HomeMy WebLinkAbout1997-04-22 ' � ,�
MINUTES
PALM DESERT ARCHITECTURAL REVIEW COMMISSION
APRIL 22, 1997
�****����********�**���***�*��*****�����*********�����****��*****��**��**�**�*
I. CALL TO ORDER:
The meeting was called to order at 12:30 p.m.
Commissioners Present: Current Meetin� Year to Date
Present Absent Present Absent
Richard Holden X 14 2
Frank Urrutia X 13 3
Chris Van Vliet X 15 1
Wayne Connar X 15 1
Richard O'Donnell (excused) X 15 1
Ronald Gregory(excused) X 14 2
Staff Present: Steve Smith
Martin Alvarez
Pat Bedrosian
Donna Bitter
II. APPROVAL OF MINUTES:
It was moved by Commissioner Urrutia, seconded by Commissioner Van Vliet, to approve
the minutes of the Apri18, 1997 meeting as submitted. Motion carried 4-0, Commissioners
Gregory and O'Donnell Absent.
III. CASES:
A. Final Drawings:
1. CASE NO.: 4808 SA
APPLICANT (AND ADDRESSI: COIJNTRY CLUB AWNING& BLIND for
NAPA'S TAPA'S, 74-877 Joni Drive, Suite 8,Palm Desert, CA 92260
NATURE OF PROJECT/APPROVAL SOUGHT: Reconsideration of conditions
of approval
LOCATION: 73-900 El Paseo
. �`,,,, ,,�v
MINUTES
ARCHITECTURAL REVIEW COMMISSION
APRIL 22, 1997
ZONE: C-1
Mr. Smith reported that the applicant was not present but had called his office to ask
far a continuance.
Action•
It was moved by Commissioner Urrutia, seconded by Commissioner Holden, to
continue the case at the applicant's request. Motion carried 4-0, Commissioners
� Gregory and O'Donnell Absent.
2. CASE NO.: 4818 SA
APPLICANT (AND ADDRESSI: PARAGON SIGNS for MONTEREY LAW
CENTER, 77-650 Enfield Lane, Palm Desert, CA 92211
NATURE OF PROJECT/APPROVAL SOUGHT: Approval of revised business
identification signage
LOCATION: 44-712 Monterey Avenue
ZONE: C-1
Mr. Alvarez presented a drawing of the revised signage indicating that it had been
reduced in size to 14' long with 10" letters and the attorneys names were deleted.
Commissioner Urrutia felt that the sign still was too long and suggested stacking the
signage on two lines using the 10" letters.
Action•
It was moved by Commissioner Urrutia, seconded by Commissioner Connor, to
approve the signage subject to staff assuring that the signage is stacked in two rows
with maximum 10" letters. Motion carried 4-0, Commissioners Gregory and
O'Donnell Absent.
2
. �r v,r,v
MINUTES
ARCHITECTURAL REVIEW COMMISSION
APRIL 22, 1997
3. CASE NO.: TT 23940-3
APPLICANT (AND ADDRESSI: CENTURY/VINTAGE HOMES for
SiJNTERRACE, 1535 South "D" Street, San Bernardino, CA 92408; R.J.
CUNNINGHAM COMPANY, 33282 Golden Lantern Street, Suite 201,Dana Point,
CA 92262
NATURE OF PROJECT/APPROVAL SOUGHT: Approval of revised
landscaping plans
LOCATION: Sunterrace (Northwest corner of Hovley Lane East and Altered
Drive)
ZONE: PR-5
The representative for the applicant,Dennis Cunningham, addressed the commission
and stated that he is waiting for comments from the Sunterrace Homeowners
Association and asked that the case be continued.
Action•
It was moved by Commissioner Holden, seconded by Commissioner Urrutia, to
continue the case at the applicant's request. Motion carried 4-0, Commissioners
Gregory and O'Donnell Absent.
4. CASE NO.: CUP 96-18
APPLICANT�AND ADDRESSI: McFADDEN&McINTOSH ARCHITECTS
for CAM'S CORNER, 73-929 Larrea Street, Suite lA, Palm Desert, CA 92260
NATURE OF PROJECT/APPROVAL SOUGHT: Final architectural and
landscaping plan review
LOCATION: Northwest corner of Highway 111 and Deep Canyon
ZONE: C-1
Mr. Smith presented the final plans indicating that the department of building and
safety advises that the exterior of the building will not be changed. He added that he
hoped that the applicant will be preserving the historical palm trees currently on the
3
r � �
MINUTES
ARCHITECTURAL REVIEW COMMISSION
APRIL 22, 1997
site. Mr. McFadden replied that they palms will be preserved and indicated that it
was shown on the plans where these palm trees would be moved.
Action•
It was moved by Commissioner Van Vliet, seconded by Commissioner Urrutia, to
approve the final architectural and landscaping plans as submitted subject to
preserving the historical palm trees currently on the site. Motion carried 4-0,
Commissioners Gregory and O'Donnell Absent.
