STAFF REPORT
Award Contract No. C22620 to NPG Corporation for the
2004 Curb, Gutter & Cross Gutter Repair Program
Mark Greenwood, P.E., City Engineer
NPG Corporation
1354 Jet Way
Perris, CA 92571
May 17, 2004
Agreement
List of Repair Locations
Vicinity Map
Recommendation:
By Minute Motion:
1) Award Contract No. C22620 to NPG Corporation for the 2004
Curb, Gutter, and Cross Gutter Repair Program in the amount of
$239,665.10.
2) Set aside $23,966.51 as 10% Contingency.
Discussion:
The annual Curb, Gutter, and Cross -Gutter Repair Program includes the
locations shown on the attached map and list.
On May 12, 2004, at 9:30 a.m., sealed bids were received by the City Clerk,
opened and read aloud with the following results:
NPG Corporation (Perris, CA)
IPS (San Bernardino, CA)
Contereras Construction (Indio, CA)
$239,665.10
$247,723.00
$307,469.35
G:IPubWorks\Staff Reports120041May 271Award Contract to NPG for Curb & Gutter Program.doc
Staff Report
Award Contract No. C22620 — 2004 Curb, Gutter & Cross Gutter Program
May 27, 2004
Page2of2
The bids were reviewed and it has been determined that NPG Corporation of
Perris, California, is the lowest responsible bidder.
Funds are available as follows:
PW-Curb and Gutter 110-4312-433-3320
PW-Cross Gutter 110-4313-433-3320
CIP-Sidwalk 400-4616-433-4001
Therefore, staff recommends that City Council, by Minute Motion, award the
subject contract to NPG Corporation.
Submitted By:
A
Mark Greenw od .E/6-1r1—.
City Engineer
Approval:
ACM for Develop " en ervices
City Manager
/sd
Department Head:
Michael Errante, P.E.
Director of Public Works
Finance Director
G:1PubWorks\Staff Reports120041May27.4ward Contract to NPG for Curb & Gutter Program.doc
AGREEMENT
THIS AGREEMENT is made and entered into this 27th day of May, 2004,
by and between City of Palm Desert, California, hereafter called "Owner",and
NPG Corporation hereinafter called "Contractor".
WITNESSETH
RECITALS:
Contractor has submitted to Owner its Contractor's Proposal for the
construction of Owner Project,
1. Contractor has submitted to OWNER its Contractor's Proposal for the
construction of OWNER'S Project: 2004 CURB, GUTTER AND CROSS
GUTTER REPAIR PROGRAM, PROJECT NO. 753-04, in strict accordance
with the Contract Documents identified below and OWNER has accepted
said Proposal.
2. Contractor states that it has re-examined its Contractor's Proposal and
found it to be correct, has ascertained that its Subcontractors are properly
licensed and possess the requisite skill and forces, has examined the site
and Contract in accordance with the Contract Documents for the money set
forth in its Proposal to be paid as provided in the Contract Documents.
AGREEMENT:
IT IS AGREED BY THE PARTIES AS FOLLOWS:
1. Contract Documents: The entire contract consists of the following: (a) The
Agreement; (b) The Notice Inviting Bids; (c) The Instruction to Bidders; (d)
The Contractor's Proposal; (e) The Bidder's Bond; (f) The Performance
Bond; (g) The Payment Bond; (h) The General Conditions; (i) The Special
Provisions; (j) The Standard Specifications as modified in other portions of
the Contract Documents; (k) The Plans; (I) Addenda Nos. 1 and 2; (m)
The Determination of Prevailing Wage Rates for Public Work; (n) Any
Change Orders issued; (o) Any additional or supplemental specifications,
notices, instructions and drawings issued in accordance with the provisions
of the Contract Documents. All of said Documents presently in existence
are by this reference incorporated herein as if here set forth in full and upon
the proper issuance of their documents they shall likewise be deemed
incorporated.
2. Contractor shall commence the work within ten calendar days after the date
of the Notice to Proceed and will do all things necessary to construct the
work generally described in Recital No. 1 in accordance with the Contract
Documents and will complete said work within 60 (Sixty) calendar days
from the Notice to Proceed date to the satisfaction of the Engineer.
