Loading...
HomeMy WebLinkAboutPersonal Storage Units - Town Center Way Station 33CITY OF PALM DESERT \Zj- F CITY MANAGER'S OFFICE STAFF REPORT REQUEST: APPROVAL OF ESTIMATES AND AWARD OF BID TO CONSTRUCT AND INSTALL PERSONAL STORAGE UNITS AT FIRE STATION NO. 33 SUBMITTED BY: Stephen Y. Aryan, Assistant to the City Manager DATE: February 9, 2006 CONTENT: Fire Department Memorandum (including Bid Estimates) Recommendation By Minute Motion: 1. APPROVE Award of Bid to Mastercraft Cabinets (Palm Springs, CA), for $28,080 for eight (8) three -unit and three (3) two -unit personal locker storage pieces at Palm Desert Fire Station No. 33. 2. APPROPRIATE $28,080 from Account No. 231-4220-422-4001 for the Palm Desert Fire Station No. 33 Personal Storage Unit Project. Executive Summary The City Council approved the allocation of funds during the FY 2004-2005 budget process, to remodel the existing kitchens and/or replace appliances in the Palm Desert Fire Station (Station No.33) and the North Palm Desert Fire Station (Station No. 71). This renovation assisted in accommodating current staffing levels, as well as improving the facilities' efficiency and appearance for station personnel and the general public. The Fire Department indicated their desire to now install personal storage unit dividers at Station No. 33. The lowest bid obtained for this project, which included installation, was from Mastercraft (Palm Springs, CA) for $28,080. This price reflects construction of eight (8) three-piece units and three (3) two-piece units. Discussion The Palm Desert Fire Station was constructed over twenty years ago in 1984. An engine company, Paramedics, and administrative staff originally utilized the station. Over the years, as service delivery has improved, the staffing level on a daily basis has grown. This growth now requires the inclusion of additional personal storage units at this station. To meet their storage needs, several firefighters currently live out of their gear bag or doubled -up with other personnel. The few lockers currently in place have been here for many years and are in need of replacement and/or repair. Additionally, the sleeping configuration at the station is in a large dorm style, with open area sleeping by personnel. This subjects all personnel to snoring and movements of others in the room, many times creating an unfavorable environment for a quality night's rest. Fire Station No. 33 Personal Storage Units February 9, 2006 Page 2 of 2 The new series of lockers will add vast improvements in the living and sleeping areas of the station. The requested number of lockers will facilitate the currently assigned staff as well as two additional lockers for days when extra staff is available or assigned. Additionally, the design in the placement of the lockers calls for them as separators of the individual bed areas, thus creating more of a private sleeping area for individual personnel. As all personnel are assigned to a minimum of a three-day shift each week, the individually assigned personal areas will enhance their station work environment. It is anticipated that the purchase of these new and more adequate lockers will facilitate a better resting and sleeping environment for all personnel. Fiscal Impact Project bids are as follows: FIRE STATION NO. 33 PERSONAL STORAGE UNITS Hollman Mastercraft Closet Wv (Irving, -(Palm Springs, CA) (Whittier, A 8 three -unit $19,338.36 $23,040 $28,200 Pieces 1 3 two -unit pieces $2,431.59 $5,040 $6,225 TOTAL $21,769.95 $28,080.00 $34,425.00 PLEASE NOTE THAT THE HOLLMAN QUOTE DID NOT INCLUDE INSTALLATION Three vendors provided estimates for this project and the Staff recommended bid from Mastercraft totals $28,080 (includes installation). City Staff also publicly posted a Notice Inviting Bids