HomeMy WebLinkAbout1995-07-11 i
14000
MINUTES
PALM DESERT ARCHITECTURAL REVIEW COMMISSION
JULY 11, 1995
I . CALL TO ORDER:
The meeting was called to order at 12 :20 p.m.
Commissioners Present: Current Meeting Year to Date
Present Absent Present Absent
Richard Holden (excused) X 18 2
Frank Urrutia X 18 2
Chris Van Vliet X 19 1
Wayne Connor X 20 0
Richard O'Donnell X 19 1
Ronald Gregory X 18 2
Staff Present: Steve Smith
Steve Buchanan
Daisy Garcia
Donna Bitter
II . APPROVAL OF MINUTES:
It was moved by Commissioner Urrutia, seconded by Commissioner
Connor, to approve the minutes of the June 27 , 1995 meeting as
submitted. Motion carried 4-0-1, Commissioner Van Vliet
Abstaining.
III . It was moved by Commissioner Connor, seconded by Commissioner
O'Donnell, to approve the following cases by minute motion.
Motion carried 5-0.
A. Final Drawings :
1 . CASE NO. : 4498 SA
APPLICANT (AND ADDRESS) : COUNTRY CLUB AWNING AND BLIND
for SALON ONE-ELEVEN, 74-877 Joni Drive, Unit 8, Palm
Desert, CA 92260
NATURE OF PROJECT/APPROVAL SOUGHT: Approval of awning
with signage
LOCATION: 73-340 Highway 111
ZONE: C-1
MINUTES
ARCHITECTURAL REVIEW COMMISSION
JULY 11, 1995
Steve Smith reminded the commission that the case was
before them at their last meeting and they had concerns
on how and where the awning would be placed on the
building. The applicant, Jack Smith, was now present to
answer their questions . Mr. Smith indicated that it
would be a black awning with 8" white letters . The
existing sign would be removed. Commissioner O'Donnell
noted that the commission had asked to see details on the
proposed awning. Mr. Smith showed that the awning would
be 15 ' long, 4 ' wide and the projection would be 4 ' .
Commission did not feel that the proposed awning was
viable. Commissioner Urrutia suggested that the awning
be brought straight down from the edge of the building
and returned rather than at a 45 degree angle as
proposed.
Commission approved the awning subject to it being
redesigned to align with the existing fascia and
returning the ends . Commission felt that the proposed
angled awning was incompatible with the architecture.
2 . CASE NO. : 4503 SA
APPLICANT (AND ADDRESS) : PALMS TO PINES CANVAS for
NICOLE, Pinyon Pines, Box 69 , Mountain Center, CA 92561
NATURE OF PROJECT/APPROVAL SOUGHT: Approval of awning
with signage
LOCATION: 73-130 E1 Paseo
ZONE: C-1
Steve Smith presented pictures of the building showing
three existing beige awnings . The new business going in
does not want to recover the entire awning so the
proposal is to cut out a 24" long x 18" high piece to
insert a black section with the new signage.
Commission approved the proposed insert on the existing
beige awning as submitted.
2
MINUTES
ARCHITECTURAL REVIEW COMMISSION
JULY 11, 1995
3. CASE NO. : TT 25711
APPLICANT (AND ADDRESS) : DESERT AGGREGATES, INC. for
TIERRAVISTA, Post Office Box 11478, Palm Desert, CA
92255-1478
NATURE OF PROJECT/APPROVAL SOUGHT: Approval of overhang
detail design
LOCATION: Eldorado Drive and Appian Way
ZONE: PR-5 S.O.
Steve Smith presented the corbeling details for the homes
at Tierravista.
Commission approved the overhang details as submitted.
IV. CASES:
A. Final Drawings :
1 . CASE NO. : 4504 SA
APPLICANT (AND ADDRESS) : THE FLOWER COMPANY, 45-120 San
Pablo Avenue, Palm Desert, CA 92260
NATURE OF PROJECT/APPROVAL SOUGHT: Approval of
additional business identification signage
LOCATION: 45-120 San Pablo Avenue
ZONEā¢ C-1
Steve Smith presented pictures and a proposal for the new
sign. He showed how the new sign had been placed on the
end of the rafters temporarily, and indicated that he did
not know of any other place on the building where the
sign could be placed. Commission noted their concerns
with the amount of signs on the building. Commissioner
Urrutia felt that the proposed sign looked out of scale
in that it was a very small frontage and there were a lot
of signs filling up the entire front of the building.
Chairman Gregory agreed.
3
vwavo *4400,
MINUTES
ARCHITECTURAL REVIEW COMMISSION
JULY 11, 1995
Ms . Garcia indicated that the building only has one
entrance and they will be leasing out one-half of the
store. Eventually the new tenant will also want signage
on the front of the building.
Action:
It was moved by Commissioner Urrutia, seconded by
Commissioner O'Donnell, to reject the sign as shown and
presently installed as they felt it did not fit
proportionally on the building. Commission suggested
that the applicant consider a similar sign that is
reduced in size and placed under the beam. Motion
carried 5-0 .
V. ADJOURNMENT:
The meeting was adjourned at 1 : 05 p.m.
S119VE441TH J-
ASSOCIATE PLANNER
SS/db
4