HomeMy WebLinkAboutC20580D1 - RTFY - Fire Station No. 67CITY OF PALM DESERT CITY MANAGER'S OFFICE STAFF REPORT REQUEST: RATIFY CITY MANAGER APPROVAL OF CHANGE ORDER NO. 5, IN THE AMOUNT OF $21,421.45, TO COMMERCIAL DIVERSIFIED, INC. (TWENTYNINE PALMS, CA), FOR VARIOUS IMPROVEMENTS ASSOCIATED WITH THE FIRE STATION NO. 67 RENOVATION PROJECT. SUBMITTED BY: Stephen Y. Aryan, Assistant to the City Manager DATE: July 13, 2006 CONTRACTOR: Commercial Diversified, Inc. 72033 29 Palms Highway Twentynine Palms, CA 92277 ATTACHMENTS: 1. Contract Change Order No. 5 RECOMMENDATION By Minute Motion: RATIFY City Manager Approval of Change Order No. 5, in the Amount of $21,421.45, to Commercial Diversified, Inc. (Twentynine Palms, CA), for Various Improvements Associated with the Fire Station No. 67 Renovation Project. BACKGROUND On March 10, 2005, the City Council awarded the Mesa View Fire Station Renovation Project to Commercial Diversified, Inc. (Twentynine Palms, CA) in the amount of $1,395,000, plus a 10% contingency. Please note that the Council previously ratified Change Orders No. 1-4 for a combined total of $59,344.28. Change Order Number 5 is in the amount of $21,421.45. This change order is to accommodate various improvements at the station noted in the table below, which were not within the original project scope. If the City Council approves Staff's recommendation, there will be $58,734.27 remaining in the contingency fund for this project. G \C1tyMgAS1ephen Aryan\Word Data\Mesa View FS Change Order 5 doc Page 1 o1 2 100**� .omft, Change Order No. 5 (Contract #C-20580-D1) City Council Staff Report July 13, 2006 Construction of new soffit in kitchen Installation of power outlets at three new cable drops Installation of additional landscape material and revised grading work Replace section of concrete apron and recoat with epoxy Repair drywall after abatement of mold in office Repair damaged clay piping located under east driveway apron Replacement of drywall and light fixtures in apparatus bay tool room upon mold remediation Replacement of clay pipe to ensure no breakage during compaction TOTAL Prepared by: Ste e Y. Aryan Assist t to the CiWI/Z Approved by: Carlos L. Ortega City Manager Reviewed by: Luis Espih of Finance Completed Completed Completed In Process Completed Completed Pending Pending --T.TY --DUNG: AC'bLON: k,ETROVED „ . DENIED. MCEIVED OTHER. $46.58 $512.61 $6,665.96 $6,958.52 $654.79 $503.66 $3,673.34 $2,405.99 $21,421.45 t`,iEETIN kJ U AYE go NOES: --2U4Le. ABSENT :e. ABSTAIN: --Z22,11rV" VERIFIED BY:.,_��� Original on File w h City Clerk's Office GACityMgrlStephen Aryan\Word Data\Mesa Yew FS Change Order 5.doc Page 2 of 2 4,;E„t CITY OF PALm DESERI CONSTRUCTION CHANGE ORDER P.O. # 012324 Contract # C-20580-D 1 Project # Project Description: Mesa View Fire Station No. 67 Remodel Contractor Name Commercial Diversified, Inc. Contractor Street Address 72033 29 Palms Highway Vendor # 8590 City, State, Zip Twentynine Palms, CA 92277 Contract Change Order # 5 Pursuant to the terms of the original contract Agreement, you are hereby directed to make the herein described changes or do the following described work not included in the plans and specifications for this Contract. Unless otherwise stated, all work shall conform to the terms, general conditions, and special provisions of the original contract. _DESCRIPTION OF CHANGE See Attached List Contingency used? (circle one) Yes No Increase/Decrease in Amount $ If yes, amount moved to base: I $21,421.45 I Increase/Decrease in Days Contract Amount (include past change orders) $1,454,344.28 Contract Date of Completion TBD Plus/Minus Current Change Order $21,421.45 Plus/Minus Current Change Order TBD Revised Total Contract Amount $1,475,765.73 ( Revised Date of Completion N/A 1. ORD ED BY: Stephen Y. Aryan 2. CERTIFIED FUNDS AVAILABLE F�1It►0" 6-30• oG Assistant to the City Man er Date Directod Fi ce Date 3. APPROVED BY: 4. APPROVED BY: City Manager Date City Council Date We, the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all materials, perform all labor, except as may be noted above, and perform all services necessary to complete the above specified work, and hereby accept as full payment the amount shown above, which includes all direct and indirect overhead expenses fort any delays. ACCEPTED BY: ContractorfVendor Date FIRE STATION NO. 67 RENOVATION PROJECT CHANGE ORDER NO. 5 DETAILED INFORMATION Change Order Description Status Amount of new soffit in kitchen Completed $46.58 Installation of power outlets at three new cable drops Completed $512.61 Installation of additional landscape material and Completed $6,665.96 revised grading work Replace section of concrete apron and recoat with In Process $6,958.52 epoxy Repair drywall after abatement of mold in office Completed $654.79 Repair damaged clay piping located under east Completed $503.66 driveway apron Replacement of drywall and light fixtures in apparatus Pending $3,673.34 bay tool room upon mold remediation Replacement of clay pipe to ensure no breakage Pending $2,405.99 during compaction TOTAL $219421.45