HomeMy WebLinkAbout05-24-77 � ' \r,M: �
AGENDA
PALM DESERT DESIGN REVIEW BOARD
TUESDAY - MAY 24, 1977
CITY HALL COUNCIL CHAMBERS
STUDY SESSION AT 4:30 PM
MEETING AT 5:30 PM
1. APPROVAL OF MINUTES OF THE PREVIOUS MEETING OF MAY 10, 1977.
2. Case ��: 48MF
Nature of Project: Parkview Subdivision
Location: Southeast Corner of Portola and Rutledge
Zone: R-1-9,000
Applicant, AFFILIATED CONSTRUCTION COMPANY
Nature of Approval Sought: Additional Elevations
Action: APPROVED
3. Case ��: 27SA
Nature of Project: Commercial Structure
Location: Northwest Corner of E1 Paseo and Portola
Zone: C-1,S.P.
Applicant: HARMON CENTER
Nature of Approval Sought: Signs
Action: APPROVED
4. Case ��: 23SA
Nature of Project: Commercial Complex
Location: Palms to Pines
Zone: P.C. (3) ,S.P.
Applicant: ROY WILLIAM CARVER
Nature of Approval Sought: Sign Program
Action: REJECT
5. Case �6: 5$SA
Nature of Project: Commercial Structure
Location: El Paseo Square
Zone: C-1,S.P.
Applicant: ROY WILLIAM CARVER
Nature of Approval Sought: Sign Program
Action: APPROVED
6. Case ��: 72MF
Nature of Project: Apartment Complex - 9 Units
Location: Shadow Mountain Drive, West of Portola
Zone: R-3-13,000(3)
Applicant: BRICKER CONSTRUCTION COMPANY
Nature of Approval Sought: Preliminary Site, Floor, and Elevation Plans
Action: APPROVED
7. Case ��: 71MF
Nature of Project: 55-Unit Condominium Project
Location: Parkview Drive, West of Monterey Avenue
Zone: PR-7,S.P.
Applicant: DON GITTELSON
Nature of Approval Sought: Preliminary Site, Floor, and Elevation Plans
Action: APPROVED
. +�rw,r `�
Agenda
Palm Desert Design Review Board
May 24, 1977 Page 'Lfao
8. Case 4�: 73MF
Nature of Project: 5-Unit Apartment Complex
Location: Tumbleweed Lane, west of Sage Lane
Zone: R-3(4)
Applicant: ALFRED A. COOK
Nature of Approval Sought: Preliminary Site, Floor, and Elevation Plans
Action: APPROVED
9. Case ��: 53MF
Nature of Project: 4-Unit Apartment Project
Location: Southwest Corner of Ocotillo and Verba Santa
Zone: R-2,S.P.
Applicant: LASZLO SANDOR
Nature of Approval Sought: Final Construction Plans
Action: qppROVED
10. Case ��: 20C
Nature of Project: Commercial Structure
Location: North of El Paseo and West of Lantana
Zone: C-•1
Applicant: EL PASEO PROPERTIES
Nature of Approval Sought: Landscape Plan
Action: qppROVED
11. Case ��: 6f3MF
Nature of Projectt 46--Condominium Units
Location: East of San Luis Rey, South of Shadow Lake Drive
Zone: PR-7
Appl�car.t: PA,LM DESERT VEPITURE LTD.
Nature of Approval Sought: Preliminary Site, Floor, and Elevation Plans
Action: qppROVED
12, Case. ��e 62MF
Nature of Project: Television Studio and Offices
Location: North Side of Park View Drive, West of Monterey Avenue
Zone: PR-7,S.P.
Applicant: WENDELL VEITH
Nature of Approval Sought: Final Construction Drawings
Action: qppROVED
13. ADJOURNMENT
� �
_�.
����' U� � 1�I�c� �D C��cgl�f�-o
• 45-275 PRICKLY PEAR LANE, PALM DESERT, CAUFORNIA 92260
TELEPHONE (714) 346-0611
DESIGN REVIEW BOARD ACTION REPORT
Date : Ma_y 24, 1977
REPORT ON: Parkview Subdivision
CASE NO. : 48MF ZONE: R-1-9,000
LOCATION: Southeast Corner of Portol a and Rutl edqe
APPLICANT: Affiliated Construction Co.
NATURE OF APPROVAL SOUGHT: Addi ti onal E1 evati ons
DESIGN REVIEW BOARD ACTION:
After reviewing the submitted plans and the presentations by
the s taf f and by the applicant, the DRB approved
this project, subject to the attached conditions .
Date of Action: 5/24/77
Motion Made By: Hobbs
Seconded By: Mi nturn
Vote: Approve 4-0 (Hobbs, Mi nturn, Leung, Urruti a)
Reasons for Ne ative Vote (s) :
An appeal o the above action may be made in writing to the
City Clerk of the City of Palm Desert within fifteen (15) days
of the date of the decision. )
STAFF COivLNIENTS : Suggested Changes: Regardi ng 301-B, restudy the garage
door and convert the plant-on to a low wing wall .
Regarding 402-B, add treatment to front wall around windows.
. . x r_.,,�,, � �
���;"� `�.r.
r '"'� f�.�
e( � �
"�`��'" ��`�� O� ��1 s�-is� ��c�5s�f�
„)t
��fi'� ��. '/ .
