HomeMy WebLinkAboutORD 175ORDINANCE NO. 175
AN ORDtNANCS OF 'PRE CITY COCNCiL OF "It CITY OF PAW
D6'ONW, CALIFORNIA, ADDING CHAVTSR 20.49, ESTABLISHING
PROPn "t IMPROVZNENT FIBS TO BZ PAID TO THE CITY FOR
TM8 PURPOSE OF MEETING CITY-WIDE DRAINAGE NEEDS.
(00ENCY ORDINANCE)
VnREAS, the City Council has found by the adoption of the
Master Drainage Plan and does again here find that subdivision as well
as development of property within the district area requires the con-
struction of facilities as not forth in the Waster Drainage Plan: and
WRIMS, the City Council has heretofore found by the adoption
of the Master Plan of Drainage and does again hereby find that the fees
as hereinafter not forth are fairly apportioned within the district
area as set forth in the Business and Professions Code of the State
of California, more particularly, Section 11543.5.
NOW, THEREFORE, the City Council of the City of Palm Desert,
California, DOES HEREBY ORDAIN as follows:
SECTION 1: That Chapter 26.49, Drainage Facilities, be
added as follows:
"Chapter 26.43, Drainage Facilities.
26.40.010 - That the City boundaries of the City of Palm
Desert are hereby declared to be the drainage area and has
hereby dreated a separate fund which shall be known as the
"Planned Local Drainage Facilities Fund". All monies col-
lected pursuant to this ordinance shall be deposited in
accordance with the laws of the State of California in said
drainage fund.
26.40.020 - No final map shall be approved and unless all
elements of the Master Plan of•Drainage within or contiguous
to said tract have been constructed or provision made for
such construction, This condition may be modified by the
City Zaginoor if the developer secures a drainage study
prepared by a California Registered Civil Znginner and
Containing a signed conclusion by such Engineer as to the
flood basard to property and structures which a twenty-five
roar (26) froqusncr storm will infltot. The City Engineer
shall thou examine each such development and issue a flood
banard report as required by State Law. Said report shall
.1.
�. 4'".r.�fti
to hied *1th the Califorsia state Mal Estate Commission
1A leatift possible flood hazard to structures,and if flood
hazard does exist$ it shall be sufficient grounds to deny
issnasce of building permits.
W-49,130 The subdivider may be required to construct all
elments of the Master Plan of Drainage which lie in or are
contiguous to the tract. The cost thereof will be deducted
from the offsite drainage charges. where the cost exceeds
the required offsite drainage charges, a reimbursement for
the excess may be provided for at the discretion of the City
Council.
26.49.040 - It shall be the responsibility of the subdivider
to construct all catch basins, storm drain laterals, junction
chambers. and drainage facilities other than the master
planned system that are within the boundaries of his subdi-
vision and deemed necessary by the City Engineer. where
street capacities exceed a ten-year (10) storm frequency,
other facilities shall be provided.
26.49.050 - There is hereby established an off -site drainage
C
fee of $1,500 per gross acre in the case of land to be
{`
subdivided. or $1,500 per net acre of improvement site, in
the case of construction or improvement of subdivided land.
The amount of fee shall be calculated on full and partial
acres, carried to the nearest 100th•of a percentage. In
the case of land to be subdivided, the fee shall apply for
any and all uses to which the land may be put. In the case
of construction or improvement of subdivided land, the fee
shall apply only to new commercial, industrial, professional,
group dwelling, or community facility us* (see Section
25.56.080 of the Palm Desert Municipal Code). Said foes
shall be collected, deposited, and expended pursuant to
Section 11543.5 of the Business and Professions Code of
the State of California and all other applicable laws of
the State of California. All necessary drainage fees
established by the City of Palm Dessrt shall be deposited
with the City prior to approval of the final map in the case
of land being subdivided, or prior to issuance of a building
pera►it in the case of construction or improvement of subdivided
.2-
f
Ordinance No. 178
h land. TM city shall have the right, in lieu of accepting
caah, pursuant to this section to accept any other proper
and valid consideration as may be determined by them.
la.d9.06Q - All drainage facilities set forth in the Master
Plan of Drainage for the City of Palm Desert are in addition
to present local drainage facilities serving the drainage
area. This chapter shall apply to all subdivisions of land
as well as developments of land within the drainage area."
SECTION Z: Because there is an urgent need for flood
drainage fees and because there are projects in the process
of being developed and it is necessary that there be a form
of regulation of said projects, and because of the necessity
of protecting the public health, safety, and welfare of the
citizens of the City of Palm Desert, this Ordinance shall
take effect upon its adoption. Pursuant to Section 66483A
of the Government Code, this Ordinance shall be applicable
to all projects filed 30 days after the enactment of this
Ordinance.
SECTION 3: The City Clerk shall certify to the passage and
adoption of this Ordinance and shall cause the same to be
published once in the Palm Desert Post, a newspaper of
general circulation, printed, published and circulated
within the City of Palm Desert, and the same shall be in
full force and effect as of this date.
PASSED, APPROVED, and ADOPTED on this 22nd day of December ,
1977, by the City Council of the City of Palm Desert, California, by
the following vote, to wit:
AYES: McPherson, Ne4rander, Wilson & Mullins
NOES: Brush
ASSENT: None
ABSTAIN: None
ATTEST:
CITT O1 PALM DEBUT, CALIFORNIA
-3-