HomeMy WebLinkAboutReimburse Developer - Fountainhead DevelopmentCITY OF PALM DESERT
PUBLIC WORKS DEPARTMENT
STAFF REPORT
REQUEST: Reimburse Developer for Improvements Built on Behalf of the City
SUBMITTED BY: Mark Greenwood, P.E., Director of Public Works
APPLICANT: Fountainhead Development
Attn: Elizabeth Meloy
1400 Quail Street, Suite 135
Newport Beach, CA 92660
DATE: May 25, 2006
CONTENTS: 07-07-04 Letter Requesting Financial Assistance, with Attachments
08-16-04 Letter Agreeing to Assistance
05-05-06 Letter of Request
Contractor Cost Breakdown
Vicinity Map
Recommendation:
By minute motion, approve payment in the amount of $24,000.00 to Fountainhead
Development of Newport Beach, California per the attached letter.
Background:
Approval of the development of the northwest corner of Washington Street and Country Club
Drive included an agreement for the developer to build the storm drain system and then be
reimbursed by the City up to a maximum of $24,000.00. This work has now been completed to
the City's satisfaction, and the developer has submitted the subcontractor's cost breakdown
depicting an actual cost of $107,428.00.
Funds are available in account 420-4291-433-4001. Therefore, staff recommends that City
Council approve reimbursement to Fountainhead Development in the amount of $24,000.00 as
the City's contribution toward construction of a storm drain system at the southeast corner of
Washington Street and Country Club Drive.
Mark Greefiwood, P.E.
Director of Public Works
Paul Gibson
Finance Director
/dhl
Homer Croy
ACM for Dev ent Services
L. Ortega
anager
r uuiv i wi�vncr-tu
PAGE 02/02
Fountainhead
evelopment
July 7, 2004
Mario Greenwood
Fmttineering Manager
City of Palm Dege rt
73-510 Fred Waring Dr.
Palm Desert, CA 92260
RE: Wendy's Redevelopment
SW C Washington / Country Club
Dear Math:
r G1✓
?VIA 3Z31S
Wle_'vP ®73—Ig
The peupose of this letter is to request 3 items from the city regarding the devclopmeor of the project They are
as foAows:
1. Financial assistance to enhance the city's storm drains system. Nuisance water army the area
currently runs onto the site and needs to be contained per undcastauding with city staff
2. Financial assistance to install a free right turn from Washington onto Country Club to alleviate
current traffic congestion at intersection
3. To allow Wendy's to open for business should'they complete their improvements prior to the
campledon of the ofNte improvements.
I appreciate the consideration of this request. Please let are know ifyou are is need of any ittfonnadon.
Sincerely,
raig Smith
Managing Member
Cc: Sang Spinello
Jerry 11mson — Wendy's
1400 Quail Street, Suite 135 ® Newport Beach, CA 92660
949/752,2515 e Fax 949/752.7442
Received Jul-07-2004 11:52 From-9497527442 To -PALM DESERT PUBLIC W Page 002
]Quantity I Unit
1 Is
i Is
1 Is
1 Is
1 Is
1 Is
t Is
Is
1 Is
1 is
1 Is
1 Is
1 Is
1 Is
1 is
4000 sf
1 Is
1 Is
7000 sf
175 if
270 If
800 sf
1800 sf
3000 sf
1 Is
80 If
640 sf
640 sf
1 Is
1 Is
1500 sf
PALM DESERT ADDITIONAL STREET IMPROVEMENTS
PRELIMINARY ESTIMATE
Rem/Scope
modify architectural site plan
modify civil plans complete
structural engineering
street improvement plan
signal plan
striping plan
modify landscape plan
traffic control plan
soils testing
erosion control
dust control
construction staking
engineered traffic control
permits, applications & fees
saw cut existing a.c. @ curb & gutter
demo/remove a.c. & curb, gutter & pole base
move 'CVWD" utility box
move ca tv box
rough & fine grade/balance site
construct 8" curb & gutter per City standard
construct 8" curb @ pork chop
construct 4" concrete City sidewalk
construct decorative concrete @ pork chop
construct 4" a.c. over 8" class II base
grind/overlay/slot patch a.c.