�\,,, 45-275 PRICKLY PEAR LANE� PALM DESERT,CALIFORNfA 92260
TELEPHONE (714) 346-0611
DESIGN REVIEW BOARD ACTION REPORT
Date : �y 24, 1977
REPORT ON: Commercial Structure
CASE NO. : 27SA ZONE: C-1,S.P.
LOCATION: Northwest Corner of El Paseo and Portola
APPLICANT: HARMON CENTER
NATURE OF APPROVAL SOUGHT: Sign Program
DESIGN REVIEW BOARD ACTI�JN:
After reviewing the submitted plans and the presentations by
the staff and by the applicant , the DRB Approved
this project, subject to the attached conditions .
Date of Action: 5/24/77
Motion Made By: Minturn
Seconded By: Hobbs
Vo t e: Approved 4-0 (Miriturn, Hobbs, Leung, Urrutia)
Reasons for Negative Vote (s) :
An appeal of the above action may be made in writing to the
City Clerk of the City of Palm Desert within fifteen (15) days
of the date of the decision. )
STAFF COi�1ENTS :
• � �
� �
- MAY 2G, 1977
GONDITIONS OF Al'PROVt1L
CASE N�. 27SA
l. The development of this project shall confor_m substantially to all
development plans submi.tted in behalf of this case (�xhibits A-D) ,
and as revised according ta the Design Review Board process. Any
minor changes require approval by the Director of Environmei�tal Services.
Any substantial change requires approval by the Planning Commission.
2. All requirements of any law, ordinance, or regulation of the State,
City, and any other applicable government entity shaJl be complied
with as part of the development process.
3. This approval is applicable, subject to the development of this project,
commencing within one year from approval date and being promptly completed.
4. No sign shall be closer. than 10 feet to any other sign.
'S. �� ��,-„ti:,, c-E�,-�, ,�'�r,�! i�L� -�-e /�2����% ,��-...rz�..��
/ �
�.�e�� ` IG�-.-�.�Z� �t�"� .
�
�O•
.�GREEMENT �
I accept and agree, prior to use of this permit or approval, to comply with all the
cor.ditions set forth, and understand that the Department of Building & Safety wi.11
not issue a building permit or allow occupancy on the use p�rmitted until this signed
confirmation has been received by the Depart�eent of Enviranmental Serv�.ces.
(Date) (Applicant's Signature)
.---�:, .
• , `j ._ .
� ..,_ -. .
.•� � �
� i ��r✓
�;'�!� �,.
r � ^ .s,,;� ,
� � � � ��� � .
< ,��f-- j� r,
'y."� ' ��i����%� ���'�� �� � �� ���l.�i.�1 �� •--�C���
� ,����� ��� 45-?_75 PRICKLY PEAR LANE, Pl�i_M DCSERT, Cl�L.IFORNIA 9?._?_60
�'��"`_.j�
7EL�PNQNE (71�) 34C-0611
DESIGN REVIEW BOARD ACTION REPORT
D a t e:_Ma�_24t._1.�J1___� ,
REPORT ON: �Q�z� 'a��� co�tplex
CASE NO. : ���� ZONE: p.C.(3) ,S.P.
LOCATION: �ms to Pines
APPLICANT: ROY WILLIAM CARIT�R
i�TATURE OF APPROVAL SOUGHT: Sign ProQram '
D�SIGN REVIEW BOARD ACTI�JN:
After reviewing the submitted plans and the presentations by
the staff and by the applicant, the DRB
this project, subject to the attached conditions .
Date of Action:
Motion �iade By:
Seconded By: � �
Vote:
• —
Feasons for Ne ative Vote (s)_
�n appeal o�he above action may be made in writing to the
City Clerk of the City of Palm Desert wa_thin fifteen (15) days
of the date of the decision. )
STAFF COi•�1ENTS :
�`;�,�� �-� �>
; .� .
_ ��� � --- �- . � ��.
w _- _.,_ .
.�..
1Y�~�S �'"��,� �• /' � "��n __5 c„� /�f /l� �� ,��<v
. � ,� '� �
i �..��—�� s
. .
� .
. � • . .
; � �
MAY 24, 1977
� CONDITIONS OF APPROVAL
CASE N0. 23SA
1. The development of this project stiall conform substantially to all develop-
ment plans submitted i.n behalf of this, case (Exhibits A-D) , and as revised
according to the Design Review Boar.d process. Any minor changes require ap-
proval by the Director of Environmental Services. Any substantial change
requires approval by the Planning Commission.
2. All requirements of any law, ordinance, or regulation of the State, City,
and any other. applicable government entity shall be complied with as part
of the development process.
3. This approval is applicable, subject to the development of this project,
commencing within one year from approval date and being promptly compl"eted.
AGREEMENT .
I accept and agree, prior to use of this permit or approval, to comply with all the
conditions set forth, and understand that the Department of Building & Safety will not
issue a building permit or allow occupancy on the use permitted until this signed
confirmation has been received by the Department of Environmental Services.
(Date) (Applicant's Signature)
��`�_ , .
�� ��.
