HomeMy WebLinkAboutCC RES 89-120RESOLUTION N0. 89-L20
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
PALM OESERT, CALIFORNIA. CERTIFYING AN ENVIRONMENTAL
1MPACT REPORT AND APPROVING AN AMENDMENT TO THE GENERAL
PLAN AND COMMERCIAL CORE AREA SPECIFIC PLAN
CASE N0. GPA 89-1
THE CITY COUNCIL OF THE CITY OF PALM DESERT HEREBY FINOS.
DETERMINES, RESOLVES, AND ORDERS AS FOLLOWS:
Section 1: The City Council hereby certifies that the Final
Environmental Impact Report for the Ahmanson Commercial
Development Plan (the "Finai EiR") anatyzes al1 potential
environmental impacts with respect to the Project (as defined
therein) and was completed pursuant to and in compiiance with the
existing procedures of the City for the implementation of the
California Environmental Quality Act and guidelines promulgated
with respect thereto and that the City Council has reviewed and
considered the contents of the Final EIR prior to deciding
whether to approve such Project including. but not limited to�
the amendment of the General Plan and the Commercial Core Area
Specific Plan as hereinafter referenced.
With respect to each of the potentially significant
environmental impacts of the Project identified in the Final EIR.
the City Council has independently reviewed and hereby adopts the
findings (attached hereto as Exhibit "A"} and on the basis
thereof hereby finds that changes or alterations have been
required in or been incorporated into the Project which avoid or
substantially lessen those impacts. Ail mitigation measures
recommended by the EIR as conditions of Project approval are
hereby adopted and made conditi�ons of Project approvai,
including, but not limited to, the amendment of the General Plan
and Commercial Core Area Specific Plan as hereinafter referenced.
Section 2: The City Council hereby adopts a mitigation
monitoring program for the changes or aiterations to the Project
which have been incorporated into the Project or made a condition
of Project approval in Section 1 of this resolution. The
Director of Community Development shall ensure that all
mitigation measures adopted in Section 1 of this resolution shall
be fully implemented and completed. In addition, approval of
subsequent development proposals pertaining to the Project shall
include, as a condition of Project approval. all applicable
mitigation measures required by Section 1 of this resolution.
RESOLUTION N0. 89-120
Section 3: The Pianning Commission of the City of Palm
Desert has recommended approval of proposed General Plan and
Commercial Core Area Specific Plan amendments as hereinafter
referenced.
Section 4: Pursuant to notice duly given, the City Council
has held a fu)1 and fair joint public hearing pursuant to law on
the proposed General Plan and Commercial Core Area Specific Plan
amendments hereinafter referenced and the City Council has duly
considered the recommendations of the Planning Commission and all
evidence for and against such proposed amendments. All
objections to the proposed General Plan and Commerciai Core Area
Specific Plan amendments hereinafter referenced were heard and
passed upon by the City Council and are hereby overruled by the
City Council.
Section 5:
General Plan and
hereto as Exhibit
Council and which
hereby approved.
Proposed Amendment GPA 89-1 pertaining to the
Commercial Core Area Specific Plan, attached
B, copy of which has been presented to the City
is on file in the office of the City Clerk, is
PASSED, APPROVED, and ADOPTED by the C i ty Counc i 1 of the
City of Palm Desert, California, this 16th day of November, 1989,
by the foliowing vote. to wit:
AYES: Benson, Kelly, Snyder, Wilson, Crites
NOE5: None
ABSENT: None
ABSTAIN: None
ATTEST:
;;
, � ;��i
% ,,�
SHEILA R. GI IGAN, CI CLERK
CITY OF PALM DESERT, IFORNIA
_ ��
, / l.-�� �_J
-6��� �✓��
BUFORD�A. CRITES. MAYOR
v
RESULUTION N0. 89-120
w,
EXHIBIT "A"
�a•� � v� � i� � e. - i�
a �• • � v. � ,. . •��• � • • •
. •• a•« �. :� •• :,
In certifyir�g tYye Firzal �viran�ental Ln�act RePoar't, the city oaa�cil makes the
following indeper�dPnt s�pecific firxi.ings ooncerniryg ti�e follawi.r�g p�tential
significant envirnrmental effects identified in the final Enviz+aniental I�act
Report (EIR).