G-1
3. Contractor agrees to indemnify, defend and save Owner and its officers,
agents and employees, and the Engineer harmless from:
a. Any and all liability, claims, damages, losses or injuries to any person or
other entity, including injury to Contractor's employees, and all claims
which arise from or are connected with the negligent performance of or
failure to perform the work or other obligations of this Agreement, or
which are caused or which are claimed to be caused by the negligent or
intentional acts or omissions of Contractor, its subcontractors, its agents
or employees, and, all expenses of investigating and defending against
same,
b. Any and all liability, claims, damages, losses or injuries to any and all
contractors, subcontractors, material -men, laborers, or any other
person, firm or corporation furnishing or supplying work, services,
materials or supplies in connection with the performance of the
Agreement.
Attention is directed to the General Specifications pages 25-26 and 33-37,
which specifications are made part of this Agreement as set forth in
Agreement paragraph 1, above.
Attention is directed to Section 6-9, "Liquidated Damages" of the Standard
Specifications and is hereby amended to the substitute the "City of Palm
Desert" in place of "Agency." Liquidated damages shall be $1,000.00 per
calendar day of delay.
4. Should any litigation or arbitration be commenced between the parties
concerning the works of improvements as referenced herein, the prevailing
party in any such litigation, being the Owner or the Contractor, should be
entitled to a reasonable sum for attorney's fees incurred in any such
litigation relating to this Contract.
5. This Agreement shall be binding upon all parties hereto and their respective
heirs, executors, administrators, successors, and assigns.
6. Contractor shall be paid in the manner set forth in the Contract Documents
the amount of its Proposal as accepted by Owner, subject to such additions
and deductions as may be made pursuant to the Contact Documents and
applicable law.
G-2
Satisfactory Performance
The prime Contractor agrees to pay each Subcontractor under this prime
contract for satisfactory performance of its contract no later than 10 days
from the receipt of each payment the prime Contractor receives from City of
Palm Desert. Any delay or postponement of payment from the above
referenced time frame may occur only for good cause following written
approval of the City of Palm Desert.
Release of Retention
The prime Contractor agrees further to release retention payments to each
Subcontractor within 30 days after the Subcontractor's work is satisfactorily
completed. Any delay or postponement of payment from the above
referenced time frame may occur only for good cause following written
approval of the City of Palm Desert.
7. Execution of the Agreement by the parties constitutes their agreement to
abide by all applicable provisions of the California Labor Code; constitutes
Contractor's certification that he is aware of the provisions of said Code and
will comply with them; and further constitutes Contractor's certification as
follows:
"I am aware of the provisions of Section 3700 of the California
Labor Code which requires every employer to be insured against
liability for worker's compensation or to undertake self insurance in
accordance with the provisions of that Code, and I will comply with
such provisions before commencing the performance of the work of
this contract."
IN WITNESS WHEREOF the parties hereto have executed or caused to be
executed by their duly authorized officials, this Agreement which shall be deemed
an original on the date first above written.
Contractor:
BY: ATTEST BY:
Signature to be notarized
TITLE: TITLE:
Owner:
BY: ATTEST BY:
Signature to be notarized
TITLE:Mavor of Palm Desert, CA TITLE:City Clerk of Palm Desert, CA
G-3
APPROVED AS TO CONTENT:
MICHAEL J. ERRANTE DAVID J. ERWIN,
DIRECTOR OF PUBLIC WORKS CITY ATTORNEY
PERFORMANCE BOND
KNOW ALL MEN BY THESE PRESENTS: That whereas the City of Palm
Desert has awarded to NPG Corporation
hereinafter designated as the "Principal", a contract for:
2004 Curb and Gutter, Cross Gutter and Sidewalk Repair Program
PROJECT NO. 753-04
CONTRACT NO. C22620
WHEREAS, said Principal is required under the terms of said contract to furnish a
good and sufficient bond for the performance of said contract:
NOW THEREFORE, WE, . NPG Corporation, the Principal, and
as Surety, are held and firmly bound
unto the City of Palm Desert hereinafter called the Owner, in the penal sum of
Two Hundred Thirty Nine Thousand Six Hundred Sixty Five and 10/100 Dollars
($239,665.10) being 100% of the contract amount in lawful money of the United
States of America for the payment of which sum well and truly to be made, we
hereby bind ourselves, our heirs, executors, administrators, and successors,
jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH that if the above
bounded Principal, his executors, heirs, administrators, and successors, or
assigns, shall in all things stand to and abide by, and well and truly keep and
perform the covenants and agreements in the said contract and any alterations
thereof made as therein provided, on his or their part, to be kept and performed at
the time and in the manner therein specified, and in all respects according to their
true intent and meaning, and shall indemnify and save harmless the Owner, its
officers and agents, as therein stipulated, then this obligation shall become null
and void; otherwise, it shall be and remain in full force and virtue.
