HomeMy WebLinkAbout2023-06-13 MINUTES
PALM DESERT
" ARCHITECTURAL REVIEW COMMISSION
JUNE 13, 2006
****************************************************************************************************
I. CALL TO ORDER
The meeting was called to order at 12:30 p.m.
II. ROLL CALL
Commissioners Current Meeting Year to Date
Present Absent Present Absent
Ronald Gregory, Chairman X 10 1
Kristi Hanson X 10 1
Chris Van Vliet X 9 2
John Vuksic X 11
Ray Lopez X 9 2
Karen Oppenheim X 11
Karel Lambell X 10 1
Also Present:
Phil Drell, Director, Community Development
Steve Smith, Planning Manager
Francisco Urbina, Associate Planner
Tony Bagato, Assistant Planner
Ryan Stendell, Assistant Planner
Diane Hollinger, Landscape Specialist
III. APPROVAL OF MINUTES
It was moved by Commissioner Vuksic, seconded by Commissioner Lambell,
approving the May 23, 2006 meeting minutes. Motion carried 4-0-1-2 with
Commissioner Hanson absent and Commissioners Lopez and Van Vliet
abstaining.
IV. ORAL COMMUNICATIONS
None.
'"�►' vim+'
MINUTES
ARCHITECTURAL REVIEW COMMISSION JUNE13, 2006
A. Final Drawings
1. CASE NO.: PP 04-35
APPLICANT (AND ADDRESS): ERNEST GOBLE, 1650 Zahker
Road, #125, San Jose, CA 95122
NATURE OF PROJECT/APPROVAL SOUGHT: Request final
approval of elevations for two showroom buildings (buildings A &
B).
LOCATION: 75-178 Gerald Ford Drive
ZONE: PCD
Action:
It was moved by Commissioner Vuksic, seconded by Commissioner
Lambell, granting final approval of Case No. PP 04-35. Motion carried 6-0
with Commissioner Hanson absent.
2. CASE NO.: MISC 06-20
APPLICANT (AND ADDRESS): TOM RICE III, 46-149 Highway
74, Palm Desert, CA 92260
NATURE OF PROJECT/APPROVAL SOUGHT: Request approval
to allow a new 5'6" high block wall 10' from the curb, replacing an
existing wood fence.
LOCATION: 44-701 San Jose
ZONE: R-1
Mr. Bagato noted that the applicant was not present for the meeting. He
stated that the request was for approval to replace an existing 5-foot high
wood fence 7 feet from the curb with a new 5 foot 6 inch high stucco wall
10 feet from the curb. The code requires a new 5 feet 6 inch high wall to
be located 20 feet from the curb.
The Commission didn't see the need for the reduced setback requested
by the applicant. From the photos presented by staff, the fairly large
2
rnr VOW
MINUTES
ARCHITECTURAL REVIEW COMMISSION JUNE13, 2006
property had sufficient room to build the new wall to the current standards.
The Commission requested a continuance to allow the applicant to be
present to answer questions.
Action:
It was moved by Commissioner Vuksic, seconded by Commissioner
Oppenheim, to continue the matter to allow the applicant to be present.
Motion carried 6-0 with Commissioner Hanson absent.
3. CASE NO.: SA 06-80
APPLICANT (AND ADDRESS): CALIFORNIA NEON
PRODUCTS, 4530 Mission Gorge Place, San Diego, CA 92120
NATURE OF PROJECT/APPROVAL SOUGHT: Request approval
of signage for the Del Taco restaurant building at Desert Gateway
Shopping Center.
LOCATION: 34-540 Monterey Avenue
ZONE: PC
Mr. Bagato presented the proposed sign application to the Commission
stating that the signage would be consistent with other signs that have
been approved in the Desert Gateway Shopping Center, except for the
proposed red LED lighting around the building. Mr. Bagato said that the
red LED lighting was not part of the approved design guidelines and
believed that the building and monument signage was adequate without
the LED lighting.
Ms. Christina Gibson, the representative, stated that the red LED lighting
was a standard request for Del Taco and part of the corporate logo. She
also stated that Del Taco would accept the Commission's action, with or
without the LED lighting.
