HomeMy WebLinkAboutR21620 CO1 David Evans and Associates - Leach Field at Freedom Park 713-00CITY OF PALM DESERT PUBLIC WORKS DEPARTMENT STAFF REPORT REQUEST: Ratify the City Manager's authorization of Change Order #1 to Contract No. R21620 for Design of a Leach Field at Freedom Park (Project 713-00) SUBMITTED BY: Mark Greenwood, P.E., City Engineer APPLICANT: David Evans and Associates, Inc. 800 North Haven Avenue, Suite 300 Ontario, CA 91764 DATE: April 14, 2005 CONTENTS: Change Order #1 Vicinity Map Recommendation: By Minute Motion: Ratify the City Manager's authorization of Change Order #1 to Contract No. R21620 for Design of a Leach Field at Freedom Park Discussion: A major problem for the City of Palm Desert, and the Public Works Department specifically, is nuisance water. The flow of water through gutters and cross gutters poses a safety issue and a pavement maintenance issue. Country Club Drive near Tamarisk Row Drive highlights some of the issues that arise when dealing with a constant flow of nuisance water from over watering landscapes. The Public Works Department would like to take advantage of a perfect test site for a leach field system which will eliminate nuisance waters from pooling on the street surface and creating a hazard. The proposed soccer field at Freedom Park provides a large area where water can be infused into the sub -surface. A catch basin would be constructed on Country Club Drive, west of the proposed soccer field to send the nuisance water through a filtering process then flow through a series of pipes to percolate into the ground, well under the playing surface. Staff Report — Change Order #1 to Contract R21620 Page 2 of 2 April 14, 2005 Under normal circumstances, the nuisance water would not flow onto the field. However, this system would be designed so that during a flood event, the soccer field would act as a detention basin to protect the businesses in the industrial complex down stream from flooding. During the last rainstorms, the businesses received a considerable amount of flooding in the parking lots and, in some cases, in the buildings. During a storm, the water would bubble out onto the soccer field, which would provide a large area where the storm water could be detained. The engineers under contract to design Freedom Park have agreed to design this leach field and to redesign the soccer field to accommodate this proposed system. They have submitted a proposal of $16,200 for the extra work. The City Manager has approved the change order and funds are available in drainage account 420-4291-433-4001. Therefore, staff recommends that City Council, by minute motion, ratify the City Manager's authorization of Change Order #1 to Contract No. R21620 for Design of a Leach Field at Freedom Park. Submitted By: k -. 2 Mark Greenwood, P.E. City Engineer Approval: pp: Homer Cro ACM for v Carlos Orteg City Manager pment Services Department Head: Michael rrante, P.E. Director of Public Works Paul Gibson Finance Director G:IPubWorkslStaff Reports1200514pril 141Ratify City Manager authorization Leach Field Freedom Park. doc CITY OF PALM DESERT CONSTRUCTION CHANGE ORDER P.O. # 11033 Contract # R21620 Project # 713-00 Project Description: Freedom Park Contractor Name David Evans and Assoc Contractor Street Address 800 North Haven Ave, Ste 300 Vendor # 6180 City, State, Zip Ontario, CA 91764 Contract Change Order # 1 Pursuant to the terms of the original contract Agreement, you are hereby directed to make the herein described changes or do the following described work not included in the plans and specifications for this Contract. Unless otherwise stated, all work shall conform to the terms, general conditions, and special provisions of the original contract. _DESCRIPTION OF CHANGE Engineering for leach field subsurface to the soccer field at freedom park. Design will also include a sand and oil separator to filter the water prior to reintroduction to the ground. Change Order is for $15,700. There is also an allowance of $500 for reimbursables. Contingency used? (yes / no) I No I Increase/Decrease in Amount I $ If yes, amount moved to base: $ Increase/Decrease in Days Contract Amount (include past change orders) $296,210 Contract Date of Completion Plus/Minus Current Change Order $ 15,700 Plus/Minus Current Change Order Reimbursable allowance $ 500 Revised Total Contract Amount $312,410 Revised Date of Completion 1. 7ORDER7 :2. CERTIFI UN AVAILABLE Department Head Director ofritance Date 3. APPROVED BY: 4. APPROVED BY: City Manager Date City Council Date We, the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all materials, perform all labor, except as may be noted above, and perform all services necessary to complete the above specified work, and hereby accept as full payment the amount shown above, which includes all direct and ' di ct over expenses fort any delays. ACCEPTED BY: . - � 2y- 05 � rractorNe dor Date CITY OF PALM DESERT CONSTRUCTION CHANGE ORDER Project Description: Freedom Park Contractor Name David Evans and Assoc Street Address 800 North Haven Ave, Ste 300 City, State, Zip Ontario, CA 91764 P.O. # 11033 Contract # R21620 Project # 713-00 Contractor Vendor # 6180 Contract Change Order # 1 Pursuant to the terms of the original contract Agreement, you are hereby directed to make the herein described changes or do the following