HomeMy WebLinkAboutC22870B - CO6CITY OF PAL1V� D�SE�tZ' CONSTR�TCTI4N CHANGE ORDER Contract Purpose Whitewater Bridge at Portola Avenue Contractor's Name Granite Construction Company ,add�ess: 3800 Monroe Street, Indio, CA 92203-9500 Contract # / P.O. # Change Order No. Contingency: Account No. Project No. Vendor No. C228706 I 12484 6 ES� � NO 400-4359-433-4001 647-04 1010 You are hereby requested to comply with the following changes from the contract plans and specifications: DESCRIPTION OF CHANGES DECREASE INCREASE (Attached Supplemental Plans and Specifications) In Contract Price In Contract Price Delete rock scour protection at the pier footings, modify concrete slope protection (channel lining), and add a concrete channel invert slab as shown on on attached revised Plan Sheets C-5 and BR-1 and specifcations. Payment for these changes shall be as follows: 1. Lump sum credit for the deletion of Bid Item 17, Scour Protection Rock at Pier Footings and in lieu, a lump sum payment for additional earth backfill and off-site disposal of scour rock not used. 2. Lump sum credit for Deletion of Bid Item 18, Concrete Slope (Protection) and in lieu, payment at the estimated 1265 C.Y. @$349/C.Y. for Concrete. Slope (Protection). 3. Construction of invert slab shall be paid on a force account basis (time & materials). TOTALS: NET CHANGE IN CONTRACT PRICE: $39,400.00 $452,800.00 $492,200.00 $42,594.00 $441,485.00 $400,000.00 $884,079.00 $391,879.00 JUSTIFICATION: The concrete channel invert slab is required to prevent scour that would most likely occur around new bridge piers, that would undermine the bridge footings and could also impact the channel slope paving. CVWD would not issue an encroachment permit without adding the invert slab. Similar scour occurred at the Monterey Bridge that required paving of the invert after that bridge was completed. TOTAL BUDGET FOR PROJECT: Less: Expend. & Encumb. To Date Less: This Change Order Amount: BALANCE OF BUDGET REMAINING FOR PROJECT: + 12,691,523.00 CONTINGENCY: 12,244,267.00 Amount Approved by Council: 391,879.00 Less: Prior Change Order(s): Less: This Change Order: 55,377.00 Balance Remaining of Contingency + $1,004,604.60 - $111,932.00 - $391,879.00 $500,793.60 The amount of the Contract will be increased by the sum of: Three Hundred and Ninety-One Thousand, Eight Hundred and Seventy-Nine Dollars ($391,879.00). G1PubWorks\Staff Reports�2007Uune 14�27 CO 6 Granite C22B70B PoAola Bndge 647-04\CCO No 6- Grarnte.dx See reverse Contract C228706 Change Order No. 6 Continued from front This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order items for a lump sum price agreed upon befinreen the Contractor and the City of Palm Desert, otherwise referred to as Owner. Contract Time Extension: To be determined later. Revised Contract Total: $10,549,857.00 The undersigned Contractor approves the foregoing Change Order # 6 as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order # 6. The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of that directly or indirectly related