�.:.._ - �����', ,,y ���� CO� � � �.�'f'u�. �Q�G`�I�L� ' �. �- Y� �����•~,. �� 45-275 PRICKLY PEAR LANE, PALM DESERT,CAUFORNIA 92260 TELEPHONE (714) 346-0611 � DESIGN REVIEW BOARD ACTION REPORT � Date : March 29, 1977 REPORT ON: 80-Unit Condominiums � CASE NO. : 33MF ZONE: PR-7,S.P. LOCATION: West of Monterey and 660 feet north of Park View Drive AFPLICANT: SUNRISE CORPOP.ATIOPd NATURE OF APPROVAL SOUGHT: Construction Plans DESIGN REVIEW BOARD ACTION: After reviewing the submitted plans and the presentations by the staff ana by the applicant , the DRB APPROTIES this project , subject to the attached conditions. Date of Act ion: 3/29/77 � - Mot ion Made By: Minturn � Seconded By: Johnson � VOte: 4-0 (approval) Reasons for Negative Vote (s} : (An appeaZ of the above action may be made in writing to the City Clerk of the City of PaZrn Desert �vithin fifteeri (ZS) days of the date of the decision.) " STAFF CObiMENTS: On the Planning Commission Agenda of April 5, 1977. , NLircli 29, 1977 , � . :,� """� C�NDITI�NS OI' API'ROVAL Ct1SE N0. 33MI� 1. The development of this pro�ect shal.l conform substantially �o all develop- ment pl.ans siibmi.tted in behalf o£ this case (Exhibits A-QQQ) , and as revisecl according to the llesign Revi.ew 13oard proccss. Any minor. ct�anges require ap- proval. by Lhe Direcror of Lnvi.ronmental Services. Any substantial chaT.ige requires approval by the Planning Conunission. All conditions of Case No. llP O1-76 and Case No. TT 7263 shall also l�e complied witb. as a part of con- struction. 2. All requirements o£ any law, ordinance, or regulation of the Srate, City, and any other applicable government entity shall be complied with as part of the development process. 3. This approval is applicable, subject to the develapment of this project, com- _ mencing within one year from approval date and being promptly completed. 4. Any roof mounted, exhaust, or air conditioning equipment shall be fully con- cealed from view from 3ny public rights-of-way and adjoining properties by architecturally integraYed means as shown. . 5. Al]_ uti�ity service, distribution, and transmission lines within or adjacent to the subject property sha71 be placed underground. b. Curb, gutter, sidewalk or approved pathways, curb cuts, and tie-in paving shall be. provided in conformance with City Standards for the following: a) The applicant shall install curb, gutter, equestr_ian trail, and concrete bikeway along the full frontage of Monterey Avenue. b) The applicant sliall install curb and gutter on Torremolinos Dr_ive and Durango Circle. c) A five (5) foot dirt equestrian trail shall be provided along the south boundary of the project. 7. Lighting of parking areas and premises sha11 be provided as approved by the Director of Environmental Services. � 8. Signage. shall be provided in accordance with signage plan submitted to the Design Review Board and the Planning Commission for final approval. 9. Traffic control pr.ovisions shall be provided as required by the Traffic Engineer. 10. A three (3) foot split rail fence shall be provided along the south property line of the project. 11. Construction plans shall be submitted for approval to the City Fire Marshall prior to issuance of building permits. Al1 conditions shall be ma.de a part of construction and no certificate of occupancy shall be issued until completed. 12. A detailed grading plan shall be submitted to the City Engineer for approval. ��� � 13. The landscape plan shall provi f a minimum of �' box trees throughout the entire project. Trees along th t boundary shall be a minimum of 24" box. � 14. All garages shall be designed to provide 20' x 2Q' of unobstructed parking space wifihin each garage. 15. The bikeway shall be constructed of concrete and shall conform to all require- ments of the City Engineer. � �;. , /�, � - �� � �,�� � ��.