� � �
/��, �,�
',�-� '� _�9��
��\ ��- �- � 'S�'��� r' _
��. ��. ,i�r%:� Gc�'��,�`�s� �, .� ��`���..u�. f� -�-,�:" �G--��S`.�
-.'"'�1� ,.-, A;:' oy � �
��'�, '�.,:� 45-275 PftlClCLY PEAR LAPJE� PALM QESERT, CALIf=ORNIA 922G0
TELEPHONE (714�) 34G-0611
DESIGN REVIEW BOARD ACTION RrPORT
Date:��, �[ , 1977
REPORT ON: CnmmPr�ial Str�irtt�r.�
CASE NO. : S��A ZONE: c-l.�s,ps
LQCATION: E1 Paseo Square
APPLICANT: ROY CAitVER
i�iATUiZE OF APPROVAL SOUG1iT: Sign Program -
DESI�;N REVIEW BOARD ACTIJN:
After reviewing the submitted plans and the presentations by
the staff and by the applicant , the DRB t-�v�'
this project, subject to the attached condition .
Date of Action:
Motion ��iade By: ���"CrS
5econded By: �___�������_
Vote: S�--z� �
Reasons for Ne ative Vote (s) :
An appeal o the above action may be made in writing to the
City Clerk of the City of Palm Desert within fifteen (15) days
of the date of the decision. )
STAFF CONLNIENTS:
-,�t---
,n �/ G��; � �-�'�� `�� �� '�
�
" C�, _�.�,,,-�t �, j�..r_ e q•�,-lr-[��:�e__� _ �
� • J �'^
�
�� ���0 � ��'��� � �.��-� �� �
. ��G, �;� �� � , . _
�_"�- S �`� ��,� 1�.�� �.-� ���.� `,`�°� -�.
___-
.� ��
�. �� ' .� ._
-� � , ,
. .
_ �
� , , �rrr+' �"'`w
May 24, 1977 ,
CONUITIONS OP' AYPP.OVAI.
CASF, N0. 58SA
1. The ,development of this project shall conform substantially to all develop-
ment plans submitted in behalf of this case (Exhibit A) , and as revised ac-
cor.ding to the Design Review Board process. Any minor changes require a�proval
by the Director of Environmental Services. Any substantial change requires ap-
proval by the Planning Commission.
2. All requirements of any law, ordinance, or regulation of the State, City, and
any other applicable government entity shall be complied with as part �of the
development process.
3. This approval is applicable, subject tk,the development of this project, com-
mencing within one year from approval date and being promptly completed.
� `
,
AGREEMENT �
I accept and agree, priar to use of this permit or approval, to comply coith all the
conditions set forth, and understand that the Department of Building and Safety will
not issue a building permit or allow occupancy on the use permitted until this signed
confirmation has been received by the Department of Environmental Services.
(Date) (Applicant's Signature)
� ,,' '�' �, '�
����
A( ' ,'�
���� � ����' U� " o �� � '` .-�'���s �
�a���
�>��F�� .
�<;' , , 45-275 PRICKLY PEAR LANE, PALM QESERT, CALIFORNIA 92260
TELEPHONE (714) 346-0611
DESIGN REVIEW BOARD ACTION REPORT
Date : May 24, 1977
REPORT ON: �iTnit Agartment Comnlex
CASE NO. : 72MF ZONE: R-3-13,000(3)
LOCATION: Shadow Mountain Drive, West of Portola
APPLICANT: BRICKER CONSTRUCTION COMPANY
NATURE OF APPROVAL SOUGHT: Preliminary Site, Floor, & Elevation Plans
DESIrN REVIEW BOARD ACTION:
After reviewing the submitted plans and the presentations by
the s taf f and by the applicant, the DRB Approved
this project, subject to the attached conditions .
Date of Action: 5/25/77
Motion Made By: Hobbs
Seconded By: Minturn
Le�ung
Vote: Approved 3-0 (Urrutia, Hobbs, Minturn) at�stained
Reasons for Negative Vote (s) :
An appeal�- the above action may be made in writing to the
City Clerk of the City of Palm Desert within fifteen (15) days
of the date of the decision. )
STAFF COi�LNIENTS :
. ', `�r� '�
May 24, 1977
CONDITIONS Or APYROVAL
CASE N0. 72MF
1. Tlie development of this project shall conform substantially to all develop-
ment plans submitted in behalf of this case (Exhibit A) , ancl as revised ac-
cording to the Design Review Board process. Any minor changes require ap-
proval by the Director of Environmental Services. Any substantial change
requires approval hy the Planning Commission.
_ 2. All requirements of any law, ordinance, or regulation of the State, City,
and any other applicable government entity shall be complied with as part
of the development process.
3. This approval is applicable, subject to the development of this project, com-
mencing within one year from approval date and being promptly completed.
4. All service lines for utilities shall be p].aced underground. -
5. Curb, gutter, sidewalk, curb cuts, and tie-in paving shall be provided on
�Shadow Mountain in conformance with City Standards and the requirements of
the City Engineer at the time of construction or by future agreement with
the City Engineer.
6. Storage facilities shall be provided in all carports.
7. , Parking area shall be re-designed so as to comply with the minimum parking
design standards mandated by the Zoning Ordinance.
8. A complete and detailed landscaping and irrigation plan, fencing, lighting,
and sign plan shall be submitted to the Design Review Board prior to final
approval.
�j' �Ute, /'�I.,t,�tl�/�� .
