Loading...
HomeMy WebLinkAboutReimburse Developer - Fountainhead DevelopmentCITY OF PALM DESERT PUBLIC WORKS DEPARTMENT STAFF REPORT REQUEST: Reimburse Developer for Improvements Built on Behalf of the City SUBMITTED BY: Mark Greenwood, P.E., Director of Public Works APPLICANT: Fountainhead Development Attn: Elizabeth Meloy 1400 Quail Street, Suite 135 Newport Beach, CA 92660 DATE: May 25, 2006 CONTENTS: 07-07-04 Letter Requesting Financial Assistance, with Attachments 08-16-04 Letter Agreeing to Assistance 05-05-06 Letter of Request Contractor Cost Breakdown Vicinity Map Recommendation: By minute motion, approve payment in the amount of $24,000.00 to Fountainhead Development of Newport Beach, California per the attached letter. Background: Approval of the development of the northwest corner of Washington Street and Country Club Drive included an agreement for the developer to build the storm drain system and then be reimbursed by the City up to a maximum of $24,000.00. This work has now been completed to the City's satisfaction, and the developer has submitted the subcontractor's cost breakdown depicting an actual cost of $107,428.00. Funds are available in account 420-4291-433-4001. Therefore, staff recommends that City Council approve reimbursement to Fountainhead Development in the amount of $24,000.00 as the City's contribution toward construction of a storm drain system at the southeast corner of Washington Street and Country Club Drive. Mark Greefiwood, P.E. Director of Public Works Paul Gibson Finance Director /dhl Homer Croy ACM for Dev ent Services L. Ortega anager r uuiv i wi�vncr-tu PAGE 02/02 Fountainhead evelopment July 7, 2004 Mario Greenwood Fmttineering Manager City of Palm Dege rt 73-510 Fred Waring Dr. Palm Desert, CA 92260 RE: Wendy's Redevelopment SW C Washington / Country Club Dear Math: r G1✓ ?VIA 3Z31S Wle_'vP ®73—Ig The peupose of this letter is to request 3 items from the city regarding the devclopmeor of the project They are as foAows: 1. Financial assistance to enhance the city's storm drains system. Nuisance water army the area currently runs onto the site and needs to be contained per undcastauding with city staff 2. Financial assistance to install a free right turn from Washington onto Country Club to alleviate current traffic congestion at intersection 3. To allow Wendy's to open for business should'they complete their improvements prior to the campledon of the ofNte improvements. I appreciate the consideration of this request. Please let are know ifyou are is need of any ittfonnadon. Sincerely, raig Smith Managing Member Cc: Sang Spinello Jerry 11mson — Wendy's 1400 Quail Street, Suite 135 ® Newport Beach, CA 92660 949/752,2515 e Fax 949/752.7442 Received Jul-07-2004 11:52 From-9497527442 To -PALM DESERT PUBLIC W Page 002 ]Quantity I Unit 1 Is i Is 1 Is 1 Is 1 Is 1 Is t Is Is 1 Is 1 is 1 Is 1 Is 1 Is 1 Is 1 is 4000 sf 1 Is 1 Is 7000 sf 175 if 270 If 800 sf 1800 sf 3000 sf 1 Is 80 If 640 sf 640 sf 1 Is 1 Is 1500 sf PALM DESERT ADDITIONAL STREET IMPROVEMENTS PRELIMINARY ESTIMATE Rem/Scope modify architectural site plan modify civil plans complete structural engineering street improvement plan signal plan striping