HomeMy WebLinkAboutC21140A CO1 and C21140B Community Works Design Group - Palm Village Neighborhood Park 712-02CITY OF PALM DESERT
DEPARTMENT OF COMMUNITY DEVELOPMENT
STAFF REPORT
REQUEST: Request for rejection of all bids for Palma Village Neighborhood Park
(Contract No. C21140-B)(Project No. 712-02), direction to redesign and
rebid the project and approval of Change Order No. 1 to Contract No.
C21140-A in an amount not to exceed $15,000 for additional design
fees.
SUBMITTED BY: Jeff Winklepleck, Parks and Recreation Planning Manager
DATE: July 8, 2004
CONTENTS: Location Map
Contractor's Proposal
Cost estimate
Redesign Proposal
Plans and exhibits
Recommendation:
1. By minute motion, that the City Council reject all bids; and
2. Direct staff to redesign and rebid the project; and
3. Authorize Change Order no. 1 to Contract No. C21140-Afor an amount not to
exceed $15,000 to complete the redesign. Funds are available in Parks and
Recreation Fund 430.
Background:
The site for the Palma Village Neighborhood Park is located at the northeast corner of De
Anza Way and San Carlos Avenue. The property, which is approximately two acres in size,
was identified as a park site in the Palma Village Specific Plan (June 1985). In December
2001, the City purchased the site for a park and directed staff to begin the design process.
G ':Planning'Jeff Winklepleck wvpdocs'•PalmaV illagePark \palmavillagcconstrucaward. wpd
Staff Report
Palma Village Neighborhood Park
Page 2
July 8, 2004
Prior to designing a park, staff conducted a neighborhood meeting and received input from
interested residents. The current design, which reflects the neighborhood input, was approved
by the City Council in April 2003. The layout includes a tot lot, basketball court, sand volleyball
court, picnic pavilions, small water feature, flower garden, synthetic putting green, restroom,
and open turf area. Staffwasthen directed to proceed with the construction documents phase
and solicit bids to construct the park.
Discussion:
Bids were opened at 3:30 p.m. on Monday, June 14, 2004. Two bids were received and the
results were as follows:
James E. Simon Company (Indio)
4-Con Engineering, Inc. (Fontana)
$1,232,781.10
$1,303,621.50
The amount of the lowest bid received ($1,232,781.10) was 26% higher than the engineer's
estimate of $910,323. The estimate was completed fourteen months ago just prior to the start
of the construction document phase for the park. Since that time, construction activity has
continued to increase driving up the demand for qualified contractors which, in turn, has
resulted in higher project costs. In addition to the limited number of qualified contractors, the
increased cost of materials (primarily steel and concrete) have also driven project costs up.
Staff recommends that the City Council reject all bids and direct staff to redesign and rebid
the project. During the redesign, staff will evaluate each park component for need and identify
cost -saving opportunities which may result in revising or removing some of the amenities.
Staff has contacted Community Works Design Group, the park consultant, and discussed the
possible redesign and additional design fees. Depending on the scope of the redesign and
the extent of additional engineering necessary, they indicated that an amount not to exceed
$15,000 would cover the changes.
Submitted by:
Department Head:
Jeff Winklpl k, Parks and Recreation Phir15.r II, Director of Community evelopment
Planning Manager
G'.PlanningVeff Wink kpleck',wpdocsWalmaVillagcPark;palrmavillageconstrucaward.wpd
Staff Report
Palma Village Neighborhood Park
Page 3
July 8, 2004
Approv
Horner Croy, for Development Services
P . I _ ibson. ► - •�7�Finance
arlos L. Ortega, ity Ma
G'•.PlanningUeli N'inklepleckw•pdoes PalmaVillagePark\palmavillageconstrucaw ard.apd
liZQ]ECT
CAk hLLA HILLS PARKt
[HAYS
�tJDi�Tr :irnf;;!,c,
r_.
w nTe4F4'
;J.1NT=Y^t'J8
a
� I 41 id II4"�1r it
i.C:''' Ml! 0'4Y Ik�i�"i°lI
'I M rl I 1 4 l Vim P 44
Id11$ �I�I i1f l� �llls'1
tq'114
1444
4444[R 114e
9bYi��il'kf
44,4•ARk(7T"^.� i�'.