�.;�'� r�; r��.�: . �<f <r: �:�' AGREEMENT I accept and agree, prior to use of this permit or approval, to comply with all the conditions set forth, and uuderstand that the Departm�nt of liuilding and Safety will not issue a building permit or a1.1ow occupancy on the use permitt�d until this signed confirmation has been received by the Aepartment of Environmental Services. (Date) (Applicant's Signature) �' �� A �, � � ,¢ ,°�..2v' ' f� o _ .��� �� : ��.,1�� O� �� 1�`�]. ��G�1�'�0 45-275 PRICKLY PEAR LANE, PALM D�SERT, CALIFORNIA 92260 TELEPHONE (714) 346-0611 DESIGN REVIEW BOAftD ACTION REPORT � Date : March 29, 1977 REPORT ON: 13-Unit Apartment Complex � CASE N0. : 321�' ZONE: R-2 LOCATION: Southeast corner of Santa Rose and San Pascual APPLI CANT: RICHARD COFFIN NATURE OF APPROVAL SOUGHT: Time Extension DESIGN REVIE�'V BOARD ACTION: � . After reviewing the submitted plans and the presentations by the staff and by the applicant , the DRB �-'PROVES this project , subject to the attached conditions. Date of Action: 3/29/77 bSotion Made By: Minturn Seconded By: Johnson VOte: 4-0 (approval) Reasons for Negative Vote (s) : (An appeaZ of the above action may be made in r�riting to the City CZerk of the City of Palm Desert �ithin fifteen (ZS) dar�s of the date of the decision.) � STAFF CObiMENTS: See attached conditions from City Fire Marshall. On Planning Commission Agenda of April 5, 1977 • , � � � ' � INTER�FFICE MEMORANDUM .' . . City of Paim Desert _ TO: Paul Williams, Director of Environr:ental Services , cc: Jim Hill, Direcfor of Building & Safety . FROM: Bud Engel, Fire Marshal � - SUBJECT: Case No. 32MF (Casa Pasqual Apts.) . . DATE: March 28, 1977 Prior to construction_of any of the proposed building,s, the following conditions must be met: � 1. Install a water system capable of delivering 1750 GPM fire flow for a two (2) hour duration in addition to donestic or other supply. The computation shall be based upon a minimum of 20 psi residual operating pressure in the supply main from which the flow is measured at the time of ineasurement. 2. Install Riverside County super fire hydrants so that no point of any build- ' ing is more than 250 feet from a fire hydrant measured along approved vehicular travel ways. . � A. Hydrants shall not be located closer than 25 feet to any building. B. �Exterior surfaces of hydrant barrels and lieads shall be painted chrome , yellow and the tops and nozzle caps shall be painted green. � C. Curbs (if installed). shall be painted red 15 feet in either direction � ' . from each hydrant. 3. Prior to issuance of a building permit, the developer shall furnish the � original and 'three (3) copies of the water system plan to the Fire Marshal . for review. Upon approval, one copy will be sent to the Building Department- and the original will be returned to the developer. 4. The water system plan shall be signed by a registered civil engineer and approved by the water company, with tl-ie following certification: _ "I certify that ttie design of the water system �in Case Number 32 MF is in accordance , with the requirements prescribed by the Fire Marshal." . � � � ��,.a-� �"-.• . $ R �,srW� , ' ;;�� `- �` �'��' OO � �IlI�. ���G—���'o ' � "' �•,�� 45-275 PRICKLY PEAR LANE} PALiN DESERT, CALIFORNIA 92260 TELEPHONE (714) 346-0611 DESIGN REVIEW BOARD ACTION REPOftT � ' Date ' March 29, 1977 I�.EPORT ON: 18-Unit Condominium � CASE N0. : 63MF ZONE: PR-3 LOCATION: El Hasson Circle � APPLICANT: �RRAKESH BUILDING & COUNTRY CLUB NATURE OF APPROVAL SOUGHT: Construction Plans DESIGN REVIEW BOARD ACTION: After reviewing the submitted plans and the presentations by the s�aff and by the applicant , the Di�B APPROVES this project , subject to the attached conditions. Date of Action: 3/29/77 Mot ion Made By: WILLIAMS � Seconded By: MINTURN VOte: 4-0 (approval) ' fteasons for Negative Vote (s) : (An appeaZ of the above action mar� be made in zuriting to the City CZerk of the City of PaZm Desert Urithin fifteen (ZS) days of the date of the decision.) � STAFF COMMENTS: On the Planning Commission Agenda of April 5, 1977 " Nlarch 29, 1977 . � . �,,, '�rr�' CUNDITtONS OI' APPROVAL - CASI? N0. 