plan modify landscape plan traffic control plan soils testing erosion control dust control construction staking engineered traffic control permits, applications & fees saw cut existing a.c. @ curb & gutter demo/remove a.c. & curb, gutter & pole base move 'CVWD" utility box move ca tv box rough & fine grade/balance site construct 8" curb & gutter per City standard construct 8" curb @ pork chop construct 4" concrete City sidewalk construct decorative concrete @ pork chop construct 4" a.c. over 8" class II base grind/overlay/slot patch a.c. increase footing size @ retaining wall construct additional retaining walls construct additional stone veneer @ wall traffic signals complete Washington south street striping landscape & irrigation supervision, general conditions & fee: @ insurance: @ contingency: @ total job estimate: Developer Estimate I subtotal $ 354,632.50 Cost Total $ 4,000.00 $ 4,000.00 $ 12,000.00 $ 12,000.00 $ 4,500.00 $ 4,500.00 $ 3,000.00 $ 3,000.00 $ 10,000.00 $ 10,000.00 $ 3,000.00 $ 3,000.00 $ 2,000.00 $ 2,000.00 $ 5,000.00 $ 5,000.00 $ 4,000.00 $ 4,000.00 $ 2,000.00 $ 2,000.00 $ 2,000.00 $ 2,000.00 $ 2,500.00 $ 2,500.00 $ 15,006.00 $ 15,000.00 $ 10,000.00 $ 10,000.00 $ 500.00 $ 500.00 $ 1.50 $ 6,000.00 $ 10,000.00 $ 10,000.00 $ 6,000.00 $ 6,000.00 $ 3.50 $ 24,500.00 $ 14.50 $ 2,537.50 $ 12.50 $ 3,375.00 $ 5.50 $ 4,400.00 $ 9.00 $ 16,200.00 $ 2.70 $ 8,100.00 $ 8,000.00 $ 8,000.00 $ 75.00 $ 6,000.00 $ 12.50 $ 8,000.00 § 18.00 $ 11,520.00 $150,000.00 $ 150.000.00 $ 4,500.00 § 4,500.00 $ 4.00 § 6,000.00 12.00% $ 42,555.90 2.00% $ 7,092.65 5.00% $ 17,731.63 422,012.68 City Esl Cost ] 4,000.00 3,500.00 2,500.00 3,000.00 7,000.00 2,000.00 1,000.00 1,000.00 2,500.00 5,000.00 5,000,00 500.00 1.50 10,000.00 6,000.00 3.50 14.50 12.50 2.50 9.00 1.75 8,000.00 75.00 12.50 10.00 75,000.00 1,000.00 4.00 mate Total 6 4,000.00 6 3,500.00 6 2,500.00 $ 3,000.00 i 7,000.00 2,000.00 i 1,000.00 1,000.00 2,500.00 5,000.00 5,000.00 500.00 6,000.00 10,000.00 6,000.00 24,500.00 2,537.50 3,375.00 2,000.00 16,200.00 5,250.00 8,000.00 6,000.00 8,000.00 6,400.00 75,000.00 1,000.00 6,000.00 $ 223,262.50 $ 26,791.50 $ 4,465.25 $ 11,163.13 $ 265,682.38 PALM DESERT STORM DRAIN - WASHINGTON / COUNTRY CLUB PRELIMINARY ESTIMATE quantity unit item / scope cost total 1 Is soils testing @ $600.00 $600.00 1 Is construction staking @ $400.00 $400.00 1 ea construct junction structure @ $7,500.00 $7,500.00 185 If construct 36 " rcp storm drain @ $40.00 $7,400.00 0.5 ea construct catch basin & manhole @ $7,000.00 $3,500.00 subtotal: supervision, general conditions & fee: @ insurance: @ contingency: @ job estimate: $19,400.00 12.00% $2,328.00 2.00% $388.00 5.00% $970.00 $23,086.00 1 Is soils testing @ $600.00 $600.00 1 Is construction staking @ $400.00 $400.00 0.5 ea construct catch basin & manhole @ $7,000.00 $3,500.00 285 If construct 36" rcp storm drain @ $40.00 $11,400.00 1 ea construct dry well @ $5,200,00 $5,200.00 subtotal: $2 i ,100.00 supervision, general conditions & fee: @ 12.00% $2,532.00 insurance: @ 2.00% $422.00 contingency" @ 5.00% $1,055.00 job estimate: $25,109.00 MAY-5-2006 04:00P FROM:FOUNTAINHERD 9497522515 TO:17603417098 P.3/8 CITY Of PRLfD DESERT 