HomeMy WebLinkAboutC23670A CO1 David Volz Design Fred Waring Soundwall 654-01GITY OF PALM DESERT PUBLIC WORKS DEPARTMENT STAFF REPORT REQUEST: Approve Change Order No. 1 to Contract No. C23670A with David Volz Design for Fred Waring Drive Widening Soundwall (Project 654-01) SUBMITTED BY: Mark Greenwood, P.E.,-City Engineer APPLICANT: David Volz Design 17060 Bushard Street, Suite 300 Fountain Valley, California 92708 DATE: December 8, 2005 CONTENTS: Change Order No. 1 Proposal Vicinity Maps Recommendation: By minute motion: 1. Approve Change Order No. 1 to Contract No. C23670A for Landscape Architecture Services to David Volz Design, of Fountain Valley, California for Fred Waring Drive Widening Soundwall Aesthetic Treatment, in the amount of $29,000. 2. Move $3,300 from contingency to base. 3. Authorize the Mayor to execute the change order. Discussion: On May 26, 2005 City Council approved Contract No. C23670A with David Volz Design for the design of the soundwall aesthetic treatment for incorporation into the construction documents of the Fred Waring Drive Soundwall Project, in the amount of $33,000 plus a 10% contingency. David Voltz was originally hired to design the architectural treatment of the soundwalls because there was not sufficient right-of-way to safely accommodate and maintain parkway landscaping along Fred Waring Drive between California Approve Change Order No. 1 to C23670A Page 2 of 2 December 8, 2005 Avenue and Tennessee Avenue. Therefore, the soundwall design provides for the use of an architecturally enhanced double-wall design that will provide an attractive soundwall appearance. In February, 2005 the Landscape Beautification Committee approved the soundwall aesthetic treatment. In addition, David Voltz is being retained to design the aesthetic treatment of the soundwalls at the Desert Breezes and Waring Court communities. These architectural treatments will also be presented to the Landscape and Beautification Committee for their approval. The attached proposal from David Volz Design outlines the cost of this additional scope of work which includes architectural treatment design, preparation of plans and specifications, and construction support. Funds are available in the Fred Waring Drive widening project account. Therefore, staff recommends that City Council, by minute motion, approve Change Order No. 1 to Contract No. C23670A, with David Volz Design for the design of the aesthetic treatment of the Fred Waring Drive Soundwall (Project 654-01) in the amount of $29,Q00, authorize moving $3,300 of contingency to base, and authorize the Mayor to execute the change order. Funds for the remaining $25,700 are available in praject account number 400-4399-433-4001. Submitted By: � �� Ma Greenwood, P.E. City Engineer Department Head: �.J�C�'G�"�!�./ M' el Errante, P.E. G� Director of Public Works ApprovaL• Fiomer Croy � ACM for Dev I ment Services ,%//�/�►,, . . . -.: r Paul Gibson Finance Director /cls(dhl G:IPub WorkslStaNReportsl2005lDecem6er 8l7Approve C01 to Volz 654-011Approve C09 C23670A David Volz for Fred Waring Soundwall 65401.doc VICINITY MAP Fred War���� Drive Soundwall at Deser� Breezes � � I � �J � I r I I i � �^ ` � _ I�,I�IIII f1 1 1 � = � ����� . � � �.�...--�- � i i � � �' - �� I I t = � � � � I . r, � i -� � - I � I .� � � - �`� - I I I I I h: � - ��� ' I �� �. � -� ��— 1! I I I II I I I I I I 1 I ----� -' �.� � ��� � � - � . � - �� � � � �:' ��r � � � � � �� i � � � � � � � � � � �� � °� � �" � �; � �. r�� �� ���� a � � Z � � � � C.± Z � � a J a 0 Z _ � Z Z 0 � W � 0 � Z � a � 0 � � � � � � : •� •� .� � � ;. . .: �. � � . � � .. .� � � � � � � � � � � �.. � �_ �. .. �. � � �■ � .■ . �� � i'■ "= � ,i �■ �■ � "■ ■r�■ � ■ � :� ■ .■ � �■ r- � ����� ��� � ���'�� � � �.� � _ � , � � �� � � � � ,� � � � � � � � � � � f � -� � r� � � � /� ��� �� J i :__ I J J � _ i,l�l{��.,8�`k1''�,'�Ai�� YY�d��J`��� �1!