63MI.� 1. The development of thi.s project shall conform substantially to al1 devel�pmenL plans submitted in beYialf of tliis case (Exhibits A-C) , ancl as r�-vised accorclin� to the nesi�n Review P,oar.d pr_ocess. Any mLnor changes require appr.ova]. �y the Director. of Lnviron�uental Services. l�iy substanti.al chai�.ge requires approval by the Planning Commission. 2. A7.1 requirements of any ]_aw, ordinance, or regulation of the SLate, City, and any other applj.cable government entity sha11 be complied with as part of the development process. 3. This approval is applicable, subject to the development of this project, com- mencing withi_n one year from approval date and being promptly completed. 4. Any roof mounted, exhaust, or air conditioning equipmer.t shall be fully concealed from view from any public rights-of-way and adjoining properties by architecturally integrated means as shocan. 5. All utili_ty service and distribution lines shall be placed underground. 6. Curb, gutter, side�valk or aPproved patk�ways,,' curb cuts, and tie-in paving shall_ be provided in conformai�ce with C�t� Standards for the following: a) The applicant shall install curb and giktter along the full frontage of El Hasson Circle. 7. Final landscaping (�oith irrigation system) �hall be installed prior to issuance of a certificate of occupancy. 8. Elevations are approved as shown. 9. Construction plans sha11 be submitted for approval to the City Fire Marshal]_ prior to issuance of L�uilding permits. All conditions shall be made a part of construction and nb certificate of occupancy shall be issued until campleted. 10. A detailed grading plan shall be submitted to the City Engineer f_or approvale _�C' 11. The landscape plan shall prov�e for a minimum of �" box trees throughaut the entire project. G AGREEMENT I accept and agree, prior to use of this permit or approval, to comply with all the conditions set forth, and understand that the Department of Building and Safety will not issue a permit or allow occupancy on the use permitfied until this signed conf irma- tion has been received by the Department of Environmental Services. (Date) (Applicant's Signature) � . � � � .� � C��.'f��' o� � � 11� ���c�r�f� • 45-275 PRICKLY PEAR LANE� PALM DESERT,CALIFORNIA 92260 TELEPHONE (714) 3�6-0611 DESIGN REVIEW BOARD ACTION REPORT Date : March 29, 1977 REPORT ON: Private Health Club CASE NO. : 64MF ZONE: R-3(4) LOCATION• North of Alessandro and 420 feet east of Portola APPLICANT: STEPHEN HERMAN NATURE OF APPROVAL SOUGHT: Preliminary site, floor, and elevation plans DESIGN REVIEW BOARD ACTION: After reviewing the submitted plans and the presentations by the staff and by the applicant, the DRB APPROVES this project, subject to the attached con itions. Date of Action: 3/29/77 Motion Made By: Hobbs Seconded By: Minturn VOte: 4-0 (approval) � Reasons for Ne ative Vote (s) : An appeal o the above action may be made in writing �o the City Clerk of the City of Palm Desert within fifteen (15) days of the date of the decision. ) STAFF CONI�ZENTS: On the Planning Commission Agenda of April 5, 1977. -. � - � � March 29, 1977 CONDI'TIONS OF liPPI�OVAL CASL N0. 64MF 1, The development of this projecL- shall conform substantially to a11 requir.emcnts of Case No. CUP 02-77 and to all devclopmenC plans :>ubmitted in behalf of tliis case (Lxhibit A) , and as revised accorclin� to the Desi,gn Review I3oard proccss. Any minor chan�es r.equire apProval by the Director. of �nvir.onmental Services. Any substantial change reyuires approval by the Planning Co�nission. 