DE SER` 'ALAS
S LANE E—•
J-0la
CoVNTFT C11,'8
„AI] 4,4,j14 II IV' µ & �k4a1141
II IL 01,11
41 : »
Ilp Iy11,11iIlls4til6 lkldtllllld}III `
l 1-R rALLS .41, !! rn4 Nrc,, Sri UH
d, 1a�i
ramu...Tarr.q wrw Mtl•� J4JJr.ow,Vyily4
r l..+iEs
MAGNESIA FALLS/PORTOLA PARk
Ala
PALMA VI IAA E PAF$K )!
tl
` - C+OW WAIN, N
RESORT
GRAPEMNET
WAY
t4kWF.WF H
4 CLU
SPeR rS COMPLE
WASHINGTON CHARTtR SCHOOL P{
HAYSTACK NATURAL AREA
IRONWOOD PARK
F'7NN OCO
;NTT v ..08
THE
0.4
CITY OF PALM DESERT
BID OPENING
DATE: le) Y 11 TIME:'
PROJECT NAME: Fq/s...)P
CONTRACTOR
- Nt4
C =
PRICE BIDDERS
BOND
SUBCONTRA(
LIST
(NO BID WILL BE CONSIDERED UNLESS THIS DOCUMENT IS COMPLETED
IN FULL. ALL APPLICABLE ITEMS MUST BE FILLED OUT)
INFORMATION REQUIRED OF BIDDER
The bidder is required to supply the following information. Additional
sheets may be attached if necessary.
(1) Address P.O. BOX 10990
(2) Telephone No. (760)347-5399
(3) Type of Firm (Individual, Partnership or Corporation) CORPORATION
(4) Corporation organized under the laws of the State of CALIFORNIA
(5) Contractor's License No. 521795 Exp. Date 12-31-05
Contractor hereby swears under penalty of perjury that this information
providetrue and correct.
By.
S. nature
Title: % (#
Contrac o�
(6) List the names and addresses of all owners of the firm or names and titles
of all officers of the corporation:
JAMES SIMON PRESIDENT IRENE ORTIZ SECRETARY
JEFFREY HERRINGTON V.P.
JON ROESSLER V.P.
(7) Number of years' experience as a Contractor in construction work
50
(8) List at least three similar projects completed recently:
Contract Class of Date Name, Address &
Amount Work Completed Telephone No of
Owner
1. 3.8 MIL
A.B. 1-10-03 CITY OF LA OUINTA!:PARK
JOHN FREELAND
2. 700,000 A.B. 1-1-02
3. 600,000 B 1-10-02
CITY OF P.D.
JEFF WINKLEPLICK
PALM DESERT COMMUNITY PARK
CITY OF P.D.
CARPORT STRUCTURE
Jun-09-2004 11:09 From -PALM DESERT PUBLIC WORKS DEPT 7803417028 T-457 P.008/022 F-584
additional engineering and architectural expense and cost of maintaining
or construction alternate facilities occasioned by the failure to execute and
deliver said documents.
It is understood that the quantities shown hereon, except for those quantities
marked "Lump Sum", are but estimates and the final payment will be based upon
the actual work performed, subject to such adjustment and alterations as
elsewhere provided herein.
,
r
•pI
-, .:,CR.PTf0N'.:. .: ,. Ni'CF
. :..... ....va'y.TOTAL
L-1�4.1:611iflt,i.;;Z,�.,,;,,‘; :.,.. .z„:,.1 ce.�,,,M�.(,,.'
'
4,i�.01
(>i.,2:.mrKllu,.,a.M1 _...
