REQUEST: APPROVE CONSTRUCTION CHANGE ORDER NO. 1 TO SMITH
FLOORS & INSTALLATIONS (CONTRACT NO. C26480) IN THE
AMOUNT OF $11,987.96 FOR THE INSTALLATION OF CARPET
AT THE DESERT WILLOW CLUBHOUSE
SUBMITTED BY: MISSY WIGHTMAN, PROJECT COORDINATOR
CONTRACTOR: SMITH FLOORS & INSTALLATIONS
14417 MERIDIAN PARKWAY, BUILDING 6
RIVERSIDE, CA 92518
DATE: AUGUST 9, 2007
CONTENTS: CHANGE ORDER NO. 1 (C.O.R. NO. 1)
Recommendation:
By Minute Motion, that the City Council:
(1) Approve Change Order No. 1 to Contract No. C26480 for the
Change Order Request No. 1 in an amount of $11,987.96 for the
installation of carpet at the Desert Willow Clubhouse; and
(2) Authorize the Finance Director to move $11,987.96 from
contingency to base.
Executive Summary:
Approval of this recommendation will allow the Contractor to move ahead as scheduled
to complete the specified area simultaneously as the original scope of work.
Discussion:
On July 12, 2007, the City Council authorized staff to negotiate with the top -ranked
contractor, Smith Flooring, in an amount not -to -exceed $120,000 and authorized the
Mayor to execute all necessary documents to facilitate the negotiated contract. Staff has
finished negotiations with the Contractor for a price of $113,470, and documents have
been executed by the Contractor and are in process for execution by the Mayor.
Staff Report
Approve Construction Change Order No. 1 to Smith Floors & Installations (Contract No.
C26480) Installation of Carpet at the Desert Willow Clubhouse
Page 2 of 2
August 9, 2007
Since then, staff has been informed that the portion of the Desert Willow Clubhouse that
was once dedicated to Intrawest for their own use has now been tumed back over to the
City, and will be used as the Desert Willow Conference Center. At the time, the project
was out to bid and negotiations were under way with Smith Floors; this area was not
part of the scope. Staff has now been requested to include this area in the scope of
work, so the new carpet design will flow throughout the Desert Willow Clubhouse in its
entirety.
Staff recommends approval of Change Order No. 1 for the replacement of carpet in the
conference center at the Desert Willow Clubhouse as required to complete this project.
Submitted by:
Project Coordinator
mh
Department Head:
Dave Yrigdyen
Director of Redevelopment/Housing
Martin Alvarez
Redevelopment Manager
Approval:
Carlos L. Ortega„ Executive Director Paul S. Gibson, Director of Finance
C1:'i'Y COUi C1L ACTION:
APPROVED / DENIED
RECEIVED OTHER
MEETING DATE X -y _ 0�1
.AYES:_E�n
NOES :
ABSENT : /- 60n
ABSTAIN: Q,
VERIFIED BY: D
Original on FFi . to wit _ity Clerk's OtficF
dig
G:\rda\Melissa Wightman\Desert Willow Carpet\Staff Report- Change Orderl .doc
co
cD
O
Z
CITY OF PALM DESERT
CONSTRUCTION CHANGE ORDER
Contract Purpose
Consultant's Name
Address:
Recarpet Desert Willow Clubhouse
Smith Floors & Installations
14417 Meridian Parkway, Building 6
Riverside, CA 92518
Contract # / P.O. # C26480
Change Order No. 1
Contingency: I YES X I NO
Account No. 241-4195-495-8092
Project No.
Vendor No.
9606
You are hereby requested to comply with the following changes from the contract plans and specifications:
DESCRIPTION OF CHANGES
(Supplemental Plans, Specifications, and Directives dated Attached)
Change in scope to include the former Intrawest conference center
TOTALS:
NET CHANGE IN CONTRACT PRICE:
JUSTIFICATION:
TOTAL BUDGET FOR PROJECT: + 113,470.00
Less: Expend. & Encumb. To Date: 113,470.00
Less: This Change Order Amount: 11,897.96
BALANCE OF BUDGET
REMAINING FOR PROJECT: (11,897.96)
DECREASE
In Contract Price
CONTINGENCY:
Amount Approved by Council:
Less: Prior Change Order(s):
Less: This Change Order:
Balance Remaining of Contingency:
INCREASE
In Contract Price
11,987.96
11,987.96
11,987.96
+ 12,000.00
11, 987.96
12.04
The amount of the Contract will be Increased by the Sum of: Eleven Thousand Nine Hundred
Eighty-seven and 96/100 Dollars ($11,987.96).
