Loading...
HomeMy WebLinkAboutCC RES 94-127,G-� ��- ;� ; �, �%� �, RESOLUTION N0. 94-127 A RESOLUTION OF THE CITY OF PALM DESERT APPROVING THE LEASING BY THE PALM DESERT REDEVELOPMENT AGENCY OF APPROXIMATELY 2Z ACRES OF REAL PROPERTY LOCATED ON THE EAST SIDE OF PORTOLA AVENUE, SO[JTH OF FRANK SINATRA DRIVE, PALM DESERT, CALIFORNIA, TO RONALD ODERIRK AND RICK ODEKIRK THE CITY OF PALM DESERT HEREBY FINDS, DETERMINES, RESOLVES AND ORDERS AS FOLLOWS: Section 1. Health and Safety Code Section 33433 requires that before the sale or lease of any property acquired by a redevelopment agency, in whole or in part, directly or indirectly, with tax increment moneys, pursuant to the redevelopment pl�n, said conveyance shall first be approved by the leqislative body by resolution after public hearing. Section 2. On Dece�aber 22, 1994, the City held a duly noticed public hearing on the approval of the Palm Desert Redevelopment Aqency's (the "Aqency") proposed lease of certain real property (the "Property") described in that certain Dispoeition and Development Agreement (the "DDA" or the "lease") between the Aqency and Ronald Odekirk and Rick Odekirk (collectively, the "Developer"), at which time all persons desirinq to comment on or ask questions concerninq the lease of the Property to the Developer were qiven the opportunfty to do so. Prior to the pnblic hearinq, informntion concerning the Agency's proposed lease of the Property' to the Developer was available for public inspection in the offices of the City of Palm Desert at 73-510 Fred Warinq Drive, Palm Desert, California, 92260, between the hours of 8:00 a.m. and 5:00 p.m., Monday through Friday. Notice of the public hearinq was published in the Desert Sun on December 7, 1994 and December 14, 1994. Section 3. The City has reviewed and considered all written and oral comments, questions and concerns regarding the Agency's proposed lease of the Property to the Developer received prior to and at the public hearinq on said lease. Section 4. The Environmental impacts of the Aqency's proposed lease of the Property to the Developer for the development of impravements thereon was analyzed in the Final Environmental Impact Report for the Section Four North Sphere Project {the "EIR"). The City certified the EIR by Resolution No. 94-119, "Resolution of the City Council of the City of Pe2m Deaert, California, Certify3r.q an Environmental Impact Report for a Proposed Section Four. Site Plan Bounded by Frank Sinatra Drive on the North, Cook 3treet on the East, Country Club Drive on the South and Portola Avenue on the West." The Aqency's environmental findings wi.th respect to the DDA are attached as Exhibit "A" to the Agency's Resolution being adopted concurrently herewith, entitled "A Resolution of the PaZm Desert Redevelopment Aqency Approvinq the Leasinq of Approximately 22 acres of Real Property Located on the East Side of Portola RESOLUTION NO. 94-127 Avenue, South of Frank Sinatra Drive, Palm Desert, California, to ronald Odekirk and Rick Odekirk" and the city concurs with such tindinqs. The mitigation measures aet forth in the EIR with respect to the project development oi the project described in the DDA. Section 5. The DDA requires the Developer to construct certain improvements on the Property as therein described, including, among other things, a softball complex containing three softball fields; four eand volleyball courts for leeque and tournament play; and a multi-purpose covered structure containing three basketball courts, convertible to one indoor soccer or hockey field, and a staqe area. Section 6. The City and the Aqency haa obtained an evaluation of the fair rental value of the Property from Rosenow Spevacek Group, Inc., who has determined that the net present fair rental value of the property for the entire term of the DDA, at the hiqhest and best use of the Property, ia approximately ;1,249,677. The net present value of the minimum rent proposed by the DDA for the entire terta of the DDA is ;1,20Z,281, and the net present value of the sum of the minimum rent and projected percentage rent for the entire term of the DDA is s3,030,823. Section 7. The City hereby finds that the sale of the Property pursuant to the DDA will aeaist in the elimination of bliqht due to the obliqation of the Developer to construct thereon the improvements described in the DDA. Section 8. The City hereby finds that the consideration to be paid by the Developer is not less than the fair rental value of the Property at its h3qhest and best use in accordance with the Redevelopment Plan for Project J�rea No. 2 of the Aqency. Section 9. The City hereby approvea the lease of the Property to the Developer in accordance with the terme and conditions of the DDA pursuant to the requirements of Health and Satety Code Section 33433(b). � PASSED, APPAOVED, nnd ADOpTED by the City Council of the City of Palm Desert, California, at its reqular meetinq held on the 22nd day of December, 1994, by the followinq vote, to wit: RF.SOLUTiON N0. 