,'' !.:1 i..r�..'''.a4iyy
MOBILIZATION
LS
,IuY,�_
$500
$ +�,o_
02
CLEARING AND GRUBBING
97110
SF
$ ./v
$ fd 7//
03
DEMOLITION- CURB AND
GUTTER, AC PAVING, BLOCK
WALL
1
LS
$
7590
$
7SD D
04
SWPPP MEASURES
1
LS
$ 5D00
$ SbOo
05
PM-10 DUST CONTROL
MEASURES
1
,
LS
$
18oa9
$
/ Say c7
06
DRAINLINE 8"
250
LF
$ 2-1-/
$ b000
07
EARTHWORK
3500
CY
$ /6.s
$ 57, 750
08
VCP SEWER CLEAN OUT
1
EA
$ & MO
$ bea'
09
3' DRAINAGE SUMP
2
EA
$ i900
$ /2
10
UNDER SIDEWALK DRAIN
1
EA
$ zero
$o
11
4' WIDE VALLEY GUTTER
460
SF
$ i0
$ 4b00
12
PLAY EQUIPMENT (2 AREAS)
1
LS
$ r qoo
$ g2Ro0
13
WATER PLAY W/ ACTIVATION
BOLLARD
1
LS
$ ib eao
$ I) iao
14
RUBBERIZED
SURFACING/AGGREGATE BASE
400
SF
$ S
$ 2-ma
15
FILTER FABRIC
1
LS
$ 3 S00
$ 35ZV
16
FIBAR PLAY MULCH
90
CY
$ -31.
$ 5420
17
PLAY AREA SHADE
STRUCTURES
2
EA
$ /SCDO
$ .?0,00o
18
CONCRETE PLAY AREA CURBS
300
LF
$ '2o
$ boo 0
19
BASKETBALL COURT PAD AND
STRIPING
1 .
LS
$ l7WO '
$ 17SDa
20
BASKETBALL EQUIPMENT
1
LS
$ e
$ 4 300
21
VOLLEYBALL EQUIPMENT
1
Ls
$ bi So
$ 40 So
22 I
VOLLEYBALL COURT CON. CURB
260
LF
$ zo
$ � 7O
23
VOLLEYBALL COURT SAND
140
CY
$ 2,r.
$ 3s770
24
PUTTING GREEN TURF/
ACCESSORIES
"L.N
3850 —
SF
$ `i.
$ 34, (iiSD
Zo
rRY PitAS 1 ERS
g
$
C-2
C:\nocuments and ScrtingsVstendell\Local Settings\Ternpunuy Internet Files OLKIA'CI 174.dnc
Jun-09-2004 1I:09 From -PALM DESERT PUBLIC WORKS DEPT 7803417098
T-457 P.007/022 F-584
1lI
I M NO
26
r1 ., rf \� I
i i TES ? SORT PT{G f `..., ; .
DRINKING FOUNTAIN
1
..0 f T,
�'
, ;_ t A%T
Al y
` UIVI'1
1
EA
$ 75"0,0
$ 7Sa0
27
BBQ GRILL
1
EA
$ g re
$ Soo
28
BENCH W/O BACK
11
°EA
$ 900
_
$ yoz
29
BENCH W/ BACK
10
EA
$ 95-00
$ Fro
30
BALL BENCH 22" DIAMETER
6
EA
$ /eoo
$ G000
31
TREE WELL
4
EA
$ /oo
$ yoo
32
PICNIC SHELTER
4
EA
$ 3 coo
$ /3bp
33
GARDEN WATER FEATURE
1
LS
$ z(,voo
$ ?4,000
34
REMOVABLE BOLLARD
7
EA
$ 500
$ -r�`oo
35
ADA ACCESS RAMP
3
EA
$ -30,0.
$ 01moo
36
PERIMETER TUBULAR STEEL
FENCE
1020
LF
$ 5-616'
$ 576/3 Co
37
PROPERTY LINE BLOCK WALL
550
LF
$ 611
$ 3y,/oo
38
ENTRY PILASTERS
6
EA
$ /PAO
$ Gooe
39
BIKE RACK
1
EA
$ zco
$ zcD
40
PICNIC TABLE- 6' ADA
ACCESSIBLE
4
EA
$ IJao
$ 4/4-00
41
CONCRETE PAVING/ SIDEWALK
23000
SF
$ 3.07
$ -70,6,10
42
MOWCURB
500
LF
$ ) 7 ,
$ es -Po
43
- CURB AND GUTTER
155
LF
$ zs-
$ 3875
44
ASPHALT PARKING LOT
103
TONS
$ 11c!
