HomeMy WebLinkAboutC23670A CO1 David Volz Design Fred Waring Soundwall 654-01GITY OF PALM DESERT
PUBLIC WORKS DEPARTMENT
STAFF REPORT
REQUEST: Approve Change Order No. 1 to Contract No. C23670A with
David Volz Design for Fred Waring Drive Widening
Soundwall (Project 654-01)
SUBMITTED BY: Mark Greenwood, P.E.,-City Engineer
APPLICANT: David Volz Design
17060 Bushard Street, Suite 300
Fountain Valley, California 92708
DATE: December 8, 2005
CONTENTS: Change Order No. 1
Proposal
Vicinity Maps
Recommendation:
By minute motion:
1. Approve Change Order No. 1 to Contract No. C23670A
for Landscape Architecture Services to David Volz
Design, of Fountain Valley, California for Fred Waring
Drive Widening Soundwall Aesthetic Treatment, in the
amount of $29,000.
2. Move $3,300 from contingency to base.
3. Authorize the Mayor to execute the change order.
Discussion:
On May 26, 2005 City Council approved Contract No. C23670A with David Volz
Design for the design of the soundwall aesthetic treatment for incorporation into
the construction documents of the Fred Waring Drive Soundwall Project, in the
amount of $33,000 plus a 10% contingency.
David Voltz was originally hired to design the architectural treatment of the
soundwalls because there was not sufficient right-of-way to safely accommodate
and maintain parkway landscaping along Fred Waring Drive between California
Approve Change Order No. 1 to C23670A
Page 2 of 2
December 8, 2005
Avenue and Tennessee Avenue. Therefore, the soundwall design provides for
the use of an architecturally enhanced double-wall design that will provide an
attractive soundwall appearance. In February, 2005 the Landscape
Beautification Committee approved the soundwall aesthetic treatment.
In addition, David Voltz is being retained to design the aesthetic treatment of the
soundwalls at the Desert Breezes and Waring Court communities. These
architectural treatments will also be presented to the Landscape and
Beautification Committee for their approval.
The attached proposal from David Volz Design outlines the cost of this additional
scope of work which includes architectural treatment design, preparation of plans
and specifications, and construction support. Funds are available in the Fred
Waring Drive widening project account.
Therefore, staff recommends that City Council, by minute motion, approve
Change Order No. 1 to Contract No. C23670A, with David Volz Design for the
design of the aesthetic treatment of the Fred Waring Drive Soundwall (Project
654-01) in the amount of $29,Q00, authorize moving $3,300 of contingency to
base, and authorize the Mayor to execute the change order. Funds for the
remaining $25,700 are available in praject account number 400-4399-433-4001.
Submitted By:
�
��
Ma Greenwood, P.E.
City Engineer
Department Head:
�.J�C�'G�"�!�./
M' el Errante, P.E. G�
Director of Public Works
ApprovaL•
Fiomer Croy �
ACM for Dev I ment Services
,%//�/�►,,
. . . -.:
r
Paul Gibson
Finance Director
/cls(dhl
G:IPub WorkslStaNReportsl2005lDecem6er 8l7Approve C01 to Volz 654-011Approve C09 C23670A David Volz for Fred Waring Soundwall 65401.doc
VICINITY MAP
Fred War���� Drive Soundwall at Deser� Breezes
� � I
� �J
�
I r
I I i
� �^ `
� _ I�,I�IIII f1 1 1
� = � ����� .
� � �.�...--�- � i i � �
�' - �� I I t = � �
� � I . r, � i
-� � - I � I .� � �
- �`� - I I I I I h: �
- ��� ' I �� �. �
-� ��— 1! I I I II I I I I I I 1 I
----� -' �.�
� ��� �
� - � .
� - ��
� �
� �:' ��r � �
� � � ��
i � � � �
� � � � �
�
��
�
°� �
�" �
�; �
�.
r��
�� ����
a
�
�
Z
�
�
�
�
C.±
Z
�
�
a
J
a
0
Z
_
�
Z
Z
0
�
W
�
0
�
Z
�
a
�
0
�
�
�
�
�
�
: •� •� .� �
� ;. . .: �. � � . �
� .. .� � �
� � �
� �
�
� �
�..
� �_ �. .. �.
�
�
�■
�
.■ .