increase footing size @ retaining wall
construct additional retaining walls
construct additional stone veneer @ wall
traffic signals complete Washington south
street striping
landscape & irrigation
supervision, general conditions & fee: @
insurance: @
contingency: @
total job estimate:
Developer Estimate
I
subtotal $ 354,632.50
Cost
Total
$ 4,000.00
$
4,000.00
$ 12,000.00
$
12,000.00
$ 4,500.00
$
4,500.00
$ 3,000.00
$
3,000.00
$ 10,000.00
$
10,000.00
$ 3,000.00
$
3,000.00
$ 2,000.00
$
2,000.00
$ 5,000.00
$
5,000.00
$ 4,000.00
$
4,000.00
$ 2,000.00
$
2,000.00
$ 2,000.00
$
2,000.00
$ 2,500.00
$
2,500.00
$ 15,006.00
$
15,000.00
$ 10,000.00
$
10,000.00
$ 500.00
$
500.00
$ 1.50
$
6,000.00
$ 10,000.00
$
10,000.00
$ 6,000.00
$
6,000.00
$ 3.50
$
24,500.00
$ 14.50
$
2,537.50
$ 12.50
$
3,375.00
$ 5.50
$
4,400.00
$ 9.00
$
16,200.00
$ 2.70
$
8,100.00
$ 8,000.00
$
8,000.00
$ 75.00
$
6,000.00
$ 12.50
$
8,000.00
§ 18.00
$
11,520.00
$150,000.00
$
150.000.00
$ 4,500.00
§
4,500.00
$ 4.00
§
6,000.00
12.00% $ 42,555.90
2.00% $ 7,092.65
5.00% $ 17,731.63
422,012.68
City Esl
Cost ]
4,000.00
3,500.00
2,500.00
3,000.00
7,000.00
2,000.00
1,000.00
1,000.00
2,500.00
5,000.00
5,000,00
500.00
1.50
10,000.00
6,000.00
3.50
14.50
12.50
2.50
9.00
1.75
8,000.00
75.00
12.50
10.00
75,000.00
1,000.00
4.00
mate
Total
6 4,000.00
6 3,500.00
6 2,500.00
$ 3,000.00
i 7,000.00
2,000.00
i 1,000.00
1,000.00
2,500.00
5,000.00
5,000.00
500.00
6,000.00
10,000.00
6,000.00
24,500.00
2,537.50
3,375.00
2,000.00
16,200.00
5,250.00
8,000.00
6,000.00
8,000.00
6,400.00
75,000.00
1,000.00
6,000.00
$ 223,262.50
$ 26,791.50
$ 4,465.25
$ 11,163.13
$ 265,682.38
PALM DESERT STORM DRAIN - WASHINGTON / COUNTRY CLUB
PRELIMINARY ESTIMATE
quantity unit item / scope
cost total
1 Is
soils testing
@
$600.00
$600.00
1 Is
construction staking
@
$400.00
$400.00
1 ea
construct junction structure
@
$7,500.00
$7,500.00
185 If
construct 36 " rcp storm drain
@
$40.00
$7,400.00
0.5 ea
construct catch basin & manhole
@
$7,000.00
$3,500.00
subtotal:
supervision, general conditions & fee: @
insurance: @
contingency: @
job estimate:
$19,400.00
12.00% $2,328.00
2.00% $388.00
5.00% $970.00
$23,086.00
1 Is
soils testing
@
$600.00
$600.00
1 Is
construction staking
@
$400.00
$400.00
0.5 ea
construct catch basin & manhole
@
$7,000.00
$3,500.00
285 If
construct 36" rcp storm drain
@
$40.00
$11,400.00
1 ea
construct dry well
@
$5,200,00
$5,200.00
subtotal: $2 i ,100.00
supervision, general conditions & fee:
@
12.00%
$2,532.00
insurance:
@
2.00%
$422.00
contingency"
@
5.00%
$1,055.00
job estimate: $25,109.00
MAY-5-2006 04:00P FROM:FOUNTAINHERD 9497522515 TO:17603417098 P.3/8
CITY Of PRLfD DESERT
73-510 FRED WARING DRIVE
PALM DESERT, CALIFORNIA 92260-2578
TEL: 760 346-061 I
LAX: 760 341-7098
info @palm-deserr.org
August 16, 2004
Craig Smith
Managing Member
Fountainhead Development
1400 Quail Street, Suite 135
Newport Beach, California 92660
RE: Wendy's Redevelopment, Southwest Corner of Washington Street &
Country Club Drive
Dear Craig,
This is in response to your letter dated July 7, 2004, regarding financial
assistance for the storm drain system, a free right turn and the opening for
business before the completion of the offsite improvements. The City will agree
to contribute to the cost of the storm drain system not to exceed $24,000.