�T�i''`,F�bit�M�ii.�: I,<^�1r�5�'<p; <�n:hi[�ckuY�-1�£'�'k_tI<zrt�.�Jtg Navembe�r 1$, Z005 Mr. Armando Rodriguez Senior Engineer CITY OF PALM DESERT 73-51 E} Fred Waring Drive Palm Desert, CA 92260 �i !;"'i.i :'�! )��i-��','ri':'�i �y Il�:i�.-.__,-, rir , , ;:!'4.�7 � %; ��t��� ��f,}�:�i'�1;.;���',.,,'f'..�. 'e.��-� ._•��ri4:3 . ., .:�"„�!:,.��!i � ':���'i:;. ��IY�I��,�. j `-�:1,;!'iY..,, :5.1 �A�RAh!�NTO ��FI�� :�v0 I STREET SiJiiE S0: �A��#A�1�F#iU, CA 95816 318,��48,7535 FAC3�ir11L� Sf6.4;y,75�' C`.G`AUHEE.LrI VALL�Y �f=�;�E 7�6� C,4LL� ���'�DO L.A Qu�ui�A, cn ��252 7Bo,�,8:,�34� �A�SIN��? � 7i�0,59�,�� 65 RE: PROPOSAL TO PROVIDE PROFESSIONAL LANDSCAPE ARCHiTECTURAL SERVICES FOR THE SOUND WALL AESTHITIC ENHANCEMENT ALONG FRED WARING DR�[VE FR4M APPROX. 800 LINEAL FEET EAST OF PHYLLIS JACKSON DR. AND FRQM WARNE�.t TRAIL TQ WASHINGTON ST1tEET �� ENTRADA LAS BRiSAS" APPROX 2500 LTNEAL FEET Dear Mr. Rodriguez, T'hank you for the opportunity to meet with you, Cora and John last week to discuss the passibi�ties to �ance the sound wa11s at two Ioca#ions along Fred VtTariaa.g Drive. Per our conversaticm I have revised this proposal to iuclude the wall e�haucement near Phillis Jackson Drive and for "Entrada Las Brisas" from Warner Trail to Washington Street. Please accept �is letter as our fee proposal to provide tha City of Palu� Desert with prafessionallandscape arcbitectural serviees. I will �ersonally be warking with you and �our staff to oversee this woric and to suceessfully gen�erate tl�e appropriat� d�sign materials, construction drawings, es�imate of costs and speci�ications to meet your schedule in a timely rrzanner. I propose the following phases and tasks to e�sure the final wall enhancement elevations, �aphic materials, construction drawings and specifications reflect the City's e�cpec#atio�s and staudards. Belaw is an outline of the major tasks: Scope of Work Phase 1. Wall Enhancement Options for P�iyllis Jackson Dr. & Entracla Las Brisas Task 1: Watl Design ��tions: David Volz Design (DVD} will prepffie three (3} se�aarate vvall enhncement oprions for Phyllis Jackson and One (1) option for Entx�ada Las Brisas. Each op�ion will be r�nd�red and vvill illustrate a typical wa11 en�#►ancement treatment in �levation and section views. DVD will pravide our opi3nion ofthe estix�.ated enl�aucement for each enhanceme�t optio�.. After receiving ya�r approval, DVD wiI1 i�ntnecliately start the process to preparing tlxe wa11 �nhanceme�t pl�s and specifications. Y:1City of Palm DesertlPhyltis Jacksan Wa111Phyi�Iis Desert Sreezes Froposal (l 1-18-05).doc �'hase 2— Prepare Wal� En�ancement Plans & Specifications Phyllis Jacksnn Dr. & Entrada Las Brisas Task 2a: Base Map �eparation: DVD will prepa�'e a base map at 20 scale on 24"x36" sheet using the electronic CAD file provided by the City's consulting engineer. All dra#�izzg work wi�l be done usi.ng AutoCAD 2004. Task 2b: Wall Enhancement Plans, Specif�cations and Opinion of Budget Estimate: DVD will prepare the necessary walt enhancement plans inciuding minor i�iga�ion and planting impravement pians far the minor area to the east end of the praject. Detaits, legend and notes relat� to the installation of wall treatment, irriga�ion and planiing will be provided. DVD will coorc#inate with the City's consulting enginser to ensure that the wall's aesthetic treat�aaent wi�l not impact its structural integrity. �'hase 3- Bidclan.g and Construction Assistance Task 3: DVD wi11 be avarlable far assisting with the bid proc�ss, construc�ion oversig,lit, RFI response, submittal review and si�e reviews. We are prepared ta support t�e City's inspectar a� each stage of t3►e cpnstruction work. Waii En�ancement Plans Identified below are the an.ticipated plan sheets that will be prepared for bath iocatio:ns. Phyllis Jac�Cson Drive (AppraximateIy 8001ineal £eet) Wall Enhanc�ner�t Layoat Plan 1 sheet Irrigation & Planting Plan 1 sheet D�tails, Notes & Legend 2 sheets Ent�ada Las Brisas (Approximate�y 2500 lineal fee�} Wall Enhanaement Layout Plan 3 sheet Modificaiaons to Ex. Landscape & Irrigation 3 sheet Details, Notes & Legend 2 sl�eets Professional Fees Task 1 Wall Design Options Phyllis �ackson Dr, Entrada Las Brisas $3500 �3500 Tas1s 2a. Base Map Preparation Phyllis Jackson Dr. Entrada Las Brisas $1500 $1500 �!