HomeMy WebLinkAbout1992-11-10 MINUTES
ARCHITECTURAL REVIEW COMMISSION
NOVEMBER 10, 1992
*****************************************************************
I . CALL TO ORDER:
The meeting was called to order at 12 : 10 p.m.
Commissioners Present Current Meeting Year to Date
Present Absent Present Absent
Rick Holden X 3 0
Frank Urrutia X 3 0
Chris Van Vliet X 3 0
Wayne Connor X 3 0
Richard O'Donnell X 3 0
Ron Gregory X 2 1
Staff Present: Steve Smith
Jeff Winklepleck
Steve Buchanan
Donna Bitter
II . APPROVAL OF MINUTES:
It was moved by Commissioner Connor, seconded by Commissioner
Van Vliet, to approve the minutes of the October 27 , 1992
meeting as amended. Motion carried 4-0 .
III . It was moved by Commissioner Holden, seconded by Commissioner
Connor, to approve the following cases by minute motion.
Motion carried 5-0 .
A. Final Drawings :
1 . CASE NO. : PP/CUP 89-18
APPLICANT (AND ADDRESS) : WILLIAMS DEVELOPMENT for
CATALINA WAY SENIOR APARTMENTS, 42-600 Cook Street, Suite
135, Palm Desert, CA 92264
NATURE OF PROJECT/APPROVAL SOUGHT: Approval of final
working drawings
LOCATION: 73-600 Catalina Way
ZONE: R-2 S.O.
Steve Smith presented the plans noting the change in the
size of the posts for the trellis work. Steve Buchanan
discussed how the required parking spaces would have to
have a concrete base. Commission approved the final
working drawings as submitted.
MINUTES
ARCHITECTURAL REVIEW COMMISSION
NOVEMBER 10, 1992
2 . CASE NO. : 376 C
APPLICANT (AND ADDRESS) : A & S ENGINEERING for TEXACO,
207 W. Alameda Avenue, Suite 202, Burbank, CA 91502
NATURE OF PROJECT/APPROVAL SOUGHT: Approval of remodel
plans for existing service station
LOCATION: Northeast corner of Highway 111 and Cabrillo
ZONE: C-1 S .P.
Commission continued the case, by minute motion, at the
applicant ' s request.
3 . CASE NO. : 4037 SA
APPLICANT (AND ADDRESS) : SIGNS BY MEL for JAKE ' S PLACE,
945 Boardwalk, Suite B, Palm Desert, CA 92261
NATURE OF PROJECT/APPROVAL SOUGHT: Approval of business
identification signage
LOCATION: 73-030 El Paseo
ZONE: C-1
Steve Smith presented the proposed signage in red and
green letters with a black and white checker board
background. Commission approved the signage as
submitted.
4 . CASE NO. : 4039 SA
APPLICANT (AND ADDRESS) : B & C AWNING & CANOPIES for
40 ' S AGAIN, 1005 Ortega Way, Placentia, CA 92670
NATURE OF PROJECT/APPROVAL SOUGHT: Approval of awning
and signage
LOCATION: 72-990 El Paseo
ZONE: C-1
Steve Smith presented drawings for business
identification signage consisting of four awnings; one
facing El Paseo with the other three along the east
elevation. Colors to be wine with white copy.
2
MINUTES
ARCHITECTURAL REVIEW COMMISSION
NOVEMBER 10, 1992
Commissioner Van Vliet felt it was too difficult to see
how the signage would look without a site plan. Menu
items would be "food" and "live entertainment" placed on
the east and south elevations . Commission approved
awning and signage as submitted.
5 . CASE NO. : 4040 SA
APPLICANT (AND ADDRESS) : PALMS TO PINES CANVAS for DANA
FELICE, Pinyon Pines, Box 69 , Mountain Center, CA 92361
NATURE OF PROJECT/APPROVAL SOUGHT: Approval of awning
with signage
LOCATION: 73-540 El Paseo, Suite A
ZONE: C-1
The applicant, Ernie Brooks, presented proposed white
awning with 13 inch upper case and 7" lower case brown
letters . Commission approved the awning with signage
subject to a maximum height of 12 inches for upper case
letters .