AGREEMENT
I accept and agree, prior to use of this permit or approval., to comply with all the
conditions set forth, and understand that the Department of Building & Safety will
not issue a building permit or allow occupancy on the use permitted until th:is signed
confirmation has been received by the Department of Environmental Services.
(Date) (Applicant's Signature)
._ � , �
�
����:.
.��-�, ���
, � � .
A
���� ! � ���� O� �� � �1.�'�. �D ��C���
���i;::�. �� 45-275 PRICKLY PEAR LANE PALM DESERT CALIFORNIA 92260
� � �
TELEPHONE (714) 346-0611
DESIGN REVIEW BOARD ACTION REPORT
Date : Ma.y 24, 1977
REPORT ON: 55-Unit Condominium Project
CASE NO. : 71MF ZONE: PR-7,S.P.
LOCATION: Parkview Drive, West of Monterey Avenue
APPLICANT: DON GITTELSON
i�TATURE OF APPROVAL SOUGfiT: Preliminary Site, Floor, and Elevation Plans
DESIGN REVIEW BOARD ACTI�JN:
After reviewing the submitted plans and the presentations by
the staff an�3 by the applicant , the DRB Approved
this project , subject to the attached conditions .
Date of Action: 5/25/77
T�7otion Made By: Hobbs
Seconded By: Leung
Vote: Approved 4-0 (Hobbs, Minturn, Leung, Urrutia)
Reasons for Ne ative Vote (s) :
An appeal o the above action may be made in writing to the
City Clerk of the City of Palm Desert within fifteen (15) days
of the date of the decision. )
STAFF COi�LNiENTS :
� . - � `"'' May 2G, 1977
CONnITIONS OI� A1'PROVAL
CASE N0. 71MF
1. The develo�ment of thi.s project shal]. confor.m s�.ibstantiall.y to all develc�p-
ment plans submitted in behalf of this case (Exhibits A-I) , and as revised
according to the Design Review Board prvicess. Any minor chan�;es require
appzoval by tl�e Director of �nvironmental Services. Any substantial ct�an�e
requires approval by the Planning Commission.
2. All requirements of any law, ordinance, or regulation of the State, City,
and any othez a�plicable �overnment entity shall b� complied with as part
of the development process.
3. This approval is applicable, subject to the development of this project, com-
mencing within �ne year from approval date and being promptly completed.
4. A1J. service lin�s for utiliti�s shall be placed underground.
5. The applicant shall comply with a11 of the Condirions of Approval for Case
No. DP 04-77 and Tract No. 9396.
�, l �/� Ca�.t,�c�,.�i, us �.�.G�" ��� �.��.J� /o'� �f`�'
��� � r2.,�� ��.c�t� �4 Zb�72ti.a.����"I
/n :� �rs ���
�� ���,� -� � � ����� ��
. , �/
-�, f��-� ��� � .
-�.�� -
, �
� �
��
�, � �2�L�,✓ L=�-�-G��-��` ���
AGREEMENT
I accept and agree, prior to use of this permit or approval, to comply with all the
conditions set forth, and understand that the Department of Builcling & Safety wi11 not
issue a building permit or allow occupancy on the use permitted until this signed con-
fi.rmation has been received by the Departn�ent of Environmental Services. �
(Date) (Applicant's Signature)
, .
,�"o% /�F�'E'/�E/1/C',E" 4N� y
� � �
PL/1�dNING COtfu�IISSION RESOLUTION N0. 222
CO��DITIONS OF APPROVAL . `
CASE N0. DP 04-77
t
s
� II. SPFCIAL C0��IDITIONS
� -__-----�___—__,
�
l. /� masonry wall shall be required along the full frontage of Park View
; Dri ve except for approved openi ng, desi gn and materi al s as app►roved
� � by the Desiyn Review Board Process. Said wall shall have a setback
t of a minir�;u�n of eigf�t (8) feet to provide for a landscape and pedestrian
� �reatn„nt adjacent to the street.
I
5
` ?_. The proposed landscaping of the public riyht-of-��aay on Park View Drive
' shall be modified as necessary to conformance of the improver��nnt rcquire-
r�nts of Tract 9396 and these conditions.
€ 3. Proposed driveway openings to the private roadway shall be t�edesigi7ed
� to be limited to a single driveway to the duplex buildings. Said t�e-
° design shall be submitted as a part of the Design Reviet�r Qoard Proress.
4. A minimum of three hundred and t�venty (3?_0) square foot private yard or
� patio shall be provided for each dwelling unit. .
5. Either the proposed t�rall on the northerly property line shall be ii�set
five (5) feet and said five (5) foot area utilized for landscape materials
t��hich ���ill result in a hedge-like effect or said wall shall be deleted and
replaced vaith a six (6) foot high chain link fence and oleanders.
6, The pt�oposed northerl;r portion of the private roadway shall have a minimurn
width of t4-aenty-eight {?8) feet.
E
t
a
8
� /1GREEMFNT
I accept and agree, prior to use of this permit or approval , to comply with all
tl�e conditions set forth, and understand that the Department of Building and
Safety ti��ill not issue a building permit or allow occupancy on the use permitted
until this siyned confirmation has been received by the Department of Environmental
Services.