94-127 EXHIBIT A ENVIRONMENTAL FINDINGS Section 1. The Final Environmental Impact Report (the "EIR") for the Section Four North Sphere Project (the "Project") was previvusly certified by the City Council of the City of Palm Desert by City Council Resolution No. 94-119. The City Council determined that the EIR was completed pursuant to the provisions of the California Environmental Quality Act ("CEQA") and.the Guidelines promulgated with respect thereto. The Palm Desert Redevelopment Agency (the "Agency") concurs with that finding. The Agency has independently reviewed and considered the contents of the EIR prior to deciding whether to approve the subject lease. The Agency hereby finds that the EIR reflects the independent judgement of the Agency and the governing Board of the Agency. Finally, the Agency hereby adopts, pursuant to Section 21081.6 of CEQA, the mitigation and monitoring program on file in the City Department of Planning. Section 2. Based upon the initial study, the EIR, public comments, and the record before the Agency, the Agency finds that there is no substantial evidence that the Project, with the mitigation recommended by the EIR and adopted by this resolution, will have any unavoidable significant adverse impact on the environment. Section 3. Based upon the initial study, the EIR, public comments, and the record before the Agency, the Agency finds that the EIR identifies the following potentially significant environmental impacts that may be caused by the Project or cumulative impacts to which the Project contributes, but that can be avoided or substantially lessened to a level of insignificance; Hydrologic and flooding impacts, geologic impacts, biologic impacts, cultural resources impacts, traffic impacts, air quality impacts, noise impacts, light and glare impacts, jobs/housing impacts, energy impacts, water impacts, wastewater impacts, solid waste impacts, electricity impacts, natural gas impacts, law enforcement impacts, fire protection impacts, school impacts, and public transportation impacts. Section 4. In response to each significant impact identified in the EIR, and listed in Section 3 of this Resolution, changes or alterations have been required in, or incorporated into, the Project which avoid or substantially lessen to a level of insignificance environmental impacts identified. The changes or alternations required in, or incorporated into, the Project and a brief explanation of the rationale for this finding with regard to each impact, are set forth below. RESOLUTiON NO. 94-127 A. Hydroloqy and Flood Control. The EIR identifies potentially significant hydrologic and flood control impacts because project construction will increase the area of impervious surfaces on the site, thereby increasing runoff, and will alter drainage patterns through grading. Changes or alterations have been required in, or incorporated into, the Project which avoid or substantially lessen the significant impacts to a level of insignificance. The mitigation measures set forth on pages 5-2 and 5-3 of the Draft EIR will mitigate impacts to a level of insignificance. The rationale for this finding is set forth in Section 5.1 of the ETR. In summary, a detailed drainage plan will be required to show that the 100 year storm will be retained on- site north of the Palm Springs Ridge Line and the increment in flows from underdeveloped to developed conditions will be retained on-site south of the ridge line, with retention in depressions in the golf courses. Any flow leaving the site during the 100 year storm must be in accordance with the City's Master Plan of Drainage. Irrigation and drainage must be designed so as to minimize runoff and/or percolation of landscape runoff and to route runoff through a wetlands area to break down chemicals in the runoff through biological and solar action. Urban runoff must also be routed through the qolf course wetland. These measures must be consistent with the City's National Pollutant Discharge Elimination System (NPDES) program. Actions must be taken to control fluvial erosion during construction and maintain sediment control basins. Prior to grading plan approval the applicant shall retain a qualified drainage consultant to prepare a drainage plan which shall be submitted for approval to the Coachella Valley Water District (CVWD) and the City. At a minimum the drainage plan shall demonstrate the following: • Within Zone 2 the increment in flows from undeveloped to developed conditions resulting from the 100 year storm is retained on-site. • Within Zone 3 the entire 100 year storm is retained on-site. • All flows leaving the site to do so in a manner consistent with the City's Master Plan of Drainage. • Consultation with the qolf course architect regarding the potential for chemicals in runoff from the golf course has been documented and addressed. • The potential for chemicals in runoff from the golf course is addressed by use of wetland areas to retain flows prior to their leaving the site or percolating into the underlying soils. 2 RESOI.UTiON NO. 94-127 • Runoff from are�s developed with urban uses is routed through the golf course and into wetland areas. • The drainage plan is consistent with the City's NPDES program. • Amount of fees payable is identified. • Flow rates are appropriate for hydraulic slopes proposed. • Fluvial erosion due to construction is controlled under a construction erosion control program. • Basins are designed to capture eroded sediments and contain them on site. B. Geoloqv The EIR identifies potentially siqnificant geologic impacts because, due to its location in a seismically active area, the Project may be subject to strong ground shaking and associated hazards such as settlement, seiching, dislodging of objects from shelves and swaying hanging fixtures. Additionally, fluvial erosion could result from grading activity and alteration to topography. Further more, since the site is in an active blow sand area, wind erosion may affect the site during and after construction. However, because the site lacks deposits of the coarse aggregate which is necessary to produce economical amounts of Portland Cement Concrete grade aggregates, site development will not result in the loss of significant mineral resources. Finally, soils on the site are not suitable for the intended