HomeMy WebLinkAbout1989-10-10 4
i ¢ 1400,
M 1 UTES
PALM DESERT Ala=ECTURAL CXZ44LSSI(N
UJESDAY, OC OBER 10, 1989
12:00 P.M. - ADKINISTRATIVE SERVICES
73-510 FRED WARIM DRIVE
I. The meeting was called to order at 12:20 p.m.
Commission Members Current Meeting Year to Date
Present Absent Present Absent
Ron Gregory, Chairman X 18 0
Mary Drury X 17 1
Rick Holden X 17 1
Steve Sullivan X 15 3
Russell McCrea X 16 2
Others Present: Steve Smith
Phil Joy
Pat Bedrosian
Brent Conley
Donna Bitter
It was moved by Commissioner Holden, seconded by Commissioner Sullivan, to
approve the minutes of September 26, 1989, as submitted. Carried 4-0.
II. Moved by Commissioner Holden, seconded by Drury to approve
the following cases by minute motion. Caged 4-0.
1. CASE NO.; PP 86-20
APPLICANT (AND ADDRESS): AHMANSON CM4MCIAL DEVELOPMENT, 1173
Parkview Drive, Suite 360, Covina, CA 91724
NATURE OF PROJECT/APPROVAL SOUGHT: Final plan approval for
commercial building on Pad 9
LOCATION: S.W. Corner of Fred Waring Dr. and Town Center Way
7CNE• P/C (3) S.P.
(Chairman Gregory abstained)
2. CASE NO.; PP 88-11
APPLICANT (AND ADDRESS): OTRA III, A LIMITED PARTNERSHIP, 27-252
Calle Arroyo, San Juan Capistrano, CA 92675
1
I' °+
NOES
ARCHITECTURAL Cn4ffSSION
OCICJBER 10, 1989
NATURE OF PROJECT/APPROVAL SOiXW: Final approval of an 11 unit
apartment project
LOCATION: 3 lots on the east side of Sunset Lane between Abronia
Trail and El Camino
ZC NE: R-3
3. CASE NO.: PP/CUP 88-12 AND TT 23904
APPLICANT (AND ADDRESS); MARRIOIT'S OWNERSHIP RESORT, INC., Post
Office Box 890, Lakeland, Florida 33802
NATURE OF PH0JBCr/APPF VAL SOUGHT: Final approval of landscape
plans for a 236 unit timeshare development
LOCATION: Off Cook Street in Marriott's Desert Springs Resort
ZONE: PR-4
4. CASE NO.: PP89-17
APPLICANT (AND ADDRESS): J. P. CONSTRUCTION, INC. P.O. Box 598,
Thousand Palms, CA 92276
NATURE OF PROJECT/APPROVAL SOUGHT: Final approval of working
drawings for architectural and landscape plans for two industrial
type warehouse-office buildings
LOCATION: Cook Street (Industrial Park)
ZONE: S.I.
Only landscaping plans approved by minute motion.
5. CASE NO.: TT 25217
APPLICANT (AND ADDRESS): JOHN AND SEAN KF_ARNF'Y, P.O. Box 4344,
Palm Desert, Ca 92260
NATURE OF PROJECT/APPROVAL SOUGHT: Preliminary nary approval of 16 hone
single family subdivision with no landscaping
LOCATION: N.E. of Monterey Avenue and Hovley Lane
ZONE: PR-5
2
14000,
ARCHITECTURAL C 744ISSICK
OCTOBER 10, 1989
6. CASE NO.: 1630 SA
APPLICANT (AND ADDRESS): PALMS TO PINES CANVAS, Pinyon Pines, Box
69, Mountain Center, CA 92301
NATURE OF PROJECT/APPROVAL SOUGHT: Awning approval
LOCATION: Hamburger Hamlet/Palm Desert Town Center
ZONE. PC-3 SP
Approved by minute motion with the condition that the awning signage
will not exceed 8" in height (not including the brass lettered
sign). Commissioner Sullivan opposed. Carried 3-1.
III. CASES;
A. Final Drawings
1. CASE NO.: 1624 SA
APPLICANT (AND ADDRESS): AMERICAN HAIRLINES, 73-640 E1 Paseo, Palm
Desert, Ca 92260
NATURE OF PROJECT/APPROVAL SOUGHT: Approval of awning and sign
LOCATION: Parking lot side of Grapevine Plaza
ZONE: Cl S.P.
Steve Smith distributed the drawings of the revised proposed awning
submitted by the applicant. It was moved by Commissioner Holden,
seconded by Commissioner Drury to approve the awning and sign as
presented. Commissioner Sullivan opposed. Carried 3-1.
2. CASE NO.: PP 89-17
APPLICANT (AND ADDRESS): J. P. CONSTRUCTION, INC., P. 0. Box 598,
Thousand Palms, CA 92276
NATURE OF PROJECT/APPROVAL SOUCW: Final approval of working
drawings for architectural and landscape plans for two industrial
type warehouse-office buildings
3
ARCHITECTURAL CCKIISSION
OCTOBER 10, 1989
LOCATION: Cook Street (Industrial Park)
ZONE: S.I.