And the said Surety, for value received, hereby stipulates and agrees that
no change, extension of time, alteration or addition to terms of the contract or to
the work to be performed there under or the specifications accompanying the
same shall in any wise affect its obligations on this bond, and it does hereby waive
notice of any such change, extension of time, alterations or additions to the terms
of the contract or to the work or the specifications.
Should it become necessary for the Owner to institute a lawsuit or any other legal
proceeding to enforce the terms and conditions of this bond, then all costs of said
proceeding, including attorneys' fees, shall be awarded to the prevailing party.
H-1
IN WITNESS WHEREOF, identical counterparts of this instrument, each of
which shall for all purposes be deemed an original thereof, have been duly
executed by the Principal and Surety above named, on this
day of , 20
SURETY PRINCIPAL
BY:
BY:
INSURANCE COMPANY and/or AGENT
ADDRESS
TELEPHONE NUMBER
H-2
CITY OF PALM DESERT
PAYMENT BOND
KNOW ALL MEN BY THESE PRESENTS:
THAT WHEREAS, the City of Palm Desert (sometimes referred to hereinafter
as "Obligee") has awarded to NPG Corporation (hereinafter designated as
the "Contractor"), an agreement dated May 27, 2004, described as follows:
2004 Curb and Gutter, Cross Gutter and Sidewalk Repair Program,
PROJECT NO. 753-04, CONTRACT NO. C22620, (hereinafter referred to as
the "Contract"); and
WHEREAS, said Contractor is required to furnish a bond in connection with said
Contract, and pursuant to Section 3247 of the California Civil Code;
NOW, THEREFORE, we, NPG Corporation, the undersigned Contractor, as
Principal, and a corporation organized and
existing under the laws of the State of , and duly authorized
to transact business under the laws of the State of California, as Surety, are held
and firmly bound unto the City of Palm Desert and to any and all persons,
companies or corporations entitled to file stop notices under Section 3181 of the
California Civil Code, in the sum of Two Hundred Thirty Nine Thousand Six
Hundred Sixty Five and 10/100 Dollars ($239,665.10), said sum being not Tess
than one hundred percent (100%) of the total amount payable by the said Obligee
under the terms of the said Contract, for which payment well and truly to be made,
we bind ourselves, our heirs, executors and administrators, successors and
assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, that, if said Contractor, his or
its heirs, executors, administrators, successors or assigns, or Subcontractors,
shall fail to pay for any materials, provisions or other supplies, implements,
machinery or power used in, upon, for or about the performance of the Public
Work contracted to be done, or to pay any person for any work or labor of any
kind, or for bestowing skills or other necessary services thereon, or for amounts
due under the Unemployment Insurance Code with respect to such work or labor,
or for any amounts required to be deducted, withheld, and paid over to the
Employment Development Department from the wages of employees of said
Contractor and his or its Subcontractors pursuant to Section 13020 of the
Unemployment Insurance Code with respect to such work and labor as required
by the provisions of Section 3247 through 3252 of the Civil Code, or for any
amounts required to be deducted, withheld, and paid over to the Franchise Tax
Board or Internal Revenue Service from the wages of employees of the Contractor
or his or its Subcontractors, the Surety or Sureties hereon will pay for the same in
an amount not exceeding the sum specified in this bond, otherwise the above
obligation shall be void. In addition to the provisions herein above, it is agreed
that this bond will inure to the benefit of any and all persons, companies and
corporations entitled to serve stop notices under Section 3181 of the Civil Code,
so as to give a right of action to them or their assigns in any suit brought upon this
bond.
I-1
The Surety, for value received, hereby stipulates and agrees that no change,
extension of time, alteration or addition to the terms of the said Contract or to the
work to be performed thereunder or the Specifications accompanying the same
shall in any way affect its obligations on this bond, and it does hereby waive notice
of any such change, extension of time, alteration or addition to the terms of the
Contract or to the Specifications.
No final settlement between the Obligee and the Contractor hereunder shall
abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.