development in their present condition because they are subject to hydroconsolidation and will require processing to limit settlement and provide adequate bearing capacity and uniform foundation materials. Excavations may be impacted by caving soils; and the trenches will require shoring. Changes or alternations have been required in, or incorporated into, the Project which avoid or substantially lessen the significant impacts to a level of insignificance. The mitigation measures set forth on pages 5-8 and 5-9 of the Draft EIR will mitigate impacts to a level of insignificance. The rationale for this finding is set forth in Section 5.2 of the EIR. In summary, habitable structures shall be designed to mitigate the impacts of ground shaking, according to UBC or more stringent quidelines. Managers of project components shall ensure that objects on shelves are adequately secured. A geotechnical engineering report shall be prepared to address the physical properties of on-site soils and provide binding recommendations to aid in foundation design. Structures shall be set back a minimum of 40 feet away and 5 feet above all lakes. Lake embankments shall be constructed no steeper than 3:1 horizontal to vertical to mitigate seiching. OSHA and CAL OSHA requirements shall be implemented during excavations or 3 RESOLUTION NO. 94-127 utility trenches. A detailed grading plan which contains the following components shall be submitted to the City for review: conformance with Chapters 29 and 70 of the UBC and City ordinances; but and fill slopes to be no steeper than 2:1 horizontal to vertical in building pad areas, but steeper in golf course features if erosion is not increased; cut and fill to be balanced on site; streets to have a minimum qrade of 0.5$; angular graded forms discouraged in favor of natural appearing forms; the grading plan to adhere to the requirements of the geotechnical report; use of water in excess of the optimum moisture defined in the geotechnical report to achieve minimum relative compaction; contouring and landscaping techniques which prevent and control slope erosion due to rainfall; a wind erosion control plan; lakes to be lined to retain water but allow percolation during major storms. Additional mitigation that is found in the Air Quality (wind erosion) and Hydrology and Flood Control (fluvial erosion) sections will also mitigate geologic impacts. C. Bialoqy. The EIR identifies potentially significant biologic impacts because development of the project will destroy the Stabilized and Partially-Stabilized Desert Sand Fields habitat on the site, a sensitive community which is disappearing throughout the Coachella Valley as a result of direct development and blockage of blowsand renewal. It will also result in a"taking" of the "Coachella Valley Fringe-toed Lizard" (CVFTL), a federally threatened and state endangered species and Coachella Valley Milk Vetch, a candidate for federal listing. Changes or alternations have been required in, or incorporated into, the Project which avoid or substantially lessen the significant impacts to a level of insignificance. The mitigation measures set forth on page 5-11 of the Draft EIR will mitigate impacts to a level of insignificance. The rationale for this finding is set forth in Section 5.3 of the EIR. In summary, the developer shall pay the required development fees as described in the 1986 Coachella Valley Fringe-toed Lizard Habitate Conservation Plan and Endangered Species Act Section 10 (a) Permit. The developer shall also pay �30,000.00 to the California Department of Fish and Game to be applied toward developmetn of a multi-species Habitat Conservation Plan which includes the Coachella Valley Milk Vetch. D. Cultural Resources. The EiR identifies potentially siqnificant cultural resources impacts. It is possible, but not probable that subsurface cultural resource sites are present which miqht be destroyed during construction. Structure remnants on the site which will be destroyed durinq construction are less than 45 years old and do not 4 RESOi.UTION NO. 94-127 represent a historic resource. Construction of the project will also result in the destruction of an archaeological site (consisting of four Cahuilla pot sherds), but since the site is not unique the impact is not significant. Changes or alternations have been required in, or incorporated into the Project which avoid or substantially lessen the significant impacts to a level of insignificance. The mitigation measure set forth on page 5-12 of the Draft EIR will mitigate impacts to a level of insiqnificance. The rationale for this finding is set forth in Section 5.4 of the EIR. In summary, if evidence of subsurface artifacts is found during gradinq, all grading shall cease and the contractor shall notify the Community Development Director. A qualified archaeologist shall review any potential finds and provide recommendations to the City. If further on-site investigation is required, all subsequent recommendations shall conform to Appendix K of the CEQA Guidelines. E. Traffic. The EIR identifies potentially significant traffic impacts because the project will generate approximately 25,800 trip-ends per day, with 1, 260 vehicles per hour during the morning peak hour and 1, 995 vehicles per hour during the afternoon peak hour. Without mitigation, project traffic in 1996 would result in a LOS worse than C in several locations. However, the proposed internal circulation system is generally adequate except for emergency access to the central hotel and conference center. Special events at the Sports Park and championship golf facilities will require more parking than is provided