73-510 FRED WARING DRIVE PALM DESERT, CALIFORNIA 92260-2578 TEL: 760 346-061 I LAX: 760 341-7098 info @palm-deserr.org August 16, 2004 Craig Smith Managing Member Fountainhead Development 1400 Quail Street, Suite 135 Newport Beach, California 92660 RE: Wendy's Redevelopment, Southwest Corner of Washington Street & Country Club Drive Dear Craig, This is in response to your letter dated July 7, 2004, regarding financial assistance for the storm drain system, a free right turn and the opening for business before the completion of the offsite improvements. The City will agree to contribute to the cost of the storm drain system not to exceed $24,000. The City will not participate with the costs associated with the free right turn from Washington Street onto Country Club Drive. The City will agree to a conditional certificate of occupancy to allow Wendy's to open for business before the completion of your offsite improvements with a cash deposit, or certificate of deposit with the City named as beneficiary, in the amount of the improvements. If you have any questions regarding the City's decisions, please do not hesitate to call, 760/776-6450, ext. 469. Sincerely, fox Mark Greenwood City Engineer /jl cc: Carlos Ortega, City Manager Homer Croy, ACM Development Services Michael Errante, Director of Public Works Phil Drell, Director of Planning Amir Hamidzadeh, Director of Building & Safety OrrmmmInmoenn MAY-5-2006 04:OOP FROM:FOUNTAINHEAD 9497522515 T0:1760-417098 P.2/8 Fountainhead Development May 5, 2006 Mr. Mark Greenwood P E- Director of Public Works City of Palm Desert 73-150 Fred Waring Drive Palm Desert, CA 92260-2578 RE: SWC Country Club & Washington Palm Desert, CA Dear Mr. Greenwood: This letter will serve as the request from Fountainhead Indio, LP, owner of the subject property, for the City's contribution of $24,000 towards the storm drain system per the attached correspondence. The work has been completed, inspected and signed off by the City inspector. Also enclosed please find the breakdown of the on -site, off -site and change orders from our general contractor, Alton Builders totaling $107,428.00. Should you have any questions, please do not hesitate to contact me at (949) 752-2515. Sincerely, FOUNTAINHEAD INDIO, LP (�&'_� Eliz6gth F. Meloy Project Manager Enclosures 1400 Quail Street, Suite 135 ® Newport Beach, CA 92660 9491752-2515 e Fax 949/752-7447 NRY-5-2006 04:00P FROM:FOUNTRINHERD 07/07/2005 10:01 FAX 760 345 092E 9497522515 ill-TIlompsON&SONS TO:17603417098 P.4/8 Z04 .. Name: ALTON BUILDERS Add: 2385 MORSE AVENUE IRVINE. CA 92814-0233 Phone: (049)250.9230 Fax: Attn: LARRY JABLIN Re: WENDY'S PALM DESERT ITEM DESCRIPTION 1 RBI DRAIN (CONCRETE)--OFFS)TE-REVISED 2 MOVE IN 3 CURB INLET CATCH BASINS PER STO. 300 W-7' ( 4 POTHOLE FOR GAS B TELEPHONE I 5 REMOVE EXISTING HEADWALL 8 SAWCUT AC I 7 REMOVE AC 8 0 I 10 11 4' X I'CULVERT TO 38" PIPE (SEE BELOW I 12 TRANSITION STRUCTURE PER STD TS301 13 W' HEADWALL 14 MANHOLE PER STD. MH252 I 15 DRYWELL D•22' 18 RIPRAP I I ff X 5.6 17 4" AC PAVEMENT OVER 8" CLASS It BASE I 18 TRAFFIC CONTROL 1 19 LOCAL DEPRESSION PER STD. 311 I 23 24 25 I 28 I 27 I 28 I 29 DATE! July a 2006 J.N. THOMPSON