described work not included in the plans and specifications for this Contract. Unless otherwise stated, all work shall conform to the terms, general conditions, and special provisions of the original contract. _DESCRIPTION OF CHANGE Engineering for leach field subsurface to the soccer field at freedom park. Design will also include a sand and oil separator to filter the water prior to reintroduction to the ground. Change Order is for $15,700. There is also an allowance of $500 for reimbursables. Contingency used? (yes / no) No If yes, amount moved to base: $ Contract Amount (include past change orders) Plus/Minus Current Change Order Reimbursable allowance Revised Total Contract Amount Department Head 3. APPROVED BY: City Manager Increase/Decrease in Amount $ Increase/Decrease in Days $296,210 Contract Date of Completion $ 15,700 Plus/Minus Current Change Order $ 500 $312,410 Revised Date of Completion 2. CERTIFI NDS AVAILABLE Director f Fiq ari Date 4. APPROVED BY: Date City Council Date We, the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all materials, perform all labor, except as may be noted above, and perform all services necessary to complete the above specified work, and hereby accept as full payment the amount shown above_ which includes =tractondor— w expenses fort anv delays. ACCEPTED BY: -j-2y oS Date CITY OF PALM DESERT CONSTRUCTION CHANGE ORDER Project Description: Freedom Park Contractor Name David Evans and Assoc Street Address 800 North Haven Ave, Ste 300 City, State, Zip Ontario, CA 91764 P.O. # 11033 Contract # R21620 Project # 713-00 Contractor Vendor # 6180 Contract Change Order # 1 Pursuant to the terms of the original contract Agreement, you are hereby directed to make the herein described changes or do the following described work not included in the plans and specifications for this Contract. Unless otherwise stated, all work shall conform to tie terms, general conditions, and special provisions of the original contract. _DESCRIPTION OF CHANGE Engineering for leach field subsurface to the soccer field at freedom park. Design will also include a sand and oil separator to filter the water prior to reintroduction to the ground. Change Order is for $15,700. There is also an allowance of $500 for reimbursables. Contingency used? (yes / no) I No Increase/Decrease in Amount I $ If yes, amount moved to base: I $ increase/Decrease in Days Contract Amount (include past change orders) $296,210 Contract Date of Completion Plus/Minus Current Change Order $ 15,700 Plus/Minus Current Change Order Reimbursable allowance $ 500 Revised Total Contract Amount $312,410 Revised Date of Completion 1. ORDE D BY: 2. CERTIFI UNDS AVAILABLE Department Head Director n n Date 3. APPROVED BY: 4. APPROVED BY: City Manager Date City Council Date We, the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all materials, perform all labor, except as may be noted above, and perform all services necessw to complete the above specified work, and hereby accept as full payment the amount shown above, which includes all direct and indjrgct overP446 expenses fort any delays. ACCEPTED BY: Co actor dor Date CITY OF PALM DESERT PUBLIC WORKS DEPARTMENT INTEROFFICE MEMORANDUM To: Carlos L. Ortega, City Manager From: Michael Errante, P.E., Director of Public Works Date: March 16, 2005 Subject: LEACH FIELD DESIGN A major problem for the City of Palm Desert, and the Public Works Department specifically, is nuisance water. The flow of water through gutters and cross gutters poses a safety issue and a pavement maintenance issue. Country Club Drive near Tamarisk Row Drive highlights some of the issues that arise when dealing with a constant flow of nuisance water from over watering landscapes. The Public Works Department would like to take advantage of a perfect test site for a leach field to eliminate nuisance waters from pooling on the surface and creating a hazard. The proposed soccer field at Freedom Park provides a large area where water can be infused into the sub -surface. The nuisance water would not flow onto the field. It would go through a filtering process then flow through a series of pipes and leach into the ground well under the playing surface. This system would be designed so that during a flood event, the businesses in the industrial complex down stream would receive protection from flooding. During the last rainstorms, the businesses received a considerable amount of flooding in the parking lots and, in some cases, in the buildings. During a storm, the water would bubble out onto the soccer field which would provide a large area where the storm water could be detained. The engineers under contract to design Freedom Park have agreed to design this leach field and to redesign the soccer field to accommodate this proposed system. They have submitted a proposal of $16,200 for the extra work. Please sign this memo to authorize this change order to the Freedom Park design contract. Public Works will take this to the City Council for ratification if approved. Public Works has money available for this drainage project in the CIP drainage Fund 420. APPROVAL: Carlos a, City Manager GAPubWorks\Ryan Gayler\Word Files\Memos\memo-Carlos leach field at freedom park.doc Page 1 of 1 PALM DESERT Freedom Park PALM DESERT RESORT COUNTRY CLUB SUN CITY PALM DESERT COUNTRY CLUB DR. NOT TO SCALE