HomeMy WebLinkAboutC24350 Amendent 1 Curb, Gutter, and Cross Gutter Repair Program 753-06CITY OF PALM DESERT PUBLIC WORKS DEPARTMENT STAFF REPORT REQUEST: Approve Contract Amendment No. 1 to Contract No. C24350 with Contreras Construction Company for Additional Curb, Gutter, and Sidewalk Work (Project Number 753-06). SUBMITTED BY: Mark Greenwood, P.E. CONTRACTOR: Contreras Construction Company P.O. Box 1808 Indio, California 92201 DATE: April 13, 2006 CONTENTS: Amendment No. 1 to Contract No. C24350 Contractors Quotation Location Photos Recommendation: By minute motion, approve Contract Amendment No. 1 to Contract No. C24350 with Contreras Construction Company to include four additional locations in the 2006 Citywide Curb, Gutter, and Sidewalk Program (Project No. 753-06), in the amount of $77,122.00. Discussion: In November 2005, the City advertised for contractors to bid on the 2006 Citywide Curb, Gutter, and Sidewalk Program. On January 12, 2006, the contract was awarded to Contreras Construction Company. Staff has identified additional locations where work of the same nature needs to be done. Instead of waiting for next year's program, staff requests approval of a contract amendment to include the additional locations. Below is a list of the locations with brief descriptions: AD-2 Desert Crossing at Fairfield Inn — Recent construction at this location caused an unforeseen condition where vehicles have been hitting the curb when making a right turn into the hotel parking lot from Highway 111. Delineators have been installed as a temporary measure to make the curb more apparent. The proposed permanent solution is to pull back the curb to eliminate the problem. Staff Report — Contract Amendment #1 to Contract C24350 Contreras Construction April 13, 2006 Page 2of2 AD-3 Elephant Bar ADA ramps — The wheelchair ramps near the Elephant Bar are not in compliance with the Americans with Disabilities Act. The proposed solution is to remove the existing ramps and replace them with ramps meeting the grade requirements. AD-4 Fred Waring median west of Highway 111 — This median prohibits left turns from the Desert Crossing driveway to Fred Waring Drive. Staff has observed drivers on various occasions making the left turn anyway and driving down the wrong side of the divided road to get back to Painters Path. Staff has determined that there is no compelling reason to prohibit this left turn movement. The proposed solution is to remove the median and replace it with a striped median which would allow the left turn movement. AD-5 Magnesia Falls median west of Portola Avenue — Originally, this median was designed to only allow egress from Portola Palms Mobile Home Park (PPMHP). Since that time, the City authorized egress and ingress from the PPMHP gate only as right turn in or out. The proposed solution is to remove the asphalt pavement and extend the curb to connect the two median islands. Then median will then be landscaped to match the existing landscape. Funds are available for this Contract Amendment in account 400-4616-433-4001. Therefore, staff recommends that City Council approve Contract Amendment No. 1 to Contract No. C24350 with Contreras Construction Company to include the additional locations in the Curb, Gutter, and Sidewalk Program (Project No. 753-06). Submitted By: Department Head: Ryan Gayler Mark Greenwood, P.E. Project Administrator Director of Public Works Approval: ACM for Development Services Finance Director City Manager W lAgenda Items12006-Apr 131Contract amendment Contreras C24350 753-061Approve Contreras amendment 1 C24350 campes nos 753-06 doc CITY OF PALM DESERT CONTRACT AMENDMENT Project Description: P.O.# 12937 Contract # C24350 2006 Citywide Curb, Gutter, and Sidewalk Project # 753-06 Program Contractor Name Contreras Construction Company Contractor Street Address P.O. Box 1808 Vendor # 166 City, State, Zip Indio, CA 92201 Contract Amendment # 1 Pursuant to the terms of the original contract Agreement, you are hereby directed to make the herein described changes or do the following described work not included in the plans and specifications for this Contract. Unless otherwise stated, all work shall conform to the terms, general conditions, and special provisions of the original contract. DESCRIPTION OF CHANGE Add locations for median removal, repair, ADA retrofit, curb realignment Contingency used? (yes / no) If yes, amount moved to base: no Increase/Decrease in Amount $77,122.00 Contract Amount (include past amendments) 242,415.00 Plus/Minus Current Amendments 77,122.00 Revised Total Contract Amount $ 319,537.00 1. ORDERED BY: Department Head 3. APPROVED BY: City Manager Date Increase/Decrease in Days 20 Contract Date of Completion 5/27/06 Plus/Minus Current Amendment 20 Revised Date of Completion 6/16/06 2. CERTIFIED FUNDS AVAILABLE Director of Finance 4. APPROVED BY: Date City Council Date We, the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all materials, perform all labor, except as may be noted above, and perform all services necessary to complete the above specified work, and hereby accept as full payment the amount shown above, which includes all direct and indirect overhead expenses fort any delays. ACCEPTED BY: Contractor/Vendor Date Contreras Construction Co. General Contractor P.O. Box 1808 Indio, Ca 92202 Phone (760) 347-6070 Fax (760) 347-5591 Ship To: City of Palm Desert Attn: Ryan Gayler 73-510 Fred Waring Dr. Palm Desert, Ca 92260 DATE March 30, 2006 Quotation # 1369 Customer # Quotation valid until: Prepared by: Lupe Perez Project Name : Curb, Gutter & Sidewalk Repair , Project # 753-06 Comments or special instructions: Price includes removals, disposals, grading, compacting, and traffic control. Additional Work: Description 1. AD-2 Desert crossing at Hwy 111 - remove curb and reconstruct with curb and gutter, concrete slab to be 8" thick. 1 LS = $ 2,918.00 2. AD-3 Elephant Bar ADA Ramps - Saw cut, remove 20 If of curb and gutter, & 17 If of curb, eliminate one ramp, and reconstruct new ramp. 1 LS = $ 6,516.00 3. AD-4 Fred Waring, West of Hwy 111 - Remove & dispose of concrete curb (@1024 If), and stamp concrete (@ 1380 sf). Place 4" of AC over 7" base @ 4620 sf. 1 LS = $ 49,887.00 4.AD-5 Magnesia Falls, West of Portola Ave next to the median islands - remove @ 126 If of curb and @ 1150 sf of median rock, ac, and base. Construct 6" curb for median island, (@ 175 If ). Place 4" of ac next to curb over 7" of base. 1 LS = $ 17,801.00 $ 77,122.00 ACCEPTED FOR BUYER BY: Title Date CONTRERAS CONSTRUCTION CO. ACCEPTANCE OF PROPOSAL The above price, specification and condition are satisfactory and are hereby accepted. You are authorized to do work as specified. Payment will be made as outline above. CONTRERAS CONSTRUCTION CO. Approve By: Henry Contreras Title President Date All material guaranteed to be as specified. All work to be completed in a substantial workmanlike manner according to specification submitted per standard practices. Any alteration or deviation from above specification involving extra cost will execute only upon written orders, and will become an extra charge over and above the estimate. All agreements contingent upon strike, accidents, or delays beyond our control. Owner to carry fire, tornado and other necessary insurance. Our workers are fully covered by Workers Compensation Insurance. When signed by the Buyer and approved by Managing Officer cf this Company, this will constitute a firm contract between both parties, hereto, for all labor and for aft materials herein referred to, according to terms and condition. AD-2 Desert Crossing: at Highway 111 AD-3 Elephant bar ADA ramps AD-3 Elephant bar ADA ramps AD-4 Fred Waring: West of Hwy 111 AD-5 Magnesia Falls: West of Portola Avenue