� Date App icant s Si gnature�--�--
�
�
;
�
-2-
, - �� � ro,� ,�E�E��-�c�- a�,�y
' ' . C17'Y CUI1N(;[T, 1?1:�O1,If1'1�; %�-- 3II , • ;,�; �
COtdlll'I'll)(JS (�l� /11'3'kUVAL . .
C�S1s NU, ,1,7. 93�G .
° APRI), l�i, 1977
�3. All d���dic�Ccd land 111cj�or ea:;c'tI1C_I1C3 L'C(lU�]:C'C� 1)y Lhis appr.ovnl shall be
�;rnnt:ed to the CiLy of P��lm Dc�scr.e, w1.t:hau� cost Lo Ll�e Gity and free
of al.l ].j.ens and cnruir.b�-zi�ces. .
l�i. ,�11 r.equiz-ect ��ubljc imp��ovements and dedi.cat;ions sh�zll be rnade as a parC
of the I�'i_nal i•fap on the property ;;I�own as 'Practi No. 9396.
�S. l�rc�a s1�all be ail�le;•,ed to Trnpravc�ne�it Distric�s PIo. 54 ��nd t1o. F30 of tlie
Coz�chel_)_a l�al.ley �'octiity �•Tat.er I)i.str.ict.
� � .
16. In�rzll. fuJ_Z p�;Uli.c irapiov�'r7ents as Yequired by ordinance and the City
J;i��i_ncer. •
17. �i2 cor;;p]_iar�e ti�rit:h Arti.cle ?6. 15 0£ the City's SLibclivision Ord�nance, ttie '
��ubl.ic faci_]_ities requirement�shall be met by the paying of a fee in an
ai�.o�;nC c;e�crli��.ned under ttie Ordinance provisions.
18. �`�11 rc,uircments of the Planning Commission action on the Development Plan
l:»o�•rn as Case iTo. DP 04-77 shall be inet as a part of the development o£ rhis
txact. •
I.9. T1r.aina�e shall be st�bject to approval of tt�e City Engineer. Applicant shall
p�'oL�ide engineering c{ata as requested.
?_0, All prii�ate si:reets sti�11 be inspected tiy ttle Engineering Department and
a Sta��dard Iil�pection Fee shaJ_1 be paid. '
?_1. Install si:reet ligIits a].ong frontage of Park View as approved by t}ie City
Engineer. .
, xr_. sZ>a:c_<<�~1. co:�l�r_�rzo.�s � .
1. The L-otal nur,.ber of dtaell�.ng unit Iots shall be limi.L-ed to fifty (50) .
�
?.. Provide additional right-of-way on the noitller].y side of Park View
- l�rive as follows:
62f Lotal half cai.dth easterly of I'airhaven � ' .
52' total half width westerly of Fairhaven •
� nev�loper shall inst-all inprovements for pedestrian, bic:ycle, and land-
sc�pe purposes as required by the City and shall be responsible for the
maintenance o£ any laildsc�ping approved for said area.
3. II1Sta1.1 a wat-er system capable of delivcring 2,250 GPri fire flow from -
any fire hydrant for a two-hour durati_on in addition to domestic supply. '
' Tt�e cornput��tion sllall be based upon a minimum of 20 �psi residual operating
pressure i.n the supply main from which the flow is measured at the time of
' nicasurement. .
. 4. Install Riverside County super fire hydrants ,J_ocated at each street
intersection (a) but not �reater than 500 feet apart in any directio�l.
� A.� Exterior st�rface of hydrant barrels and heads stiall be painted
chrome yellow, and ttle tops and nozzle caps shall be painted orange.
, •$. Curbs shall be painted red 15 feet in either direction from each
hydrant.
S. Prior to recordation of t}ie Final Map, tl�e dcveloper shall furnish the
. ori�inal and three (3) copies of L-he water system plan to the Fire Marsliall
for revicw. .
�'o� �EFE�Q�',r�CE ONGy
� � � � � ��.,
. ,�,, ,�,,;
CITY Cl)ifNCll. ]t1;501.U7'ION 77- 3�
" CUPd1)T1'I OfJ5 O1� �l'P1�OVt1i, �^ � �
cnsL t�o, rx �39G Ar�u�. 1�,, 1977
X�. SPI:CTI�L CUi1DITI0NS (conLinucd) �
6. Provi.de a secoiid entrance for iise by erner�eilcy v�tlica.es and xesidei�ts �
�I1 C1(1CY�CIICY S1LU1L:j0I1Se •
� . . •
7. xhe prc�pa�ed northcrly porL-ion of tlie private r_ozdt•:ay SI11J.]. }11VC a .
�t�injmum �aicli:h of Cwenty--eight (?.8) .fc:et. .
� ,
�1 • �
AGR}�EI-f ERTT
Z accept ��nd agree, prior to use of this permit or approval, to comPl.y wit.h a11
tlze conditions set forth and understand t:hat ttie Departmeiit of Building and Safety
cri�I not issue a building permit or allow occupancy on the use permitted i.uitil this
signed confirmation has been received by the Department of r,ilvironmenta]_ Services.
,: .
�._________________��_____._._ ._.,______._. .--- �...�_(_�__�r__�_______.____________�_�________._.________
: J (Date) Applicant�s Si�nature)
,
( . .
. �
� � � r _ _ e
�_.. _, �; �
,��;.