The City will not participate with the costs associated with the free right turn from
Washington Street onto Country Club Drive.
The City will agree to a conditional certificate of occupancy to allow Wendy's to
open for business before the completion of your offsite improvements with a cash
deposit, or certificate of deposit with the City named as beneficiary, in the amount
of the improvements.
If you have any questions regarding the City's decisions, please do not hesitate
to call, 760/776-6450, ext. 469.
Sincerely,
fox Mark Greenwood
City Engineer
/jl
cc: Carlos Ortega, City Manager
Homer Croy, ACM Development Services
Michael Errante, Director of Public Works
Phil Drell, Director of Planning
Amir Hamidzadeh, Director of Building & Safety
OrrmmmInmoenn
MAY-5-2006 04:OOP FROM:FOUNTAINHEAD
9497522515 T0:1760-417098 P.2/8
Fountainhead
Development
May 5, 2006
Mr. Mark Greenwood P E-
Director of Public Works
City of Palm Desert
73-150 Fred Waring Drive
Palm Desert, CA 92260-2578
RE: SWC Country Club & Washington
Palm Desert, CA
Dear Mr. Greenwood:
This letter will serve as the request from Fountainhead Indio, LP, owner of the subject
property, for the City's contribution of $24,000 towards the storm drain system per the
attached correspondence. The work has been completed, inspected and signed off by the
City inspector.
Also enclosed please find the breakdown of the on -site, off -site and change orders from
our general contractor, Alton Builders totaling $107,428.00.
Should you have any questions, please do not hesitate to contact me at (949) 752-2515.
Sincerely,
FOUNTAINHEAD INDIO, LP
(�&'_�
Eliz6gth F. Meloy
Project Manager
Enclosures
1400 Quail Street, Suite 135 ® Newport Beach, CA 92660
9491752-2515 e Fax 949/752-7447
NRY-5-2006 04:00P FROM:FOUNTRINHERD
07/07/2005 10:01 FAX 760 345 092E
9497522515
ill-TIlompsON&SONS
TO:17603417098 P.4/8
Z04 ..
Name: ALTON BUILDERS
Add: 2385 MORSE AVENUE
IRVINE. CA 92814-0233
Phone: (049)250.9230
Fax:
Attn: LARRY JABLIN
Re: WENDY'S PALM DESERT
ITEM DESCRIPTION
1 RBI DRAIN (CONCRETE)--OFFS)TE-REVISED
2 MOVE IN
3 CURB INLET CATCH BASINS PER STO. 300 W-7'
( 4 POTHOLE FOR GAS B TELEPHONE
I 5 REMOVE EXISTING HEADWALL
8 SAWCUT AC
I 7 REMOVE AC
8
0
I 10
11 4' X I'CULVERT TO 38" PIPE (SEE BELOW
I 12 TRANSITION STRUCTURE PER STD TS301
13 W' HEADWALL
14 MANHOLE PER STD. MH252
I 15 DRYWELL D•22'
18 RIPRAP I I ff X 5.6
17 4" AC PAVEMENT OVER 8" CLASS It BASE
I 18 TRAFFIC CONTROL
1 19 LOCAL DEPRESSION PER STD. 311
I 23
24
25
I 28
I 27
I 28
I 29
DATE! July a 2006
J.N. THOMPSON s SONS. INC.
General Engineering Contractors
License No. 734478
79.607 Country Club Drive, Suite 2
Bermuda Dunes, CA 92201
Phone: (760) 345.0003
Fax: (760) 345.0525
a -mall:
LS
$
3.500.00
$
3,500.00
i
2 EA
S
6.600.00
5
11,11m.00
LS
S
1.460.00
5
I
1,450.00I
r•
800,00I
LS
$
500.00
$
88 LF
$
6.00
8
440.00 I
284 SF
I S
2.00
$
568.I70
I I
Ij
I�
1 EA
I S
4.W0.00
S
'4.0W.00
i EA
S
5.IX10,00
$
6400.00 I
I
I EA
$
3.800.DO
S
3.51N).DO
1 EA
S
4.000.00
$
4.000.9 1
1 FA
$
750.00
S
760.6
2.840.00
284 SF
5
10.00
$
lS
S
800.00
S
Ill
2 EA
S
600100
S
1.M0.
