HomeMy WebLinkAboutC22760 Parsam Construction - Fred Waring Soundwall between Deep Canyon and Yellow Sage 653-01REQUEST:
CITY OF PALM DESERT
PUBLIC WORKS DEPARTMENT
STAFF REPORT
Authorize Award of Contract No. C22760 to Parsam
Construction Inc. for the Construction of the Fred Waring
Drive Soundwall Between Deep Canyon Road and Yellow
Sage (Project 653-01)
SUBMITTED BY: Mark Greenwood, P.E.
CONTRACTOR: Parsam Construction Inc.
3334 Barnes Circle
Glendale, CA 91208
DATE: June 10, 2004
CONTENTS: Agreement
Vicinity Map
Recommendation:
By Minute Motion:
1. Authorize Award of Contract No. C22760 to Parsam
Construction Inc., of Glendale, California, for the
Construction of the Fred Waring Drive Soundwall
between Deep Canyon Road and Yellow Sage, in the
amount of $1,385,420.00.
2. Set aside $138,542.00 as 10% contingency.
Discussion:
On January 9, 2003, City Council approved a Reimbursement Agreement
between Coachella Valley Association of Governments (CVAG), the City of
Indian Wells, and the City of Palm Desert for the design engineering services for
the widening of Fred Waring Drive to six lanes from Phyllis Jackson to
Washington Street. As a portion of this project, the area between Deep Canyon
Road and Phyllis Jackson was identified for widening.
As a portion of this project a soundwall is to be constructed, as part of the
mitigation to the categorical exemptions.
Staff Report
Award Contract C22760 for construction of the Fred Waring Drive Soundwall
Page 2of2
June 10, 2004
On June 1, 2004, the City Clerk opened and read aloud the following bids:
Parsam Construction Inc. (Glendale, CA)
Denboer Eng. & Const., Inc. (Palm Springs, CA)
$1,385,420.00
$2,193,810.00
Funds are available for this project in Account No. 400-4399-433-4001.
Therefore, staff recommends that City Council by minute motion, authorize award
of Contract No. C22760 to Parsam Construction, Inc., in the amount of
$1,385,420.00, and authorize a 10% contingency.
Mark Greenwood, P.E.
City Engineer
Approval:
for Dev- : D - nt Services
City Manage
MG:AR/cls
Department Head:
Michael Erranie, P.E.
Director of Public Works
O
Finance Director
G:IPubWorksIPROJECTSk653-011Staf3 Reports\STAFF REPORT -Award construction contract. dot
Contract No. C22760
AGREEMENT
THIS AGREEMENT is made and entered into this 10th day of June, 2004, by
and between City of Palm Desert, California, hereafter called "Owner", and Parsam
Construction Inc., hereinafter called "Contractor".
WITNESSETH
RECITALS:
Contractor has submitted to Owner its Contractor's Proposal for the construction
of Owner's Project, the following:
FRED WARING DRIVE WIDENING BETWEEN DEEP CANYON AND YELLOW SAGE
- SOUND WALL, PROJECT NO. 653-01, CONTRACT NO. C22760 , in strict
accordance with the Contract Documents identified below and Owner has accepted
said Proposal.
1. Contractor states that it has re-examined its Contractor's Proposal and found it to
be correct, has ascertained that its subcontractors are properly licensed and
possess the requisite skill and forces, has examined the site and Contract in
accordance with the Contract Documents for the money set forth in its Proposal
to be paid as provided in the Contract Documents.
AGREEMENT:
IT IS AGREED BY THE PARTIES AS FOLLOWS:
1. Contract Documents: The entire contract consists of the following: (a) The
Agreement; (b) The Notice Inviting Bids; (c) The Instruction to Bidders; (d) The
Contractor's Proposal; (e) The Bidder's Bond; (f) The Performance Bond; (g)
The Payment Bond; (h) The General Conditions; (i) The Special Provisions; (j)
The Standard Specifications as modified in other portions of the Contract
Documents; (k) The Plans; (I) Addenda Nos.1&2; (m) The Determination of
Prevailing Wage Rates for Public Work; (n) Any Change Orders issued; (o) Any
additional or supplemental specifications, notices, instructions and drawings
issued in accordance with the provisions of the Contract Documents. All of said
Documents presently in existence are by this reference incorporated herein as if
here set forth in full and upon the proper issuance of their documents they shall
likewise be deemed incorporated.