B. Preliminary Plans:
1. CASE NO.: CUP 91-8
APPLICANT�AND ADDRESSI: STANFORD LEONHARD ARCHITECTS for
SOUTHWEST COMMLJNITY CHURCH, 74-055 Highway 111, Palm Desert, CA
92260
NATURE OF PROJECT/APPROVAL SOUGHT: Approval of revised
preliminary plans,with landscaping, for temporary building
LOCATION: 73-251 Hovley Lane West
ZONE: PR-5
Mr. Smith presented plans indicating that the representative for the applicant, Wes
Oliphant, had spoken to Phil Drell regarding the landscaping. Mr. Oliphant noted
that the landscaping will remain in the boxes and that they will be stock piling the
trees for their future site in the County. Commissioner Urrutia asked what will
happen if the trees die in the meantime. Mr. Oliphant replied that they would replace
them. He added that the trees would remain in the boxes for the same period
approved for the conditional use permit which is 18 months.
Commissioner Holden discussed his concerns with the large, white shiny roof. Mr.
Oliphant felt that the 36" trees in the boxes would screen the roof. Commissioner
Holden asked if there was any way to soften the roof. Mr. Oliphant indicated that the
roof only comes in white. Commissioner Connor asked if there was any planting
immediately around the building. Mr. Oliphant indicated that the building sits on a
5 acre grass lot between the existing parking and the buildings. He added that there
4
. �,,,+ �
MINUTES
ARCHITECTURAL REVIEW COMMISSION
APRIL 22, 1997
were property owners to the west concerned with the blank wall and that is why the
landscaping was added to the west side. Commissioner Connor asked if the grass
was being irrigated. Mr. Oliphant indicated that it was.
Commissioner Van Vliet asked if the neighbors had been notified. Mr. Oliphant
indicated that the neighbors had been very involved in the public hearing process.
He added that they are also striping the grass lot to help make the parking area more
efficient. Commissioner Connor indicated that the landscape plan did not show the
screen walls for the swamp cooler. He added that the boxes sitting on top of the
grass would create a real maintenance problem and felt that it would be a lot easier
to take care of the trees if they were planted in the boxes in the ground.
Mr. Smith added that the landscaping on the west side needs to be enough to break
up the shiny white roof. Mr. Oliphant indicated that he would install additional trees
if any complaints are received from the neighbors. Commissioner Connor suggested
that 48" box trees be used and placed in larger boxes.
Action:
It was moved by Commissioner Connor, seconded by Commissioner Urrutia, to
approve the revised preliminary plans with the condition that the plant material
remain in the boxes but planted in the ground with a strong recommendation that
they increase the size of the trees. Motion carried 4-0, Commissioners Gregory and
O'Donnell Absent.
2. CASE NO.: PP 97-5
APPLICANT (AND ADDRESSI: JOHN TURNOCK for GRAND PRIX CAR
WASH, 36-720 Palm Court, Rancho Mirage, CA 92270
NATURE OF PROJECT/APPROVAL SOUGHT: Approval of preliminary
architectural and landscaping plans for a full service car wash and detail center
LOCATION: 72-800 Dinah Shore Drive
ZONE: P.C. (2)
Mr. Smith reported that the proposed car wash is located on the side immediately
west of the fuel station at Price/Costco indicating that the development did not access
off either driveway, but takes access from the parking lot to the north. The
5
� � �
MINUTES
ARCHITECTURAL REVIEW COMMISSION
APRIL 22, 1997
representative for the applicant,Mr. Dan Thornbury,noted that they have taken a lot
of care in preserving the existing landscaping and berming.
Action:
It was moved by Commissioner Urrutia, seconded by Commissioner Van Vliet, to
approve the preliminary plans as submitted for the full service car wash. Motion
carried 4-0, Commissioner Gregory and O'Donnell Absent.
3. CASE NO.: C 97-4
APPLICANT (AND ADDRESSI: JERRY WALKER for T W W
INVESTMENTS for DEL TACO RESTAURANT,76-968 California Avenue,Palm
Desert, CA 92260
NATURE OF PROJECT/APPROVAL SOUGHT: Preliminary approval of
exterior elevations
LOCATION: 74-617 Highway 111
ZONE: C-1
Mr. Alvarez presented the proposed plans for the 3,000 square foot building fronting
on the frontage street along Highway 111 as well as colored photographs showing
examples of existing Del Taco Restaurants. He indicated that the landscaping plan
had not been submitted. Mr. Alvarez indicated that one of staffs concerns was the
exposed neon on the east elevation facing Holiday Inn. Commissioner Urrutia asked
if the applicant was trying to duplicate the Del Taco prototype. The applicant, Mr.
Jerry Walker, indicated that they would like to duplicate the prototype per the
direction of Del Taco.
Mr. Alvarez noted that there were some landscaping issues that needed to be
addressed as well as some of the awnings not being shown on the elevations.