I! II:
al
li
TOTAL:
3
li
I,
Ii 11
ICI
30.948.b0
MAY-5-2006 04:01P FROM:FOUNTAINHERD 9497522515 TO:17603417098 P.5/8
Name: ALTON BUILDERS
Add: 2385 MORSE AVENUE
IRVINE, CA 92814-0233
Phone: (949)250.9230
Fax:
Ann: LARRY JABUN
Re: WENDY'S PALM DESERT
TION
1 � O
2 NYLOPLAST BASINS
3 36" NOS N-12 PLASTIC
4 18" NOS N-12 PLASTIC
5 NYLOPLAST MANHOLES
636"X16"WYE
7 36" 45' BEND
8 38" 22.6' BEND
9 38" 11.28a BEND
1016"X18"WYE
11 18" 450 BEND
12 18" 22.60 BEND
13 18" 11.254 BEND
14
t5
18
17 I
18
19
20
21
22
23
24
25
26
J N THOMPSON SONS, (NC.
General Engineering Cordrectom
Llcene9 No. 734478
79.607 Country Club Drive, Suite 2
Bermuda Dunce, CA 92201
Phone: (780) 346.8003
Fox: (760) 345-0626
e-mail:
I
i
i
1 `
3 EA
S
1.600.00 $
4.600.00
560 LF
S
45,00 $
26,680.b0
390 LF
5
25,00 S
9,760.00
I
1,850.L'90
I'
1 EA
$
1.850.00 $
4 EA
3
1.46D.00 S
ii
6,800,00
1 EA
S
750.00 13
760.6110
I
2 EA
$
600,00 $
1.000.d0
1 EA
is
500.00 8
600,1)0
I
1 EA
IS
960.00 fj j S
060.00
I
1
2 EA
$
600.00 $
1,000.00
8001 I
2 EA
$
300.00 $
n
1 EA
3
I
I
300.00 $
300.d0
it tI
i I
'I
TOTAL: S 63.880.60
li
MAY-5-2006 04:01P FROH:FOUNTRINHEPD 9497522515 TO:17603417093
�LJIL�ERS
P.6/S
Saab -Contractor Change Order
PROJECT: Wendy's Palm Desert CHANGE ORDER# 9
78030 Country Club Dr.
Palm Desert, CA CSI CODE 08100
TO: JH Thompson
79-607 Country Club Dr., Suite 2
Bermuda Dunes, CA 92203 DATE 3/5/2005
ATTN.: Jackson
In accordance with the terms of your Subcontract or Purchase Order for Site Work
on the above referenced project, you are herby authorized and directed to proceed with the following
changes In the work connected with said project.
1. Install water line for fire protection dudng construction per proposal dated
10/14/2005 $6,025.00
1/2/1900 Install (2) bends with MJ kits, (2) concrete kickers, the 8" C-900 pipe and
excavating additional depth $2,400.00
1/3/1900 Per City move out 2 feet and Install manhole In the sidewalk $1,575.00
din #z ( O �
-1- 7 6 ;�
c ctwcC =—
Adjusted Contract Through C/O# 0
Amount of this C/O #1
Current Adjusted Contract Amount
Sub Total $9,000.00
$434,078.00
$9,000.00
$443,078.00
Unless specifically noted on this document, the time required to complete the work discdbed In Contractors
original Subcontract Shall not be affected by this Change Order.
The undersigned hereby agrees to perform the work above discrlbed In
accordance with the terms herin set forth, and to accept as payment
for said work the amount above shown.
