Loading...
HomeMy WebLinkAboutC20210 CO2 PSOMAS - Desert Crossing Improvements 615-02CITY OF PALM DESERT PUBLIC WORKS DEPARTMENT STAFF REPORT REQUEST: Approve Change Order #2 to C20210 SUBMITTED BY: Mark Greenwood, P.E., City Engineer APPLICANT: PSOMAS 11444 West Olympic Boulevard Los Angeles, California 90064 DATE: July 8, 2004 CONTENTS: Change Order No. 2 Vicinity Map Recommendation: By Minute Motion; Approve Change Order #2 with Psomas (Los Angeles, CA) in the amount of $19,500 including contingency for the Highway 111 at Desert Crossings project (Project 615-02). Discussion: On June 13, 2002, City Council awarded the engineering contract for the design of the Desert Crossing Intersection Improvements to Psomas for the amount of $79,102.00, with a 10% contingency in the amount of $7,910.20. On April 10, 2003, Change Order #1 was approved in the amount of $11,000.00. This change order addresses the need for additional title, appraisal, and acquisition services in conjunction with the right-of-way necessary to complete the improvements. Change Order #2 to the Psomas Engineering contract will enable the engineers to modify the existing design plans for better traffic circulation on Highway 111. Modifications will include an extension of the left turn lanes on Northbound Highway 111 to allow greater stacking, and to accommodate more traffic entering Desert Crossings shopping center. Also, a dedicated right turn pocket into the Toys "R" Us parking lot will be added on Northbound Highway 111 at the same intersection. This will decrease the Staff Report — Change Order No. 2 to Contract No. C20210 Page 2 of 2 July 8, 2004 hindrance for through traffic on Highway 111 and improve overall circulation at the intersection. These changes need to be made within this fiscal year to allow proper time for advertisement and the bidding process to occur in support of a May 2005 construction schedule. Funds are currently available in the Measure "A" project account: 213-4347-433-4001. Therefore, the staff recommends that City Council approve Change Order #2 to Contract No. C20210 for $19,500. City Engineer Approval: ACM for De - = • en t Services City Manager Icls Department Head: Michael Errante, P.E. Director of Public Works irect of Finance G:\PubWorks\PROJECTS\615-02\Staff Reports\Change Order No. 2.doc CITY OF PALM DESERT CONSTRUCTION CHANGE ORDER P.O. # 9681 Contract # C20210 Intersection Improvements Highway 111 at Project # 615-02 Project Description: Desert Crossings Contractor Name Psomas Street Address City, State, Zip 11444 West Olympic Boulevard. Los Angeles, California 90064 Contractor Vendor # 6983 Contract Change Order # 2 Pursuant to the terms of the original contract Agreement, you are hereby directed to make the herein described changes or do the following described work not included in the plans and specifications for this Contract. Unless otherwise stated, all work shall conform to the terms, general conditions, and special provisions of the original contract. DESCRIPTION OF CHANGE Revise approved street improvement plans based upon City's comments, revise approved traffic improvement plans based upon City's comments, reestablish survey control, obtain additional survey Contingency used? (circle one) If yes, amount moved to base: Yes No Increase/Decrease in Amount 19,500.00 Contract Amount (include past change orders) 90,102.00 Plus/Minus Current Change Order 19,500.00 Revised Total Contract Amount $109,602.00 1. ORDERED BY: Department Head 3. APPROVED BY: City Manager Date Increase/Decrease in Days Contract Date of Completion Plus/Minus Current Change Order Revised Date of Completion 2. CERTIFIED FUNDS AVAILABLE Director of Finance 4. APPROVED BY: Date City Council Date We, the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all materials, perform all labor, except as may be noted above, and perform all services necessary to complete the above specified work, and hereby accept as full payment the amount shown above, which includes all direct and indirect overhead expenses fort any delays. ACCEPTED BY: ContractorNendor Date