2. Contractor shall commence the work within ten calendar days after the date of
the Notice to Proceed and will do all things necessary to construct the work
generally described in Recital No. 1 in accordance with the Contract Documents
and will complete said work within sixty (60) calendar days from the Notice to
Proceed date to the satisfaction of the Engineer.
G-1
Contract No. C22760
3. Contractor agrees to indemnify, defend and save Owner and its officers, agents
and employees, and the Engineer harmless from:
a) Any and all liability, claims, damages, losses or injuries to any person or
other entity, including injury to Contractor's employees, and all claims
which arise from or are connected with the negligent performance of or
failure to perform the work or other obligations of this Agreement, or which
are caused or which are claimed to be caused by the negligent or
intentional acts or omissions of Contractor, its subcontractors, its agents
or employees, and, all expenses of investigating and defending against
same.
b) Any and all liability, claims, damages, losses or injuries to any and all
contractors, subcontractors, material -men, laborers, or any other person,
firm or corporation furnishing or supplying work, services, materials or
supplies in connection with the performance of the Agreement.
Attention is directed to the General Specifications - Claims, Liability, and
Indemnity Agreement/Hold Harmless sections, (pages, GS-18, GS-26, and GS-
29) which specifications are made part of this Agreement as set forth in
Agreement paragraph 1, above.
4. Attention is directed to Section 6-9, "Liquidated Damages" of the Standard
Specifications and is hereby amended to the substitute the "City of Palm Desert"
in place of "Agency." Attention shall be directed to "Order of Work" within these
provisions. Failure of the Contractor to complete work within the time allowed for
each phase as stated in "Order of Work" within these provisions will result in
damages being sustained by the City of Palm Desert. The liquidated damages
shall be $2,500 dollars per calendar day of delay.
5. Should any litigation or arbitration be commenced between the parties
concerning the works of improvements as referenced herein, the prevailing party
in any such litigation, being the Owner or the Contractor, should be entitled to a
reasonable sum for attorney's fees incurred in any such litigation relating to this
Contract.
6. This Agreement shall be binding upon all parties hereto and their respective
heirs, executors, administrators, successors, and assigns.
7. Contractor shall be paid in the manner set forth in the Contract Documents the
amount of its Proposal as accepted by Owner, subject to such additions and
deductions as may be made pursuant to the Contract Documents and applicable
law.
G-2
Contract No. C22760
Satisfactory Performance
The prime contractor agrees to pay each subcontractor under this prime contract
for satisfactory performance of its contract no later than 10 days from the receipt
of each payment the prime contractor receives from City of Palm Desert. Any
delay or postponement of payment from the above referenced time frame may
occur only for good cause following written approval of the City of Palm Desert.
Release of Retention
The prime contractor agrees further to release retention payments to each
subcontractor within 30 days after the subcontractor's work is satisfactorily
completed. Any delay or postponement of payment from the above referenced
time frame may occur only for good cause following written approval of the City
of Palm Desert.
8. Execution of the Agreement by the parties constitutes their agreement to abide
by all applicable provisions of the California Labor Code; constitutes Contractor's
certification that he is aware of the provisions of said Code and will comply with
them; and further constitutes Contractor's certification as follows:
"I am aware of the provisions of Section 3700 of the California Labor Code
which requires every employer to be insured against liability for worker's
compensation or to undertake self insurance in accordance with the provisions
of that Code, and I will comply with such provisions before commencing the
performance of the work of this contract."
IN WITNESS WHEREOF the parties hereto have executed or caused to be executed
by their duly authorized officials, this Agreement which shall be deemed an original on
the date first above written.
