HomeMy WebLinkAboutCC RES 2019-76RESOLUTION NO. 2019- 7 6
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PALM
DESERT, CALIFORNIA, APPROVING A GENERAL PLAN AMENDMENT
RECLASSIFYING PAINTERS PATH FROM A "LOCAL STREET" TO AN
"ENHANCED SECONDARY ROADWAY" AND ACCEPT AN ADDENDUM
TO THE CERTIFIED ENVIRONMENTAL IMPACT REPORT FOR THE CV
LINK PROJECT
GPA1 9-0001
WHEREAS, the CV Link project is a +49-mile multi -modal transportation path that
connects cities in the Coachella Valley and passes through the City of Palm Desert, within
the City's right-of-way, through the College of the Desert, and along the Whitewater River
Channel; and
WHEREAS, the CV Link project provides access and connectivity between
residential, commercial, recreational, educational, and civic facilities, within the City of Palm
Desert by providing a safe and recreational pathway for multiple user groups; and
WHEREAS, the Coachella Valley Association of Governments ("CVAG") Executive
Committee, acting as the lead agency for the CV Link project did, on the 15th day of May
2017, adopted Resolution Nos. 2017-003 and 2017-004, certifying the Environmental
Impact Report ("EIR") for the CV Link project; and
WHEREAS, pursuant to Section 15091(a) of the California Code of Regulations,
Implementation Guidelines for the State California Environmental Quality Act (CEQA) (Cal.
Code Regs., Tit. 14, § 15000 et seq.), and the City of Palm Desert's ("City's") Local CEQA
Guidelines, the City is defined as a responsible agency for the CV Link project; and
WHEREAS, the City of Palm Desert, California, as a responsible agency, on the 12th
day of July 2018, did adopt a Notice of Determination ("NOD") to carry out its discretionary
approval over the project; and
WHEREAS, at the City Council meeting on the 12(h day of July 2018, the City
Council provided direction to initiate a General Plan Amendment of Painters Path to
accommodate the extension of the CV Link improvements to connect to the City's trail
system, also known as "The Bump and Grind Trail, and
WHEREAS, the City's General Plan Mobility Element identifies a "CV Link
Connector" along the Coachella Valley Water District's Palm Desert Operations Center's
eastern boundary to extend CV Link improvements from the identified CV Link Whitewater
River Channel crossing to Hovley Lane East; and
WHEREAS, a General Plan Amendment to reclassify Painter Paths from a "Local
Street" to an "Enhanced Secondary Roadway" has been prepared and an Addendum to the
CV Link EIR has analyzed the revised project in accordance with CEQA Guidelines and has
found that no new significant impacts are created by the extension of CV Link
improvements along Painters Path or the Hovley Lane East connection; and
RESOLUTION NO. 2019-76
WHEREAS, in accordance with Palm Desert Municipal Code Section 25.60.060 and
25.78.070, the City Council of the City of Palm Desert, California, did on the 12th day of
September 2019, hold a duly noticed public hearing to consider the General Plan
Amendment and EIR Addendum, and has determined that the General Plan Amendment is
consistent with the Goals and Policies within the General Plan and as specified below; and
WHEREAS, the City Council of the City of Palm Desert finds that the General Plan
Amendment and CV Link project extensions comply with the following Goals and Policies of
the City's General Plan:
• L.U. Policy 1.3 — Balance medium and high intensity/density development with
pedestrian -oriented and bicycle -friendly design features to maximize trip and
VMT reduction.
• L.U. Policy 1.6 — Balance the impacts of new development, density, and
urbanization through the provisions of a high-level of neighborhood and
community amenities and design features.
• L.U. Policy 2.1 — Design the streetscape of high -volume corridors to balance
regional traffic flow with pedestrian movement and safety and the unique physical
environment of the area.
• L.U. Policy 2.5 — Enhance the pedestrian experience through streetscape
improvements that could include new street lighting, tree planting, and easement
dedications to increase the size of the sidewalks and pedestrian amenities.
• L.U. Policy 2.8 — Improve existing and create new gathering spaces throughout
the city to provide beautiful, comfortable, and inviting public and pedestrian
spaces, encouraging walking and public gathering spaces.
• L.U. Policy 3.1 — Provide a safe and convenient circulation system for
pedestrians that include sidewalks, crosswalks, places to sit and gather,
appropriate street lighting, buffers from moving vehicles, shading, and amenities
for people of all ages.