$ /3 207
45
ADA / PARKING LOT STRIPING
1
LS
$ 2coo '-$
Uoo
46
SOIL PREP/FINE GRADING
53000
SF
L$ ,/3
$ &BOO
47
WEED ABATEMENT
53000
SF
$ .'b
$ 3! go
48
90 'AY MAINTENANCE AND
53000
SF
$ ,) 3
$ 40840
PLANT ESTABLISHMENT
49
EXISTING TREE PROTECTION
1
LS
$ J/V GL
$ /4)41.-
50
GROUNDCOVERS (LINERS)
1130
EA
$ 2,1 M-
$ -2-5 3 1. ZD
51
SHRUBS (1 GAL.)
280
EA
$ 17 1
$ J Rs, W
52
SHRUBS (5 GAL.)
80
EA
$ 2,9.g.-
$ 1 I'l.. e?
53
VINES (5 GAL.)
13
EA
$ 24,
$ 338
54
TREES (24" BOX)
51
EA
$ zb S
$ / 3/0643
55
PALMS (8' BT)
Z
EA
$ a 47)-& ei
$ z Nv qv
56
STRUCTURAL SOIL ROOT
GUARD a@ TREE WELLS
90
CY
$ /120, ?
$ : 1o72-
57
TURF SOD
17015
SF
$ ‘ ,7
$ /1, ei00. o5
58
BOULDERS 2'-3' DIAMETER
25
EA
$ /23,)-
$ wo
59
BOULDERS 3'-4' DIAMETER
18
EA
$ z/z.8
$ ?g3o,Jib
60
BOULDERS 4'-5' DIAMETER
14
EA
$ 32,./,7
$ q.-4/5-.80
61
DECOMPOSED GRANITE Lau
C nstruction Pla
1
LS
$ /�/qy0
$ ' �9Ld
62
CALSENSE CONTROLLER
1
LS
$ /34<Vo
$ /3,sV4/0.
C-3
C''Oocumcncs and Settings \nmodel I\Local Scinngs\Temporary Internet Files\OLfG A\C 1.C4.doc
Jun-09-1004 11:10 From -PALM DESERT PUBLIC WORKS DEPT
7803417098
T-457 P.008/022 F-584
! E(v#,NC
63
ITEM •RESCf�1PTT Qh1 ... �,
IRRIGATION SYSTEM-ROTOR-
SPRAY -DRIP AND BUBBLER
;
UNIT$
49150
�:, T,
• ' UN IT
.,..:CQ , „!
$ ' 9z
. „T T(L ,...
$ 1/612 / 8
SF
64 -
1 W' WATER MCTCR
1
(6V
- CA
$-
.
65-
2" RP BACKFLOW PREVENTER
(CVWD)
1
EA
$
$
66
1" WATCR DOMCCTIC METER
(CVWD
1
EA
$
$
07
1" RP DACKFLOW
PRC NTCLR
1
EA
$
$
68
WATER 2 %" MAINLINE
2050
LF
$ 3,?y
$ loeMs? .
69
4" VCP SEWER LATERAL
80
LF
$ G 1,7s-
$ SS'oo
70
ELECTRICAL SERVICE/MA1N
SWITCHBOARD
1
LS
_ i.So0
$ /Soo
71
LIGHTING FIXTURES
1
LS
$ 67,1,9D
$ 47, eve
72
CONDUIT, CONDUCTOR & MISC.
1
LS
$ tggr
$ Vf'P,000
73
ELECTRICAL CONNECTION TO
WATER FEATURE/ CONTROLLER
1
LS
$ ->So
$ 7so
74
PRE-FAB RESTROOM
1
LS
$ i3oopo
$ /30,eb0
75
SITE/ PAD PREPARATION
835
SF
$ z.aq
$ 249G45
76
UTILITY CONNECTION TO
RESTROOM
1
LS
$ 3QW
$ 3000
77
AGGREGATE BASE
—TREES
1
LS
$ 31-00
$ -sad
78
(15 GAL.)
gl
EA
I G72--
$ /s 5'5 &
TOTAL BID PRICE
$
The costs of any work shown or required in the Plans and Specifications, but not
specifically identified as a Pay Item are included in the Pay Item, and no additional
compensation shall be due Contractor by virtue of Contractor's compliance with
the Plans and Specifications.