CONTRACTOR:
BY: ATTEST BY:
Signature to be notarized
TITLE: TITLE:
G-3
OWNER:
BY:
ATTEST BY:
Signature to be notarized
Contract No. C22760
TITLE: Mayor of Palm Desert, CA TITLE: City Clerk of Palm Desert, CA
AGREEMENT APPROVED AS TO CONTENT:
MARK GREENWOOD, P.E. DAVID J. ERWIN,
CITY ENGINEER CITY ATTORNEY
G-4
Contract No. C22760
PERFORMANCE BOND
KNOW ALL MEN BY THESE PRESENTS: That whereas the City of Palm
Desert has awarded to Parsam Construction Inc. after designated as the "Principal," a
contract for:
FRED WARING DRIVE WIDENING BETWEEN DEEP CANYON AND
YELLOW SAGE - SOUND WALL
PROJECT NO. 653-01
CONTRACT NO. C22760
WHEREAS, said Principal is required under the terms of said contract to furnish
a good and sufficient bond for the performance of said contract:
NOW THEREFORE, we Parsam Construction Inc., the Principal, and
as Surety, are held and firmly bound unto the City of Palm
Desert hereinafter called the Owner, in the penal sum of One Million Three Hundred
Eighty Five Thousand Four Hundred Twenty and 00/100 Dollars ($1,385,420.00) being
100% of the contract amount in lawful money of the United States of America for the
payment of which sum well and truly to be made, we hereby bind ourselves, our heirs,
executors, administrators, and successors, jointly and severally, firmly by these
presents.
THE CONDITION OF THIS OBLIGATION IS SUCH that if the above bounded Principal,
his executors, heirs, administrators, and successors, or assigns, shall in all things stand
to and abide by, and well and truly keep and perform the covenants and agreements in
the said contract and any alterations thereof made as therein provided, on his or their
part, to be kept and performed at the time and in the manner therein specified, and in
all respects according to their true intent and meaning, and shall indemnify and save
harmless the Owner, its officers and agents, as therein stipulated, then this obligation
shall become null and void; otherwise, it shall be and remain in full force and virtue.
And the said Surety, for value received, hereby stipulates and agrees that no change,
extension of time, alteration or addition to terms of the contract or to the work to be
performed there under or the specifications accompanying the same shall in any wise
affect its obligations on this bond, and it does hereby waive notice of any such change,
extension of time, alterations or additions to the terms of the contract or to the work or
the specifications.
Should it become necessary for the Owner to institute a lawsuit or any other legal
proceeding to enforce the terms and conditions of this bond, then all costs of said
proceeding, including attorneys' fees, shall be awarded to the prevailing party.
H-1
Contract No. C22760
IN WITNESS WHEREOF, identical counterparts of this instrument, each of which shall
for all purposes be deemed an original thereof, have been duly executed by the
Principal and Surety above named, on this day of
20
CONTRACTOR:
BY: ATTEST BY:
Signature to be notarized
TITLE: TITLE:
OWNER:
BY:
TITLE: Mayor of Palm Desert, CA
APPROVED AS TO CONTENT:
ATTEST BY:
TITLE: City Clerk of Palm Desert, CA
MARK GREENWOOD, P.E. DAVID J. ERWIN,
CITY ENGINEER CITY ATTORNEY
H-2
Contract NO. C22760
CITY OF PALM DESERT
PAYMENT BOND
KNOW ALL MEN BY THESE PRESENTS:
THAT WHEREAS, the City of Palm Desert (sometimes referred to hereinafter as
"Obligee") has awarded to Parsam Construction Inc. (hereinafter designated as the
"Contractor"), an agreement dated June 10, 2004, described as follows: FRED
WARING DRIVE WIDENING BETWEEN DEEP CANYON AND YELLOW SAGE -
SOUND WALL, PROJECT NO. 653-01, CONTRACT NO. C22760, (hereinafter
referred to as the "Contract"); and
WHEREAS, said Contractor is required to furnish a bond in connection with said
Contract, and pursuant to Section 3247 of the Califomia Civil Code;
NOW, THEREFORE, we, Parsam Construction Inc., the undersigned Contractor, as
Principal, and a corporation organized
and existing under the laws of the State of , and duly
authorized to transact business under the Taws of the State of California, as Surety, are
held and firmly bound unto the City of Palm Desert and to any and all persons,
companies or corporations entitled to file stop notices under Section 3181 of the
California Civil Code, in the sum of One Million Three Hundred Eighty Five Thousand