��
� i'■ "= �
,i �■
�■ � "■
■r�■
�
■ �
:� ■ .■
� �■
r-
� ����� ���
�
���'�� �
�
�.�
�
_ � , �
� ��
�
� �
�
,�
�
�
�
�
�
�
�
�
�
�
f
� -�
�
r�
� �
� /� ��� �� J i
:__ I J J � _
i,l�l{��.,8�`k1''�,'�Ai�� YY�d��J`��� �1!�T�i''`,F�bit�M�ii.�:
I,<^�1r�5�'<p; <�n:hi[�ckuY�-1�£'�'k_tI<zrt�.�Jtg
Navembe�r 1$, Z005
Mr. Armando Rodriguez
Senior Engineer
CITY OF PALM DESERT
73-51 E} Fred Waring Drive
Palm Desert, CA 92260
�i !;"'i.i :'�! )��i-��','ri':'�i �y Il�:i�.-.__,-,
rir , ,
;:!'4.�7 � %; ��t���
��f,}�:�i'�1;.;���',.,,'f'..�. 'e.��-� ._•��ri4:3
. ., .:�"„�!:,.��!i � ':���'i:;. ��IY�I��,�.
j `-�:1,;!'iY..,, :5.1
�A�RAh!�NTO ��FI��
:�v0 I STREET
SiJiiE S0:
�A��#A�1�F#iU, CA 95816
318,��48,7535 FAC3�ir11L�
Sf6.4;y,75�'
C`.G`AUHEE.LrI VALL�Y �f=�;�E
7�6� C,4LL� ���'�DO
L.A Qu�ui�A, cn ��252
7Bo,�,8:,�34� �A�SIN��? �
7i�0,59�,�� 65
RE: PROPOSAL TO PROVIDE PROFESSIONAL LANDSCAPE ARCHiTECTURAL
SERVICES FOR THE SOUND WALL AESTHITIC ENHANCEMENT ALONG
FRED WARING DR�[VE FR4M APPROX. 800 LINEAL FEET EAST OF
PHYLLIS JACKSON DR. AND FRQM WARNE�.t TRAIL TQ WASHINGTON
ST1tEET �� ENTRADA LAS BRiSAS" APPROX 2500 LTNEAL FEET
Dear Mr. Rodriguez,
T'hank you for the opportunity to meet with you, Cora and John last week to discuss the
passibi�ties to �ance the sound wa11s at two Ioca#ions along Fred VtTariaa.g Drive. Per our
conversaticm I have revised this proposal to iuclude the wall e�haucement near Phillis Jackson
Drive and for "Entrada Las Brisas" from Warner Trail to Washington Street. Please accept �is
letter as our fee proposal to provide tha City of Palu� Desert with prafessionallandscape
arcbitectural serviees. I will �ersonally be warking with you and �our staff to oversee this woric
and to suceessfully gen�erate tl�e appropriat� d�sign materials, construction drawings, es�imate of
costs and speci�ications to meet your schedule in a timely rrzanner.
I propose the following phases and tasks to e�sure the final wall enhancement elevations, �aphic
materials, construction drawings and specifications reflect the City's e�cpec#atio�s and staudards.
Belaw is an outline of the major tasks:
Scope of Work
Phase 1. Wall Enhancement Options for P�iyllis Jackson Dr. & Entracla Las Brisas
Task 1: Watl Design ��tions: David Volz Design (DVD} will prepffie three (3} se�aarate
vvall enhncement oprions for Phyllis Jackson and One (1) option for Entx�ada Las Brisas.
Each op�ion will be r�nd�red and vvill illustrate a typical wa11 en�#►ancement treatment in
�levation and section views. DVD will pravide our opi3nion ofthe estix�.ated
enl�aucement for each enhanceme�t optio�.. After receiving ya�r approval, DVD wiI1
i�ntnecliately start the process to preparing tlxe wa11 �nhanceme�t pl�s and specifications.
Y:1City of Palm DesertlPhyltis Jacksan Wa111Phyi�Iis Desert Sreezes Froposal (l 1-18-05).doc
�'hase 2— Prepare Wal� En�ancement Plans & Specifications Phyllis Jacksnn Dr. & Entrada Las
Brisas
Task 2a: Base Map �eparation: DVD will prepa�'e a base map at 20 scale on 24"x36"
sheet using the electronic CAD file provided by the City's consulting engineer. All
dra#�izzg work wi�l be done usi.ng AutoCAD 2004.
Task 2b: Wall Enhancement Plans, Specif�cations and Opinion of Budget Estimate:
DVD will prepare the necessary walt enhancement plans inciuding minor i�iga�ion and
planting impravement pians far the minor area to the east end of the praject. Detaits,
legend and notes relat� to the installation of wall treatment, irriga�ion and planiing will
be provided. DVD will coorc#inate with the City's consulting enginser to ensure that the
wall's aesthetic treat�aaent wi�l not impact its structural integrity.
�'hase 3- Bidclan.g and Construction Assistance
Task 3: DVD wi11 be avarlable far assisting with the bid proc�ss, construc�ion oversig,lit,
RFI response, submittal review and si�e reviews. We are prepared ta support t�e City's
inspectar a� each stage of t3►e cpnstruction work.