and at the time this report was prepared, has currently not received any additional bids. Submitted By: St ZpDhe'rZvY.Aryan Assistant to the Ci glarnager Approved By: Reviewed By: Carlos L. O ga Paul S. Gibson City Manager Director of Finance CADocuments and SetbngsystaNey\Local Settings\Temporary Internet FlIes10 MMStation No. 33 Personal Storage Units.doc C#&`� MEMORANDUM r� r Puna j Riverside County Fire Department ru� 1� City of Palm Desert MUTWARr DATE: 16 January 2006 TO: Stephen Aryan, Assistant to the City Manager FROM: Walt Holloway, Battalion Chief RE: Locker Bids for Station 33 Town Center Stephen, I have attached the bids for the approved project to construct lockers in the dorm facility at the Town Center #33. The bid totals are; Hollman $21,769.95 (2,417.30 & 810.53 — 3 & 2 Units Each) Out of State Company — does not include installation. Includes 8, 3-unit pieces as well as 3, 2-unit pieces for one of the extra bed areas. Note that these units are built in single increments only, and attached on -site as three and two unit assemblies. We also must build base units to place product onto, most likely 2x4 framing. ***Mastercrafit Cabinets $28,080.00 (2,885.00 & 1,680.00— 3 & 2 Units Each) Local and includes installation. Includes 8, 3-unit pieces as well as 3, 2-unit pieces for one of the extra bed areas. Closet World $34,425.00 (3,525.00 & 2,075.00 — 3 & 2 Units Each) Local and includes installation. This bid includes 8, 3-unit pieces as well as 3, 2- unit pieces for one of the extra bed areas. Based on the design needs, the individual pieces are in 3 and 2 unit increments in order to separate the individual bed areas. Therefore, based on the monies available, the units may be ordered in separate increments, up to the maximum monies available. All bidders are in agreement that costs may be simply divided into equal costs as noted above for each unit, to the maximum of the bid offer. This was done to facilitate an efficient and timely process in going forward with the project. Please call if there are any questions. Thanks. * * * Desired option by the Fire Department because of included professional installation. JAN 06 2006 16:14 FR HOLLMAN INC 972 815 2921 TO 917605689981 P.02/07 Sell To: Palm Desert Fire Station #33 Walt Holloway USA Tel: 760,W-M8 Fax: 760-568-9981 Ship TO. - Palm Desert Fire Station #33 USA Tel: 760-348.0508 Fax: 760-568-901 Quote Document Date: 1WO06 Quabe No.: SQL-16591 We are pleased to submit die fol ov ing proposal, The order will be fabricated per Holtman architectural specifications and approved elevations. Project Name: Palm Desert Fire Station #33 Stahl Friel: Standard Hardware Finish: StandardChrome or Brass wood Species: Red Oak Melamine: Almond 2UM PVC Edgebanding: Standard Quantity Desedptiion unit Price pfte 24 Single tier, model A - Melamine Locker 488.29 11,718.96 84-L, 30-W, 24-D, 2-Goat Hooks, 1-Coat Rods Door Set: Door: Flush Veneer Door 24 5-Pin Keyloclk 5.61 13224 48 Melamine Drawer 30.97 1,486.56 19.75-L, 20-W, 9-H 24 Recessed Red Oak Handle 1.83 43.92 8 Flush Veneer Single End Panel 78.00 624.00 84-L. 23.25-W 8 Flush Veneer Filler Panel 14.24 113.92 84-L, 6-W 24 Flush Veneer Back Panel 148.84 3,524.16 84-L. 30-W 140 Feet of Veneer Base Trim 1.89 264.60 3-W 1 Locker Freight 1.430.00 1,430.00 Applicable Charges: 0.00 Total F_stknate: 19,338.36 Comments: Bid Based on: 2 page fax received 10/20/05. Includes 6 out of 10 locker sets. AlI core material is Class C. No Class A or Urea Formaldehyde Free material is inCluded. Lockers quoted as RED OAK FLUSH VENEER DOORS with Melamine Interior. 