to the approved time extension, required to complete the Change Order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the Owner. Execution of this Change Order by the Contractor constitutes a binding accord and satisfaction that fully satisfies, waives, and releases the Owner from all claims, demands, costs, and liabilities, in contract, law or equity, arising out of or related to the subject of the Change Order, whether known or unknown, including but not limited to direct and indirect costs and/or damages for delay, disruption, acceleration, loss of productivity, and stacking of trades, as well as any and all consequential damages. This document will become a supplement to the Contract and all provisions will apply hereto, all items included above must have required signatures as per the purchase resolution. REQUESTED BY: DEPARTMENT HEAD 3 CERTIFIED FUNDS AVAILABLE: FINANCE DIRECTOR NOTE: No payments will be made prior to City Manager and Council approval 2. ACCEPTED BY: 4. APPROVED BY: CONTRACTOR Date Accepted RICHARD S.KELLY, MAYOR CITY MANAGER Date Approved Date Approved G:�PubWorks�Staff Reports�2007Uune 14�27 CO 6 Granite C22B70B Portola Bridge 647-04\CCO No 6- Granite.doc See reverse WHITEWATER RIVER BRIDGE AT PORTOLA AVENUE PROJECT NO. 647-04 CONTRACT NO. C28870B CONSTRUCTION CHANGE ORDER NO. 6 June 14, 2007 In the Special Provisions, Section 3.17 is replaced in its entirety with the following: 3.17 CHANNEL INVERT SLAB CONCRETE 1. Construction of the channel invert slab shall conform to the provisions in Section 72-4, "Concrete Slope Protection, Gutter Lining, Ditch Lining, and Channel Lining", of the Caltrans Specs and these special provisions. 2. Expansion joints shall not be installed unless indicated on the plans. 3. Concrete shall be structural concrete conforming to the requirements in, "Structural Concrete," of these special provisions. 4. Concrete shall be cured by the water method or by the application of an approved membrane. VICINITY MAP �� � T � �q T ER PROJECT LOCATION � C l� A N NF� � �° � � — � �� Location Location Map I� ` � � PROJECT LOCATION - PORTOLA AVENUE 0 87.5 175 350 525 �oo CROSSING AT WHITEWATER CHANNEL Feet � 6� /,, / GG���O Gi � �� ��� � � � Q'��g�.�'� � Ck.�pP� / , / � �� / TOP OF S.I �' EL 163.91 / � �� - � � � ,, � i I \ `, I � I li ��i i -- i ,-- i- i ' ' \ I I� II II II� II� \�-L � �i.. � � l � � ' ��� � � � � � l �R��NE, �A��FORN�A � � _ �� � � � � � oFEss, t / NOTE: PROVIDE WEAKENED PLANE JOWTS IN eR oN � CHANNEL INVERT SLAB PARALLEL TO PIERS � ��° �� �L' i � 7 / AT 21.8' O.C. (MEASURE ALONG � PORTOLA AVE) ' AL ELY `- „� /i �l SEE CALTRANS STD PLAN BO-3. - / N � /, / REGISTER D CIVIL ENGINEE No z � 18880 � . ' � _ / �oiN Sosr � ^ /�.. s-3o-o APPROX LIMIT 162p X� � �` ExP. '� TOP OF S.P. 20F�.�'t LT OF GRADING � + o a s c i v i � MAY 5, 2005 'q� o��P oF �n � / � P�ANs aPPaova� oAre Cnu EL 165.9t <v � BJM S P. ),53,0't JZT / � TOE 0 P. 160.0't LT _ Q `` � EL �28.d� F � / / SYMM ABOUT � EL 152.3f EL 134.9t � TQE 9f P, 1���� RT � PORTOLA AVE � � , � BTM S.P. 153,0't LT � 162p+ � /�L 1�5.