Loading...
HomeMy WebLinkAboutRepair of Skip Loader by RDO EquipmentREQUEST: SUBMITTED BY: VENDOR: DATE: ATTACHMENT: Recommendation: CITY OF PALM DESERT PUBLIC WORKS STAFF REPORT Approve the Repair of John Deere Skip Loader Tom Bassler, Maintenance Services Manager RDO Equipment Company (Vendor #2817) Riverside, CA November 10, 2005 Repair Estimate -'v'',- By minute motion, authorize the repair of the City's John Deere skip loader by RDO Equipment Co. of Riverside, California for the estimated amount of $28,121.98. Discussion: The hydrostatic transmission on the City's heavy-duty loader, John Deere 544E, failed while repairing washed-out roadway shoulders on Gerald Ford Drive after the last rain. This piece of equipment is essential and used extensively for a wide variety of maintenance needs. It was purchased new in 1989 at a cost of over $74,000. With the exception of this component failure, the equipment is in good operating condition and it is staff's opinion that replacement should not be considered at this time. Replacement cost would be approximately $100,000. RDO Equipment Co. is the local John Deere original equipment manufacturer repair facility. Funds are available in the auto fleet and equipment maintenance account, 110-4331-413-3340, for this repair. Submitted By: Maintenance Services Manager Approval: ACM for Developices Finan Department Head: Michael Errante Director of Public Works --1„._ City flanager L /dhl I V v V J • J J V J• I- 1.. Quotes ' Pagel of 2 Ship To location CITY OF PALM DESERT IRV - RIVERSIDE, C 73-510 FRED WARING DR. Date Time Page p1/03/2005 113:22:08 (0) 11 PALM DESERT CA 92260 Account Number Phone Number Invoice Numb 10611007 17603460611 1000264 Sold To Ship Vla Purchase Order CITY OF PALM DESERT ' ,P0 REQUIRE 73-510 FRED WARING DR. Tax exemption Number Blank 1 1 PALM DESERT CA 92260 Salesperson RSM 3 Description QUOTED/ESTIMATED EXPIRY DATE: 12/03/2005 DESCRIPTION AMOUNT ESTIMATE 01 Stock t: K0095578 MS t: DW544ED522683 Is to have the following work done by 11/30/2005 (Estimated) REPLACE TRANSMISSION, AND COOLER. OUR ESTIMATE DOES NOT INCLUDE FREIGHT. ALL WORK IS TO BE PERFORMED AT OUR SHOP, BASED ON NORMAL WORKDAY. ANY CONCEALED DAMAGES AND/OR ITEMS FOUND NESSARY TO BE REPAIRED OR REPLACED, AND NOT READILY APPARENT PRIOR TO THE BEGINNING OF REPAIRS. SHALL BE BROUGHT TO YOUR IMMEDIATE ATTENTION AND A PRICE FOR ADDITIONAL WORK AGREED UPON PRIOR TO PROCEEDING WITH THE REPAIRS. PARTS TRANSMISSION AT188405 QTY: 1 PRICE: 21900.00 21,100.00 OIL FILTER AT168989 1 26.99 26.99 OIL COOLER AT102874 1 950.00 950.00 HYGARD QT AR69445Q 22 2.34 51.48 MISS PARTS OUTLA 1 300.00 300.00 MISCELLANEOUS CHARGES HAZARDOUS MTL 25.00 25.00 SRV ACCESSORIES 95.00 95.00 Parts: 23228.47 Labor: 2964.00 Miscolleneout: 120.00 http://10.16.128.65:81 /CGI-BIN/LANSAWEB?WEBEVENT+L0A9A98147DC9030051 D... 11 /3/2005 IIOV UJ UU UJ. cor Quotes Page 2 of 2 Authorization: QUOTEC/ESTIMATED DESCRIPTION Subtotal: 26312.47 Parts: 23228.47 EXPIRY DATE: 12/03/2005 AMCUNT Labor: 2964.00 Miscellaneous: 120.00 Tax: 1809.51 Quote/Estimate Total: 28:21.98 E-mall Fax Close zg,/21.98 http://10.16.128.65:81 /CGI-BIN/LANSAWEB?WEBEVENT+L0A9A98147DC9030051 D... 11/3/2005