Commissioner Van Vliet, Commissioner Gregory and Commissioner
Lambell agreed with staff and were not in favor of the LED lighting.
Commissioner Vuksic, Commissioner Lopez and Commissioner
Oppenheim stated that they did not have any concerns and would be in
favor of the red LED lighting.
3
1%W `4W
MINUTES
ARCHITECTURAL REVIEW COMMISSION JUNE13, 2006
Action:
It was moved by Commissioner Oppenheim, seconded by Commissioner
Lambell, approving the proposed sign application and continuing the red
LED lighting portion to June 27, 2006. Motion carried 6-0 with
Commissioner Hanson absent.
4. CASE NO.: SA 06-79
APPLICANT (AND ADDRESS): JIM ENGLE JR. for IMPERIAL
SIGN CO., 46-120 Calhoun Street, Indio, CA 92201
NATURE OF PROJECT/APPROVAL SOUGHT: Request approval
of business signage for the Spine & Sport Clinic.
LOCATION: 72-405 Parkview Drive
ZONE: PC
Mr. Bagato presented the plans and stated that the 3-foot sign would be
placed in a 4-foot area, leaving a 6-inch space at the top and bottom of the
wall area.
Action:
It was moved by Commissioner Vuksic, seconded by Commissioner Van
Vliet, approving the sign as submitted. Motion carried 6-0 with
Commissioner Hanson absent.
5. CASE NO.: MISC 06-21 AND VAR 06-04
APPLICANT (AND ADDRESS): ANNE SALERNO, 74-251 De
Anza Way, Palm Desert, CA 92260
NATURE OF PROJECT/APPROVAL SOUGHT: Request approval
of a 6' high block wall with a 10' setback and review of a new two-
car carport.
LOCATION: 74-251 De Anza Way
ZONE: R-1
4
MINUTES
ARCHITECTURAL REVIEW COMMISSION JUNE13, 2006
Mr. Urbina presented the cases. He explained that the applicant was
requesting approval to construct a 6-foot high block wall with stucco finish,
decorative wood pedestrian door and a 6-foot high sliding wrought iron
gate at the front property line, which is located 10 feet from the street curb
face. The zoning ordinance requires a 20-foot setback. The purpose of the
wall and gate is to provide security and reduce noise impacts from traffic
on De Anza Way.
The variance would allow construction of a two-car carport with a
reduction in the combined side yards from 20 to 10 feet. The carport would
have a 5-foot side yard setback. The home does not have any covered
parking and was built in the 1960's on an irregularly-shaped lot that does
not meet the minimum lot width and size of the R-1-13,000 zone.
The applicant, Anne Salerno, stated she wanted the 6-foot high wall for
security and to reduce noise from increased traffic on De Anza Way.
Upon questioning by Mr. Drell, Mr. Urbina replied that notices had not
been mailed to adjacent property owners informing them that the
Architectural Review Commission would be considering the applicant's
request for an exception to allow a setback reduction for the proposed 6-
foot wall.
Commissioner Vuksic suggested reducing the wall height to 5 feet or
berming up the lot grade in front of the wall so that the wall would appear
to be 5 feet in height. Additional design articulation was also suggested for
the wall to enhance its appearance.
Action:
It was moved by Commissioner Vuksic, seconded by Commissioner
Lambell, to continue the matter to June 27, 2006 to allow the applicant to
make the suggested changes to the project and staff to notify adjacent
property owners. Motion carried 6-0 with Commissioner Hanson absent.
6. CASE NO.: PP 05-10
APPLICANT (AND ADDRESS): SRW INVESTMENTS, LLC, P.O.
Box 986, Rancho Mirage, CA 92270-0986
NATURE OF PROJECT/APPROVAL SOUGHT: Request final
approval of a four-unit, two-story apartment building.
5
. ern' `VrrY'
MINUTES
ARCHITECTURAL REVIEW COMMISSION JUNE13, 2006
LOCATION: 73-692 Santa Rosa Way
ZONE: R-3
Commission reviewed plans submitted by the applicant and found them to
be acceptable.