Four Hundred Twenty and 00/100 Dollars ($1,385,420.00), said sum being not less
than one hundred percent (100%) of the total amount payable by the said Obligee
under the terms of the said Contract, for which payment well and truly to be made, we
bind ourselves, our heirs, executors and administrators, successors and assigns, jointly
and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, that, if said Contractor, his or its
heirs, executors, administrators, successors or assigns, or Subcontractors, shall fail to
pay for any materials, provisions or other supplies, implements, machinery or power
used in, upon, for or about the performance of the Public Work contracted to be done,
or to pay any person for any work or labor of any kind, or for bestowing skills or other
necessary services thereon, or for amounts due under the Unemployment Insurance
Code with respect to such work or labor, or for any amounts required to be deducted,
withheld, and paid over to the Employment Development Department from the wages of
employees of said Contractor and his or its Subcontractors pursuant to Section 13020
of the Unemployment Insurance Code with respect to such work and labor as required
by the provisions of Section 3247 through 3252 of the Civil Code, or for any amounts
required to be deducted, withheld, and paid over to the Franchise Tax Board or Internal
Revenue Service from the wages of employees of the Contractor or his or its
Subcontractors, the Surety or Sureties hereon will pay for the same in an amount not
exceeding the sum specified in this bond, otherwise the above obligation shall be void.
In addition to the provisions herein above, it is agreed that this bond will inure to the
benefit of any and all persons, companies and corporations entitled to serve stop
notices under Section 3181 of the Civil Code, so as to give a right of action to them or
their assigns in any suit brought upon this bond.
I-1
Contract No. C22760
The Surety, for value received, hereby stipulates and agrees that no change, extension
of time, alteration or addition to the terms of the said Contract or to the work to be
performed thereunder or the Specifications accompanying the same shall in any way
affect its obligations on this bond, and it does hereby waive notice of any such change,
extension of time, alteration or addition to the terms of the Contract or to the
Specifications.
No final settlement between the Obligee and the Contractor hereunder shall abridge the
right of any beneficiary hereunder, whose claim may be unsatisfied.
Contractor and Surety agree that if the Obligee is required to engage the services of an
attorney in connection with the enforcement of the bond, each shall pay Obligee's
reasonable attorney's fees incurred, with or without suit, in addition to the above sum.
IN WITNESS WHEREOF, we have hereunto set our hands and seals this
day , 20
PRINCIPAUCONTRACTOR: SURETY:
(Typed Name of Contractor) (Typed Name of Surety)
By: By:
(Signature) (Signature of Attorney -in -Fact)
(Typed Name and Title) (Typed Name of Attorney -in -Fact)
The rate of premium on this bond is per thousand.
The total amount of premium charged: $
(the above must be filled in by corporate surety).
IMPORTANT: Surety companies executing bonds must possess a certificate of
authority from the Califomia Insurance Commissioner authorizing them to write surety
insurance defined in Section 105 of the California Insurance Code, and if the work or
project is financed, in whole or in part, with federal, grant or loan funds, it must also
appear on the Treasury Department's most current list (Circular 570 as amended).
THIS IS A REQUIRED FORM.
I-2
Contract No. C22760
Any claims under this bond may be addressed to:
(Name, Address, and Telephone Number of Surety Company
(Name, Address and Telephone Number of agent or representative for service of
process in California if different from above)
I-3
• ":.
•
•
AlaLDAIIMS141-
"",..... •
_ • -
•• -
7111.11gAMIVA f
.•
. „ .
•
b-
, -..;;- --:__i_...i__.„ r.,____•___„, . .
.--
/
. 1.: • ; , -1
. •--..1 - - - - .,', :
' -.T..' .1- •--.
\\'
\ ..
- _
• •
1-it' • -•-
•- - .- • IL__ ..
.44
14
1.14
1.1
• .
— •
74- • 7:
/
1_4 .
E..L;
/- •
•,— ---\ • t-_-•
;-_7•
•
•
--- :7 : 1,;.-••,.
•
, •••• '
• ---
•
J9
TI
—15'11003
t--"1
•
ta-ca
-3L111;m7ff\s
31003:;1-14 •
czi 9
• "--.•
31003