Loading...
HomeMy WebLinkAboutRes No 184PLANNING COMMISSION RESOLUTION NO. 184 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF PALM DESERT, CALIFORNIA, ANNOUNCING FINDINGS AND APPROVING DESIGN REVIEW BOARD ACTIONS OF SEPTEMBER 21, 1976. WHEREAS, the Planning Commission of the City of Palm Desert, did review the Design Review Board actions of September 21, 1976, approving: Case No. 39C - A 12,000 Square Foot Commercial Building for J & R ENTERPRISES Case No. 40C - A 22,000 Square Foot Commercial Building for CHRIS HAENEL Case No. 36MF - Modifications to a Previous Approval for JOMO DEVELOPMENT WHEREAS, at this time, upon receiving and considering all testimony and arguments, if any, of all persons who desired to be heard, said Commission did find sufficient facts and reasons to exist to approve the Design Review Board actions of September 21, 1976; and, WHEREAS, the Planning Commission does find that Cases No. 39C and No. 40C are in conformance with the Redevelopment Plan for the City. NOW, THEREFORE, BE IT RESOLVED by the Planning Commission of the City of Palm Desert, California, as follows: 1. That the above recitations are true and correct and constitute the findings of the Commission in this case; 2. That it does hereby approve the Design Review Board actions of September 21, 1976. PASSED, APPROVED, and ADOPTED at a regular meeting of the Planning Com- mission of the City of Palm Desert, California, held on the 5th day of October, 1976, by the following vote, to wit: AYES: NOES: ABSENT: ABSTAIN: ATTEST: } L A. WI LIAMS, SECRETARY S. '1 WILSON,/CHAIRMAN September 21, 1976 CONDITIONS OF APPROVAL CASE NO. 39C 1. The development of this project shall conform substantially to all develop- ment plans submitted in behalf of this case (Exhibits A-E), and as revised according to the Design Review Board process. Any minor changes require ap- proval by the Director of Environmental Services. Any substantial change requires approval by the Planning Commission. 2. All requirements of any law, ordinance, or regulation of the State, City, and any other applicable government entity shall be complied with as part of the development process. 3. This approval is applicable, subject to the development of this project, com- mencing within one year from approval date and being promptly completed. 4. Any roof mounted, exhaust, or air conditioning equipment shall be fully con- cealed from view from any public rights -of -way and adjoining properties by architecturally integrated means as shown. 5. All utility service lines shall be placed underground. 6. Curb, gutter, sidewalk or approved pathways, curb cuts, and tie-in paving shall be provided in conformance with City Standards for the following: a. The applicant shall dedicate two feet (2') on the full Portola frontage of the site. b. The applicant shall install a ten foot (10') wide sidewalk along the full frontage of Portola to the specifications of the City Engineer. 7. Final landscaping (with irrigation system) plans shall be provided to the Design Review Board for approval prior to issuance of a building permit. 8. A non-combustible trash storage area shall be provided. 9. Lighting of parking areas and premises shall be provided as approved by the Director of Environmental Services. 10. Signage shall be provided in accordance with signage plan to be submitted to the Design Review Board and the Planning Commission for final approval. 11. Traffic control provisions shall be provided as required by the Director of Environmental Services. 12. Elevations are approved as modified. 13. Construction plans shall be submitted for approval to the City Fire Marshall prior to the issuance of building permits. All conditions shall be made a part of construction and no certificate of occupancy shall be issued until completed. 14. A detailed grading plan shall be submitted to the City Engineer for approval. 15. The building shall be shortened by two feet (2') to compensate for the two feet (2') of additional dedication. 16. The applicant shall agree to join any assessment district formed that includes the subject property within its boundaries. 17. The applicant shall grant to the City of Palm Desert, easement rights over the parking lot area of the project site. AGREEMENT I accept and agree, prior to use of this permit or approval, to comply with all the conditions set forth, and understand that the Department of Building and Safety will not issue a permit or allow occupancy on the use permitted until this signed confir- mation has been received by the Department of Environmental Services. (Date) (Applicant's Signature) September 21, 1976 CONDITIONS OF APPROVAL CASE NO. 40C 1. The development of this project shall conform substantially to all develop- ment plans submitted in behalf of this case (Exhibits A-E), and as revised according to the Design Review Board process. Any minor changes require ap- proval by the Director of Environmental Services. Any substantial change requires approval by the Planning Commission. 2. All requirements of any law, ordinance, or regulation of the State, City, and any other applicable government entity shall be complied with as part of the development process. 3. This approval is applicable, subject to the development of this project, com- mencing within one year from approval date and being promptly completed. 4. Any roof mounted, exhaust, or air conditioning equipment shall be fully con- cealed from view from any public rights -of -way and adjoining properties by architecturally integrated means as shown. 5. All utility service lines and distribution lines shall be placed underground. 6. Curb, gutter, sidewalk, or approved pathways, curb cuts, and tie-in paving shall be provided in conformance with City Standards for the following: a. The applicant shall improve the full frontage of the site on Sage Lane at twenty feet (20') from centerline. b. The applicant shall install ten foot (10') sidewalk along El Paseo and Sage Lane to the specifications of the City Engineer. 7. Final landscaping (with irrigation system) plans shall be provided to the Design Review Board process for approval prior to issuance of a building permit. Additional landscaping in front of the building shall be provided with a side opening. 8. A non-combustible trash storage area shall be provided. 9. Lighting of parking areas and premises shall be provided as approved by the Director of Environmental Services. 10. Signage shall be provided in accordance with signage plan to be submitted to the Design Review Board and the Planning Commission for final approval. 11. Traffic control provisions shall be provided as required by the Director of Environmental Services and shall be integrated with the signage plan. 12. Elevations are approved as shown. 13. Construction plans shall be submitted for approval to the City Fire Marshall prior to issuance of building permits. All conditions shall be made a part of construction and no certificate of occupancy shall be issued until completed. 14. A detailed grading plan shall be submitted to the City Engineer for approval, prior to construction. 15. The applicant shall agree to join any assessment district formed that includes the subject property within its boundaries. Driveways shall be 20' (twenty foot) in width. 16. The parking lot layout shall be re -studied to attempt to get additional land- scaping on the perimeter of the project. 17. The street trees along El Paseo and Sage Lane shall be Ficus. Retussa. AGREEMENT I accept and agree, prior to use of this permit or approval, to comply with all the conditions set forth, and understand that the Department of Building and Safety will not issue a permit or allow occupancy on the use permitted until this signed confirma- tion has been received by the Department of Environmental Services. (Date) (Applicant's Signature)