on-site. Chanqes or alternations have been required in, or incorporated into the Project which avoid or substantially lessen the significant impacts to a level of insignificance. The mitigation measures set forth on pages 5-25 through 5-28 of the Draft EIR will mitigate impacts to a level of insignificance. The rationale for this finding is set forth in Section 5.5 of the EIR. In summary, these impacts will be fully mitigated by improvements paid for fully or on a fair share basis by the developer. These will include freeway intersection improvements and additional turn lanes and traffic signals. The project will pay the Coachella Valley Association of Governments (CVAG) Transportation Uniform Mitigation Fee (TUMF) and contribute to City and County bridge benefit districts to participate in funding area improvements. The project applicant shall be responsible for constructing or financing the project share of circulation improvements (freeway interchange improvements, additional turn lanes and traffic signals) required for 1996 and 2015. The applicant shall design the project internal circulation system to include an emergency service road to the central hotel and conference center. The developer shall provide Park-N-Ride parking and bike trails and lanes. The developer shall prepare a TDM plan consistent with the City's Ordinance 689. 5 RESOLUTION NO. 94-127 Developers of the Sports Park and championship golf course shall enter into a joint use agreement with adjacent land owners to provide special event parking; special event promoters shall obtain a City permit covering off-site parking. The parking area for the Sports Park shall be redesigned. All unsignalized site egress points shall be stop sign controlled. F. Air Quality. The EIR identifies potentially significant air quality impacts because construction-related emissions associated with the proposed project are projected to exceed the SCAQMD significance threshold for NOx and PM10. Additionally, the project will have a potentially significant long-term impact on air quality if ineasured by the SCAQMD operational threshold criteria for CO, ROC and NOx. However, the project appears to be consistent with the Coachella Valley PM10 SIP and the goals and policies set forth in the Air Quality Management Plan. Because the project is less intense than existing General Plan designations used by the SCAQMD to formulate the Air Quality Management plan that will bring the Coachella Valley into compliance with federal and state air quality standards, and because the Project improves the jobs/housing balance, the Agency cancludes that with implementation of proposed mitigation the project's impacts are reduced below the level of significance. Changes or alternations have been required in, or incorporated into, the Project which avoid or substantially lessen the significant impacts to a level of insignificance. The mitigation measures set forth on pages 5-38 through 5-40 of the Draft EIR will mitigate impacts to a level of insignificance. The rationale for this finding is set forth in Section 5.6 of the EIR. In summary, to minimize construction activity emissions; SCAQNID Rule 403 shall be adhered to, insuring the clean up of construction-related dirt on approach routes to the site; SCAQNID Rules 1108 and 1108.1 shall be adhered to, prohibitinq the use of rapid and medium cure cutback asphalts as well as organic compounds in emulsified asphalts used during the construction process; SCAQMD Rule 1113 shall be adhered to, restricting the VOC content of any architectural coating materials used on-site to a maximum of 2.08 pounds of VOC per gallon; adequate watering techniques (with reclaimed water if available) shall be employed to partially mitigate the impact of construction-generated dust particulates; portions of the project site that are undergoing earth moving operations shall be watered such that a crust will be formed on the ground surface and then watered again at the end of the day; vegetative ground cover shall be planted as soon as possible to reduce the amount of open space subject to wind erosion. Irrigation systems needed to water these plants shall be installed as soon as possible to maintain the ground cover and minimize wind erosion of the soil; the project proponents shall comply with all provisions of the Palm Desert Municipal Code related to construction activities includinq the 6 RESOLUTION NO. 94-1?_7 development of a Grading Plan, an Irrigation Plan and a Fugitive Dust Control Plan for submittal and approval prior to the initiation of grading activities on-site; any construction access roads shall be paved as soon as possible and cleaned after each work day. The maximum vehicle speed on unpaved roads shall be 15 mph; grading operations shall be suspended during first and second stage ozone episodes or when winds exceed 30 mph; any construction equipment using diesel drive internal combustion engines shall use a diesel fuel with a maximum of 0.05� sulfur and a four degree retard. To reduce construction-related traffic congestion; construction personnel shall be informed of ridesharing and transit opportunities; construction parking shall be configured to minimize traffic interference; construction operations affecting off-site roadways shall be scheduled for off peak traffic hours and shall minimize obstruction of through-traffic lanes. To reduce long-term wind erosion impacts: wind breaks and building locations shall be designed to optimize wind deflection; wind breaks shall be designed to allow debris removal; and phasing shall be planned to minimize wind erosion effects on previously developed areas. To reduce long-term