�f � � � CUTOFF WALL-- ��� � A % �L�16�6�� �0�.5't RT � EL 127.9f INVERT SLAB �� 20' 54', � , 54' 20' 4� i� ` , , CUTOFF 1 � 6 I - i 9 i � T E OF S.P.160' RT TO OF S. 203.5' RT '� A 26'� �- � }I ��f � � E� 134.94 �7�' � J� ' �, ELPi63.9$�� I CHANNEL BOTTOM �'iur�i� -, � ; I� I,+ -_- _ - - - -- -- --- - - _ - � -' �' 1 / � ELEV 132A ELEV 133.5 ELEV 133.5 ELEV 132.0 � � - - - -- - - - - --- F- � � � I - - - � i. � � � � �. _ t ) � �CUTOFF WALL I � � �� . � � i BTM S.P. 153.0't RT, � /% �� _ , �T / __:, . /� , i ?�\�� ��� \ _ � �-� i �� � ���\���\����/ \ ' - - - _. � '� �. -- �, i � EL 127 94 �� 1.� � , _-- � - � ���-- -�� , -- - - -- � � ��� - -{- � i � � - � �. � !i � ; - � ��i��ii?>%�� � � ��i?�;i��i;�� � i � � i /j � i�� I� _� _ � ; ELEV 128.0 ELEV 128.0� wY i �� � i i l '��' � 1 � ��ti � ; '��i' llll�l��l �� , "� � / / ; __"� ..�_(cl � �/ :'. ; / � � , �, � N nn � n i av r / i / � i : l �5.2'_ _ j l ------�----- -�--�--�� --�,� �-------��i ( 1-,-- 1 - - --�- ----}---.- 4� 12 EA WAY� TYP 1'-- �„ �1--------- -f- # 15 / 16 I�' i �� 1'7 �! 1 �/ 19,�' �i�%� O�"�20 � � 2� INVERT SLAB REINF � 1:1 ��, i �// � i; � �e�e- �- GRADE BREAK 2�_��� � � 1�2" EXP JT FILLER / �AR VAR �� �� j ,� � �m� I , ��� i � - �„ INVERT SLAB �-� � - � 18+02J3 � PORTOLA AVE o i � ! - FRONT FACE .-''� � � . • i�� i �, ,-- y u • � \ �✓i !i i� � �`� � TOP OF S.P. 200.90' LT � � �� = 1819+18.97 � CHANNEL ��TQP OF S.P. 201.11' RT OF ABUT ,� � � � r�� ` � / EL 163.84! I - - - - - i EC 163.91 � ; : _-_ � � � I � � `��� � � ' : ' ,- . / / I ' / i ,- � - -- " ' � a ' i�/i ' � 7 � �'` -�-� � I I ' ; � � - #a � a � - ; � - --- � � �__ � -- � � _ � - . �� � � 7 --`---_� -- - - -= --- ---`- _� � , i � I � � �• � "� PROVIDE 12" WIDE �. �-� � ,�. ,�� � . � � ---- < � < �i �� � �_ 1 ;-�� � � I � 6+ / STRIP FILTER FABRIC, i / I r � ._ I INVERT SLAB / �/� , l I CONCRETE SLOPE / , �� �� \ M GRADE BREAK � � CUTOFF i � �,�,�- �� i� I PROTECTION -- TYP w � +g8f / � EL 152.3t t r--- - - � - --- -- -�81g+64� -� ; \q/� / - �'�='� 14 I OP 0r $, . 206.5'f Rj #4 x /-' � 8 � i TOP pF S P �06.5' LT ��� � / MATCH TOP Y � %; � R � �L 165.90 � SECTION . • � _ ; GRADE BRE� EL 165.82 761j+6Q� � � OF HW � EL 150.4t � � � �� , � � � � I INVERT GUTTER ��� � ��CUTOFF WALL � MATCH TOP OF HW�� �� � jOP S.P. 20�,5' RT DETAIL � D 1 /2"=1'-0" �� , � � � i CUTOFF WALL- i / � � =1 -0 , � i � ,� � / EL 165.87 � � � i TOE OF S,P. 116J't LT TOE OF S.P. 125.3't RT ��`�� TOP ry�F S.P. ?p6.5' LT� q �.� �� V� /= TOP OF APRON � l W W = TOP OF APRON � q � �\ ���3f BEGIN BRIDGE OR EL 198.9t ��� � � / i EL 140.2t I 2 1618 � i � A EL 162 6t � � 3 2 EL 140.1t +�g2 �� �� � END BRIDGE � ,; � �6 � � I �� �/i 1 �� 4�CUTOFF WA ELEV TOP OF SLOPE � CU TOFF WALL- / �� � 1 �+g\t 3 � /= V �, y y � PROTECTION 2-� 0 3� i� p ��ATC��Tilp �� �7 �w� I EL �52.