Action:
It was moved by Commissioner Vuksic, seconded by Commissioner
Lambell, granting final approval of Case No. PP 05-10. Motion carried 6-0
with Commissioner Hanson absent.
7. CASE NO.: MISC 05-11
APPLICANT (AND ADDRESS): PALM DESERT
REDEVELOPMENT AGENCY, 73-510 Fred Waring Drive, Palm
Desert, CA 92260
NATURE OF PROJECT/APPROVAL SOUGHT: Request final
approval of exterior renovation of Laguna Palms.
LOCATION: 73-875 Santa Rosa
ZONE: R-2
Commission reviewed the working drawings, which were found to be
acceptable.
Action:
It was moved by Commissioner Vuksic, seconded by Commissioner
Lambell, approving Case No. MISC 05-11. Motion carried 6-0 with
Commissioner Hanson absent.
8. CASE NO.: CUP 04-13
APPLICANT (AND ADDRESS): ROMAN CATHOLIC BISHOP OF
SAN BERNARDINO, 1201 E. Highland Avenue, San Bernardino,
CA 92404
6
MINUTES
ARCHITECTURAL REVIEW COMMISSION JUNE13, 2006
NATURE OF PROJECT/APPROVAL SOUGHT: Request final
approval of elevations for Sacred Heart parish hall/gymnasium and
expansion of school.
LOCATION: 43-775 Deep Canyon
ZONE: R-1
The Commission reviewed the plans and elevations and found them to be
acceptable.
Action:
It was moved by Commissioner Vuksic, seconded by Commissioner
Lambell, granting final approval of Case No. CUP 04-03. Motion carried 6-
0 with Commissioner Hanson absent.
9. CASE NO.: C 06-06
APPLICANT (AND ADDRESS): EL PASEO COLLECTION
NORTH, 73-061 El Paseo, #200, Palm Desert, CA 92260
NATURE OF PROJECT/APPROVAL SOUGHT: Request approval
of remodel of exterior store front.
LOCATION: 73-080 El Paseo, Suites 3 & 4
ZONE: C-1
Mr. Smith outlined the proposed remodel plans and noted that in the near
future Ralph Lauren would be presenting a detailed store front proposal.
This plan will establish the perimeter treatment.
Commissioner Vuksic suggested that the roof element needed to extend
further back on the roof so as not to look like a stage set.
Mr. David Fletcher and architect Mr. Steve Lovell (from the architectural
firm of Field Taoli) were present and concurred with the suggested
modification.
7
MINUTES
ARCHITECTURAL REVIEW COMMISSION JUNE13, 2006
Action:
It was moved by Commissioner Vuksic, seconded by Commissioner
Oppenheim, approving the request subject to the roof element extending
back on the roof for a distance equal to two-thirds of its width. Motion
carried 6-0 with Commissioner Hanson absent.
10. CASE NO.: SA 06-84
APPLICANT (AND ADDRESS): SIGN*A*RAMA, 41-945
Boardwalk, Suite L, Palm Desert, CA 92211
NATURE OF PROJECT/APPROVAL SOUGHT: Request approval
of two monument signs for Pres/Monterey 10 Business Centre.
LOCATION: 73-605 Dinah Shore Drive
ZONE: SI
Commission reviewed the plans submitted by the applicant and were
found to be acceptable.
Action:
It was moved by Commissioner Vuksic, seconded by Commissioner
Lambell, approving Case No. SA 06-84. Motion carried 6-0 with
Commissioner Hanson absent.
11. CASE NO.: TT 31071
APPLICANT (AND ADDRESS): RILINGTON COMMUNITIES, 30-
885 Date Palm Drive, Cathedral City, CA 92234
NATURE OF PROJECT/APPROVAL SOUGHT: Approval of
revised perimeter walls for a 159-lot single family subdivision.
Dolce
LOCATION: 35-758 Gateway Drive
ZONE: PR-5
8
vr' *rr0,
MINUTES
ARCHITECTURAL REVIEW COMMISSION JUNE13, 2006
Mr. Bagato indicated that this matter was continued from the previous
meeting. He explained that the Commission requested that the applicant
look into designing the wall with offsets to vary the wall from the curb. Mr.