6" Fascia between lockers is exkkuded. Door will be full 30" width. Coat Rod and shelves are not adjustable. Finger Pull (recessed handle) to be Red Oak on front of door. Installation, Field measurements, Site Visits, unbading, 2x pbdomrt base, are not inckKied. Page 1 1 a25 wALNUT HILL LN. ' IRVING. TEXAS 75o3a' Ter 972-815-40M * FAX: 972$15-2921 -_- - - - JAN 06 2006 16:14 FR HOLLMAN INC. 9?2 815 2921 TO 917605689981 P.03i07 Quote Document Date: 1WO06 Quote No.: S0L-16591 Typical Lead Time: Wood: 8-10 weeks after receipt of all approved submittals and deposit Custom: Lead Time sub)ec to availability from vendor. " Lockers are shipped fully assembled with pre -drilled holes and hardware kit. * Locker interior made of 51W particleboard with almond melamine thermally fused to BOTH sides. Front facing views of locker frame are edge banded with 2mm PVC. 5/8' Diameter coat rod in polished brass or chrome included where applicable. " Lockers are to be fabricated per Holman Standard Specifications, manufacturing processes, and material& • Hollman standard plastic laminate meets Class II 8 Fire Retardant Code. * Holman standard Melamine board conforms to HUD 24 CFR-part 3280 mquirement for formak*vyde emissions of less than 0.3 ppm. • Full size mock up is not included. ADA compbance. If required, please specify number and location of lockers. Signage is not included. Special ADA compliant locks (Dgiioc k TB or TE) available upon request. Hollman's Locker System with plastic laminate or PATENTED WOOD VENEER doors are warranted to be free from any major defects attributable to the manufacturing process under normal use and service for a period of three (3) years from the date of delivery. Please note: solid wood doors are not *a,..uj6J against warping, discoloration, twisting, expansion or contraction. EXCLUSIONS (unless stated otherwise in bid) Site meetings, installation, unloading, 2x platform base, slope top, wall elevations, crown moulding, scribed valance, soffit fillers, top comer panels, finished flat tops, base trial, unit priced items, electric fb ttAes, plumbing fb tcires, onside field measurements, lockers in rooms other than those listed, any item not specifically listed in this bid and Union labor. THANK YOU FOR CONTACTING HOLLMAN, INC. PRICE VALID FOR 90 DAYS. Signed Quote serves as binding contract Subject to Terms & Conditions. Original Contract (SQL-16591): 19,338.36 Total Contract: 19,338.36 Payment Terms: 509'o Deposit, 50% Two Weeks Prior to Shipment Sales Consultant: Megan Gomez Sales Consultant Phone No.: 800-433-3630 ext. 4017 Sales Consultant Ema6: megang@hoilman.com Accepted by: Date: Page 2 1 it7F VVAI NI IT Hit 1 1 N " IRVING TEXAS 75= - Tel: 972-915.4M • FSW M415-Ml JAN 19 2006 13:01 FR HOLLMAN INC. 972 815 2921 TO 9176056899B1 P.01i02 Sell To: Palm Desert Fire Station #33 Tony Mecham USA Tel: 7W346-0508 Fax. 760-568-9981 Ship To: Palm Desert Fire Station 933 USA Tel: 760-346-OBW F&x. 760-568-9981 Quote Docxanent Data: 111912006 CA49fe No_: SQL-16767 We are pleased to submit the following proposal. The order will be Uftcated per Hollman archftctural ,-,;..Ions and approved elevations - Project Name: Palm Desert Fire Station #33 (Phase Stairs Finish: Standard 111) Wood Species: Red Oak Hardware FinM: StandardCtxwne or Brass 21111111 PVC Edging: Standard Melamine: AUmond Quantity Description Unit Price Price 3 Single tier, model A - Melarine Locker 358.92 1.076-76 84-L, 21.5-W, 24-D, 2-Coat Hooks, I -Coat Rods Door Set: Door: Flush Veneer Door 3 5-Pin Keybck 5.51 16.53 6 Melamine Drawer 31.03 186.18 19.75-L, 20-W, 9-H 3 Recessed Red date Handle 1.83 5.49 1 Flush Veneer Single End Panel 7827 78.27 84-L, 23.25-W 1 Flush Veneer Filler Panel 14.24 14.24 84-L, 6-W 2 Flush Veneer Back Panel 146.88 293.76 84-L, 30-W 24 Feel of Veneer Base Trim 1.89 45.36 3-W 1 Locker Freight 715.00 715.00 Applicable Charges: 0.00 Total Vie: 2,431.59 Comments: Bid Based on: 2 page fax recenoed 1 MOM. Includes 4 out of 10 locker sets. All core material is Class C_ No Class A or Urea Formaldshyde Free material is kiciuded. Lockers quoted as RED OAK FLUSH VENEER DOORS with Mehur4ne Irderior. 