B. Preliminary Plans :
1 . CASE NO. : CUP 92-7
APPLICANT (AND ADDRESS) : CHRISTOPHER S . MILLS
ARCHITECT, INC. for SACRED HEART CHURCH, 121 So. Palm
Canyon Drive, Suite 222, Palm Springs, CA 92262
NATURE OF PROJECT/APPROVAL SOUGHT: Approval of
preliminary landscape plan for playground area and
architectural plans for school building
LOCATION: 43-775 Deep Canyon Drive
ZONE: R-1/PR-4
Jeff Winklepleck presented the preliminary landscape and
architectural plans noting that the maximum height would
be 15 ' 6" . Commissioner O'Donnell questioned the plans
showing Phase 1 . Mr. Winklepleck discussed possible
future phase plans . Commission granted preliminary
approval to the landscaping and architectural plans as
submitted.
3
\rr `memo'
MINUTES
ARCHITECTURAL REVIEW COMMISSION
NOVEMBER 10, 1992
2 . CASE NO. : 389 C
APPLICANT (AND ADDRESS) : RON P. ROBERGE for WARING
PLAZA, 83-616 Avenue 45, Indio, CA 92201
NATURE OF PROJECT/APPROVAL SOUGHT: Approval of
satellite antennas
LOCATION: Waring Plaza - Building E-1
ZONE:
Steve Smith presented drawings for proposed umbrella type
satellite dish with cement table and three additional
dishes on roof of building noting that the building is
located directly in front of Circuit City. He noted that
the dishes would rotate and the highest point would be
7 ' 8" . Commissioner Urrutia discussed his concerns on
what would be visible and felt that he would need to see
an actual dish installed on the roof before he could
approve the request for all four dishes . Commissioner
Holden agreed and felt by placing the dish on the roof of
the actual store, it would show how the dish could be
installed and how it will be screened. Commissioner
Urrutia requested to see how the dish placed on the
ground would be integrated with the existing landscaping.
Commission continued the request to allow the applicant
time to install one dish on the roof by Friday, November
20th for commission to review as well as prepare a site
plan showing where the dish would be located on the
ground, and how it will be integrated with the
landscaping.
3 . CASE NO. :
APPLICANT (AND ADDRESS) : TOM SPARKS for MR. AND MRS .
PAUL F. WHITE, 43-718 Marigold, Palm Desert, CA 92260
NATURE OF PROJECT/APPROVAL SOUGHT: Approval of remodel
and addition
LOCATION: 44-155 El Cercado Street
ZONE: R-2 S.O.
Steve Smith presented the plans on an existing house at
the corner of Santa Rosa and El Cercado noting that the
4
MINUTES
ARCHITECTURAL REVIEW COMMISSION
NOVEMBER 10, 1992
applicant was requesting approval of a second floor
addition as well as a garage to the first floor. He
noted that the maximum height would be 19 feet.
Commissioner Urrutia felt that the addition would be much
nicer if it was all on the ground level . Commissioner
Holden felt the addition could be done on the second
story, but needed to tie-in better with the first story
structure. Commission discussed various options with the
applicant on keeping the addition on the first floor.
Commission approved the remodel and addition subject to
revised plans eliminating the second story element.
Commission felt that staff should consider an adjustment
to the setback in order to maintain the preferred one-
story addition.
IV. CASES :
A. Final Drawings :
1 . CASE NO. : PP 91-11
APPLICANT (AND ADDRESS) : MR. JAMES SATTLEY for SAN
RAFAEL CASA DE PISOS, 41-625 Eclectic Street, Suite G-1,
Palm Desert, Ca 92260
NATURE OF PROJECT/APPROVAL SOUGHT: Approval of final
working drawings
LOCATION: 44-250 San Rafael
ZONE: R-3 S .O.