TOTAL AMOUNT BASE BID IN FIGURES $ / 23 2./ 74SPV, /0
TOTAL AMOUNT BASE BID IN WORDS ONE
IN WITNESS WHEREOF Contractor cuted this proposal as of date set forth
on Page C-1:
By:
Signature
Title: aa.e 'C��G%�'��� I1
ontractor
C-4
C:'Documcnts ar.d S ttings\ntcndcl1ll.ocaI Settings\Temporary Interact Files\QLK)A\C"1-C4.doc
/7c
COMMUNITY WORKS DESIGN GROUP Page:1
PRELIMINARY COST ESTIMATE
DATE: 03/01/03
C. 1IIVIM1C CT: /1IVICLIN I'ICRIVUVIV
PROJECT: PALMA VILLAGE PARK FINAL CONCEPT
PROJECT # 020165
DESCRIPTION
UNIT TOTAL
QTY. UNIT COST COST
DEMOLITION AND CLEARING
CURB AND GUTTER 130 L.F. $5.00 $650
CLEAR AND GRUB 97110 S.F. $0.15 $14,567
MOBILIZATION 1 ALLOW $3,000.00 $3,000
GRADING/ DRAINAGE
DRAINLINE 8" 250 L.F. $25.00 $6,250
EARTHWORK 3350 C.Y. $4.50 $15,075
CATCH BASIN 3 EACH $500.00 $1,500
CONSTRUCTION
PLAY GROUND
PLAY EQUIPMENT 2 L.S. $40,000.00 $80,000
PLAY AREA CURB 12"X14" 300 L.F. $25.00 $7,500
3" CONCRETE BASE 400 S.F. $2.50 $1,000
FILTER FABRIC 4400 S.F. $1.00 $4,400
WATER PLAY 1 L.S. $15,000.00 $15,000
RUBBER MATTING 400 S.F. $15.00 $6,000
WOOD MULCH 90 C.Y. $18.00 $1,620
SHADE STRUCTURE (FABRIC) 2 EACH $15,000.00 $30,000
BASKETBALL
4" CONCRETE W/ #4 REBAR 18" O.C. 5300 S.F. $5.00 $26,500
POLE/BACKBOARD/HOOP/NET 2 EACH $2,500.00 $5,000
SURFACE STRIPING 500 L.F. $1.00 $500
VOLLEYBALL
VOLLEYBALL EQUIP 1 EACH $800.00 $800
VOLLEYBALL SAND 140 C.Y. $25.00 $3,500
VOLLEYBALL CURB 260 L.F. $25.00 $6,500
PUTTING GREEN
ARTIFICIAL TURF/ACCESSORIES 2000 S.F. $7.50 $15,000
SITE FEATURES
BBQ GRILL 1 EACH $600.00 $600
BENCH W/O BACK - METAL (6') 11 EACH $625.00 $6,875
BENCH W/BACK - METAL (6') 10 EACH $725.00 $7,250
BALL BENCH 22" DIA. 6 EACH $1,200.00 $7,200
BIKE RACK 1 EACH $500.00 $500
DRINKING FOUNTAIN 2 EACH $2,500.00 $5,000
DRINKING FOUNTAIN SUMP 2 EACH $750.00 $1,500
DATE: 03/01/03
CO I IIVIH IC C T: HIVICLIH I-1CRIVUVIN Page:2
PROJECT: PALMA VILLAGE PARK FINAL CONCEPT
PROJECT # 020165
DESCRIPTION
UNIT TOTAL
QTY. UNIT COST COST
PICNIC TABLE - 6' (H.C. ACCESS) 4 EACH $950.00 $3,800
TREE WELL 4 EACH $150.00 $600
PICNIC SHELTER W/BLOCK POST 4 EACH $35,000.00 $140,000
GARDEN FEATURE 1 EACH $0.00 $0
BOLLARDS (REMOVABLE) 7 EACH $600.00 $4,200
TRASH RECEPTACLE 6 EACH $600.00 $3,600
ADA ACCESS RAMP 3 EACH $150.00 $450
WALLS/FENCES
TUBULAR STEEL FENCE - 6'
1020 L.F. $50.00 $51,000
HARDSCAPE
ASPHALT PAVING (3") W/SEAL COAT 2700 S.F. $1.50 $4,050
CONCRETE PAVING - 4" 25000 S.F. $5.50 $137,500
6" CURB AND GUTTER 150 L.F. $20.00 $3,000
LANDSCAPING
SOIL PREP/FINE GRADING 53000 S.F. $0.25 $13,250