s SONS. INC. General Engineering Contractors License No. 734478 79.607 Country Club Drive, Suite 2 Bermuda Dunes, CA 92201 Phone: (760) 345.0003 Fax: (760) 345.0525 a -mall: LS $ 3.500.00 $ 3,500.00 i 2 EA S 6.600.00 5 11,11m.00 LS S 1.460.00 5 I 1,450.00I r• 800,00I LS $ 500.00 $ 88 LF $ 6.00 8 440.00 I 284 SF I S 2.00 $ 568.I70 I I Ij I� 1 EA I S 4.W0.00 S '4.0W.00 i EA S 5.IX10,00 $ 6400.00 I I I EA $ 3.800.DO S 3.51N).DO 1 EA S 4.000.00 $ 4.000.9 1 1 FA $ 750.00 S 760.6 2.840.00 284 SF 5 10.00 $ lS S 800.00 S Ill 2 EA S 600100 S 1.M0. I! II: al li TOTAL: 3 li I, Ii 11 ICI 30.948.b0 MAY-5-2006 04:01P FROM:FOUNTAINHERD 9497522515 TO:17603417098 P.5/8 Name: ALTON BUILDERS Add: 2385 MORSE AVENUE IRVINE, CA 92814-0233 Phone: (949)250.9230 Fax: Ann: LARRY JABUN Re: WENDY'S PALM DESERT TION 1 � O 2 NYLOPLAST BASINS 3 36" NOS N-12 PLASTIC 4 18" NOS N-12 PLASTIC 5 NYLOPLAST MANHOLES 636"X16"WYE 7 36" 45' BEND 8 38" 22.6' BEND 9 38" 11.28a BEND 1016"X18"WYE 11 18" 450 BEND 12 18" 22.60 BEND 13 18" 11.254 BEND 14 t5 18 17 I 18 19 20 21 22 23 24 25 26 J N THOMPSON SONS, (NC. General Engineering Cordrectom Llcene9 No. 734478 79.607 Country Club Drive, Suite 2 Bermuda Dunce, CA 92201 Phone: (780) 346.8003 Fox: (760) 345-0626 e-mail: I i i 1 ` 3 EA S 1.600.00 $ 4.600.00 560 LF S 45,00 $ 26,680.b0 390 LF 5 25,00 S 9,760.00 I 1,850.L'90 I' 1 EA $ 1.850.00 $ 4 EA 3 1.46D.00 S ii 6,800,00 1 EA S 750.00 13 760.6110 I 2 EA $ 600,00 $ 1.000.d0 1 EA is 500.00 8 600,1)0 I 1 EA IS 960.00 fj j S 060.00 I 1 2 EA $ 600.00 $ 1,000.00 8001 I 2 EA $ 300.00 $ n 1 EA 3 I I 300.00 $ 300.d0 it tI i I 'I TOTAL: S 63.880.60 li MAY-5-2006 04:01P FROH:FOUNTRINHEPD 9497522515 TO:17603417093 �LJIL�ERS P.6/S Saab -Contractor Change Order PROJECT: Wendy's Palm Desert CHANGE ORDER# 9 78030 Country Club Dr. Palm Desert, CA CSI CODE 08100 TO: JH Thompson 79-607 Country Club Dr., Suite 2 Bermuda Dunes, CA 92203 DATE 3/5/2005 ATTN.: Jackson In accordance with the terms of your Subcontract or Purchase Order for Site Work on the above referenced project, you are herby authorized and directed to proceed with the following changes In the work connected with said project. 1. Install water line for fire protection dudng construction per proposal dated 10/14/2005 $6,025.00 1/2/1900 Install (2) bends with MJ kits, (2) concrete kickers, the 8" C-900 pipe and excavating additional depth $2,400.00 1/3/1900 Per City move out 2 feet and Install manhole In the sidewalk $1,575.00 din #z ( O � -1- 7 6 ;� c ctwcC =— Adjusted Contract Through C/O# 0 Amount of this C/O #1 Current Adjusted Contract Amount Sub Total $9,000.00 $434,078.00 $9,000.00 $443,078.00 Unless specifically noted on this document, the time required to complete the work discdbed In Contractors original Subcontract Shall not be affected by this Change Order. The undersigned hereby agrees to perform the work above discrlbed In accordance with the terms herin set forth, and to accept as payment for said work the amount above shown. Alton Builders (i Subcontractor It r Approved by: IdL Approved B EFO Title: (Je o _� YV Title: F�-�5 I, b►, +- Alton Builders �+,. L r 2385 Morse Ave. Address: 79-4" .V? WJ 1, 4,n 41-4 $ fzn , 7v I R z Irvine