Commissioner Urrutia suggested that the last parking stall be widened and noted his
concerns along the east and west wall where the cars run into the building. Mr.
Smith noted that they brought this issue to the attention of the applicant and indicated
that they will need to reconfigure the circulation.
Commissioner Van Vliet asked how much flexibility they had with the architecture.
Mr.Walker indicated that he had some flexibility but that the peak is Del Taco's new
6
. �.r �
MINUTES
ARCHITECTURAL REVIEW COMMISSION
APRIL 22, 1997
`Concept 2000' and the squiggly neon is a concept they want to incorporate.
Commissioner Holden indicated that they need to see the peak shown on all
elevations. He added that the exposed neon would have to be integrated into the
architecture. Mr. Walker indicated that Del Taco does not refer to the neon as
signage but rather as a part of the new Concept 2000. Commissioner Urrutia added
that the neon needs to be more than just a plant on and suggested that Mr. Walker
look at what was done with the neon on Outback Steakhouse. Mr. Walker asked if
the neon could be shortened. Commissioner Holden indicated that they would have
to look at the design as the neon needed to look like it is part of the building. He
added that the commission discourages shiny material for the awnings as the vinyl
tends to cook in the heat and loose its color. Commissioner Urrutia questioned the
limited use of the tile as it seemed to be an afterthought. He thought their needed to
be more tile or none at all. Commissioner Holden suggested bringing out the entire
element of the entrance.
Action:
It was moved by Commissioner Urrutia, seconded by Commissioner Connor, to
continue the request to allow the applicant to revise the plans per recommendations
discussed with commission. Motion carried 4-0, Commissioners Gregory and
O'Donnell Absent.
4. CASE NO.: TT 24254
APPLICANT(AND ADDRESSI: CENTURY HOMES for SONATA AT PALM
DESERT, 1535 South"D" Street, San Bernardino, CA 92408
NATURE OF PROJECT/APPROVAL SOUGHT: Approval of preliminary
architectural plans
LOCATION: North of Hovley Lane, 1900 feet west of Portola Avenue
ZONE: PR-5
Mr. Smith reported that the previous developer sold these lots to Century Homes.
The applicant,Mr. Dennis Cunningham, indicated that the homes were basically the
same as Belmonte. Commissioner Van Vliet asked if any comments were received
from existing homeowners. Mr. Smith replied that the comments were at the
planning commission hearing and their concerns were addressed at that time.
7
: � � �
MINUTES
ARCHITECTURAL REVIEW COMMISSION
APRIL 22, 1997
Action•
It was moved by Commissioner Van Vliet, seconded by Commissioner Urrutia, to
approve the preliminary architectural plans as submitted. Motion carried 4-0,
Commissioners Gregory and O'Donnell Absent.
5. CASE NO.: CUP 92-7
APPLICANT�AND ADDRESSI: THE LARSON GROUP for SACRED HEART
CHURCH, 73-441 Little Bend Trail, Palm Desert, CA 92260
NATURE OF PROJECT/APPROVAL SOUGHT: Approval of preliminary
architectural and landscaping plans for new 6,500 square foot pastoral center
LOCATION: 43-775 Deep Canyon Drive
ZONE: R19,000/PR-4
Mr. Smith presented the plans showing the demolition of the existing 3,000 square
foot building and a construction of the new 6,500 square foot pastoral center which
meets the setback requirements. The representative for the applicant, Mr. David
Prest,presented the colored site plan.
Action:
It was moved by Commissioner Van Vliet, seconded by Commissioner Holden, to
approve the preliminary architectural and landscaping plans as submitted. Motion
carried 2-0-2, Commissioners Connor and Urrutia Abstaining with Commissioners
Gregory and O'Donnell Absent.
C. Miscellaneous:
1. CASE NO.:
APPLICANT.�AND ADDRESSI: MR. JAMES JONES for PALM DESERT
PALMS APARTMENTS,Post Office Box 8294,Palm Springs, CA 92263
NATURE OF PROJECT/APPROVAL SOUGHT: Approval of Certificate of
Zoning Conformance
8
�
. ` � `�r �
MINUTES
ARCHITECTURAL REVIEW COMMISSION
APRIL 22, 1997
LOCATION: 42-675 Washington Street
ZONE: O.P.
Mr. Smith presented pictures of the existing property indicating that the property
owner is asking far approval of a Certificate of Zoning Conformance. He explained
that after the city annexed the area an on-going study was conducted which included
the rezoning of this property to O.P.
Action:
It was moved by Commissioner Urrutia, seconded by Commissioner Connor, to
approve the Certificate of Zoning Conformance for the Palm Desert Palms
Apartments. Motion carried 4-0, Commissioners Gregory and O'Donnell Absent.
IV. ADJOURNMENT
The meeting was adjourned at 1:25 p.m.
�
� n
STEVE SMITH
PLANNING MANAGER
SS/db
9