WEED ABATEMENT 51000 S.F. $0.05 $2,550
90 DAY MAINTENANCE PERIOD 51000 S.F. $0.09 $4,590
SHRUBS (1 GAL) 1450 EACH $7 $10,150
SHRUBS (5 GAL) 370 EACH $15 $5,550
SPECIALTY SHRUBS (5 GAL) 150 EACH $20 $3,000
TREES (15 GAL) 10 EACH $85.00 $850
TREES (24" BOX) 16 EACH $250.00 $4,000
TREES (36" BOX) 6 EACH $575.00 $3,450
ROOTBARRIER 4 EACH $24.00 $96
PALMS (8' B.T.) 8 EACH $70.00 $560
TURF HYDROSEED 39000 S.F. $0.10 $3,900
VINES (1 GAL) 105 EACH $7.00 $735
D.G. COVER 125 C.Y. $35.00 $4,375
IRRIGATION/ WATER/ SEWER
AUTOMATIC IRRIGATION SYSTEM
LARGE AREAS 40000 S.F. $0.75 $30,000
SMALL AREAS 11000 S.F. $1.50 $16,500
BACKFLOW PREVENTER 2 EACH $3,000.00 $6,000
CONTROLLER 1 EACH $5,000.00 $5.000
WATER METER - 2" 1 EACH $4,000.00 $4.000
SEWER LINE - 6" 100 L.F $25.00 $2,500
ARCHITECTURE
PRE-FAB RESTROOM 1 ALLOW $96,000.00 $96,000
LIGHTING/ ELECTRICAL
DATE: 03/01/03
GO 1 IIVIM 1 C D T t11VICLIH fICRIVUVIV Page:3
PROJECT: PALMA VILLAGE PARK FINAL CONCEPT
PROJECT # 020165
DESCRIPTION
UNIT TOTAL
QTY. UNIT COST COST
BASKETBALL COURT LIGHTS
PLAY AREA LIGHTS
VOLLEYBALL COURT LIGHTS
CONDUIT, CONDUCTOR & MISC ITEMS
SERVICE/MAIN SWITCHBOARD
SECURITY WALKWAY LIGHTS
4 EACH $2,500
4 EACH $2,500
4 EACH $2,500
1 ALLOW $5,000.00
1 ALLOW $10,000.00
12 EACH $2,200.00
$10,000
$10,000
$10,000
$5,000
$10,000
$26,400
MISCELLANEOUS
CURB PAINT 20 L.F. $1.00 $20
STRIPING - SINGLE LINE STALLS 8 EACH $20.00 $160
STRIPING (H.C.)-EMBLEM & SIGN 1 EACH $200.00 $200
SUBTOTAL $910,323
10.00% CONTINGENCY $91,032
**a
GRAND TOTAL $1,001,355
07/01/2004 THU 13:30 FAX 909 3694039 CWDG
1 002/005
A
DtSIGN GROUP
LANll5CAPt. A RCNIIi:CTURE
4649 Brockton keno
Riverside, C192506
(909) 369.0100
Fox (909) 369.4039
email: coi worksrcnne.nct
htip: //www,cotnworksdu,cont
CA license #2t 10
@V l.ironen 92119
June 30, 2004
Mr. Jeff Winklepleck,
Parks and Recreation Planning Manager
CITY OF PALM DESERT
73-510 Fred Waring I)rivc
Palm Desert, California 92260-2578
RE: Proposal for Professional Scrviccs - Palma Village Neighborhood Park
Dear Mr. Winklcplcck:
On behalf of the Design Team of Community Works Design Group (CWDG), we are
pleased to present this proposal to continue with our professional design services for the
City of palm Desert.
SCOPE OF SERVICES
Services provided by the Design 'ream will reflect City and community expectations.
We will review and revise the existing 13id Documents to better reflect the City's project
budgetary requirements. Ifnceded, Engineering services will be considered within a separate
work authorization and is outside this Proposal's scope of work.