2. All requirements of any law, ordinance, or regulation of the State, City, and any other applicable government entity shall. be complied with as part- of the development process. 3. This approval is applicable, subject to the development of this project, com- mencing within one year from approval date and being promptly completed. 4. Any roof mounted, exhaust, or air conditioning equipment shall be fully con-- cealed from view from any public rights-of-way and adjoining properties by arcllitecturally integrated means. 5. All utility service and distribution lines shall be placed underground. 6. Curb, gutter, sidewalk or approved pathways, curb cuts, and tie-in paving shall be provided in conformance with City Standards for the foll.owing: a) The applicant shall i_nstall curb, gutter, and sidewalk along the full frontage of the subject property on Alessandro Drive. b) The applicant shall dedicate five (S) feet along the full frontage of the subject property on Alessandro Drive. 7. Final landscaping (with irrigation system) plans indicating plant sizes and heights shall be provided to the Design Review Board for approval prior to issuance of a buildin.g permit. 8. Lighting of parking areas and premises shall be provided as approved by the Directar of Environmental Services. 9. Signage shall be provided in accordance with signage plan to be submitted to the Design Review Board and the Planning Commission for final approval. 10. Traffic control provisions sha11 be provided as required by the Traffic Engineer. 11. A five (S) foot slump block wall shall be installed in the land�cape planter south of parlcing stall ��19 and along the east property line to meet the existing wood fence. A five (5) foot wood fence shall be provided along the remaining side and rear lot lines. . 12. Construction plans shall be submitted for approval to the City Fire rlarshall- prior to issuance of building permits. All conditions shall be made a part of construction and no certificate of occupancy shall be issued until completed. 13. A detailed grading plan shall be submitted to the City Engineer for approval. 14. The applicant shall grant to the City of Palm Desert, easement rights over the parking lot area of the project site. 15. Parking lot improvements and final construction plans for this total site shall be suhmitted to the Design Review Board process for approval. 16. The trash enclosure shall be located on parking space ��19 and shall be �Cnte- grated into the required slump block wall. 17. The landscape plan shall provide for a minimum of five 20" box trees thr_oughout the entire project. AGREEMENT - I accept and agree, prior to use of this permit or approval, to comply with all the conditions set fortli, and understand that the Department of Building and Safnty will not issue a hui.lding permit or .,�.1_l.a�* ,�cctiz��.ncv c�n. the use permitted until th:is signed confirmation has been teceived by the Departinent of Lnviranmental Services. (1)ate} (AppJ.icant �s Si�natur.e) .r � .�.�. � :=�`µ ;,. F� . � , ' � - '��i, � -,.. �.�'' C�a�f�� o� ��I1r��. ���r.�f� - �'� ~ �+ 45-275 PRICKLY PEAR LANE� PACM DESERT,C�IUFORNIA 92260 TELEPHONE (714) 345-061! DESIGN REVIEW BOARD ACTION REPORT � Date : March 29, 1977 REPORT ON: 70-Unit Final Phase of Portola Del Sol � CASE N0. : 65MF ZONE: PR-5,N LOCATION: East of Portola, North of Catalina Way extended APPLI CANT: FRED RICE NATURE OF APPROVAL SOUGHT: Construction Plans DESIGN REVIEW BOARD ACTION: After reviewing the submitted plans and the presentations by the staff and by the applicant , the L'RB APPROVES this project , subject to the attached conditions. Date of Action: 3/29/77 Motion Made By: Minturn � Seconded By: Johnson For: Minturn, Johnson, Hobbs Vote: 3-1 AQainst: Williams Reasons for Negative Vote (s) : � (An appeaZ of the above action may be made in writing to the City �'Zerk of the City of Palm Desert r.