�t � �� � � � W � � � OF HW �� MA7 fi TOP � `� �� �-EXISTING OUTLET / A ��� / 206.5' TO �i%�i%� OF HWEXISTING OUTLET- � �1 BTM S.P. EL 127J9 6�N EXISl �� � ��, STRUCTURE 1�� o� C� CHANNEL / STRUCTURE ��'�Sp 1L BTM S.I', EL 127.84 / A� �� i� TOP OF S.P. BEYOND APPROX LIMIT /� /j, BRIDGE OF GRADING 3_#4 � � �"-"-"- �•5 � ELEV TOP OF SLOPE & VARIES � PROTECTION � PLAN AT CHANNEL �� �-� \ ,�-�� o ELEV TOE OF SLOPE i�� #3 � 4" #3 � 4" �� 1% � N - 1"=30' PROTECTION � EA WAY EA WAY � .� \ ' 0 � �j � �� J,(P: ......... N � 206.5' (TYP) 206.5' (TYP) . T� � i�� � / / `��Y��% �2° EXP � i VARIES � }�O �� NOTE: PROVIDE WEAKENED ������ JT FILLER PLANE JTS IN SLOPE 4-#4 I �� ',�, , END TERMINATION PROTECTION AT 20' OC Nyi��� � EL TOP �� T` c�� CUTOFF WALL OFASL PEE� EE�CALTRANS �A' ,o ELEV BTM OF SLOPE � �j � OF S.P. j�� -� PROTECTION STD PLAN BO-3 _ ��: • � �� z N} EL TOP OF S.P. �-��� CHANNEL TYPICAL SECTION EXiST SLOPE SECTION AT ABUTMENT II II �-CONCRETE SLOPE o PROTECTION II II A f PROTECTION (TYP) M, 5�� ��5 % � II II � APPROXIMATE ��i�%��/: �/ �//� � �/�%i��/� �'EXIST WALL II II � EXIST GRADE _---- #3 �14" o#3 � 4" OF OUTLET � --_-__,_II II � ___---- EA WAY $ � EA WAY $�� STRUCTURE � II Ir - - - -- - -- - -- uu --------- __ � EL TOE PROFILE GRADE VARIES -- M OF S.P. ~ / FROM EL 134J9 AT STA 1617+50 CUTOFF WALL� CUTOFF WALL � �% a TO EL 135.00 AT STA 1620+50 �y, � �\� SECTION SECTION � � ������������ ��,-'' - - - - �;������a��;���;��;!���� A A1 INVERT 1 ��� EL BTM OF S.P. �� ��GUTTER � � cHANNE� CONCRETE SLOPE PROTECTION DETAILS INVERT SLAB 1/4"=1'-0" CHANNEL SECTION AT BRIDGE CONSTRUCTION CHANGE ORDER N0.6 % HORIZ: 1"=30', VERT: 1°=�0� DATE � BENCHMARK: oEs�c� er eiivoFPn�MoeseRr APPROVALOFTHISDRAWINGBYC.V.W.D.ISONLY C.V.W.D. DRAWINGAPPROVAL DRAWING � 1NE E1fVA➢ONS SHOYM HEREM ARE BASEO ON 1NE qtt OF PAM APPRo�Eo B�: CITY OF PALM DESERT No. � wnx�iecow��nxoKooic"siREerTMENORTM�srcoxecaamm H. NGUYEN FORTHATPORTIONWITHINC.V.W.D.RIGHTOFWAY oprE �� ELEVATION: 164.425 NGVD 1929 oAAwN ar FORENCROACHMENTPERMITNO. 050616-2-034 /`� � C-5 APPROVAL OFTHIS DRAWING BYC.V.W.D. DOESNOT cHECKEo: � LY✓�p/� � 15 JULY 05 � BASRIS OF BEARINGS: A k T. ALSTON � I, DE�ETED FooTiNG SCouR PROTECTioN ROCK, �/14/05 ����t�� t�� tth WHITEWATER RIVER BRIDGE AT PORTOLA AVE YU�^ QWa.� Q^-- S 2 INCLUDEAPPROVALOFANYSTRUCTURALITEMS,NOR DELETED SLOPE PROTECTION TOE WALLS, ow� Na. SHEET5R'I - aMER�=a�'�aNM�F,sa=`���a���������r�n�s ��E=KEo ar � � CHANNEL IMPROVEMENT DETAILS NO. 1 HOS ZONTEIL OF ERNBR 3 Ni0 flMAOR. BO1H BEiNC�CU551FlED AS MARK GREENWOOD, R. C. E. 5�989 OF PROJECT ENGINEER � C17Y EN�iNEER APPROVAL OFANYPORTION OF THEPROJECTASTO ADDED INVERT SLAB aEcoMMENOEo�___�� ����� 33641 _, esmvnnansu�o,wccwroxHusre�c G. LIM THEADEQUACYOFITSINTENDEDFUNCTION. REvisioNs onrE naPaovEo oiaeci tNc;iNtt iNc; TOTAL 35 -� cur�iE cRio zorvc es � 33f 41 GENERAL PLANBR-1CONSTRUCTION CHANGE ORDER NO. 6DATE: ____________WHITEWATER RIVER BRIDGE AT PORTOLA AVEC.V.W.D. DRAWING APPROVALAPPROVAL OF THIS DRAWING BY C.V.W.D. IS ONLYFOR THAT PORTION WITHIN C.V.W.D. RIGHT OF WAYFOR ENCROACHMENT PERMIT NO. 050616-2-034APPROVAL OF THIS DRAWING BY C.V.W.D. DOES NOTINCLUDE APPROVAL OF ANY STRUCTURAL ITEMS, NORAPPROVAL OF ANY PORTION OF THE PROJECT AS TOTHE ADEQUACY OF ITS INTENDED FUNCTION.CITY OF PALM DESERT