HomeMy WebLinkAbout2010-10-26 r
��•�� CITY OF PALM DESERT
_( ARCHITECTURAL REVIEW COMMISSION
• MINUTES
October 26, 2010
I. CALL TO ORDER
The meeting was called to order at 12:30 p.m.
II. ROLL CALL
Commissioners Current Meeting Year to Date
Present Absent Present Absent
Ronald Gregory, Chairman X 18 2
Chris Van Vliet X 19 1
John Vuksic X 18 2
Karel Lambell X 18 2
Pam Touschner X 14 6
Allan Levin X 19 1
Ken Stendell X 19 1
Also Present
Tony Bagato, Principal Planner
Kevin Swartz, Assistant Planner
Diane Hollinger, Landscape Specialist
Pedro Rodriquez, Senior Code Officer
Christina Canales, Assistant Engineer
Janine Judy, Senior Office Assistant
III. ORAL COMMUNICATIONS
IV. APPROVAL OF MINUTES: October 12, 2010
Action:
Commissioner Stendell moved and Commissioner Levin seconded, to
approve the October 12, 2010 meeting minutes. Motion carried
4-0-1-2, with Commissioner Lambell abstaining and Commissioners
Gregory and Touschner absent.
V. CASES:
ARCHITECTURAL RW COMMISSION
lvrr+
MINUTES October 26, 2010
A. Final Drawings:
1. CASE NO: MISC 10-143
APPLICANT (AND ADDRESS): BETWEEN THE SHEETS, 17302
Daimler Street, Suite B, Irvine, CA 92614
NATURE OF PROJECT/APPROVAL SOUGHT: Approval of
revised awning material; Between the Sheets.
LOCATION: 73-425 El Paseo Suite 113
ZONE: C-1
Mr. Swartz presented the project and reminded the Commission
that the awning for Between the Sheets was changed from the
approved pattern.
The Commission stated that they drove by and reviewed the store
awning at length and thought the awning should be brown as
originally approved because it is cleaner and more elegant.
Commissioner Lambell thought that the brown pattern bespeaks
elegance and old world, which is what Between the Sheets is;
higher-end with a lot of old world feeling inside. The cheetah print
is trendy now, but will change in time. Commissioner Van Vliet
stated that the cheetah print appears to clash with the building
color; which is pinkish. Commissioner Lambell stated that with the
darker brown and the pinkish color of the building it is more
pleasing to the eye than the gold brown of the cheetah pattern.
Commissioner Levin feels they are asking for forgiveness not
permission and thought that if the Commission had received the
swatch at a previous meeting, they would never have approved it.
Commissioner Stendell said that if you look at the awning as a
whole street scene, one could make a case that it could be an
acceptable design. He agrees that it is trendy and they will come
back someday with another trend. He personally prefers what was
approved because it looks more elegant.
Mr. Jim Sadler, awning representative described the awning and
stated that the awnings are big and the panels are almost flat,
sticking out only 22". The owners thought they could break it up
with the cheetah pattern and not have a big broad brown paint roller
across the whole front of the store. He stated that they also
GAPlanning\Janine Judy\Word Files\A Minutes\20MAR101026min.doc Page 2 of 7
ARCHITECTURAL REW COMMISSION
MINUTES October 26, 2010
modified the signage as opposed to what it was, which has been
approved. Mr. Swartz stated that at a previous meeting the original
sign was not approved and the Commission recommended
reducing it. This current proposal with the cheetah print and
signage has not been approved.
Commissioner Van Vliet stated that he did not like the large
"Between the Sheets" signage on the awning. Commissioner
Lambell stated that what was approved is far better looking than
this in multiple ways; size of the sign, the cheetah print, and the
color of the awning. She said that the awning needs to bespeak
the elegance of the store and El Paseo.
Commissioner Lambell moved and Commissioner Levin seconded
to deny the cheetah pattern. Commissioner Van Wet asked if the
Commission is advocating going back to the original approved
design. Commissioner Lambell stated that the applicant has a
choice to bring something else in, but the brown is what has been
previously approved. Mr. Swartz informed Mr. Sadler that the
applicant has 15 days to appeal the decision to City Council. The
Commission and Mr. Sadler discussed options for approval of the
awning and the size of the signage. They stated that the applicant
would have to come back to get approval of signage if they decide
to go with stacked letters.
ACTION:
Commissioner Lambell moved and Commissioner Levin seconded, to deny
Case MISC 10-143 with the cheetah print and recommends proceeding with
the previously approved awning pattern and resubmit for signage approval.
Motion carried 4-0-1-2, with Commissioner Vuksic abstaining and
Commissioners Gregory and Touschner absent.
2. CASE NO: SA 10-148
APPLICANT (AND ADDRESS): THIRD CORNER BISTRO, Ed
Moore, 73-101 Highway 111, Palm Desert, CA 92260
NATURE OF PROJECT/APPROVAL SOUGHT: Approval of new
monument sign; Third Corner Bistro.
LOCATION: 73-101 Highway 111
ZONE: C-1
GAPlanning\Janine Judy\Word Files\A Minutes\2010\AR101026min.doc Page 3 of 7
ARCHITECTURAL REW COMMISSION "
MINUTES October 26, 2010
Mr. Bagato presented the project and stated that the applicant is
requesting approval of a non-illuminated sign on Monterey Avenue
instead of Highway 111. Staff believes that the sign will match the
existing signs approved for the business and recommends
approval. He stated that the Director of Public Works will allow the
encroachment permit if the City Council approves the location.
The Commission reviewed and discussed the sign and the location.