��*�� V:1City of 1'atm DesertlPhyllis Jaakson WalllPhyi3lis-Desert Breezes Propvsa3 (l 1-18-05).doc 11r �., ��� ��+ �;h �.�, �;Y,., Task 2}�Plaz�s, Specifications & Opi�tion of Estixna.te Phyllis Jaekson Dir. $7000 Entrada Las Brisas $12000 Task 3 Bidtling and Construction {As needed — Time & Ma�erials} Toia#. Praject Fees $29,000 Pr�nting and regrogra�hic cost will be bilIed at cost plus 15%. When prepared in-house, these services will be billed at market rates with no �aark-up. Additional services, if requested, will be pxovided at oux standard hourly rates, sub-consultant fees are billed at cost plus 15% if additional work is requested b�yond that noted above. Two (2} �neetings have been included in our fe�. Scbedule Task � vvil� be scheduled for campletion within 2 weeks from reeeiving your notice to proce�d. Completio� af taslcs 2a & 2b, 9(}% plans will require approxi.mately 3 weeks. �iz�al draw�gs and specificatiuns will be ready withi� 2 week after receipt of 90% p�ans with any p�an check cvmments. DVD understand the importance of having biddable set plans and specificatians and �1 work closely wifih yau to se� that your schadule is met. Thanlc you again for allovving me to prepare this proposal. I am looking forward to working with Ci€y of'I'a1m Desert agai.n. Again, T will aversee yo�tar praject's success thraugh each task of the war%. Should you have azry questions of need additional information, please do not i�esitate to ca�l ezther Da�id Volz or myself. Very truly yours, DAVID VOLZ ESIGN Gary Vasquez Project Mauagex/Lanc�scap� Archiiect #3883 �I���i►' ��: V:1City of Pa1m DesertlPhyllis Jackson WalllPhyillis-Desert Breczes Proposal (11-18-fl5).doc ���s;,�.�w ��;-,��; ����,w,��N,� � C ITY OF P ALM D ESERT CONSTRUCTION CHANGE ORDER P.O. # 12291 Contract # C23670A Project # 654-01 Fred Waring Drive Widening Soundwall Project Description: Applicant Name David Volz Design Contractor Street Address 17050 Bushard Street, Suite 300 Vendor # 8383 City, State, Zip Fountain Valley, California 92708 Contract Change Order # Pursuant to the terms of the original contract Agreement, you are hereby directed to make the herein described changes or do the following described work not included in the plans and specifications for this Contract. Unless otherwise stated, all work shall conform to the terms, general conditions, and special provisions of the original contract. DESCRIPTION OF CHANGE Increase scope of design to include 800 linear feet at Phyllis Jackson and Fred Waring Drive and 2500 linear feet at Desert Breezes community Contingency used? (yes / no) Increase/Decrease in $29,000.00 Amount If yes, amount moved to base: $3,300.00 Increase/Decrease in Days Contract Amount (include past change orders) Contract Date of Completion 33,000.00 Plus/Minus Current Change Order Plus/Minus Current Change Order 29,000.00 Revised Total Contract Amount Revised Date of Completion $62,000.00 1. 2. ORDERED BY: CERTIFIED FUNDS AVAILABLE Department Head Director of Finance Date 3. 4. APPROVED BY: APPROVED BY: City Manager Date City Council Date We, the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all materials, perform all labor, except as may be noted above, and perform all services necessary to complete the above specified work, and hereby accept as full payment the amount shown above, which includes all direct and indirect overhead expenses fort any delays. ACCEPTED BY: Contractor/Vendor Date