1. Traffic - The implementation of required mitigation measures
descxibed in Table 9 of The EIR Traffic Stluiy will rechioe p�ojected
im�aact to a le�v�el of insi�ifiaar�ce.
2. Noise - The implem�tation of the required mitigatiai measures
identified in the EIR noise analysis, and within the e�x�anded
r�oise study ocntained within tt�a res�ponse to oo[tm�ts, will redtxce
potential i�acts to a le�vel of insignificance.
3. Air Quality - The analysis oontained within the Air Quality Study
sup�pc�x-ts the oonclusion that there will be r�o si�ificant locx,� teim
air quality i�t resulting fsrin the p�oject. Required mitigation
measures ai Pages 8 and 9 of the analysis will red�x�e shoxt tetm
and c�anulative i�act to a level of insignificanoe.
4. air e- Mitigation measures desc�ibed in EIR text, and res�ponse
to oannents, Deparbnent of Public Wo�ks mam dated October 19, 1989,
will � px�ject impacts t+o a le�v�el of insi�ificaryce.
5. A�esthetics/Light and Glare - The i�lemesitation of required d�esign
review mitigation meas��es aontained in the analysis will reduce
potential in�acts to a level of insi�ificaryce.
6. Public Se�zvic�s - The existir�g r�vesnye sou�ces and public ager�cy
i�act fees identified in the EIR are sufficient to finat�ae public
se,ivice need.s ge�erated by the p�o j ect.
7. Emplvyment/Housing - The hausir�g mitigatirn pacogram to ooczs-t�x;t
and subsidize low and moderate ii�ie units to meet the i�ou.siryg
demarr3s of ti�e p�oject reduce potential impacts to a level of
i na; c�ificar�oe.
g, C�lt�sal Resources - An am,heological field surv�y of the p� j ect
site vor�uct,ed by qualified eaq�e�z'ts vor�cluded that rn si�ificant
Cultural resautrss will be i�actsd bY � P���.
r
'� "1
/ �,�� •/ s �• ,tl• -- I _ '
1� = ��••�� Y: i �.
� � �.• .
� ��
! =, :=4'W■ui.. '�'
: �� vW �.�
_
.�..� 3
�
'� ♦ \
� 6 ,
; `
_ r,_,_._.�.-
:
�
�
I
i .
�
I
1 •
� �k ��
I �.,,�.��
�
� NORTH
ii
�
CEHTER '�-�r
��
.......I. -' � �
���
Illllll�i lilllll
I I I I I I 1 1 1 1 I I I I � I I
7 I "�
�
� ���_
�-
�� �� �
� ��������,,.,.,�,���, , ,;
� 4 17� H�c�w�r ��
�;II:I� !1 �� �II
— � III���II / IIIIIII
� � � ,...1 �
5 '
���
���
�� ��� ; �;"����'�';'��
'...� � �, � ,,
�ii� �
�� r
/SMAOOW
1 1 N7AIN`
� �
�
�. . / �
-�
�1,� CITY OF PALM DE3ERT Ca39
� "� GEN. PLAN
AMEND.
. C�U�l O o 0 u
�
� - �� �
� �••�� ` i�mi�
� ���� : � �m��
� � �j m��u�
��� � �
Y�� � �1�
_ ��1���/\��
; � __��
- �.�
..� �
� �
♦t�_ �� --- ��II�I
, �
s,, )
tiG
T��CJ( i71�JH �'�iN / � � t
SITE
AREA Nl�. ARFA �CIST. G.P. PROP. G.P.
1 12.3 Ac. Medium Office
DP_rLsity Professional
Residential
2 49.8 Ac. Resort Regional
G1�m�rcial Canne,rcial
3 2.00 Ac. Service Regionai
Lndustrial Cbm�ercial
4 8.47 Ac. Regiu�al Regional
Crnmercial �rcial
Residential
5 10.66 A�c. Cbre Area �e Area
C,amie�ccial �,rcial
6 54.85 Ac. Hillside Open Space
, Plaru�ed
� Residential
No.GP69-1 CITY COUNCIL
RESOLUTION NQ.8`120
Date 11/16/89