HomeMy WebLinkAboutC22300 CA2 Harris & Associates - Include Striping Plan to Cook Street Widening 601-05CITY OF PALM DESERT PUBLIC WORKS DEPARTMENT STAFF REPORT REQUEST: Approve Contract Amendment No. 2 to Contract No. C22300 with Harris & Associates to include a Striping Plan for Cook Street Widening (Project Number 601-05). SUBMITTED BY: Armando Rodriguez, P.E. CONTRACTOR: Harris & Associates 34 Executive Park, Suite 150 Irvine, California 92614-4705 DATE: August 25, 2005 CONTENTS: Contract Amendment No. 2 to Contract No. C22300 Vicinity Map Recommendation: By minute motion, approve Contract Amendment No. 2 to Contract No. C22300 with Harris & Associates to expand the scope of work to include a Striping Plan for the Cook Street Widening (Project No. 601-05), in the amount of $17,500.00. Executive Summary: The Cook Street Widening from Fred Waring Drive to Frank Sinatra Drive is part of the Five Year Capital Improvement Program, and the project is scheduled to begin this fiscal year. Harris & Associates is currently designing the Portola Avenue, Country Club Drive and Cook Street Storm Drain Improvements (Project No. 505-03). Because the firm has already engineered plans of Cook Street for a large section of the street to be affected by the Cook Street Widening, staff determined that an economy of scale savings would be realized by contracting with Harris & Associates to engineer the striping plan for the Cook Street Widening. Staff Report — Contract Amendment #2 to Contract C22300 Harris & Assoc. Page 2 of 2 August 25, 2005 Discussion: On February 12, 2004, City Council approved Contract No. 22300. This contract provided for professional engineering services to design the storm drain system for Portola Avenue, Country Club Drive, and Cook Street. Much of the area on Cook Street to be improved by the storm drain system is also part of the upcoming Cook Street Widening Project. On June 24, 2004 Council approved Contract Amendment 1 to include the Hydrology Study for the Monterey Avenue Storm Drain between Fred Waring and the Whitewater Channel. The Cook Street Widening Project will provide a six -lane arterial from Fred Waring Drive to Frank Sinatra Drive. The project includes traffic signal modifications, utility relocations and drainage improvements. The road construction will alleviate the traffic congestion that currently exists on Cook Street. CVAG will be contributing 50% of the project costs up to a maximum of $2.75 Million. There may be some areas along Cook Street that will require only re -striping to accommodate the expansion from four lanes to six lanes. Because Harris & Associates already has engineered drawings of the area, staff would like to have them study the areas of Cook Street between Fred Waring Drive and Frank Sinatra Drive to determine what portions of the roadway may be able to accommodate six lanes of traffic at its current width. Funds are available for this Contract Amendment in the project account for the Cook Street Widening: 213-4385-433-4001. Therefore, staff recommends that City Council approve Contract Amendment No. 2 to Contract No. 22300 with Harris and Associates to include a Striping Plan for Cook Street Widening (Project No. 601-05). Submitted By: A Armando Rodrigo , P.0 Senior Engineer Approval: I/ A for 6lopment Services City Manager Department Head: Michael 4ErraP.E. Director of Public Works Finance Director G. PubWorkslStaff Reportsi2005Wugus7 250pprove Hams Assoc CO #2 C22300 Cook S! WKdenrng 60f-05. doc •`^iu+;/CITY OF PALM DESERT CONTRACT AMENDMENT P.O. # 11245 Contract # 22300 Project # 505-03/601-05 Project Description: Cook Street Widening Striping Plan Contractor Name Harris $ Associates Contractor Street Address 120 Mason Circle Vendor # 6862 City, State, Zip Concord, CA 94520 Contract Amendment # 2 Pursuant to the terms of the original contract Agreement, you are hereby directed to make the herein described changes or do the following described work not included in the plans and specifications for this Contract. Unless otherwise stated, all work shall conform to the terms, general conditions, and special provisions of the original contract. DESCRIPTION OF CHANGE Expand scope of work to include re -striping plan from Fred Waring to Frank Sinatra (Cook Street Widening P601- 05). Contingency used? (yes no Increase/Decrease in Amount $ 17,500.00 If yes, amount moved to base: , $ Increase/Decrease in Days Contract Amount (include past amendments) 476,775.00 Contract Date of Completion Plus/Minus Current Amendments 17,500.00 Plus/Minus Current Amendment Revised Total Contract Amount $ 494,275.00 Revised Date of Completion 1. ORDERED BY: Department Head 3. APPROVED BY: City Manager Date 2. CERTIFIED FUNDS AVAILABLE Director of finance Date 4. APPROVED BY: City Council Date We, the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all materials, perform all labor, except as may be noted above, and perform all services necessary to complete the above specified work, and hereby accept as full payment the amount shown above, which includes all direct and indirect overhead expenses fort any delays. ACCEPTED BY: ContractorNendor Date jaa=j 00VU 00£`6 OOZ`9 006,E 099` 6 0 VIJI dNIS )INVIIJ 013AMa JNIlJVM a31H WOIJJ MAL'affli 10 3AV H18£ Ndld ONIdIHIS 133HIS M003 L3 NO Va1VNIS MNVa� veld a4!S N�a ri