Mr. Lou Bishop, Architect for J. P. Construction, was present to
answer any questions from commission. It was mowed by Commissioner
Drury, seconded by Commissioner Holden to approve the architectural
plans with the conditions that the actual roof mounted equipment
fits within the parapet heights, and the parapet height must be
within the maximum allowable ceiling height for this type of
building. If the applicant wishes to screen the roof mounted
equipment by any other means than shown on the elevations presented,
they will have to come back to the commission for approval.
Carried 4-0.
B. Preliminary Plans:
1. CASE NO: PP 89-5
APPLICANT (AND ADDRESS): NARENDRA PATEL for S.W. Plaza, 69-730
Highway 111, Suite 118, Rancho Mirage, Ca 92270
NATURE OF PROJEC,r/APPROVAL SOUGHT: Preliminary architectural and
landscape plan approval
LOCATION: Southwest corner Highway Ill and Lupine Lane
ZONE: Cl S.P.
Steve Smith explained the changes made in the proposed architecture
and landscape plans, with the applicant noting that the landscape
area had been increased. It was moved by Commissioner Drury,
seconded by Chairman Gregory to approve the plans with the conditions
that the palms be changed to 36" jacarandas and the date palms in
back of the building be reduced in size. Commissioner Sullivan
opposed. Carried 3-1.
2. CASE NO.: PP 89-24
APPLICANT (AND ADDRESS): GUY EVANS, 74-794 Lennon Place, Palm
Desert, Ca 92260
NATURE OF PROJECT/APPROVAL SOUGHT: Preliminary approval of plans
for two individual buildings
4
"we
ARCHITECTURAL CONMISSICN
OCTOBER 10, 1989
LOCATICN: East side Beacon Hill, south of Howley Lane
ZONE: S.I.
Architect, Lou Bishop, was present. Commission's concerns were
the lack of sidewalk in front of the building. Applicant felt that
the structure would house a number of industrial users and not one
large industrial building. Therefore, he felt the walkway would not
be necessary as clients would not be going from one building to
another. Steve Smith added that the driveway in the rear of the
building was only 20' wide, and the code states that it needs to be
24' wide. Applicant stated that he could move the retaining wall
back 4' if needed for the 24' driveway. Commission felt that some
landscaping should be added at the entry to soften the building. It
was moved by Commissioner Holden, seconded by Chairman Gregory to
approve the plans with the conditions the driveway in the rear of the
building be extended to 24' and consideration be made to increase the
landscaping in front of the building for screenage. Commissioner
Sullivan opposed. Carried 3-1.
3. CASE NO.: 349C
APPLICANT (AMID ADDRESS): SHELL OIL CO., P.O. Box 6848, Anaheim, Ca
90803
NATURE OF PROJECT/APPROVAL SOUGHT: Preliminary and final approval
of exterior facia remodel
UXATION: S.E. Corner of Highway 111 and Highway 74
ZONE: C.1.
Mr. Dave Bowlin, Consultant for Shell Oil Co., was present and
explained proposed exterior remodel. He stated that they were
planning on only remodeling the exterior of the station, which would
include the two island canopy, therefore leaving the existing,
uncovered island as is. It was moved by Commissioner Holden,
seconded by Commissioner Drury for conceptual approval with the
conditions that the applicant return with actual drawings of the
proposed plan with canopy sizes, etc., that they add more planters
to the location, and that the situation with the trash existing off
the side of the station be taken care of. Carried 4-0.
4. CASE NO.; CUP 89-7 and VAR 89-4
APPLICANT (AND ADDRESS): OLIPHANT, LIZZA AND ASSOCIATES, 77-900
Avenue of the States, Palm Desert, CA 92260
5
MINUTES
ARC[-1ITECIURAL COMMIISSION
OCTOBER 10, 1989
NATURE OF PROJECT/APPROVAL SOU(M: Preliminary approval of a
18,800 sq. ft. office building and street setback variance
LOCATION: N.W. of Monterey Avenue and Fred Waring Drive
ZONE: O.P.
Commission felt that added landscaping would make the courtyard
enjoyable. Commissioner Holden noted that the City was once planning
on some future parking structure at this location to avoid the
traffic on Acacia. Commission felt that architecturally it looked
fine, however fran the planning point of view, it really should have
landscaping added to the front of the building. It was moved by
Ccmmnissioner Sullivan, seconded by Commissioner Holden to continue
this case for restudy. Chairman Gregory abstained. Carried 3-0-1.
5. CASE NO.; 1629 SA
APPLICANT (AND ADDRESS): PALMS TO PINES CANVAS, Pinyon Pines, Box
69, Mountain Center, CA 92301
NATURE OF PROJECT/APPROVAL SOUGHT• Awning with signs
LOCATION: 73-111 El Paseo
ZONE: C-1 S.P.
Steve Smith advised ccmuission that the proposed awning was to be in
gold. After a brief discussion with the applicant, it was moved by
Commissioner Drury, seconded by Commissioner Sullivan to continue
this case until the October 24, 1989, meeting to restudy as they were
concerned with the awning being substantially connected to the
building and felt the awning really should line up with the center of
the store. Commission advised applicant to look at the rain run-off,
and perhaps the awning should wrap around the building more.
Carried 4-0.
IV.
The meeting adjourned at 2:20 p.m.
Steve Smith, is a Planner
/db
6