HomeMy WebLinkAboutCC RES 81-010RESOLUTION N0. 81-10
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PALM
DESERT, CALIFORNIA, CERTIFYING ENVIRONMEP�TAL IMPACT
REPORT EIR 80-1 FOR A PROJECT DESCRTBED AS CHANGE OF
ZONE G1-80, DEUELOFMEPJT PLAN 07-80, COhDITIOPdAL USE
PERNIT 07-80 AS MEETIPJG THE REQUIREMENTS OF THE CALIF-
ORNIA ENVIRONMENTAL QUALITY ACT, STATE AND LOCAL
GUIDELINES FOR THE PREPARATION OF ENVIRONMENTAL IMPACT
REPORTS.
WHEREAS, the City Council of the City of Palm Desert, California, did on
the 12th day of February, 1981, hold a duly noticed Public Hearing to consider certi-
fication of a final Environmental Impact Report, herein after referred to as EIR 80-1,
for a project commonly reTerred io as The Fountains;
WHEREAS, said project encompassed an application for a Change of Zone,
herein after referred to as C/Z 01-80; a Development Plan, herein after referred to as
DP 07-80; and a Conditional Use Permit, herein after referred to as CUP 07-80; encom-
passing approximately 30 acres generally located at the northeast corner of State
Nighway 111 and Deep Canyon Road;
WHEREAS, the City Council of the City of Palm Desert had previously scheduled
and advertised a Public Hearing for its regular meeting of January 22, 1981, to hear
testimony pertaining to Draft EIR 80-1 and C/Z 01-80;
41HEREAS, an appeal was filed with the City Council from the City of Palm
Desert Planning Commission approval of DP 07-80 and CUP 07-80 at its regular scheduled
meeting of December 30, 1981, per Planning Commission Resolution Nos. 667 and 668;
WHEREAS, said appeal was scheduled for Puolic Hearing before the City Council
of the City of Palm DEsert on February 12, 1981;
WHEREAS, the City Council subsequently opened and continued said Public
Hearing on CJZ 01-80 and EIR 80-1 as it pertained thereto, to February 12, 1981, the
date set for the duly advertised hearings on DP 07-80, CUP 07-80 and EIR 80-1 as it
pertains thereto; and recontinued entire matter to February 26, 1981;
WHEREAS, the City Council did receive and review copies of EIR 80-1;
4JHEREAS, the City Council did receive and review staff reports, public
comments and responses to said public comments, all minutes and resolutions pertaining
to EIR 80-1; ' � '
l4HER�AS, the following potential environmental impacts and mitigation
measures were identified either within EIR 80-1, or testimony, staff reports, or
comments and responses pertaining to EIR 80-1:
A) DRAIyAGE �
Tmpacts
The site'is adequately drained, however, the site's drainage
facilities plan is not designed to accomodate any significant
increases in storm water flow ontb the site from the upslope
areas. � �
Mitigation Measures
Provisians should be made to assure that the site's drainage
facility can accomodate this added drainage.
� B) TRAFFIC AND CIRCULATTON
' Im_ pacts
There will be additional traffic generated on Deep Canyon
Road and Higfi�vay 111; with 65I of the generated traffic
utilizing Highway 111.
._
. ��
RESOLUTION N0. 81-10
Page Two
Mitiaation Measures
a. The California State Department of Transportation
shall impose measure to reduce or mitigate potential
impacts of Highway 111.
b. The proposed public street into the project from
Highway 111 must meet California Department of
• Transportation standards and requirements.
C) NOISE
c. Additional dedi•cation and improvement of Deep Canyon
Road adjacent to the site will mitigate any s�gnifi-
cant adverse traffic impact on Deep Canyon Road.
, ` .
Im acts � �
There would be noise during construction and operation of the
commercial cenier.
Miti�ation Measures
Existing state and loCal regulations would mitigate potential
noise during construction. Limiting hours of delivery to the
market as well as proper design of the loading area would
mitigate noise impacts.
l�lNEREAS, conditions of approval set forth by Planning Commission Resolution
No. 668 did implement those mitigation measures recommended in EIR 80-1 as follows:
A) Special Conditions 1 and 2- Drainage
1. "Drainage facilities shall be provided per Ordinance No 218
and the master drainage plan to the specifications of the
Public Works Director.
2. Additional storm drain construction shall be contingent
upon a drainage study by the appiicant's engineer; said
additional storm drainage construction shall be designed
to protect the site from storm water flows."
B) Special Conditions 3, 4 and 7- Traffic and Circulation
3. "Applicant shall dedicate and improve that portion of
Deep Canyon Road, adjacent to the property, to coincide
with the existing curb, gutter, and paved roadway abutting
subject property to the north. - ,
4. Applicant shall dedicate sufficient parkway to assure that
the ultimate improvements of Deep Canyon Road are provided
for in a manner to coincide and be uniform with existing
improvements north of the subject property.
7. Street improvements along Highway 111 shall be made as required
by the State of California Department of Transportation."
C) Special Conditions 3, 6 and 9- Noise
5. "There shall be no night deliveries to the supermarket
between the hours of 10:00 p.m. and 8:00 a.m.
6. All mechanical equipment associated with the development
shall be equipped with manufacturer supplied noise control
devices and screened to satisfaction of Design Review Board.
9. The supermarket loading area shall be enclosed by a masonry
wall or an equivalent combination of grade differential and
masonry wall as approved by the Design Review Board."
�
WHEREAS, said conditions of approval were also imposed by the City Council
in their Resolutions of approval of DP 07-80 and CUP 07-80; and,
RESOLUTTON N0. $1-10
Page Three
. WHEREAS, said Environmental Impact Report 80-1 concludes that the
project described as C/Z 01-80, DP 07-80, CUP 07-80 will not have a significant
adverse impact on the environment.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Palm
Desert, California, as fol�lows:
1. That the above reci�ations are true and correct and
constitute the findings of the Council in this matter.
2. The Council does hereby certify the final EIR Text has
been completed in compliance with the California
Environmental Quality Act of 1970 as amended; and,
State and City guidelines implementing said act, with
the inclusion of the follo�ing attached hereto:
- Exhibit "A", draft EIR 80-1 Text;
- Exhibit "B", comments and recommendations received on
the draft EIR during the public review period;
- Exhibit "C", listing of persons, organizations and
public agencies commenting on the draft EIR;
- Exhibit "D", authorized response to significant envir-
onmental points raised in the review and consultation
process;
- Exhibit "E", minutes of City of Palm Desert Planning
Commission meeting of December 30, 1980;
- Exhibit "F", minutes of City Council meetings of
January 22, and February 12, 1981;
- Exhibit "G", Environmental Services Department staff
reports dated January 22, and February 12, 1981; and,
- Exhibit "H", City Council Resolutions and Ordinances
approving C/Z 01-80, DP 07-80 and CUP 07-80.
PASSED, APPROVED and ADOPTED at a regular scheduled meeting of the City
Council of the City of Palm Desert on this 26 day of February , 1981, by the
following vote, to wit:
AYES: ticPherson, Newbrander, Puluqi, Snyder & Wilson
NOES: Pdone
ABS ENT : None
ABSTAIN: idone
ATTEST:
�
SHEILA R. GTCL�GAN, City
City of Palm Desert, Cali
a
m
/lr