A. REVISE CONSTRUC"1'X)N DOCUMENTS
Our office will revise the Construction Documents until 100% complete, where
they will be turned over to City staff and Departments as required for final review.
t. CONS'1'IZUC"I'ION DRAWINGS: Revise Construction Drawings and
Details to match, the revised scope.
2. IRRiGATH.)N PLANS: Rcvisc Irrigation Plans and Details as necessary to
match the revised scope.
3. PLANTING Pi.,ANS: Rcvisc Irrigation Plans and Details as necessary to
match the revised scope.
4. SPEC1FICATTdNS: Revise the Project Specifications detailing the revised
rnaterials and workmanship for all of the above items.
5. COST ESTIMATES: Final estimates ofprobable costs will be prepared for
review.
Received JuI-01-2004 12:35
From-000 3$94030 To —PALM DESERT PUBLIC W Page 002
07/01/2004 THU 13:30 FAX 909 3694039 CWDG [1003/005
PALMA VILLAGE NEIGHBORHOOD PARK June 30, 2004
6. DOCUMENT PROC:ESSINO: We will submit the documents for City and various agency
approvals. We will review documents and make all necessary corrections.
FEE PROPOSAL
Thc following is our proposed fee for the Scope of Work outlined for Palma Village Neighborhood Park.
-Construction Documents and
•Rcimbursablcs per Attachment I
Total Fee Not to Exceed $15,000
A. Our fees will be billed at our Normal Hourly Rates per Attachment 1.
13. Provisions of Attachment I and 2 are an integral part of this proposal as if herein written in full.
Thc members of the Design Team and 1 appreciate your consideration cf our team for this important project
and we look forward to continuing our great working relationship with the City of Palm Desert.
Respectfully submitted,
COMMJJNITY WORKS DESIGN GROUP
Timothy I. Maloney ASLA, C:PRS
Landscape Architect
License Number 2110
Page 2
Received Jul-01-200d 1215
From-000 3504030 To -PALM DESERT PUBLIC W Page 003 .
07/01/2004 THU 13:30 FAX 909 3694039 CWDG ? 004/005
PALMMIA VILLAGE NEIGHBORHOOD) PARK .June 30, 2004
ATTACHMENT - 1
NORMAL HOURLY RATES
Principal Landscape Architect's
time at the fixed rate of:
Landscape Architect's
time at the fixed rate of:
I..andscape Designer's
time at the fixed rate of:
Professional Staf('s
time at the fixed rate of:
$115.00 per 1-Tour
$ 95.00 per Hour
$ 75.00 per [-lour
$ 55.00 per Hour
OUTSIDE C:ONSULTANTS
Services of outside consultants not listed in this proposal., at our direct cost, plus 15% of the actual cost of
their services for coordination,
RI IMI3URSA13L1 ITEMS
Reimbursable items, such as the cost of blueprint, graphic reproduction and photo copying, al our direct cost
plus 15%. Auto travel shall he charged at 35 cents per mile.
TERMS AND CONDITIONS OF PAYMENT
We will bill in proportion to the percentage of work complete al the time crf billing.
Page 3
Received Jul-01-2004 12:35
From-909 3694039 To -PALM DESERT PUBLIC W Page 004
07/01/2004 THU 13:30 FAX 909 3694039 CWDG gj005/005
PALMA 'VILLAGE NEIGHBORHOOD PARK. June 30. 2004
A'r'rAC:HNI NT - 2
ADDITIONAL SERVICES
Additional Services shall be performed only when requested or approved by the City. Compensation for such
services shall be in accordance with our Nortnal Hourly Rates and Reimbursable items per Attachment l .
Additional services may include, but are not limited to:
1. Making measurements or drawings of existing construction when requested by thc City.
2. Revising previously approved drawings to accomplish changes ordered by the City.
3. Any work requcstcd by the City that is not heretofore mentioned.
4. Civil .Engineering services.
5. Electrical Engineering services.
cars RESPONSIBILITY
1. City to provide all available data possible regarding the site information and surrounding properties.
2. Complete info1i nation concerning available services and utilities for all contract areas.
3. Assist with coordinating thc approval process with City departments and provide as -built plans to
the extant possible.
4. Development restrictions. program restrictions and other such data.
l'slge 4
Received Jul-01-2004 12:35
From-909 3594039 To -PALM DESERT PUBLIC W Page 005