Ca 92614 949-250-9230 Phone: 'X MAY-5-2006 04:01P FROM:FOUNTAINHEAD 9497522515 TO:17603417098 P.7/8 Sub -Contractor Change Order PROJECT: Wendy's Palm Desert CHANGE ORDER# 4 78030 Country Club Dr. Palm Desert, CA CSI CODE 08100 TO: JH Thompson 7M07 Country Club Dr., Suite 2 Bermuda Dunes, CA 92203 DATE 3/17/2006 ATTN.: Jackson In accordance with the terms of your Subcontract or Purchase Order for Site Work on the above referenced project, you are herby authorized and directed to proceed with the following changes in the work connected with said project. Additional manhole adjustments at Desret County Circle $2.325.00 Modlfy storm drain box (m Wendy's drive thru $2.475.00 Slurry -coat parking lot $1,200.00 Adjusted Contract Through C/O# 3 Amount of this C/O #4 Current Adjusted Contract Amount o dance-t�-ss b,°� Sub Total $6,000.00 $465,865.00 $6.000.00 $471,865.00 Unless specifically noted on this document, the time required to complete the work discribed In Contractors original Subcontract Shall not be affected by this Change Order. The undersigned hereby agrees to perform the work above discribed In accordance with the terms herin set forth, and to accept as payment for said work the a ounl ab90 shown. Alton BuildersKV Subcontractor ter' Approved by: Approved By: Title: Title: ?N+a+-�+ r Alton Builders 2385 Morse Ave. Address: Irvine Ca 92614 949-250-923D Phone: MAY-5-2006 04:01P FR014:170UNTAINHEAD 9497522515 TO:17603417098 P.8/8 . Saab -Contractor Change Order PROJECT: Wendy's Palm Desert CHANGE ORDER# 3 78030 Country Club Dr. Palm Desert, CA CSI CODE 08100 TO: JH Thompson 79.607 Country Club Dr., Suite 2 Bermuda Dunes, CA 92203 DATE 2/6/2007 ATTN.: Jackson In accordance with the terms of your Subcontract or Purchase Order for Site Work on the above referenced project, you are herby authorized and directed to proceed with the following changes in the work connected with said project. Install drainline and catch basins on east side of Wendy's as per plan by Saxon Engineering 2. Add sleeves across street. Adjusted Contract Through C/O# 2 Amount of this C/0 #3 Current Adjusted Contract Amount $7,225.00 $600.00 Sub Total $7,225.00 $458,640.00 $7,225.00 $465,865.00 Unless specifically noted on this document, the time required to complete the work discribed In Contractors original Subcontract Shall not be affected by this Change Order. The undersigned hereby agrees to perform the work above discribed in accordance with the terms herin set forth, and to accept as payment for said work the amount above shown. Alton Builders � Approvedvedbby: �p Title: en Alton Builders 2385 Morse Ave. Irvine Ca 92614 949-250.9230 Subcontractor II Approved By: c..�- t✓ Title: Address• 7?-1 o'] Phone: %Gx7, 3q5 �C�3 NRY-5-2006 04:00P FROM:FOUNTRINHERD 07/07/2005 10:01 FAX 760 345 092E 9497522515 ill-TIlompsON&SONS TO:17603417098 P.4/8 Z04 .. Name: ALTON BUILDERS Add: 2385 MORSE AVENUE IRVINE. CA 92814-0233 Phone: (049)250.9230 Fax: Attn: LARRY JABLIN Re: WENDY'S PALM DESERT ITEM DESCRIPTION 1 RBI DRAIN (CONCRETE)--OFFS)TE-REVISED 2 MOVE IN 3 CURB INLET CATCH BASINS PER STO. 300 W-7' ( 4 POTHOLE FOR GAS B TELEPHONE I 5 REMOVE EXISTING HEADWALL 8 SAWCUT AC I 7 REMOVE