Alton Builders (i Subcontractor It r
Approved by: IdL Approved B
EFO
Title: (Je o _� YV Title: F�-�5 I, b►, +-
Alton Builders �+,. L r
2385 Morse Ave. Address: 79-4" .V? WJ 1, 4,n 41-4 $ fzn , 7v I R z
Irvine Ca 92614
949-250-9230 Phone: 'X
MAY-5-2006 04:01P FROM:FOUNTAINHEAD 9497522515 TO:17603417098 P.7/8
Sub -Contractor Change Order
PROJECT: Wendy's Palm Desert CHANGE ORDER# 4
78030 Country Club Dr.
Palm Desert, CA CSI CODE 08100
TO: JH Thompson
7M07 Country Club Dr., Suite 2
Bermuda Dunes, CA 92203 DATE 3/17/2006
ATTN.: Jackson
In accordance with the terms of your Subcontract or Purchase Order for Site Work
on the above referenced project, you are herby authorized and directed to proceed with the following
changes in the work connected with said project.
Additional manhole adjustments at Desret County Circle $2.325.00
Modlfy storm drain box (m Wendy's drive thru $2.475.00
Slurry -coat parking lot $1,200.00
Adjusted Contract Through C/O# 3
Amount of this C/O #4
Current Adjusted Contract Amount
o dance-t�-ss b,°�
Sub Total $6,000.00
$465,865.00
$6.000.00
$471,865.00
Unless specifically noted on this document, the time required to complete the work discribed In Contractors
original Subcontract Shall not be affected by this Change Order.
The undersigned hereby agrees to perform the work above discribed In
accordance with the terms herin set forth, and to accept as payment
for said work the a ounl ab90 shown.
Alton BuildersKV Subcontractor ter'
Approved by: Approved By:
Title: Title: ?N+a+-�+ r
Alton Builders
2385 Morse Ave. Address:
Irvine Ca 92614
949-250-923D Phone:
MAY-5-2006 04:01P FR014:170UNTAINHEAD
9497522515 TO:17603417098 P.8/8
. Saab -Contractor Change Order
PROJECT: Wendy's Palm Desert CHANGE ORDER# 3
78030 Country Club Dr.
Palm Desert, CA CSI CODE 08100
TO: JH Thompson
79.607 Country Club Dr., Suite 2
Bermuda Dunes, CA 92203 DATE 2/6/2007
ATTN.: Jackson
In accordance with the terms of your Subcontract or Purchase Order for Site Work
on the above referenced project, you are herby authorized and directed to proceed with the following
changes in the work connected with said project.
Install drainline and catch basins on east side of Wendy's
as per plan by Saxon Engineering
2. Add sleeves across street.
Adjusted Contract Through C/O# 2
Amount of this C/0 #3
Current Adjusted Contract Amount
$7,225.00
$600.00
Sub Total $7,225.00
$458,640.00
$7,225.00
$465,865.00
Unless specifically noted on this document, the time required to complete the work discribed In Contractors
original Subcontract Shall not be affected by this Change Order.
The undersigned hereby agrees to perform the work above discribed in
accordance with the terms herin set forth, and to accept as payment
for said work the amount above shown.
Alton Builders �
Approvedvedbby: �p
Title: en
Alton Builders
2385 Morse Ave.
Irvine Ca 92614
949-250.9230
Subcontractor II
Approved By: c..�-
t✓
Title:
Address• 7?-1 o']
Phone: %Gx7, 3q5 �C�3
NRY-5-2006 04:00P FROM:FOUNTRINHERD
07/07/2005 10:01 FAX 760 345 092E
9497522515
ill-TIlompsON&SONS
TO:17603417098 P.4/8
Z04 ..
Name: ALTON BUILDERS
Add: 2385 MORSE AVENUE
IRVINE. CA 92814-0233
Phone: (049)250.9230
Fax:
Attn: LARRY JABLIN
Re: WENDY'S PALM DESERT
ITEM DESCRIPTION
1 RBI DRAIN (CONCRETE)--OFFS)TE-REVISED
2 MOVE IN
3 CURB INLET CATCH BASINS PER STO. 300 W-7'
( 4 POTHOLE FOR GAS B TELEPHONE
I 5 REMOVE EXISTING HEADWALL
8 SAWCUT AC
I 7 REMOVE AC
8
0
I 10
11 4' X I'CULVERT TO 38" PIPE (SEE BELOW
I 12 TRANSITION STRUCTURE PER STD TS301
13 W' HEADWALL
14 MANHOLE PER STD. MH252
I 15 DRYWELL D•22'
18 RIPRAP I I ff X 5.6
17 4" AC PAVEMENT OVER 8" CLASS It BASE
I 18 TRAFFIC CONTROL
1 19 LOCAL DEPRESSION PER STD. 311
I 23
24
25
I 28
I 27
I 28
I 29
DATE! July a 2006
J.N. THOMPSON s SONS. INC.
