Loading...
HomeMy WebLinkAbout1978-11-21 R MINUTES PALM DESERT DESIGN REVIEW BOARD MEETING TUESDAY - NOVEMBER 21 , 1973 CITY HALL COUNCIL CHAMBERS I. The meeting was called to order at 2:30 p.m. , after a 12 hour study session. Members present: Eric Johnson Phyllis Jackson Bernie Leung Frank Urrutia (not present at study session) Jim Hill (study session) Paul Williams Members Absent: Vern Barton Staff Present: Murrel Crump Ralph Cipriani Clyde Beebe (study session) It was moved by Williams, seconded by Jackson, that the minutes of the Novem- ber 7, 1978, meeting be approved as written; carried 2-0-2 (AYES: Jackson, Johnson; ABSTAIN: Leung, Urrutia) II. It was moved by Leung, seconded by Williams to approve the following cases reviewed in study session and found acceptable: Case No. 28C - Subject to conditions Case No. 52C - Subject to all signs being 8 feet in length Case No. 57C Case No. 71C Carried 3-0-1 (AYES: Jackson, Johnson, Leung; ABSTAIN: Urrutia) III. CASES • Case No. 159MF - FRANK C. & H. FRANK OLIVER - Preliminary site, floor and elevations for a pre-school facility to be located at the northwest corner of Alessandro Drive and Cabrillo. Applicant was present. On a motion by Jackson, seconded by Urrutia, the case was continued to the meeting of December 12, 1978, to allow the applicant time to resolve building design problems to keep in accordance with applicable codes for pre-school construction; carried 4-0 (Jackson, Johnson, Leung, Urrutia) . • Case No. 91C - HUGHES INVESTMENTS - Final construction drawings for a commer- cial project to be located on the northeast corner of E1 Paseo and Highway 74. Applicant was present. The Board discussed the material to be used for the Carl 's Jr. building, noting that the drawings represented a different roof detail than the other proposed buildings in the center. Also, extensively discussed were the landscaping plan details for the center. On a motion by Jackson, seconded by Leung, the Board approved the case sub- ject to the following revisions being submitted to staff: vow Center Plans 1 . Sheets SA-4 and 5 to be revised to be consistent with detail on landscape plan. Center Landscaping 1 . Place landscape planters between columns on south side of building 4. 2. Indicate type of Ficus (Retusa preferred). 3. Silk Floss to be 24" box size. 4. Shrub and ground cover plan to be submitted in addition -to tree plan, showing precise details. v Minutes Palm Desert Design Revvew Board November 21 , 1978 Page Two II" . CASES (Cont. ) • Case No. 91C (Cont. ) Carl ' s Jr. Building 1 . Change roof tile to match the other buildings. 2. Change detail above and below roof from wood to matching stucco (per original elevation drawings). Carl ' s Jr. Landscaping 1 . Revise Sheet L-1 to conform to the balance of the center. 2. Indicate all trees at 24" box size. 3. Indicate shrubs numbered 2 to 4 in minimum 5 gal size. 4. Eliminate easterly most opening on the frontage road and replace with landscaping. Carried 4-0 (Jackson, Johnson, Leung, Urrutia) . Case No. 148MF - D. K. KAVANAUGH - Elevations for a 381 single-family residential complex to be located east of Cook Street and northerly of Merle Drive. Applicant not present. Staff reviewed with the Board complete elevation drawings for the proposed condominium units, noting that other than continuation of the roof line (per original Development Plan approval ) , side and rear elevations had not been detailed (continuing architectural treatment on all sides of the build- ings) . It was also observed that architecturally integrated patio covers should have been designed for at least units receiving severe sun exposure. Discussion also included the design of the perimeter tract wall . ago On a motion by Jackson, seconded by Leung, the Board approved the architec- tural elevations as submitted and approved the perimeter wall detail subject to the following conditions: 1 . That engineering calculations be submitted for the wall design, and that pilasters be placed a maximum of 10 feet apart. Carried 4-0 (Jackson, Johnson, Leung, Urrutia) . IV . DISCUSSION ITEMS (Not on Agenda) The Board discussed the following cases for the purpose of providing de- sign input to staff: DP 17-78 - PRO-CON DEVELOPMENT CO. , 50 residential condominium units on the nortE—side of Hovely Lane, east of Monterey Avenue. Design Considerations: 1 . Provide 20' driveway apron for units with projecting garage structures, by moving garage structure back from private street/driveways. 2. Move the center duplex buildings back from private street to provide design relief and provide 20' driveway apron. 3. Provide one additional swimming pool in area indicated for recreation. DP 18-78 - T&D INVESTMENTS/PRO-CON DEVELOPMENT CO. , 24 residential condominium units on the south side of Hovely Lane, west of Portola Avenue. Design Considerations: 1 . Move guest parking island north, closing first driveway entry to unit groups. Minutes Palm Desert Design Review Board November 21 , 1978 Page Three IV. DISCUSSION ITEMS (Not on Agenda) DP 18-78 2. Provide additional tree/shade canopy treatment in guest parking areas. 3. Provide 20' driveway apron for units with projecting garage structures by moving garage structure back from private street/driveways. `"W 4. Utilize designated "passive area" for spacing between units. 5. Consider turning buildings and providing radial driveways. DP 19-78 - LOS COCINEROS, 160 residential condominium units on the north- east corner of Hovely Lane (extended) and Cook Street. 1 . Sink perimter tennis courts if proposed to be lighted. 2. Add one swimming pool to common area between unit custers along the eastern site boundary. 3. Provide 20' driveway apron for units with projecting garage structures, by moving garage structure back from private street/driveways. 4. Stagger four unit building to achieve additional driveway apron and allow design of radial driveways into the side of garages. The meeting was adjourned at 3:50 p.m. MURREL CRUMP, Principal Planner mc/ks /