Loading...
HomeMy WebLinkAboutC22440 CO1 Garza Landscaping - LMA 2CITY OF PALM DESERT PUBLIC WORKS DEPARTMENT STAFF REPORT REQUEST: Approve Change Order #1 to Contract No. C22440, (Landscape Maintenance Area No. 2), for the Landscape Maintenance of the Charger Sculpture Landscape Area to Garza Landscaping, Inc. SUBMITTED BY: H. Spencer Knight, Landscape Manager APPLICANT: Garza Landscaping, Inc. 81-101 Indio Boulevard Indio, California 92201 DATE: November 18, 2004 CONTENTS: Proposal Change Order No. 1 Vicinity Map Recommendation: By minute motion, accept Garza Landscaping, Inc. proposal of $80.00 per month for the Landscape Maintenance of the Charger Sculpture Landscape Area. Discussion: The Charger Sculpture was relocated to the present location on the east side of Highway 74, between El Paseo and Highway 111, in February 2002. The landscape around the sculpture was completed in early summer of 2004. The maintenance is currently being invoiced on a month -to -month bases. The proposal given by Garza Landscape is consistent with the cost for similar work being done in Landscape Maintenance Area No. 2. G.\PubWorks\Stall Reports\2004\November 18\Change Order No 1 to Contract No C 22440 doc Staff Report — Change Order #1 to LMA 2 Page 2of2 November 18, 2004 Funds are currently available in landscape maintenance account number 110-4611- 453.33-70. Therefore, the staff recommends that City Council approve Change Order #1 to Contract No. 22440 for $560.00, for the remainder of fiscal year 2004/2005. Submitted By: H. Sp cer n • ht L dsc pe ager Approval: ACM for Dev ent Services City Manager /jI Department Head: Michael Erran e, P.E. Director of Public Works Director of Finance G \PubWorks\Staff Reports\2004\November 18\Change Order No 1 to Contract No C 22440 doc GARZA LANDSCAPING INC. Contract No. C22440 81-101 Indio Blvd. Bldg B-1 Indio, CA 92201 Phone 760 775-9988 Fax 760 342-0722 PROPOSAL FOR THE LANDSCAPING MAINTENANCE OF PALOMINO CHARGER PROJECT August 17, 2004 CITY OF PALM DESERT We hereby propose to furnish equipment and labor necessary to maintain the landscaping of Palomino Charger Project perimeter common areas along Hwy 74 between El Paseo and Hwy 111 This project shall receive service level "A" and all terms and condition as per contract #C22230 - trim trees and shrubs (natural appearance) - weed all beds as needed - rake D.G. in beds for good appearance - pick up all litter and debris - re -stake trees if needed - check and repair sprinkler systems - control pest as needed - mow lawns Garza shall perform the above work for the sum of: Eighty dollars ($80.00) per month. Submitted by: GARZA LANDSCAPING INC. Zeke Garza president ACCEPTANCE OF PROPOSAL: signature date CITY OF PALM DESERT CONSTRUCTION CHANGE ORDER Project Description: Contractor Name Street Address City, State, Zip Landscape Maintenance Area No. 2 Garza Landscaping, Inc. 81-101 Indio Blvd. Indio, California 92201 P.O. # Contract # C22440 Project # 904-XX Contractor Vendor # 5364 Contract Change Order #1 Pursuant to the terms of the original contract Agreement, you are hereby directed to make the herein described changes or do the following described work not included in the plans and specifications for this Contract. Unless otherwise stated, all work shall conform to the terms, general conditions, and special provisions of the original contract. DESCRIPTION OF CHANGE Addition to Landscape Maintenance Area No.2, the Charger Sculpture Landscape Area to Garza Landscaping, Inc. Contingency used? (circle one) If yes, amount moved to base: Yes No Increase/Decrease in Amount $560.00 Increase/Decrease in Days Contract Amount (include past change orders) $115,860.00 Plus/Minus Current Change Order $ 560.00 Revised Total Contract Amount $116,420.00 1. ORDERED BY: Department Head 3. APPROVED BY: City Manager Date Contract Date of Completion Plus/Minus Current Change Order Revised Date of Completion 2. CERTIFIED FUNDS AVAILABLE Director of Finance 4. APPROVED BY: Date City Council Date We, the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all materials, perform all labor, except as may be noted above, and perform all services necessary to complete the above specified work, and hereby accept as full payment the amount shown above, which includes all direct and indirect overhead expenses fort any delays. ACCEPTED BY: ContractorNendor Date 111002 O fetsaim MAGNESIA PALLS DR ALESSANDRO DR fA/RWAY DR V P7 1101 JAY P70110/ HAYSTACK RD 11,002 hht Ci t 14 17 I W e e r701101 [ ° . 1 e 1Ar1M ° w 0 IZl I� 1AY011Y/ i iS 0 i 1 14 Z o N a V LOC o117 f et km 4e re 1Ar�A111N Ar'A1i11N • JD00, 2 MO fA/RWAY DR • AVM