operations emissions (by implementing energy conservation measures and by reducing vehicle miles travelled): building construction shall comply with the energy use quidelines in Title 24 of the California Code of Regulations; the proposed project shall comply with SCAQMD Regulation XV, the City's TDM Ordinance 689 and any other relevant wind erosion and blowsand programs; and future stationary sources of air pollutants shall adhere to applicable SCAQMD rules and regulations. G. Noise The EIR identifies potentially significant noise impacts because construction activities on-site will result in short-term increases in noise levels adjacent to site access routes and the on-site areas under construction. The project will not generate audible noise increases (greater than 3.0 dBA) along any of the roadway links analyzed for opening year 1996 conditions or cumulative year 2015 conditions. Potential audible increases (between 1.0 and 3.0 dBA) are projected to occur in 1996 along six roadway links (three of which are adjacent to the project site) where noise levels will increase between 1.0 and 1.4 decibels as a result of the addition of project traffic. Project-related traffic noise increases will represent a long-term incremental impact in the vicinity that is potentially audible adjacent to two roadways links adjacent to the project site (on Cook Street and Country Club Drive). Noise impacts from the proposed sports park will not be significant. Noise measurements taken at a similar sports park in Poway during typical weekly activities with approximately 150 people in 7 RF.SOI.UTTON NO. 94-127 attendance fall within the normally acceptable range for any adjacent residential land uses. Furthermore, based on the measured maximum noise level at a similar sports park on the six days each year that special events were held, the noise levels generated by the proposed sports park on-site would be less than 52 Leq at the nearest existing resident (and less than the 58 Leq at the nearest proposed residence). Changes or alternations have been required in, or incorporated into, the Project which avoid or substantially lessen the significant impacts to a level of insignificance. The mitigation measures set forth on pages 5-53 through 5-54 of the Draft EIR will mitigate impacts to a level of insignificance. The rationale for this finding is set for in 5ection 5.7 of the EIR. In summary, during construction activities on-site, the following short-term acoustic mitigation measures shall be implemented: construction on- site shall take place only during the days and hours specified by City Ordinance; all construction equipment, fixed or mobile, shall be equipped with properly operating and maintained mufflers; stationary equipment shall be placed such that emitted noise is directed away from noise sensitive receivers; stockpiling and vehicle staging areas shall be located as far as practical from noise sensitive receptors; every effort shall be made ta create the greatest distance between noise sources and sensitive receptors during construction activities. Site design measures to reduce noise over the long-term shall include: building setbacks used to reduce intrusive noise levels at retail and office/professional uses; building setbacks and pad elevations used in conjunction with acoustic berm or berm and barrier combinations to reduce intrusive noise levels at any time- share vacation ownership units located within the 55 CNEL contour adjacent to Portola Avenue prior to the issuance of building permits; building setbacks used to ensure that all hotel rooms in Planning Area 11 are located outside the ultimate unattenuated 65 CNEL contours of adjacent roadways; an earthen berm around the sports park shall provide noise shielding for any adjacent uses; truck access, parking area design and air conditioning refrigeration units shall be designed and evaluated detailed levels of planning to minimize the potential for acoustic impacts to adjacent noise sensitive development. H. Light and Glare The EIR identifies potentially significant light and glare impacts because night lighting at the Sports Park is a potential source of light and glare impacts. However, these impacts are fully mitigatable through proper fixture design and sufficiently far from existing or proposed residential receptors. Night lightinq systems associated with the remaining proposed land uses are unremarkable and will not create light and glare impacts if designed and installed according to City codes. 8 RF.S0I.UTTON NO. 94-127 Changes or alternations have been required in, or incorporated into, the Project which avoid or substantially lessen the significant impacts to a level of insignificance. The mitigation measures set forth on page 5-56 af the Draft EIR will mitigate impacts to a level of insignificance. The rationale for this finding is set forth in Section 5.8 of the EIR. In summary, a detailed lighting plan for the Project shall be reviewed by the Planning Commission. An independent professional lighting engineer shall review the details lighting plan for the Sports Park; his recommendations for minimizing impacts on surrounding properties shall be incorporated into the plan prior to the issuance of building permits, ensuring that the net ambient light level impact on surrounding properties shall be the level that exits prior to installation of lights. Glare shields shall be used for the proposed lights. The lighting shall be adjusted as necessary after installation to eliminate light spill and glare; visors to prevent glare shall be adjusted based on direct observation from residential viewpoints. Outdoor lighting of sports events shall