AC 8 0 I 10 11 4' X I'CULVERT TO 38" PIPE (SEE BELOW I 12 TRANSITION STRUCTURE PER STD TS301 13 W' HEADWALL 14 MANHOLE PER STD. MH252 I 15 DRYWELL D•22' 18 RIPRAP I I ff X 5.6 17 4" AC PAVEMENT OVER 8" CLASS It BASE I 18 TRAFFIC CONTROL 1 19 LOCAL DEPRESSION PER STD. 311 I 23 24 25 I 28 I 27 I 28 I 29 DATE! July a 2006 J.N. THOMPSON s SONS. INC. General Engineering Contractors License No. 734478 79.607 Country Club Drive, Suite 2 Bermuda Dunes, CA 92201 Phone: (760) 345.0003 Fax: (760) 345.0525 a -mall: LS $ 3.500.00 $ 3,500.00 i 2 EA S 6.600.00 5 11,11m.00 LS S 1.460.00 5 I 1,450.00I r• 800,00I LS $ 500.00 $ 88 LF $ 6.00 8 440.00 I 284 SF I S 2.00 $ 568.I70 I I Ij I� 1 EA I S 4.W0.00 S '4.0W.00 i EA S 5.IX10,00 $ 6400.00 I I I EA $ 3.800.DO S 3.51N).DO 1 EA S 4.000.00 $ 4.000.9 1 1 FA $ 750.00 S 760.6 2.840.00 284 SF 5 10.00 $ lS S 800.00 S Ill 2 EA S 600100 S 1.M0. I! II: al li TOTAL: 3 li I, Ii 11 ICI 30.948.b0 MAY-5-2006 04:01P FROM:FOUNTAINHERD 9497522515 TO:17603417098 P.5/8 Name: ALTON BUILDERS Add: 2385 MORSE AVENUE IRVINE, CA 92814-0233 Phone: (949)250.9230 Fax: Ann: LARRY JABUN Re: WENDY'S PALM DESERT TION 1 � O 2 NYLOPLAST BASINS 3 36" NOS N-12 PLASTIC 4 18" NOS N-12 PLASTIC 5 NYLOPLAST MANHOLES 636"X16"WYE 7 36" 45' BEND 8 38" 22.6' BEND 9 38" 11.28a BEND 1016"X18"WYE 11 18" 450 BEND 12 18" 22.60 BEND 13 18" 11.254 BEND 14 t5 18 17 I 18 19 20 21 22 23 24 25 26 J N THOMPSON SONS, (NC. General Engineering Cordrectom Llcene9 No. 734478 79.607 Country Club Drive, Suite 2 Bermuda Dunce, CA 92201 Phone: (780) 346.8003 Fox: (760) 345-0626 e-mail: I i i 1 ` 3 EA S 1.600.00 $ 4.600.00 560 LF S 45,00 $ 26,680.b0 390 LF 5 25,00 S 9,760.00 I 1,850.L'90 I' 1 EA $ 1.850.00 $ 4 EA 3 1.46D.00 S ii 6,800,00 1 EA S 750.00 13 760.6110 I 2 EA $ 600,00 $ 1.000.d0 1 EA is 500.00 8 600,1)0 I 1 EA IS 960.00 fj j S 060.00 I 1 2 EA $ 600.00 $ 1,000.00 8001 I 2 EA $ 300.00 $ n 1 EA 3 I I 300.00 $ 300.d0 it tI i I 'I TOTAL: S 63.880.60 li MAY-5-2006 04:01P FROH:FOUNTRINHEPD 9497522515 TO:17603417093 �LJIL�ERS P.6/S Saab -Contractor Change Order PROJECT: Wendy's Palm Desert CHANGE ORDER# 9 78030 Country Club Dr. Palm Desert, CA CSI CODE 08100 TO: JH Thompson 79-607 Country Club Dr., Suite 2 Bermuda Dunes, CA 92203 DATE 3/5/2005 ATTN.: Jackson In accordance with the terms of your Subcontract or Purchase Order for Site Work on the above referenced project, you are herby authorized and directed to proceed with the following changes In the work connected with said project. 1. Install water line for fire protection dudng construction per proposal dated 10/14/2005 $6,025.00 1/2/1900 Install (2) bends with MJ kits, (2) concrete kickers, the 8" C-900 pipe and excavating additional depth $2,400.00 1/3/1900 Per City move out 2 feet and Install manhole In the sidewalk $1,575.00 din #z ( O � -1- 7 6 ;� c ctwcC =— Adjusted Contract Through C/O# 0 Amount of this C/O #1 Current Adjusted Contract Amount Sub Total $9,000.00 $434,078.00 $9,000.00 $443,078.00 Unless specifically noted on this document, the time required to complete the work discdbed In Contractors original Subcontract Shall not be affected by this Change Order. The undersigned hereby agrees to perform the