Mr. Bagato stated that the sign letters are non-illuminated '/2" thick
cast acrylic, painted white with reflective vinyl on the face of the
letters. The Commission wanted to clarify that the sign would not
be illuminated. Mr. Ed Moore, applicant stated that the sign will not
be illuminated.
ACTION:
Commissioner Lambell moved and Commissioner Stendell seconded, to
grant approval of a non-illuminated monument sign. Motion carried
5-0-0-2, with Commissioners Gregory and Touschner absent.
3. CASE NO: SA 10-339
APPLICANT (AND ADDRESS): MEPHISTO, 73-560 El Paseo,
Suite D, Palm Desert, CA 92260
NATURE OF PROJECT/APPROVAL SOUGHT: Approval of a new
awning; Mephisto.
LOCATION: 73-560 Ell Paseo, Suite D
ZONE: C-1
Mr. Swartz presented the project and said that the forest green
awning is attached to the building below the roof line and extends 5'
out and must be located out of the public right-of-way. He pointed
out that they are proposing signage on the awning and on the band
of the awning and staff is recommending approval with the removal
of the signage on the band.
Commissioner Vuksic stated that the green is a good choice to
offset the black on both sides. Mr. Jim Sadler, awning
representative stated that this color is the company color and is the
same color they had at ,their old location. Commissioner Vuksic
stated that it was unfortunate that the arch is the one piece of
architecture that building has and a horizontal awning will make this
GAPlanning\Janine Judy\Word Files\A Minutes\2010 AR101026min.doc Page 4 of 7
ARCHITECTURAL R4,,.,ZW COMMISSION
MINUTES October 26, 2010
one relief go away. Mr. Sadler said he understands, but stated that
it wasn't a breezeway and open to the building. He also said there
was an awning in that same location before this spot emptied out.
The Commission and Mr. Sadler discussed the arch, the design of
the awning and the roof elements.
ACTION:
Commissioner Vuksic moved and Commissioner Lambell seconded, to
granted approval subject to: 1) removing the small "Mephisto" sign on the
band of the awning; and 2) awning shall not project into the right-of-way.
Motion carried 5-0-0-2, with Commissioners Gregory and Touschner
absent
4. CASE NO: SA 10-323
APPLICANT (AND ADDRESS): PREST VUKSIC ARCHITECTS,
44-530 San Pablo Avenue, Palm Desert, CA 92260
NATURE OF PROJECT/APPROVAL SOUGHT: Approval of a new
monument sign, fencing and landscaping; Sacred Heart.
LOCATION: 43-775 Deep Canyon Road
ZONE: R-1 9,000
Mr. Swartz presented the project and reported that this is a request
to approve a monument sign, fencing and minor landscape on the
northwest corner of Fred Waring Drive and Deep Canyon Road.
He explained where the sign would be located and the type of
fencing. Staff is recommending approval.
The Commission reviewed and discussed the height and length of
the sign and setbacks and felt that an exception should be
approved because of the pre-school.
Mr. John Vuksic, representative presented samples of block colors
that already exist at that location. The Commission reviewed the
color pallet for the block wall and the signage. Mr. Vuksic
explained that the words "Sacred Heart Church" are channel letters
with LED lighting and backlit against the brown surface. The words
"School" and "Pre-School" will not be illuminated. Mr. Swartz stated
that the sign cannot be within the right-of-way.
GAPlanningUanineJudyMord Files\A Minutes\2010\AR101026min.doc Page 5 of 7
ARCHITECTURAL REW COMMISSION '
MINUTES October 26, 2010
ACTION:
Commissioner Lambell moved and Commissioner Stendell seconded, to
grant approval subject to: 1) sign shall be out of the right-of-way; 2) block
wall to match pre-school color, "orco tanned"; and 3) submitting final
landscape plan for review and approval. Motion carried 4-0-1-2, with
Commissioner Vuksic abstaining and Commissioners Gregory and
Touschner absent.
5. CASE NO: MISC 10-352
APPLICANT (AND ADDRESS): PREST VUKSIC ARCHITECTS,
44-530 San Pablo Avenue, Palm Desert, CA 92260
NATURE OF PROJECT/APPROVAL SOUGHT: Approval of
exterior paint color.
LOCATION: 73-400 Ell Paseo
ZONE: C-1
Mr. Bagato presented approval of paint colors for El Paseo Square
and presented the Commission with the color board for their review.
The applicant is trying to update their colors to give it a little more
interest and give the building a more retail feel; right now it is a little
dark. Staff did not have any concerns and is recommending
approval. The Commission felt that the right depth and combination
of colors were chosen for this building.
ACTION:
Commissioner Stendell moved and Commissioner Lambell seconded, to
grant approval. Motion carried 4-0-1-2, with Commissioner Vuksic
abstaining and Commissioners Gregory and Touschner absent.
B. Preliminary Plans:
None
GAPlanning\Janine Judy\Word Res\A Minutes\2010\AR101026m1n.doc Page 6 of 7
ARCHITECTURAL Rt,,,EW COMMISSION
MINUTES October 26, 2010
C. Miscellaneous Items:
None
VI. ADJOURNMENT
Commissioner Stendell moved and Commissioner Lambell seconded to adjourn
the meeting. Motion carried 5-0-0-2, with Commissioners Gregory and
Touschner absent. The meeting was adjourned at 1:25 p.m.
TONY BAGATO
PRINCIPAL PLANNER
GAPlanning\JanineJudy\Word Files\A Minutes\201MAR101026min.doc Page 7 of 7
*4w