be turned off at 11:00 p.m. I. Jobs/Housinq. The EIR identifies a potentially significant impact on the supply of affordable housing because project employees are expected to generate a need for 691 units of affordable housing. No substantial increase in permanent population will result from the project. Changes or alternations have been required in, or incorporated into, the Project which avoid or substantially lessen the significant impacts to a level of insignificance. The mitigation measure set forth on page 5-58 of the Draft EIR will mitigate impacts to a level of insignificance. The rationale for this finding is set forth in Section 5.9 of the EIR. In summary, the various components of the project shall pay the appropriate commercial development low-income housing mitigation fee as mandated by City Resolution 90-130. J. Enerqy Use. The EIR identifies a potentially significant environmental impact due to the Project's energy consumption. The project will result in the daily consumption of 60,830 kWh of electrical power, 331,108 cubic feet of natural gas and 9,442 gallons of gasoline. Changes or into, the significant measure set impacts to finding is potential i: alternations have been required in, or incorporated Project which avoid or substantially lessen the impacts to a level of insignificance. The mitigation forth on page 5-59 of the Draft EIR will mitigate a level of insignificance. The rationale for this Bet forth in Section 5.10 of the EIR. In summary, tpacts on supplies of non-renewable energy resources RESOLUTION NO. 94-127 will be reduced below the level of significance through adherence to Title 24 of the California Code of Regulations, cooperation with energy-conserving programs conducted by the utilities and compliance with Transportation Demand Management measures. In addition, energy consumption will be reduced through compliance with other mitigation measures set forth in Section 5.5 (Traffic), 6.1.4 (Electricity) and 6.1.5 (Natural Gas) of the EIR. K.Water. The EIR identifies a potentially significant environmental impact as a result of the Project's water consumption. The proposed project will utilize an estimated 4,167.94 acre feet of water per year for domestic and irrigation purposes; this figure might be �educed by 2,593.43 acre feet if tertiary reclaimed water is used to irrigate the golf course. Changes or alternations have been required in, or incorporated into, the Project which avoid or substantially lessen the significant impacts to a level of insignificance. The mitigation measure set forth on page 6-2 through 6-3 of the Draft EIR will mitigate impacts to a level of insignificance. The rationale for this finding is set forth in Section 6.1.1 of the EIR. In summary, the project will be required to reduce its impact on groundwater supply, which is in overdraft, by using reclaimed water and water conserving appliances, fixtures and irrigation and landscaping techniques. The applicant will also be required to pay the cost of hooking up to existing CVWD infrastructure and installing an estimated seven wells on the site in order to mitigate any impact on CVWD facilities. L. Wastewater. The EIR identifies a potentially significant environmental impact as a result of the Project's generation of wastewater. The project will generate an estimated 460,930 gallons per day of effluent. The project will utilize 17.6$ of the total available sewage treatment plant capacity. Changes or alternations have been required in, or incorporated into, the Project which avoid or substantially lessen the significant impacts to a level of insignificance. The mitigation measure set forth on page 6-4 of the Draft EIR will mitigate impacts to a level of insignificance. The rationale for this finding is set forth in Section 6.1.2 of the EIR. In summary, the mitigation measures to reduce water consumption set forth in Section 6.1.1 of the Draft EIR will reduce wastewater generation. Additionally, the payment of fees to CVWD will mitigate impacts by contributing to the cost of treatment facility expansion. Finally, the applicant will pay for pipelines and a hookup to CVWD's existing line on Country Club Drive. 10 RESOLUTION NO. 94-127 M. Solid Waste. The EIR identifies a potentially significant environmental impact as a result of the Project's generation of solid waste. The project will generate approximately 2,335 tons of solid waste and 7,545 cubic yards of green waste per year, which represents a potentially significant impact on the limited capacity of the Edom Hill Landfill unless the waste stream is reduced through recycling. Changes or alternations have been required in, or incorporated into, the Project which avoid or substantially lessen the significant impacts to a level of insignificance. The mitigation measures set forth on page 6-5 of the Draft EIR will mitigate impacts to a level of insignificance. The rationale for this finding is set forth in Section 6.1.3 of the EIR. In summary, adherence to the City's Ordinance 612 will result in sufficient recycling of both solid and green waste to mitigate the project's impacts. Further more, promoters of any tournament proposed on the project site shall develop an operations recycling plan, acceptable to the City's Recycling Coordinator, which calculates the waste to be generated by the event and proposed waste reduction measures. N.Electricity The EIR identifies a potentially significant environmental impact due to the Project's consumption of electrical energy. The project will utilize an estimated 60,630 kWh of electrical power per day and will require on-site electrical service improvements. Changes or alternations have been