work above discrlbed In accordance with the terms herin set forth, and to accept as payment for said work the amount above shown. Alton Builders (i Subcontractor It r Approved by: IdL Approved B EFO Title: (Je o _� YV Title: F�-�5 I, b►, +- Alton Builders �+,. L r 2385 Morse Ave. Address: 79-4" .V? WJ 1, 4,n 41-4 $ fzn , 7v I R z Irvine Ca 92614 949-250-9230 Phone: 'X MAY-5-2006 04:01P FROM:FOUNTAINHEAD 9497522515 TO:17603417098 P.7/8 Sub -Contractor Change Order PROJECT: Wendy's Palm Desert CHANGE ORDER# 4 78030 Country Club Dr. Palm Desert, CA CSI CODE 08100 TO: JH Thompson 7M07 Country Club Dr., Suite 2 Bermuda Dunes, CA 92203 DATE 3/17/2006 ATTN.: Jackson In accordance with the terms of your Subcontract or Purchase Order for Site Work on the above referenced project, you are herby authorized and directed to proceed with the following changes in the work connected with said project. Additional manhole adjustments at Desret County Circle $2.325.00 Modlfy storm drain box (m Wendy's drive thru $2.475.00 Slurry -coat parking lot $1,200.00 Adjusted Contract Through C/O# 3 Amount of this C/O #4 Current Adjusted Contract Amount o dance-t�-ss b,°� Sub Total $6,000.00 $465,865.00 $6.000.00 $471,865.00 Unless specifically noted on this document, the time required to complete the work discribed In Contractors original Subcontract Shall not be affected by this Change Order. The undersigned hereby agrees to perform the work above discribed In accordance with the terms herin set forth, and to accept as payment for said work the a ounl ab90 shown. Alton BuildersKV Subcontractor ter' Approved by: Approved By: Title: Title: ?N+a+-�+ r Alton Builders 2385 Morse Ave. Address: Irvine Ca 92614 949-250-923D Phone: MAY-5-2006 04:01P FR014:170UNTAINHEAD 9497522515 TO:17603417098 P.8/8 . Saab -Contractor Change Order PROJECT: Wendy's Palm Desert CHANGE ORDER# 3 78030 Country Club Dr. Palm Desert, CA CSI CODE 08100 TO: JH Thompson 79.607 Country Club Dr., Suite 2 Bermuda Dunes, CA 92203 DATE 2/6/2007 ATTN.: Jackson In accordance with the terms of your Subcontract or Purchase Order for Site Work on the above referenced project, you are herby authorized and directed to proceed with the following changes in the work connected with said project. Install drainline and catch basins on east side of Wendy's as per plan by Saxon Engineering 2. Add sleeves across street. Adjusted Contract Through C/O# 2 Amount of this C/0 #3 Current Adjusted Contract Amount $7,225.00 $600.00 Sub Total $7,225.00 $458,640.00 $7,225.00 $465,865.00 Unless specifically noted on this document, the time required to complete the work discribed In Contractors original Subcontract Shall not be affected by this Change Order. The undersigned hereby agrees to perform the work above discribed in accordance with the terms herin set forth, and to accept as payment for said work the amount above shown. Alton Builders � Approvedvedbby: �p Title: en Alton Builders 2385 Morse Ave. Irvine Ca 92614 949-250.9230 Subcontractor II Approved By: c..�- t✓ Title: Address• 7?-1 o'] Phone: %Gx7, 3q5 �C�3 Date: 5/11/2006 LOCATOR MAP . 0 250 500Feet City of Palm Desert WASHINGTON STC O U N TRY CLUB DR I-10 DESERT COUNTRY CIR