Bagato stated that the final map had been recorded and if the wall was
designed with offsets, the wall would encroach into a Southern California
Edison 30' easement and property lines would extend outside the wall.
The wall as designed would be 42 feet from Gerald ford with a
meandering sidewalk. The applicant requested approval of the wall with a-
foot columns every 200 feet. Mr. Bagato also noted that an adjacent
residential project (Ponderosa Homes) would have a perimeter wall along
Gerald Ford that would tie into the proposed wall. He presented the
material and color samples of the walls and columns for both projects.
The Commission believed that the colors were too similar and stated that
the walls needed to be identical or a different color. The Commission liked
the 3-foot columns, but reduced the distance between columns from 200
feet to 100 feet. The Commission also stated that Ponderosa Homes
should use a darker brown color for their perimeter block walls.
Action:
It was moved by Commissioner Lambell, seconded by Commissioner
Vuksic, approving the proposed wall with 3-foot pilasters 100 feet on
center on the wall. Motion carried 6-0 with Commissioner Hanson absent.
B. Preliminary Plans
1. CASE NO.: TPM 34437 AND CUP 06-03
APPLICANT (AND ADDRESS): GERALD FORD BUSINESS
PARK, LLC., 74-399 Highway 111, Suite M, Palm Desert, CA
92236
NATURE OF PROJECT/APPROVAL SOUGHT: Request for
preliminary approval of the revised north elevation of the parking
structure.
LOCATION: 75-300 Gerald Ford Drive
ZONE: SI
9
• '�" wr/
MINUTES
ARCHITECTURAL REVIEW COMMISSION JUNE13, 2006
Mr. Urbina stated that the applicant submitted a revised north elevation for
the parking structure that showed greater design articulation as the
Architectural Review Commission previously requested.
Mr. Norman Barrett of Smith Consulting Architects described the changes
to the north elevation of the two-level parking structure. The revised north
elevation showed two paint colors, beige and light brown, whereas the
previous elevation had only a beige color. On the revised elevation, seven
sections of concrete walls were "popped-out" 16 inches to create off-sets
in the north elevation wall. These seven sections of wall were painted a
light brown color to contrast with the beige color of the parking structure's
other wall sections. Additionally, these seven brown wall were raised 18
inches above the 20-foot height of the beige wall sections.
Commissioner Vuksic suggested adding a third color to the parking
structure's north elevation and raising some of the pop-out wall sections
by more than the proposed 18 inches. Although he would like to have
seen the pop-out depths of these wall sections increased to 24 inches,
Commissioner Vuksic stated that the proposed 16-inch pop-out depth
would be acceptable.
Action:
It was moved by Commissioner Vuksic, seconded by Commissioner
Lambell, granting preliminary approval of the parking structure's revised
north elevation subject to some pop-out elements being increased in
height an additional 18 inches and that a third color be added. Motion
carried 6-0 with Commissioner Hansen absent.
2. CASE NO.: PP 06-04
APPLICANT (AND ADDRESS): SIPOVAC CONSTRUCTION,
INC., 72-651 Theodora Lane, Palm Desert, 92260
NATURE OF PROJECT/APPROVAL SOUGHT: Preliminary
approval of a five-unit residential project.
LOCATION: 74-360 Magnesia Falls Drive
ZONE: PR-7
10
rri/
MINUTES
ARCHITECTURAL REVIEW COMMISSION JUNE13, 2006
Mr. Smith outlined the proposed addition of five units to the 44-unit Village
Park complex. He stated that the project needed a change of zone to
increase the density from seven to eight units per acre.
The project was a two-story, 24-foot high desert contemporary
architectural style. The three westerly units connect to the existing units to
the west and take their access from the north. The easterly two (2) units
would share a new driveway access from Magnesia Falls Drive.
Commission reviewed the plans and liked the architectural concept, but
felt that the plans needed to show additional detail to be complete.
Commission requested railing and wall thickness details, as well as a
material sample board to show the project colors.
Action:
It was moved by Commissioner Vuksic, seconded by Commissioner
Lopez, continuing Case No. PP 06-04 to allow the applicant to provide the
requested materials. Motion carried 6-0 with Commissioner Hanson
absent.