required in, or incorporated into, the Project which avoid or substantially lessen the significant impacts to a level of insignificance. The mitigation measures set forth on page 6-6 through 6-7 of the Draft EIR will mitiqate impacts to a level of insignificance. The rationale for this finding is set forth in Section 6.1.4 of the EIR. In summary, construction will be required to comply with Title 24 of the California Code of Regulations (State Building Efficiency 5tandards), which will ensure that the project's energy use is not wasteful. Wherever practical, electrical lines will be undergrounded as per City policy. The applicant will pay the costs of on-site electrical improvements on a fair share basis. Prior to issuance of occupancy permits, the developer shall contact Southern California Edison ("SCE") and implement all reasonable energy conserving measures in SCE programs. The developer shall submit written proof that this has been done to the City. O. Natural Gas. The EIR identifies a potentially significant environmental impact from the Project's consumption of natural gas. The proposed project will utilize an estimated 331,108 cubic feet of natural gas per day. Changes or alternations have been required in, or incorporated into, the Project which avoid or substantially lessen the significant impacts to a level of insignificance. The il RESOLUTTON NO. 94-127 mitigation measures set forth on page 6-7 of the Draft EIR will mitigate impacts to a level of insignificance. The rationale for this finding is set forth in Section 6.1.5 of the EIR. In summary, construction will be required to employ energy conservation measures set forth in Title 24 of the California Code of Regulations, which will reduce the project's use of natural gas below the level of significance. Construction of infrastructure, includinq pipelines and meters, will link proposed uses to existing Sauthern California Gas Company (SCG) natural gas lines on Cook Street and Country Club Drive. The applicant shall contact SCG to obtain assistance in selecting effective energy conservation techniques which shall be implemented prior to issuance of building occupancy permits. The applicant shall contact SCG to obtain assistance in selecting effective energy conservation techniques which shall be implemented prior to issuance of building occupancy permits. The applicant shall submit to the City written proof that this has occurred. Finally, those mitigation measures set forth in Section 6.1.4 (Electricity), regaining energy conservation in construction shall also reduce natural gas consumption. P. Law Enforcement. The EIR identifies a potentially significant impact on law enforcement. Project development will cause an increase in calls for police services and in traffic, necessitating an annual meeting between police and the City Manager to discuss police manpower needs. Special events at the Sports Park and champfonship golf course will create a need for additional law enforcement and traffic control services and will require special permits. Changes or alternations have been required in, or incorporated into, the Project which avoid or substantially lessen the significant impacts to a level of insignificance. The mitigation measures set forth on page 6-9 of the Draft EIR will mitigate impacts to a level of insignificance. The rationale for this finding is set forth in Section 6.2.1 of the EIR. In summary, the Palm Desert City Manaqer and Station Commander shall meet annually to assess police manpower needs related to project development and shall increase or adjust police services to address thoae needs. Promoters of special events at the Sports Park or championship golf course shall obtain a permit from the City (approved by the Riverside County Sheriff's Department) based on an application which details security needs and the mechanism for financinq them. The developer of the Sports Park shall obtain police department approval of a plan for control of the sale of alcoholic beveraqes, including a design wi�ich confines alcohol consumption to a single location. Q. Fire. The EIR identifies a potentially significant impact on fire protection services. At buildout, the project will have 12 RF.SOT.U7'ION NO, 94-127 approximately 1, 733,000 square feet of structures requiring fire protection. Hotel and time-share visitors and employees may also require emergency medical services. However, existing fire stations are adeuate to serve the pro ject provided that the pro ject complies with current Code requirements. Changes or alternations have been required in, or incorporated into, the Project which avoid or substantially lessen the significant impacts to a level of insignificance. The mitigation measures set forth on page 6-10 of the Draft EIR will mitigate impacts to a level of insignificance. The rationale for this finding is set forth in Section 6.2.2 of the EIR. In summary, protection will be provided by adherence to the ordinance requiring that all buildings above 3,000 square feet be sprinkled and by provision of adequate fire flows. Fire flow requirements, based on the standards of the National Fire Protection Association and/or the Uniform Fire Code, shall be met for all structures. R. Schools. The EIR identifies a potentially significant impact on school facilities. All affected schools in the Desert Sands Unified School District are over capacity. The project will not include permanent households which would generate students. However, households created by project elated employment will add an estimated 200 students to district enrollment. Changes or alternations have been required in, or incorporated into, the Project