General Engineering Contractors
License No. 734478
79.607 Country Club Drive, Suite 2
Bermuda Dunes, CA 92201
Phone: (760) 345.0003
Fax: (760) 345.0525
a -mall:
LS
$
3.500.00
$
3,500.00
i
2 EA
S
6.600.00
5
11,11m.00
LS
S
1.460.00
5
I
1,450.00I
r•
800,00I
LS
$
500.00
$
88 LF
$
6.00
8
440.00 I
284 SF
I S
2.00
$
568.I70
I I
Ij
I�
1 EA
I S
4.W0.00
S
'4.0W.00
i EA
S
5.IX10,00
$
6400.00 I
I
I EA
$
3.800.DO
S
3.51N).DO
1 EA
S
4.000.00
$
4.000.9 1
1 FA
$
750.00
S
760.6
2.840.00
284 SF
5
10.00
$
lS
S
800.00
S
Ill
2 EA
S
600100
S
1.M0.
I! II:
al
li
TOTAL:
3
li
I,
Ii 11
ICI
30.948.b0
MAY-5-2006 04:01P FROM:FOUNTAINHERD 9497522515 TO:17603417098 P.5/8
Name: ALTON BUILDERS
Add: 2385 MORSE AVENUE
IRVINE, CA 92814-0233
Phone: (949)250.9230
Fax:
Ann: LARRY JABUN
Re: WENDY'S PALM DESERT
TION
1 � O
2 NYLOPLAST BASINS
3 36" NOS N-12 PLASTIC
4 18" NOS N-12 PLASTIC
5 NYLOPLAST MANHOLES
636"X16"WYE
7 36" 45' BEND
8 38" 22.6' BEND
9 38" 11.28a BEND
1016"X18"WYE
11 18" 450 BEND
12 18" 22.60 BEND
13 18" 11.254 BEND
14
t5
18
17 I
18
19
20
21
22
23
24
25
26
J N THOMPSON SONS, (NC.
General Engineering Cordrectom
Llcene9 No. 734478
79.607 Country Club Drive, Suite 2
Bermuda Dunce, CA 92201
Phone: (780) 346.8003
Fox: (760) 345-0626
e-mail:
I
i
i
1 `
3 EA
S
1.600.00 $
4.600.00
560 LF
S
45,00 $
26,680.b0
390 LF
5
25,00 S
9,760.00
I
1,850.L'90
I'
1 EA
$
1.850.00 $
4 EA
3
1.46D.00 S
ii
6,800,00
1 EA
S
750.00 13
760.6110
I
2 EA
$
600,00 $
1.000.d0
1 EA
is
500.00 8
600,1)0
I
1 EA
IS
960.00 fj j S
060.00
I
1
2 EA
$
600.00 $
1,000.00
8001 I
2 EA
$
300.00 $
n
1 EA
3
I
I
300.00 $
300.d0
it tI
i I
'I
TOTAL: S 63.880.60
li
MAY-5-2006 04:01P FROH:FOUNTRINHEPD 9497522515 TO:17603417093
�LJIL�ERS
P.6/S
Saab -Contractor Change Order
PROJECT: Wendy's Palm Desert CHANGE ORDER# 9
78030 Country Club Dr.
Palm Desert, CA CSI CODE 08100
TO: JH Thompson
79-607 Country Club Dr., Suite 2
Bermuda Dunes, CA 92203 DATE 3/5/2005
ATTN.: Jackson
In accordance with the terms of your Subcontract or Purchase Order for Site Work
on the above referenced project, you are herby authorized and directed to proceed with the following
changes In the work connected with said project.