Contractor and Surety agree that if the Obligee is required to engage the services
of an attorney in connection with the enforcement of the bond, each shall pay
Obligee's reasonable attorney's fees incurred, with or without suit, in addition to
the above sum.
IN WITNESS WHEREOF, we have hereunto set our hands and seals this
day of , 20
PRINCIPAL/Contractor: SURETY:
(Typed Name of Contractor) (Typed Name of Surety)
By: By:
(Signature) (Signature of Attorney -in -Fact)
(Typed Name and Title) (Typed Name of Attorney -in -Fact)
The rate of premium on this bond is per thousand.
The total amount of premium charged: $
(the above must be filled in by corporate surety).
IMPORTANT: Surety companies executing bonds must possess a certificate of
authority from the California Insurance Commissioner authorizing them to write
surety insurance defined in Section 105 of the California Insurance Code, and if
the work or project is financed, in whole or in part, with federal, grant or loan
funds, it must also appear on the Treasury Department's most current list (Circular
570 as amended). THIS IS A REQUIRED FORM.
I-2
Any claims under this bond may be addressed to:
(Name, Address and Telephone No. of Surety)
(Name, Address and Telephone No. of agent
or representative for service of process in California if different from above)
I-3
CITY OF PALM DESERT
2004 Curb & Gutter, Cross Gutter and Sidewalk Repair Program
LIST OF REPAIR LOCATIONS
LOCATION STREET & DESCRIPTION
1 Shepherd Lane and Kokopelli Circle
Remove and replace cross gutter as marked in the field. Sawcut, remove
and replace AC 6" full depth. Remove and replace curb/gutter of curb
return.
2 Shepherd Lane and Daisy Lane
Remove and replace cross gutter as marked in the field. Sawcut, remove
and replace AC 6" full depth. Remove and replace curb/gutter of curb
return.
3
4
5
6
7
8
9
Grapevine Street and White Stone Lane
Remove and replace cross gutter as marked in the field. Sawcut, remove
and replace AC 6" full depth. Remove and replace curb/gutter of curb
return.
45-644 Verba Santa Drive
Install 8" type II barrier curb per CPD Standard. Install curb on southerly
property line just behind curb easterly to top of driveway approach.
73-300 Royal Palm Drive
Install 6' wide sidewalk per CPD Standard. Install between existing
driveways on Royal Palm Drive and San Anselmo Avenue. Remove
existing turf, tree, and remove and replace any existing irrigation lines.
Joshua Road — East Side
Remove and replace 6" type I curb/gutter from 43-630 Joshua Road
southerly to next catch basin. Sawcut, remove and replace AC 6" full
depth.
Joshua Road — West Side
Remove and replace 6" type I curb/gutter from Cholla Street southerly to
next property line. Install drywell per CPD Standard at end point of
installation. Sawcut, remove and replace AC 6" full depth.
Dinah Shore Drive
Remove and replace 8" type II median curb on Dinah Shore Drive west
of Monterey Avenue to Miriam Way. Sawcut, remove and replace AC 9"
full depth.
Palm Desert Country Club
Indiana and Illinois Avenue. Install drywell per CPD Standard at low
spot. Sawcut, remove and replace AC 6" full depth. Sawcut, remove
and replace PCC.
10 Monterey Avenue
Southeast corner of Monterey Avenue and Fred Waring Drive. Remove
and replace sidewalk around existing Verizon vault. Remove whole
panels.
Green Way
East of Palm Valley Channel. Remove type 1 curb/gutter east of existing
driveway to location marked in field. Install driveway approach per CPD
Standard to same location. Install 8' wide sidewalk to same limits.
Sawcut, remove and replace AC 6" full depth.
12 Alessandro Avenue — North Side
East of Portola Avenue to west of Santa Ynez. Install 6' wide sidewalk at
various locations within this limit. Remove and relocate all mailboxes.
Remove and dispose of existing AC used for parking. Install ADA
access ramps at Cabrillo and Santa Ynez. Remove and replace existing
trees and irrigation in conflict. Remove and replace shrubs and irrigation
in conflict. Adjust water meters to grade. Remove and dispose of PCC
hardscape and rock beds in conflict.
13 Cabrillo and Highway 111
South side of the frontage road, approximately 400' east of Cabrillo, east
of the existing bus stop. Remove and replace existing 8" type I curb and
gutter 5' south of existing location for 120'. Sawcut, remove and replace
AC 9" full depth