which avoid or substantially lessen the significant impacts to a level of insignificance. The mitigation measures set forth on page 6-12 of the Draft EIR will mitigate impacts to a level of insignificance. The rationale for this finding is set forth in Section 6.2.4 of the EIR. In summary, the developer will be required to pay the maximum fee in effect at the time of construction�to offset the impact of commercial/industrial development on school facilities. State law prohibits additional mitigation of impacts on school facilities, thus making further mitigation infeasible. S. Public Transportation. The EIR identifies a potentially significant environmental impact resulting from the need for on-site accommodation for mass transit stops. Preliminary analysis shows a need for six bus stops/turnouts, to be financed by the project developer, with the location of these facilities to be determined as additional bus routes are developed in the area. Changes or alternations have been required in, or incorporated into, the Project which avoid or substantially lessen the significant impacts to a level of insignificance. The mitigation measures set forth on page 6-13 of the Draft EIR will mitigate 13 RESOLUTiON NO. 94-127 impacts to a level of insignificance. The rationale for this finding is set forth in Section 6.2.6 of the EIR. In summary, prior to tentative map approval for any phase of the project, the City shall require construction of, or guaranteed financing of, the proposed bus stoplturnout facilities to be located in that phase, with all facilities being constructed per SunLine Transit standards within 5 years of all phases of the project being completely constructed. Section 5. The agency finds that the EIR describes a reasonable range of alternatives to the proposed Project. Although the Agency has determined that each significant environmental impact identified in the EIR has been mitigated to a level of insignificance, the Agency has nevertheless also rejected these alternatives as infeasible for economic, social or other considerations or because such alternatives are not more environmentally protective than the Project, as summarized below. A. No Project Alternative. The "No-Project" alternative would involve no development at the Project site. The Agency finds that this alternative is infeasible because it would not provide the City with develqpment in accordance with the City's General Plan and in furtherance of the Agency's objective to elfminate blight within the Redevelopment Project Area No. 2. In addition, the no project alternative is infeasible because it would deprive the landowners in the area of all reasonable return on the landownez's property. Finally, because the Project site would remain vacant, the Project would fail to fulfill any of the basic ob jectives for the Pro ject which are listed on page 4-1 of the EIR. B. Alternative Nos . 2 and 3- Reduced Intensity. The reduced intensity alternatives would involve less extensive development of the Project site. Although these alternatives would fulfill the goals of the Project to some extent, fewer jobs would be created, and a"championship-type" golf course would not be created. Therefore, the Agency finds that these alternatives are infeasible for social and economic reasons because they would not adequately fulfill several of the basic objectives of the Project. C. Alternative No. 4- Existinq General Plan and Zoning. Alternative No.4 would not be environmentally superior to the Project because it would result in more intense development thereby creating more significant environmental impacts that the Project in many areas. D. Alternative No. 5- Alternative Site. The only alternative site that is available for development and on which the Project could be feasibly located is not environmentally superior to the Project. Although most impacts caused by this Alternative would be similar to the Pro ject, the biologic impacts caused by the Alternative would be substantially greater becauae the alternative site received suffiCient blow sand to maintain a viable Desert 14 RESOi.UTiON NO. 94-127 Sands Fields habitat in the long term. Section 6. Although the EIR identifies no significant unavoidable environmental impacts that are associated with the adoption and implementation of the Project, the Agency finds that even if the proposed mitigation measures set forth in the EIR were determined to be insufficient to lessen each impact to a level of insignificance, the social economic and other benefits of the Project outweigh any unavoidable adverse impacts. Due to such overriding benefits and considerations, the City finds that any unavoidable adverse environmental impacts of the Project are acceptable. This determination shall constitute a statement of overriding considerations within the meaning of the CEQA and is based on the following benefits identified in the EIR and the record of proceedings for the Project. A. The Project will result in the provision of substantial amenities to the City, including a championship golf course and a conference center. B. The development of the Project site will contribute to the elimination of blight within the Redevelopment Project Area No. 2. C. The Project will result in the creation of emplayment opportunities within the City. D. The Project will result in increased revenues to the City, including sales tax revenues generated by the golf courses and accompanying pro shop and the retail uses planned for the site. In addition, the hotel uses and associated ancillary facilities such as hotel restaurants and gift shops will generate transient occupancy tax revenues and sales tax revenues. 15