Steve Smith presented final working drawings noting that
they were consistent with the preliminary plans with the
exception of minor elevation changes as discussed.
Action:
It was moved by Commissioner Urrutia, seconded by
Commissioner Holden, to approve the final working
drawings subject to landscape conditions placed by Eric
Johnson and the addition of walls along the front
elevations to comply with preliminary plans. Motion
carried 3-0-1, Commissioner Connor Abstaining.
5
0
`-40001
MINUTES
ARCHITECTURAL REVIEW COMMISSION
NOVEMBER 10, 1992
2 . CASE NO. : 4029 SA
APPLICANT (AND ADDRESS) : PACIFIC SPA AND BATH, 73-446
Highway 111, Palm Desert, CA 92260
NATURE OF PROJECT/APPROVAL SOUGHT: Approval of revised
wood trellis and signage
LOCATION: 73-446 Highway 111
ZONE: C-1
Steve Smith presented revised drawings on proposed
structure. Commissioner Holden felt that a structure of
this type would require footings, etc . and he did not see
how the city would allow this . Mr. Smith indicated that
the property line appeared to be 10 feet back from the
curb face and felt that the public works department would
not be in favor of issuing an encroachment permit for
this type of structure.
Action:
It was moved by Commissioner Holden, seconded by
Commissioner Connor, to grant conceptual approval to the
plan subject to compliance with city building
requirements and applicant obtaining encroachment permit
from the public works department. Motion carried 2-1-1,
Commissioner Van Vliet voting No and Commissioner Urrutia
Abstaining.
V. The following items were added to the agenda by a
unanimous vote:
1 . CASE NO. : PP 92-4
APPLICANT (AND ADDRESS) : EDWARD STRZELCZYK for GONZALO
MEMDOZA COMMERCIAL BUILDING, 82-231 East Helio Court,
Indio, CA 92201
NATURE OF PROJECT/APPROVAL SOUGHT: Approval of final
working drawings
LOCATION: Sheryl Avenue between Caroline Court and
Melanie Place
ZONE: S. I .
6
N
MINUTES
ARCHITECTURAL REVIEW COMMISSION
NOVEMBER 10, 1992
Steve Buchanan presented the plans indicating that they
had been through plan check and were ready for approval .
Commissioner Urrutia discussed the location of the
handicapped parking spaces and planter islands .
Action:
It was moved by Commissioner Van Vliet, seconded by
Commissioner Connor, to approve the final working
drawings subject to expansion of the landscape areas in
front of the entries and handicapped spaces to comply
with city requirements . Motion carried 4-0 .
2 . CASE NO. : 4037 SA
APPLICANT (AND ADDRESS) : WATERBEDROOM, 73-394 Highway
111, Palm Desert, CA 92260
NATURE OF PROJECT/APPROVAL SOUGHT: Approval of business
identifications signage
LOCATION: 73-394 Highway 111
ZONE: C-1 S.P.
The applicant indicated that he was relocating his
business from Cathedral City to the former Ortho building
on Highway 111 and was requesting approval to install
their existing metal box sign with the background in
ivory, trim in blue and lettering in red. Commissioner
Holden felt the three colors were too much contrast.
Commissioner Urrutia felt the signage would look better
if the letters were arched over the entry door as it
would tie-in better with the architecture.
Action:
It was moved by Commissioner Holden, seconded by
Commissioner Connor, to approve the 12 ' 2" metal can sign
replacing the face with an ivory background and either
the blue or the red for the letters and cabinet color.
Lettering and cabinet to be the same color. Commission
directed staff to approve final color. Motion carried
4-0 .
7
MINUTES
ARCHITECTURAL REVIEW COMMISSION
NOVEMBER 10, 1992
VI . ADJOURNMENT:
The meeting adjourned at 1 :45 p.m.
STEVE SMITH
ASSOCIATE PLANNER
SS/db
8