6" Fascia between lockers is excluded. Door win be full 30' width. Coat Rod and shelves are not adjustable. Finger PtM (recessed handle) tD be Red Oak on front of door. - - — — — — - Page 1 1825 WALNUT HILL LK. ' IR1MiG, TEXAS 75MB * Tat 972.815 AM " Faac 972.815*M JAN-3-20M6 11:30A FRQ9:MRSTERCRAFT KITCIENS 7603270182 T0:95689981 P.2 GRANITE TRANSFORMATIONS #237251 SHOWROOM LOCA17ONS • 70M C MM" Chat Dr. • [TlM ffi 6war ia6 8tariaoks Plain TnweBmvwd& Owkes. CASMI • 4M IL Camino Ptieaeala t1W SI s)Lp, G ax rA (7aa) 772-M I • Pam (781)) TM.Grn f7M19�6-t6�6 • lra=17S01 >M6�61: IP Spr6indsk, CA so" • 4296-A Jurups 8-.8te 109 Mal Fax C:MI MAIM • 1916andliands Blgd. sake 101, Ontariq CA 917i1 Remands. CA tifYl3 (9a9) 9664M • Faw (9811) 39049 a MW 9a74M • Fax (9a11') 9a7.230 {� PURCHASE ORDER Name R�� A( 4e 6PLwV -? Fige, DOD —IOA4-41 Address 44442P TCXAJU 02AAVJ2-U444c, 04c4h '11,2z 0 Phone (I) --Ml, (a5o $ PtKxw (w) DESCRIPPION '1`o►'�-r��-i 3� (Z -.a V-z3 4 -)L* Lv c-kae- Per XAP—� <�§? 28Br -a 4-� --2� * -)+ Lc:;, e-A-P,.x &4 -C!, G /1,29 ` So4o1° T or->4t� 3 C5$a ` PlAws AA-0 45POCI-4 iFi e-� a&J-C- - - � �--.v+a�t� � ors,_ w� ►� ycl��*�� Sub Total S 7.75% Sales Tax Delivery CMrge S ^ _ Contract Total S /'� C> r MASTERCRAFfICRANi'IE TRANSFMMA71UNS will supply all materials as specified above, all material ie guaranteed teed &. all work to be coep1�leied,�i�n,, a workawaYioe manna so �s-t�a Warr d�. ... , indwary standsrda and attached plans and specification& For the sum of^KJ� iZr J:-7 tTT F iR7CJE ~ -r 7 Dollars (S7^�O $ t� ,F erg Payment as follows: Deposit S r1 (10%) Tune of BYeprir�tliet+tptaae! S T 0410 (40%) r At Delivery S 1125%) Coe>pktiwt S-- — , 4 (25%) If% agree that the above detail are correct and chat addibond charges will be made for any ours, servixs or eura noseaak not specified in the above agreement. You. the buyer, may canod this transaction at nay time prior to etidniEht of the third business day after ie date of this transaction. Cancellation aaas; #* owe in wrkmg. Estimated Spat Dow.. wbriunE Days Completion Date: ACCEPTANCE OF AGIiE04E YT 7be mrdersigeed acimmledRes that they ha•c rad et. understood the terms of ttcis agrecrrreet and the description of work & pieces arc swidaclary A hereby socepted Customer Si twe Date In wi d and o of ty�� n . Signori Z Date Y Signed Dose fl " 6 - = ET CL S W RLD We Add SPace A Valus Ta Your Flame (562) 699-9945 • Fox (562) 699-5755 3860 Capitol Ave., Whittier, CA 90601 December 23, 2005 Captain Tony Mecham Riverside County Fire Department 44-400 Town Center Way Palm Desert, CA 92260 Re: Platform -based lockers Tony, Pursuant to your request on Wednesday, December 21s', the following is the breakdown for both the 3-unit and 2-unit lockers and a total for the entire project. This price includes all taxes and installation charges. 3-Unit lockers, includes drawers, doors, full backing and hardware ......... $3525/unit 2-unit lockers, includes drawers, doors, full backing and hardware ......... $2075/unit As requested: Eight (8) 3-unit lockers @$3525........ $28200.00 Three (3) 2-unit lockers @2075......... $ 6225.00 TOTAL COST........................................$34425.00 Once approved and contract is signed, the approximate installation date would be 14 days and would probably be a five (5) day install. This time frame will be determined by Closet World Installation Department at the appropriate time. Thank you again for your time and, hopefully, the opportunity to do business with you and your organization. Happy Holidays. Skip Wells Closet World Senior Designer 760.831.2763 (Cell) 760.776.5497 (Fax)