3. CASE NO.: PP 05-26
APPLICANT (AND ADDRESS): ELLIOT LANDER, 16 Villaggio
Place, Rancho Mirage, CA 92270
HOLT ARCHITECTS, 70-225 Highway 111, Suite B, Rancho
Mirage, CA 92270
NATURE OF PROJECT/APPROVAL SOUGHT: Request for
preliminary approval of revised elevations for a new two-story
office building totaling 86,000 square feet with a two-level parking
structure.
LOCATION: 73-650 Dinah Shore
ZONE: SI
Mr. Urbina presented the revised building elevations that were prepared
by the new architect, Tim Holt of Holt Architecture. All windows would
have a vaulted standing seam metal roof shade canopy. The lower half of
support columns at building entrances would have cultured stone veneer
with ledgestone. The revised elevations showed decorative metal grille
frames between the first and second floors. Most of the building had
11
W
MINUTES
ARCHITECTURAL REVIEW COMMISSION JUNE13, 2006
heights ranging from 29 feet to 30 feet. The height limit in the SI zone is
30 feet and the applicant was requesting a height exception to allow some
parts of the building to exceed 30 feet up to a maximum height of 38'-10"
for the clerestory architectural element in the middle of the building with
vaulted standing metal seam roof. Roof-mounted mechanical equipment
would be screened by metal louvered screen walls at a height of 33'-0".
Mr. Holt stated that on the revised site plan all of the off-street parking had
been moved to the rear of the site. The building's main entrance had also
been moved to the rear (north) elevation. A garden was created in the
front of the building. The building's revised front elevation incorporated
several off-sets and metal shade canopies over the windows improving
the building's appearance from Dinah Shore Drive. Exterior building walls
would consist of tilt-up concrete panels painted in five shades of colors
ranging from beige to rust brown. Metal architectural elements on exterior
walls such as steel beam trellises, steel vault beams, decorative metal
grille frames, and screen walls for roof-mounted mechanical equipment
would be painted in four shades of green, ranging from light green to dark
green. Mr. Holt stated that there would not be any signs on the two-level
parking structure.
Members of the Commission stated that the revised building elevations
were a substantial improvement over the previous elevations they
reviewed.
Action:
It was moved by Commissioner Lambell, seconded by Commissioner
Oppenheim, granting preliminary approval of revised plans for Case No.
PP 05-2. Motion carried 5-0-1-1 with Commissioner Vuksic abstaining and
Commissioner Hanson absent.
C. Miscellaneous Items
1. CASE NO.: MISC 06-22
APPLICANT (AND ADDRESS): MR. & MRS. DEAN SCHUMAN,
72-775 Beavertail, Palm Desert, CA 92260
NATURE OF PROJECT/APPROVAL SOUGHT: Request for
approval of an 18' high tower element as part of a remodel of a
single-family residence.
LOCATION: 72-775 Beavertail
12
err' "�►"
MINUTES
ARCHITECTURAL REVIEW COMMISSION JUNE13. 2006
ZONE: R-1
Mr. Smith reviewed the proposed remodel plans with Commission.
Commissioner Vuksic felt that the tower element needed to be wider to be
better proportioned.
Mr. Dean Schuman was present and agreed to the suggested change.
Action:
It was moved by Commissioner Vuksic, seconded by Commissioner Van
Vliet, approving the request, subject to widening the tower by one foot on
each side. Motion carried 6-0 with Commissioner Hanson absent.
2. CASE NO.: RV 06-03
APPLICANT (AND ADDRESS): PHILLIP JESS GUADAN, JR.,
44-841 Santa Ynez Avenue, Palm Desert, CA 92260
NATURE OF PROJECT/APPROVAL SOUGHT: Request approval
to park and store and RV in the front driveway of a single-family
residence.
LOCATION: 44-841 Santa Ynez Avenue
ZONE: R-1
Mr. Bagato presented photos of the proposed RV and stated that the
applicant has a unique property where the home is 123 feet from the
property line. Currently, there were two recreational vehicles in the
driveway, however, the applicant sold one of them and it would be
removed from the property. The adjacent properties' homes were closer to
the street and screened the RV from the sides of the property. The only
time the RV was visible is when someone drives in front of the RV. The
applicant proposed an 8-foot high redwood cedar fence with landscaping
along the side of the vehicle and a 12-foot long redwood cedar gate in
front of the RV.