W \Agenda Items\2007-Aug 9\CO1 Smith Floors Cont DW Clubhouse Carpet\CO1 Form doc
See reverse ...
Contract C26480
Change Order No. 1 Continued from front
This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish
equipment and materials, and perform all work as necessary or required to complete the Change Order items for a
lump sum price agreed upon between the Contractor and the City of Palm Desert, otherwise referred to as Owner.
Contract Time Extension Days.
Revised Contract Total $125,457.96
The undersigned Contractor approves the foregoing Change Order # 1 as to the changes, if any, in the contract
price specified for each item including any and all supervision costs and other miscellaneous costs relating to the
change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said
Change Order # 1 . The Contractor agrees to furnish all labor and materials and perform all other necessary work,
inclusive of that directly or indirectly related to the approved time extension, required to complete the Change Order
items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood
that the Change Order shall be effective when approved by the Owner.
Execution of this Change Order by the Contractor constitutes a binding accord and satisfaction that fully satisfies,
waives, and releases the Owner from all claims, demands, costs, and liabilities, in contract, law or equity, arising out of
or related to the subject of the Change Order, whether known or unknown, including but not limited to direct and
indirect costs and/or damages for delay, disruption, acceleration, loss of productivity, and stacking of trades, as well as
any and all consequential damages.
This document will become a supplement to the Contract and all provisions will apply hereto, all items included above
must have required signatures as per the purchase resolution.
1. REQUESTED BY: 2. ACCEPTED BY:
3. CERTIFIED
FUNDS AVAILABLE:
DEPARTMENT HEAD
FINANCE DIRECTOR
NOTE: No payments will be made prior
to City Manager and Council approval
CONTRACTOR Date Accepted
4. APPROVED BY:
Richard S. Kelly, MAYOR 8/9/07
CITY MANAGER 8/9/07
W \Agenda Items\2007-Aug 9\CO1 Smith Floors Cont DW Clubhouse Carpet\CO1 Form doc
See reverse ...
FLOORS—,111 l it
JNSTALLATIOVS'
July 30, 2007
LJKC, INC. dba
SMITH FLOORS & INSTALLATIONS
14417 Meridian Parkway, Bldg. 6
Riverside, CA 92518
(951)656-1004
FAX (951)653-5778
City of Palm Desert
73-610 Fred Waring Dr.
Palm Desert, CA 922(30-2578
Attn: Melissa Wightman
Re: Desert Willow Country Club
Change Order Request
Original contract price
Credit for reselection of carpet
Add for Banquet room
160 yards Yarn Tile color Latina
40 yards border carpet and closets Manmade color Latina
30 yards border carpet #2 6"
n i Iy e—.0k01316—rA 5 62- 505)
Change order request Color rncwfvle: !Koss
color nvrnU-Lt3371
Initial preparation included, which consists of sweeping, filling small cracks, and saw cuts. Floating,
grinding, sanding or resurfacing shall be completed at a rate of $60.00 per hour per man plus materials,
standard time. Overtime is at a rate of $80.00 per hour per man plus materials. Unless otherwise noted.
Fax: (760) 341-6372
$113,470.00 Dr i 9ral C,onOTta. -
$-1,000.00 trc i-F
(55 b 1bo��s .frovn
Cost: $12,987.96e.h Oilier L.
,987.96C.It Or-tr
err
Cafpe{-3onsec's. exert -
EXCLUSIONS:
Overtime/Stand-by Time/Clean, Seal, Wax, Vacuum, Protection/Demolition/Furniture R & R/Pad/Floor Prep.
(sanding, scraping, floating, ramping, etc.)/Hoisting/Unforeseen Conditions/ Liquidated CamagelPre-
molded Base Corners/Sub-floor Moisture Correction.
Subject to field inspection and final addendum.
CANCELLATIONS:
Cancellations will be subject to manufacturer/Distributors approval. Upon Manufacturers/Distributors
approval. A 25% restocking fee and delivery charge, will be applied on any cancellation of material already
ordered.
Above prices effective for 60 days.
When accepted, please sign, date and fax back this and preliminary lien information, we cannot
proceed without this it formation.
Signaturo Date
Accoptanco of Proposal _ -'rho ahovo prices, specifications and conditions aro satisfactory and aro hereby aceoptod.
You aro authorized to do tho work as specified.
Cordially,
E KC, Inc. d
stallations
h
t Estimator
EG -ah
I0 39Fid SJDD1d HlIWS Z£I988L1981 £I:80 L003/0E/L0