Loading...
HomeMy WebLinkAbout2016-06-14 11%W' CITY OF PALM DESERT ARCHITECTURAL REVIEW COMMISSION MINUTES June 14, 2016 I. CALL TO ORDER The meeting was called to order at 12:30 p.m. II. ROLL CALL Commissioners Current Meeting Year to Date Present Absent Present Absent Chris Van Vliet, Chair X 8 Karel Lambell, Vice Chair X 7 1 Paul Clark X 6 2 Gene Colombini X 6 2 Allan Levin X 7 1 Michael McAuliffe X 8 Jim McIntosh X 7 1 John Vuksic X 7 1 Also Present Ryan Stendell, Director of Community Development Eric Ceja, Principal Planner Kevin Swartz, Associate Planner Pedro Rodriguez, Code Compliance Supervisor Debbie Thompson, Recording Secretary Cancelled meeting:2/9/16,3/8/16,5/24/16, III. ORAL COMMUNICATIONS None IV. APPROVAL OF MINUTES: Minutes of May 10, 2016 continued to a future meeting. ARCHITECTURAL REVIEW COMMISSION MINUTES June 14, 2016 V. CASES: A. Final Drawings: 1. CASE NO.: CUP 16-99 APPLICANT (AND ADDRESS): Alfredo Alvidrez, 77-530 Delaware Place, Palm Desert, CA 92211 NATURE OF PROJECT/APPROVAL SOUGHT: Consideration to approve a new accessory detached garage 18 feet in height and 25 feet from rear property line. LOCATION: 77700 Delaware Place (Vacant Lot) ZONE: R-E, 40,000 For the record: Mr. Swartz asked Commissioner McIntosh if he wished to be recused from this project as he did at a previous meeting. Commissioner McIntosh responded that he did not have any concerns with the project and did not recuse himself. Mr. Kevin Swartz, Associate Planner, reminded the Commissioners this item was continued from a previous meeting for an accessory building. He presented the site plan and described the home and the height of the accessory building. He pointed out the location of the building and stated that it is 25' from the rear setback line. The Commission had some architectural concerns that it wasn't compatible. Per their comments the applicant is now considering a mansard roof with tile to match the existing house. Another concern raised by the Commissioners was the viewing corridor. Mr. Swartz presented photos of the location and stated that this will not be viewed from the line of sight. Staff feels this is a better design and is recommending approval. The Commission reviewed and discussed setbacks, the viewing corridor, and attic vents. They felt this was a much better design. ACTION: Commissioner Levin moved to approve detached garage RV storage as proposed. Motion was seconded by Commissioner Colombini and carried by a 6-0-2 vote, with Colombini, Lambell, Levin, McAuliffe, McIntosh, and Van Vliet voting YES and Commissioners Clark and Vuksic absent. GAPlanning\JanineJudyWRC\1Minutes\2016\160614min.dou Page 2 of 4 'ww ARCHITECTURAL REVIEW COMMISSION MINUTES June 14, 2016 B. Preliminary Plans: 1. CASE NO.: PP 16-76 APPLICANT (AND ADDRESS): ROBERT RICCIARDI ARCHITECT, 75400 Gerald Ford Drive, Suite 115, Palm Desert, CA 92211 NATURE OF PROJECT/APPROVAL SOUGHT: Consideration to review and make architectural comments for a new 5,280 square foot industrial building. LOCATION: 34-751 Spyder Circle (Vacant Lot) ZONE: S.I. Mr. Kevin Swartz, Associate Planner, presented a proposal to review and make architectural comments for a new 5,280 square foot industrial building The Commission reviewed and discussed the plans and continued this item to allow the applicant to made additional changes to the building based on their comments. ACTION: Commissioner Levin moved to continue Case PP-16-76 with comments from ARC that the applicant adds articulation to break up the massing of the building. Motion was seconded by Commissioner Lambell and carried by a 6-0-2 vote, with Colombini, Lambell, Levin, McAuliffe, McIntosh, and Van Vliet voting YES and Commissioners Clark and Vuksic absent. C. Miscellaneous Items: Mr. Kevin Swartz, Associate Planner, presented for discussion only a building paint color change along San Pablo Avenue for Silver Fox Lounge and Bar. The Commission reviewed and discussed the plans and thought that the color change would look out of place. They suggested the applicant either replace existing awnings or be creative with their signage to identify their business. ACTION: No Action taken. Discussion Only. GAPIanningUanineJudy\ARC\1Minutes\2016\160614min.docx Page 3 of 4 ARCHITECTURAL REVIEW COMMISSION MINUTES June 14, 2016 VI. COMMENTS VII. ADJOURNMENT Commissioner Lambell moved to adjourn the Architectural Review Commission meeting at 1:07 p.m. ERIC CEJA PRINCIPAL PLANNER SECRETARY JA I* JUDY RE ORDING SECRETARY GAPIanningUanineJudy\ARC\1Minutes\2016\160614min.docx Page 4 of 4