Commissioner Gregory stated that this was one of the rare cases where
the RV is so far from the street that it could be approved. He
recommended that the applicant install landscaping hedges to screen the
vehicle, not the wood fence or gate. If the hedges extend 20 feet beyond
the front of the RV, the vehicle would be screened.
13
MINUTES
ARCHITECTURAL REVIEW COMMISSION JUNE13, 2006
Action:
It was moved by Commissioner Gregory, seconded by Commissioner
Lopez, approving the request, subject to staff approval of a landscape
plan that screens the side of the RV and extends 20 feet in front of the RV.
Motion carried 6-0 with Commissioner Hanson absent.
Staff requested that an additional item be added to the Agenda. Commission concurred
and it was moved by Chairman Gregory, seconded by Commissioner Van Wet, adding
Case No. PP 04-07 to the Agenda. Motion carried 6-0 with Commissioner Hanson
absent.
3. CASE NO.: PP 04-07
APPLICANT (AND ADDRESS): ALLAN ZYLSTRA, 12161
Firestone Boulevard, Norwalk, CA 90650.
NATURE OF PROJECT/APPROVAL SOUGHT: Approval of final
working drawings for retail/office building.
LOCATION: 73-168 Highway 111
ZONE: C-1
Mr. Urbina stated that the applicant was seeking final approval of
working drawings for a retail/office building.
Mr. Drell asked if the building elevations in the construction
drawings were the same exact ones previously approved.
Mr. Zylstra responded that they were not. Two windows on the left
side of the rear elevation had been deleted.
Action:
It was moved by Commissioner Vuksic, seconded by Commissioner
Lopez, granting final approval of Case No. PP 04-07, subject to the
applicant making the following revisions to the building elevations:
a. On the first floor left side of rear building elevation, remove the pop-
out stucco window frame.
b. On the second floor left side of the rear building elevation, add a
notation stating that the interior rectangle of the pop-out stucco
window frame will have spandrel glass with opaque backing. There
14
• '�nr+° ``rw+
MINUTES
ARCHITECTURAL REVIEW COMMISSION JUNE13, 2006
is to be no wrought iron grillwork on the exterior of this spandrel
glass.
C. On the second floor right half of the rear building elevation, add a
notation stating that the there will be wrought iron decorative
grillwork placed on the second window from the right edge of the
building.
Motion carried 6-0 with Commissioner Hanson absent.
Staff requested that an additional item be added to the Agenda. Commission concurred
and it was moved by Commissioner Vuksic, seconded by Commissioner Lambell,
adding Case No. MISC 06-23 to the Agenda. Motion carried 6-0 with Commissioner
Hanson absent.
4. CASE NO.: MISC 06-23
APPLICANT (AND ADDRESS): WESLEY AND BONNIE
SARTAIN, 73-230 Desert Rose Drive.
NATURE OF PROJECT/APPROVAL SOUGHT: Addition to
existing home ranging in height from 16 feet 9 inches to 17 feet 4
inches.
LOCATION: 73-230 Desert Rose Drive
ZONE: R-1 12,000
Mr. Urbina stated that the applicant was requesting approval of an addition
and remodel to an existing home ranging in height from 16'-9" to 17'-4".
The existing home already has a maximum height of 17'-4".
Action:
It was moved by Commissioner Vuksic, seconded by Commissioner
Lopez, granting final approval of Case No. MISC 06-23. Motion carried 6-
0 with Commissioner Hanson absent.
15
MINUTES
ARCHITECTURAL REVIEW COMMISSION JUNE13, 2006
VI. ADJOURNMENT
It was moved by Commissioner Van VIiet, seconded by Commissioner
Oppenheim, adjourning the meeting. Motion carried 6-0 with Commissioner
Hanson absent. The meeting was adjourned at 2:25 p.m.
81tVE-WITI-f--�
PLANNING MANAGER
16