Waii En�ancement Plans
Identified below are the an.ticipated plan sheets that will be prepared for bath iocatio:ns.
Phyllis Jac�Cson Drive (AppraximateIy 8001ineal £eet)
Wall Enhanc�ner�t Layoat Plan 1 sheet
Irrigation & Planting Plan 1 sheet
D�tails, Notes & Legend 2 sheets
Ent�ada Las Brisas (Approximate�y 2500 lineal fee�}
Wall Enhanaement Layout Plan 3 sheet
Modificaiaons to Ex. Landscape & Irrigation 3 sheet
Details, Notes & Legend 2 sl�eets
Professional Fees
Task 1
Wall Design Options
Phyllis �ackson Dr,
Entrada Las Brisas
$3500
�3500
Tas1s 2a.
Base Map Preparation
Phyllis Jackson Dr.
Entrada Las Brisas
$1500
$1500
�!��*��
V:1City of 1'atm DesertlPhyllis Jaakson WalllPhyi3lis-Desert Breezes Propvsa3 (l 1-18-05).doc 11r �., ��� ��+ �;h �.�, �;Y,.,
Task 2}�Plaz�s, Specifications & Opi�tion of Estixna.te
Phyllis Jaekson Dir. $7000
Entrada Las Brisas $12000
Task 3 Bidtling and Construction {As needed — Time & Ma�erials}
Toia#. Praject Fees $29,000
Pr�nting and regrogra�hic cost will be bilIed at cost plus 15%. When prepared in-house,
these services will be billed at market rates with no �aark-up. Additional services, if
requested, will be pxovided at oux standard hourly rates, sub-consultant fees are billed at
cost plus 15% if additional work is requested b�yond that noted above. Two (2} �neetings
have been included in our fe�.
Scbedule
Task � vvil� be scheduled for campletion within 2 weeks from reeeiving your notice to proce�d.
Completio� af taslcs 2a & 2b, 9(}% plans will require approxi.mately 3 weeks. �iz�al draw�gs and
specificatiuns will be ready withi� 2 week after receipt of 90% p�ans with any p�an check
cvmments. DVD understand the importance of having biddable set plans and specificatians and
�1 work closely wifih yau to se� that your schadule is met.
Thanlc you again for allovving me to prepare this proposal. I am looking forward to working with
Ci€y of'I'a1m Desert agai.n. Again, T will aversee yo�tar praject's success thraugh each task of the
war%. Should you have azry questions of need additional information, please do not i�esitate to
ca�l ezther Da�id Volz or myself.
Very truly yours,
DAVID VOLZ ESIGN
Gary Vasquez
Project Mauagex/Lanc�scap� Archiiect #3883
�I���i►' ��:
V:1City of Pa1m DesertlPhyllis Jackson WalllPhyillis-Desert Breczes Proposal (11-18-fl5).doc ���s;,�.�w ��;-,��; ����,w,��N,� �
C ITY OF P ALM D ESERT
CONSTRUCTION CHANGE ORDER
P.O. # 12291
Contract # C23670A
Project # 654-01
Fred Waring Drive Widening Soundwall
Project Description:
Applicant Name David Volz Design Contractor
Street Address 17050 Bushard Street, Suite 300 Vendor # 8383
City, State, Zip Fountain Valley, California 92708
Contract Change Order #
Pursuant to the terms of the original contract Agreement, you are hereby directed to make the herein described changes
or do the following described work not included in the plans and specifications for this Contract. Unless otherwise
stated, all work shall conform to the terms, general conditions, and special provisions of the original contract.
DESCRIPTION OF CHANGE
Increase scope of design to include 800 linear feet at Phyllis Jackson and Fred Waring Drive and 2500
linear feet at Desert Breezes community
Contingency used? (yes / no) Increase/Decrease in $29,000.00
Amount
If yes, amount moved to base: $3,300.00 Increase/Decrease in
Days
Contract Amount (include past change orders) Contract Date of Completion
33,000.00
Plus/Minus Current Change Order Plus/Minus Current Change Order
29,000.00
Revised Total Contract Amount Revised Date of Completion
$62,000.00
1. 2.
ORDERED BY: CERTIFIED FUNDS AVAILABLE
Department Head Director of Finance Date
3. 4.
APPROVED BY: APPROVED BY:
City Manager Date City Council Date
We, the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we
will provide all materials, perform all labor, except as may be noted above, and perform all services necessary to complete the above specified
work, and hereby accept as full payment the amount shown above, which includes all direct and indirect overhead expenses fort any delays.
ACCEPTED BY:
Contractor/Vendor Date