��
'�\�,Y, �� o
�'. ?;:t� � ��,�� O�S �s�.��, .5'��'s� �����
"�'��?_���,� � 45-275 PRICKLY PEAR LANE, PALM DESERT, CALIFORNIA 92260
TELEPNONE (714) 346-06t1
DESIGN REVIEW BOARD ACTION REPORT
Date : May 24, 1977
REPORT ON: 5-Unit Apartment Proiect
CASE NO. : 73� ZONE : R-3(4)
LOCATION: Tumbleweed Lanei West of Sage Lane
APPLICANT: AI,FRED H. COOK
NATURE OF APPROVAL SOUGHT: Preliminary Site, Floor, & Elevation Plans
DESIGN REVIEW BOARD ACTION:
After reviewing the submitted plans and the presentations by
the staff and by the applicant, the DRB Approved
this project, subject to the attached conditions .
Date of Action: 5/24/77
Motion Made By: Hobbs
Seconded By: Leung
Vote: Approved 4-0 (Leung, Hobbs, Minturn, Urrutia)
Reasons for Ne ative Vote (s) :
An appeal o the above action may be made in writing to the
City Clerk of the City of Palm Desert within fifteen (15) days
of the date of the decision. )
S`rAFF COi�Lti1ENTS :
, . `wr.�' ''"r`
� May 24, 1977
CONDITIONS OF Al'PKOVAL
� CASE N0. 73MF
1. The development of this project shall conform substantially to all develop-
ment plans submi.tted in behalf of this case (Exhibits A-B), and as revi.sed
according to the Design Review Board process. Any minor changes require
approval by the Director of Environmental Services.
2. All requirements of any law, ordinance, or regulation of the State, City,
and any other applicable government entity shall be complied with as part
of the development process.
3. This approval is applicable, svbject to the development of this project, com-
mencing within one year from approval date and being promptly completed.
4. All service lines for utilities shall be placed underground.
S. Curb, gutter, sidewalk, curb cuts, and tie-in pa.ving shall be provided on
Tumbleweed in conformance with City Standards and the requirements of the
•City Engineer at the time of construction or by future agreement �aith the
City Engineer. Improvement location is not approved.
fi. Storage facilities shall be provided in all carp�rts.
� ^� �
l• ,�L��¢ ��r� 2.c
AGREEMENT �
I accept and agree, prior to use of this permit or approval, to comply with all the
conditions set forth, and understand that the Department of Building & Safety wi11 '
not issue a building permit or alltiw occupancy on the use permitted until this signed
confirmation has been received by the Department of Environmental Services.
(Date) (Applicant's Signature)
;l
'�r ��„ yp� ,w��.
�. �1�M,�'�„
/ y
� �^�
F���1' ��'��' O� s- � �1,� ��C���
�:�, �"
�_; s� 45-275 PRICKLY PEAR LANE, PALM DESERT, CALIFORNIA 92260
TELEPHONE (714) 346-0611
DESIGN REVIEW BOARD ACTION REPORT
Date :_ May 24. 1977 ___
REPORT ON: 4-Unit Apartm�n� Project __,
CASE NO . : 53� 7.ONE: R-2,S.P.
LOCATION: Southwest Corner of Ocotillo and Verba Santa
APPLICANT: LASZLO SANDOR
NATURE OF APPROVAL SOUGIiT: Final Construction Plans
DESIGN REVIEW BOARD ACTI�JN:
After reviewing the submitted plans and the presentations by
the staff and by the applicant, the DRB A�proved _
this project , subject to the attached conditions .
Date of Action: 5/24/77
Motion Made By: Hobbs
Seconded By: Minturn
Vo te: Approved (Leung, Hobbsz Minturn, Urrutia)
Reasons for Ne ative Vote (s) :
An appeal o the above action may be made in writing to the
City Clerk of the City of Palm Desert within fifteen (15) days
of the date of the decision. )
STAFF COi`'LT'IENTS : plants must be relocated away from the street corner and
the sidewalks.
. � .. l C ( . � � �
_ . - � � � . � !
' �C01dDITlU(�S OF !11'f'ROV/�L � n >��� `�,�
. . .
�
' CASf� PJO. 53f�1F
1. TI�e cievelopment of this project shall confol�m subst��ntially to all
developu;c►�t �lans sul}iuitted in behalf of this case (Er,h�ibit, /1-13) ,
af�d as revised ��ccordinc� �:o Planning Con�mission action. /�ny m�inor
cfi�nges requi re a��p��oval f�y the Di rccto►� of Envi ronn��ntal Scrvi ces.
. Any suUstantial changc requires approval by Lhe F'lanning Coi>>inission.
2. All requir•em�ni;s of any la�v, ol�dinance, or regulation of the State,
Ci ty, and any other appl i cabl e �overnn��ni� enti i;y shal l be coinpl i ed
with as p�rt of the developn�znt process. �
3. This approval is applicable, subject to the developimnt of this p�ro-
ject, conimencing t-�ithin one year fl�om ap>>roval date and beiny promptly
completed.
4. Ai�y �{ir conditioning equinrnent shall be fully concealed from view from
an�� �ublic rigl�-ts-of_-t•�ay and adjoining properties by means of screeni�ig.