�ithin fifteen (ZS) daz�s of the date of the . decision.) • STAFF COh1MENTS: On the Planning Commission Agenda of April .�, 1977 ` See portion of minutes pertaining to Condition No. �4. . 4 � . � � M�zrch 2�, 1977 y � CONllI7'zONS OF APPROVAL CASr N0. 65h11� l. The development of this projcct shall conform suUstantially to all development plans submi.tted in behalf of this case (Lxhi_bits A-M) , and as revised accorcling to the Design Revie�a Board process. Any minor chat��es requir.e ap�roval by ttie Director of �nvironmental SE�rvices. Any subsLantial change requ:tres approval by the Plannin�; Commission. 2. All requi.reinents of. any law, ordinance, or regulation of ttie State, City, and and other applicable government entity shall be complied with as part of the development process. . 3. This approval is applicable, subject to the development of this project, com- mencin� within one year from approval date and being promptly completed. 4. Any roof mounted, exhaust, or air conditioning equipment shall be fully con- cealed from view from any public rights-of-way and adjoining properties by architecturally integrated means as shown. 5a All utility service and distribution lines shall be place.d tznderground. 6. Curb, gutter, sidewalk or approved pathways, curU cuts, and tie-in paving shall be provided in conformance with City Standards for the fallowing: a) The applicant shall install curb, gutter, and sid.ewalk along the full frontage of Catalina Way. 7. Final landscaping (with irrigation system) plans indicating plant sizes and heights shall be provided to the Department of Environmental Services staff for approval prior to issuance of a building permit. 8. Lighting of parking areas and premises shall be provided as approved Uy ti�e Director of Environmental Services. 9. The applicant shall delete the main identification sign north of Catalina Way or both may be permitfied if reduced to fifteen (15) square feet each. 10. Traffic contr.ol provisions sha11 be provided as required by the Traffic �ngineer. 11. Elevations are approved as shown. 12. Construction plans shall be submitted for approval to the City Fire Marsliall prior to issuance of building permits. All conditions shall be made a part of construction and no certificate of occupancy shall be issued until completed. 13. A detailed grading plan shall be submitted to the City Engineer for approval. �� - 14. The landscape plan shall provide for a minimum of �P" box trees throughout the entire project. , { . �; AGREEMENT I accept and agree, prior to use of this permit or approval, to comply with all the conditions set forth, and understand that the Department of Building and Safe�y will not issue a building permit or allow occupancy on the use permitted until this signed confirmation has been received by the Department of Environmental Services. (Date) (Applicant's Signature) � . . ;� v� _�. C�,f��' o� �Il�. �C��c-�r�f� . . 45-275 PRICKLY PEAR LANE, PALM DESERT,CALlFORNIA 92260 TELEPHONE (714) 346-0611 DESIGN REVIEW BOARD ACTION REPORT Date : March 29, 1977 REPORT ON: Single Family Residence CASE NO. : 187sF ZONE: R-1-12,000 LOCATION: Tamarisk, east of Desert Lily APPLICANT: ROBERT WILLARD � NATURE OF APPROVAL SOUGHT: Revised roof material DESIGN REVIEW BOARD ACTION: After reviewing the submitted plans and the presentations by the s taf f and by the applicant, the DRB DENIES this project, subject to the attached con itions. Date of Action: 3/29/77 Motion Made By: Minturn Seconded By: williams VOte: 4-0 (denial) � Reasons for Ne ative Vote (s) : An appeal o the above action may be made in writing to the City Clerk of the City of Palm Desert within fifteen (15) days of the date of the decision. ) See attached minutes from the DRB meeting. STAFF CONLMENTS :