• L.U. Policy 4.1 — Provide bicycle facilities where shown in Figure 4.2 along all
roadways to implement the proposed network of facilities outlined in the General
Plan.
• L.U. Policy 9.2 — Coordinate with CVAG and other agencies on the planning,
design, and construction of regional non -motorized routes such as CV Link.
• H.W. Policy 7.1 — Facilitate the construction of a built environment that supports
a healthy physical and social environment for new and existing neighborhoods
and strengthens community cohesion.
• E.R. Policy 5.2 — Promote land use and development patterns that reduce the
community's dependence on, and length of, automobile trips.
• C.C. Policy 1.10 — Encourage and facilitate streetscape and building designs that
are unique to Palm Desert to create a distinctive City Center.
• C.C. Policy 2.6 — Prioritize pedestrian access in the design of public and private
facilities within the City Center Area.
• C.C. Policy 3.1 — Ensure that new public and private projects in the City Center
consider pedestrian connectivity and contribute to improving the pedestrian
network through the application of strategies such as sidewalk improvements and
pedestrian crossings.
2
RESOLUTION NO. 2019-76
• C.C. Policy 4.1/4.2 — Facilitate the development of pedestrian and bicycle
facilities that connect the City Center with surrounding neighborhoods, districts,
and centers.
WHEREAS, as contained herein, the City has endeavored in good faith to set forth
the basis for its decision on the CV Link project; and
WHEREAS, all of the findings and conclusions made by the City pursuant to this
Resolution are based upon the oral and written evidence before it as a whole; and
WHEREAS, at the said public hearing, upon hearing and considering all testimony
and arguments, if any, of all interested persons desiring to be heard, the City Council did
make the following findings to justify the approval of said request; and
WHEREAS, all other legal prerequisites to the adoption of this Resolution have
occurred.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
PALM DESERT, CALIFORNIA, AS FOLLOWS:
SECTION 1. Recitals. The City Council hereby finds that the foregoing recitals are
true and correct and are incorporated herein as substantive findings of this Resolution.
SECTION 2. Compliance with the California Environmental Quality Act. As a
responsible agency for the Project, the City Council has reviewed and considered the
information contained in the EIR, and has adopted a Notice of Determination accepting the
EIR, and that extensions of the CV Link project as described above have not created any
additional significant impacts and that an Addendum to the EIR has been prepared and
complies with the CEQA (Pub. Res. Code § 21000 et seq.: "CEQA") and the State CEQA
Guidelines.
SECTION 3. Findings on Environmental Impacts. In the City's role as a responsible
agency under CEQA, the City Council finds that the EIR prepared for the CV Link project is
complete and accurate in reporting of the environmental impacts associated with the Project.
The City Council further finds that the Addendum to the EIR has been completed in
compliance with CEQA, the State CEQA Guidelines, and the City of Palm Desert local CEQA
guidelines. The City Council further finds that all environmental impacts of the revised project
are either insignificant or can be mitigated to a less than significant level pursuant to the
mitigation measures outlined in the EIR, and the Mitigation Monitoring and Reporting Program.
The City Council further finds that there is no substantial evidence in the record supporting a
fair argument that the project may result in significant environmental impacts and that any
comments received to date regarding the project have been examined and determined not to
modify the conclusions of the Addendum to the EIR.
SECTION 4. Custodian of Records. The documents and materials that constitute the
record of proceedings on which these findings are based are located at the City's Clerk's office
at 73-510 Fred Waring Drive, Palm Desert, CA 92260. Rachelle Klassen, the City Clerk, is the
custodian of the record of proceedings.
3
RESOLUTION NO. 2019-76
SECTION 5. Execution of Resolution. The Mayor of the City Council signs this
Resolution and the City Clerk shall attest and certify to the passage and adoption thereof.
PASSED, APPROVED, AND ADOPTED by the City Council of the City of Palm
Desert, California, at its regular meeting held on the 12th day of September 2019, by the
following vote, to wit:
AYES: HARINK, JONATHAN, KELLY, NESTANDE, and WEBER
NOES: NONE
ABSENT: NONE
ABSTAIN: NoNE.
ATTEST:
CITY OF PALM DESERT, CALIFORNIA
SUSAN MARIE WEBER, MAYOR
4