1. Install water line for fire protection dudng construction per proposal dated
10/14/2005 $6,025.00
1/2/1900 Install (2) bends with MJ kits, (2) concrete kickers, the 8" C-900 pipe and
excavating additional depth $2,400.00
1/3/1900 Per City move out 2 feet and Install manhole In the sidewalk $1,575.00
din #z ( O �
-1- 7 6 ;�
c ctwcC =—
Adjusted Contract Through C/O# 0
Amount of this C/O #1
Current Adjusted Contract Amount
Sub Total $9,000.00
$434,078.00
$9,000.00
$443,078.00
Unless specifically noted on this document, the time required to complete the work discdbed In Contractors
original Subcontract Shall not be affected by this Change Order.
The undersigned hereby agrees to perform the work above discrlbed In
accordance with the terms herin set forth, and to accept as payment
for said work the amount above shown.
Alton Builders (i Subcontractor It r
Approved by: IdL Approved B
EFO
Title: (Je o _� YV Title: F�-�5 I, b►, +-
Alton Builders �+,. L r
2385 Morse Ave. Address: 79-4" .V? WJ 1, 4,n 41-4 $ fzn , 7v I R z
Irvine Ca 92614
949-250-9230 Phone: 'X
MAY-5-2006 04:01P FROM:FOUNTAINHEAD 9497522515 TO:17603417098 P.7/8
Sub -Contractor Change Order
PROJECT: Wendy's Palm Desert CHANGE ORDER# 4
78030 Country Club Dr.
Palm Desert, CA CSI CODE 08100
TO: JH Thompson
7M07 Country Club Dr., Suite 2
Bermuda Dunes, CA 92203 DATE 3/17/2006
ATTN.: Jackson
In accordance with the terms of your Subcontract or Purchase Order for Site Work
on the above referenced project, you are herby authorized and directed to proceed with the following
changes in the work connected with said project.
Additional manhole adjustments at Desret County Circle $2.325.00
Modlfy storm drain box (m Wendy's drive thru $2.475.00
Slurry -coat parking lot $1,200.00
Adjusted Contract Through C/O# 3
Amount of this C/O #4
Current Adjusted Contract Amount
o dance-t�-ss b,°�
Sub Total $6,000.00
$465,865.00
$6.000.00
$471,865.00
Unless specifically noted on this document, the time required to complete the work discribed In Contractors
original Subcontract Shall not be affected by this Change Order.
The undersigned hereby agrees to perform the work above discribed In
accordance with the terms herin set forth, and to accept as payment
for said work the a ounl ab90 shown.
Alton BuildersKV Subcontractor ter'
Approved by: Approved By:
Title: Title: ?N+a+-�+ r
Alton Builders
2385 Morse Ave. Address:
Irvine Ca 92614
949-250-923D Phone:
MAY-5-2006 04:01P FR014:170UNTAINHEAD
9497522515 TO:17603417098 P.8/8
. Saab -Contractor Change Order
PROJECT: Wendy's Palm Desert CHANGE ORDER# 3
78030 Country Club Dr.
Palm Desert, CA CSI CODE 08100
TO: JH Thompson
79.607 Country Club Dr., Suite 2
Bermuda Dunes, CA 92203 DATE 2/6/2007
ATTN.: Jackson
In accordance with the terms of your Subcontract or Purchase Order for Site Work
on the above referenced project, you are herby authorized and directed to proceed with the following
changes in the work connected with said project.
Install drainline and catch basins on east side of Wendy's
as per plan by Saxon Engineering
2. Add sleeves across street.
Adjusted Contract Through C/O# 2
Amount of this C/0 #3
Current Adjusted Contract Amount
$7,225.00
$600.00
Sub Total $7,225.00
$458,640.00
$7,225.00
$465,865.00
Unless specifically noted on this document, the time required to complete the work discribed In Contractors
original Subcontract Shall not be affected by this Change Order.
The undersigned hereby agrees to perform the work above discribed in
accordance with the terms herin set forth, and to accept as payment
for said work the amount above shown.
Alton Builders �
Approvedvedbby: �p
Title: en
Alton Builders
2385 Morse Ave.
Irvine Ca 92614
949-250.9230
Subcontractor II
Approved By: c..�-
t✓
Title:
Address• 7?-1 o']
Phone: %Gx7, 3q5 �C�3
Date: 5/11/2006
LOCATOR MAP .
0 250 500Feet
City of Palm Desert WASHINGTON STC O U N TRY CLUB DR
I-10
DESERT COUNTRY CIR