5. Al1 set�vice utility lines shall be placed underground and the overhead
utility distribu�ion/trans���ission lines shall be placed undergr�oui�d for
th� full length of ihe subject parcel .
6. Curb, g�rtter, curb cuts, S1(121��d�I:,� at�d tie-in paving shall be p��ovided
in coniormai�ce ��rith Ci�;y Standai,ds along the full frontage of the pi�o-
perty on Ocotillo and G'erba Santa.
7. Dei�ailed cor�si.ruction plans, including landscaping, irrigation, exterior
. lighting, grading, trash storage, and iencing shall be submitted through
the G2sign Revie��� Goard Process for approval prior 1;o ihe issuance of a
building �errnit.
. 8. Uni t B sf�al l be revi sed as Shot�Jn on F>;hi bi t A,
AGRFLhiEIdT
I accepi; and agree, pri or to use of thi s permi t or approval , to com�ly �;�i tf�� a i 1 �
the conditions set forth, und u�d�rstand tl�a.t the Departn:ent of [3�;ild-ing � Safety
t;i 11 not i ssue a hui 1 ci r�g pern�i t or al lot;� occupancy oi� i;he use permi�i:ed unti 1
this sic;reu confirir�at-i�n has been received by the Depa�-ttr�nt of Cnv�iron�;;��ntal �
Services.
(�Uate Appl i cant s Si gn�turej��
_�.,.� `i � '�r�
�I���-�4
;� r .,..
� ;._y
A�� � ��f`�� O� �`��, �n c.�-���]s�f�
' '-sL;•� 45-275 PRICKLY PEAR LANE, PALM DESERT, CAUFORNIA 92260
TELEPHONE (714) 346-0611
DESIGN REVIEW BOARD ACTION REPORT
Date : May 24, 1977
R�PORT ON: Commercial Structure
CASE NO . : 20C ZONE: C-1
LOCATICiN: North of E1 Paseo and West of Lantana
APPLICANT: EL PASEO PROPERTIES
NATURE OF APPROVAL SOUGHT: Landscaping Plans
DESIGN REVIEW BOARD ACTION:
After reviewing the submitted plans and the presentation.s by
the staff an�3 by the applicant , the DRB Approved
this project, subject to the attached conditions .
Date of Action: 5/24/77
Motion Made By: Hobbs
Seconded By: Minturn
Vote: Approved 4-0 (Minturn, Hobbs, Urrutia, Le.ung)
Reasons for Ne ative Vote (s) :
An appeal o the above action may be made in writing tc� the
City Clerk of the City of Palm Desert within fifteen (1S) days
of the date of the decision. )
S'I'AFF COi�LNIENTS :
p. c.
, � T;I.SC)lall'I'TON N0, '� ' ' : i
. __-- � �,'?��'_Q�>:��� G?
-' � -. . � CONllI'1'IONS OF /�PPROVAL `"� '
� ' � •
C�fSE N0. 20C � �
1. The developrne�it of tllis project shall COJIfOT'1D stibstanti.ally to all
develol�ment pJsins suL,niti.ed i_n Uel,�l� o�' i�his c�se (Exhi.t�i�l;(s) A , &
B ) , and as revi_sed accordi_z�� to Plannin�; Commission ric�:�on. l�ny
rninor chan�es require apl�roval . Uy tlle Direci;or o� Environ�ne��tal
Services. Any subsi;ani;ial chan�;e requi.res approval Uy tihe Planning
Com�nissian.
2. All, requirements of any law, ordi.nance, or regulation of the Sta1�e,
City and othc.r applicable �ovein�rrent entity shall Ue complied �vi�h
as part of the development process.
3. Th�s approval is applicaUl.e, subject Lo the development of this pro-
ject cornmencing ti�ithin one ycar from approval date and Ueing promptly
comple�Led. Applicant shall also submit plans approved by Palm Desert
Property Oc�-ners Association ��rior to construction.
4. Curb, gutter, sid����alk, curb cuts, tie-in paving , and parking lot
improvemen�;s shall Ue provided in conformance with Riverside County
star�dards and Palm Desert Zoning Ordinance require�r,en�;s.
5. Alley sl�o�vn along rear of property shall be paved to a minimum of 20'
�to ;�ive��side County stai�ciards.
6. Traffic control provisions shall be provided as required by the
Director of Enviroi�mental Services. � �
7. Lighting of parking areas and premises si�all Ue approved by the Direc
. of Environmental Services.
8. Applicant sl�all submit a drainage plan considering the building site
and properties to the east and ���est to the Director of Environmental
Services for approval. '
9. A complete and detailed landscaping and irrisation plan sl�a�.l Ue
- pro��ided to the Director of Environmental Services for approval .
Said iii��rovements s3ia11 be made a ?�art cf the construction and no
permit for final occupancy shall be anproved until installed.
l�J. All service lines shall be placed und�r�round and a cash= bond sha11
be provi�ed for the costs of undergrounding distribution lines.
11 . An}� roof mounted exhaust or air conditioning equipment shall be full;
concealed from view from any puUlic ri;ht-of-«•ay and adjoining
pl-�perties Uy architectura_lly integrated means.
12. � �:levations are approved as shown.
13. Sivnage shall be pro��ided in accordance with comprehensive sibnage
plan to be submitted to DRB for final approval.
14. �pplicant shall suUmit a material sasnple board to Planning Division
staff for approval.
15. The property ouner agrees to join any assessment district forrned
that includes the subject property within its bounc3aries.
1G. An easement shall Ue �ranted to the City or other appropraate
a�ency for the entire parking area.
� � �
__�
�
- C��f�� O� �1��.cu�i . ��c��f�
• 45-275 PRICKLY PEAR LANE� PALM DESERT,CALIFORNIA 92260
TELEPHONE (714) 346-0611
DESIGN REVIEW BOARD ACTION REPORT
Date: May 24, 1977
REPORT ON: 46 - Condominium Units
CASE NO. : 68MF ZONE: PR-7
LOCATION: East of San Luis Rey, South of Shadow Lake Dr.
APPLICANT: PALM DESERT VENTURE, LTD.
i�TATURE OF APPROVAL SOUGHT: Preliminary Site, f loor and elevations
DESIGN REVIEW BOARD ACTION:
After reviewing the submitted plans and the presentations by
the s taf f and by the applicant, the DRB Approved
this project , subject to the attached conditions .
Date of Action: 5/24/77
Motion Made By: Hobbs
Seconded By: Minturn
Vote: Approved 3-0 (Urrutia abstained)
� Reasons for Ne ative Vote (s) :
An appeal o the above action may be made in writing tca the
City Clerk of the City of Palm Desert within fifteen (l.�) days
of the date of the decision. )
STAFF COi�L^4ENTS :
9 �� � �
_,V ,
�� k;;� �.,,
�t-R-.._» .v �� �
, '#-'
: ,
�
�`�-w� � , .�,�" C���f`'��� CO� � .�,�Z, _ �-n �����c=�`�f�
���_�
�'����� 45-275 Pf�ICKLY PEAR L/�NE, PAL��4 DCSERT, CALIFORPdiA 52_?_GO
1��[_EPt-iONE (714) 346-0611
DESIGN KI�VIFW I30ARD ACTION REPORT
Dai�e : May 24, 1977
REPOR`l' ON: Television Studio and Offices
CASE NO . : 62MF `I..ONE: PR-7,S.P.
T,OCL�TION: , North Side of Parkview_Drive, West of Monterey Avenue__________`__
A�'1'T,ICANT: WENDELL VEITH
Nl�TURE OF APPROVAL SQUGHT: Final Construction Drawings
DESTGN REVT_EW BOARD ACTION:
After reviewing the submitted plans and the presentations by
the staff and by the applicant, the DRB _Approved ____ �^__
this project , subject to the afitached conc3itions .
Date of Action: _ 5/25/77__" ____ _�_____—_---_ .._
Tlotion Made By: _ Hobbs �`� _�--- --- ---
Sec_onded By: _Minturn _ ____
Vote: Approve 4-0 (Hobbs, Minturn, Leung, Urrutia)
Reasons f_or Negative Vote (s)_
�An appeal of the above action may be made in writing to the
City Clerk of the City of Palm Desert within fifteen (15) days
of the date of the decision. )
S`l'AFF COi�L�'IENTS :
,' �, � �,,,,� � May 24, 19 77
CONDITIONS OI� APPROVAL
CAS� N0. 62MF
1. The deveZopment of this project sl�all conform substantially to all requ:ire-
ments of Case No. CUP 08-76 as amended and to all development plans submitted
in behaif of this case (L'xhibits (A-D) , and as revised according to Planning
Commissi.on action. Any minor changes requirE� approval by tlie Director of
Environmental Services. Any substantial change requires approval by the
Planning Commission. .
2. All requirements of any law, ordinance, or regulation of the State, City, and
and other applicable government entity shall be complied with as part of the
development process.
3. This approval is applicable, subject to the development of this project, com-
mencing within one year from approval date and being promptly completed.
4. Any roof mounted, exhaust, or air conditioning equipment shall be fully con-
cealed from view from any public rights-of-way and adjoining properties by
architecturally integrated means.
S. All utility service lines shall be placed underground.
6. Curb, gutter, street lights, sidewallc or approved pathways, bikeway, curb cuts,
and ti.e-in paving shall be provided in conformance with City Standards and the
reqairements of the City Engineer.
7. Traffic control provisions shall be provided as required by the Director of
• Environmental Services.
$. Elevations are approved as shown, to be modified according to annotated changes.
.
9. Final construction drawings, including but not limited to revised landscaping,
irrigation, exterior lighting, fencing, trash storage, color and material sample
board, parking lot lighting, storage and loading, and signage plans shall be
submitted for Design Review Board process approval prior to submittal of plans
for building permits.
10. The landscaping plan shall include treatment of the equestrian trail along the
northerly property line.
11. Drainage area east of the offiee building shall be shifted northward to ac-
commodate future expansion of the parking lot.
12. A six (6) foot high chain link fence shall be constructed along the nor.th
property line. .
13. A complete and detailed landscape plan shall be submitted to the Department of
Environmental Services for approval prior to final inspection.
'
AGREEMENT
I accept and agree, prior to use of this permit or approval, to comply with all the
conditions set forth, and understand that the Department of Building and Safety will
not issue a building permit or allow occupancy on the use permitted until this signed
confirmation has been received by the Department of Environmental Services.
(Date) (Applicant's Signature)