C22870B CO8 Portola Ave Bridge 647-04
REQUEST: SUBMITTED BY: CONTRACTOR: DATE: CONTENTS: Recommendation: CITY OF PALM DESERT PUBLIC WORKS DEPARTMENT STAFF REPORT 1 CI Approve Construction Change Order No. 8 to Contract No. C22870B with Granite Construction Company for the Whitewater Bridge at Portola Avenue (Project Number 647-04) Mark Greenwood, P.E. Director of Public Works Granite Construction Company 38000 Monroe Street Indio, California 92203-9500 November 8, 2007 Construction Change Order No. 8 Status of Construction Change Orders Vicinity Map By minute motion, approve Construction Change Order No. 8 to Contract C22870B with Granite Construction Company which will provide for differing site conditions related to pile drilling, revised channel slope paving reinforcement, costs related to the Verizon delay, and the deletion of landscaping from the contract, resulting in a credit to the City of $30,133.00, and providing for a contract time extension for the construction of the Whitewater Bridge at Portola Avenue. Discussion: On July 14, 2005, City Council approved Contract No. C22870B with Granite Construction Company in the amount of $10,046,046.00, plus a 10% contingency, for construction of the Whitewater Bridge at Portola Avenue. The Notice to Proceed with construction was issued on August 22, 2005. Except for landscaping, the project is nearly complete. Attached is the Summary of Construction Change Orders that lists the seven change orders that were previously approved by City Council and this change order. Staff recommends approval of Construction Change Order No. 8, consisting of the following items: 1. Additional compensation in the amount of $19,391.00 for differing site conditions encountered during drilling for bridge piles. The contractor encountered cobbles up to 12" in diameter that required significant re -drilling and repair of excavations with slurry. Staff Report — Contract Change Order 8 to C22870B Granite Page 2of2 November 8, 2007 2. A credit in the amount of $44,460.00 for changing the rebar size and spacing in the channel slope paving requested by CVWD. 3. Additional compensation in the amount of $89,936.00 for the costs incurred by the contractor related to the 77-calendar day delay due to the relocation of Verizon conduits, manholes, and cables. It is the intent of staff to seek reimbursement from Verizon for this delay cost. 4. Deletion of landscaping and irrigation work from contract plans at a credit of $95,000.00. The landscaping plans and specifications were revised to meet current standards and requirements and address requests of adjacent property owners. Staff and the contractor were unable to agree on a price for the revisions; therefore, the work will be bid as a separate project. 5. Granting of a 192-calendar day extension due to the Verizon delay and for Change Orders 6 and 7 that was to be determined later. The new project completion date is November 16, 2007. Including this change order, the total amount of change orders to date is $1,034,489.00 or 10.3% of the original contract amount. Submitted By: Departmen H John A. Garcia, P.E. Engineering Manager Approval: trep-) Homer Croy ACM for Development Services Carlos Ortega City Manager JG:dhl Mark Gre: nwood, P.E. Director of Public Works Paul Gibson Finance Director CITY COUNCIL ACTION: APPROVED V/ DENIED RECEIVED OTHER MEETING DATE I I AYES: b rlson) FRrauscn, Ru\er-ry, `9',caLI� Kil U NOES: ti on �.J ABSENT: ABSTAIN: 16 -0rle. VERIFIED BY: (Lb}Uiqt� Original on File withJCity Clerk's Office CONTRACT NO. 22870B 0 0 0 O 0 0 Eft $10,126,046.00 $9,991,889.00 $10,067,802.00 $10,128,974.00 $10,157,978.00 $10,549,857.00 0 0 0 0 0 0 0 co co (o co 0 m 0 0 0 �00t N- ti rn • O O O co CD O ti EftC Eft C) 00 N (0 00 N O) 0 CO C TT) 0 0)O Eft Eft Eft Eft O m c•- 0 Eft $11,110,668.00 $11,080,535.00 CCO Amount CCO Description Original Amounts $ O 0 0 0 0 00 C) 00 Cfl O M O O O 0 0 0 0 7 0 0 0 0 0 0 0 0 0 0 CO o • rn 0 co 0 co a0 r•- fa co ea to N 0) COO Oc s- Eft CO ( Eft EA Eft Eft ti ti co co cc) co Co o 0 0 0 0 0 0 0 0 N N CO cM 00 N N N CO N N CO 0N d r 0 0 0 O V - 43 Additional Traffic Control and ZN 18 U O O E 'N c' p c U L 2 *LiO N c C N C —as • ca W O c 0 >o c u) Q) c -0 > NC 7CD t 0Q c o-0 () D ° La CDr N D 0. 0-0 0 Cl.) U a_ v c .-c' coo a-,vi of ca) (°N10 U c• >c c) ECU vco o Ct•c 0.c oa)v)O o J N oco NO N> oc 06 O c U Q)c 5 o f N U O • N0 TO TD-N •� O c g� •• as i Cr) O c`13 Q) - Q) c)O •� O _cN -0 Q) O O U CC Cl. 1-oU ° o 2>U - N CO (1) CO N- 00 O 0 M O $1,034,489.00 Total To Date CITY OF PALM DESERT CONSTRUCTION CHANGE ORDER Contract Purpose Contractor's Name Address: Whitewater Bridge at Portola Avenue Granite Construction Company 3800 Monroe Street, Indio, CA 92203-9500 Contract # / P.O. # Change Order No. Contingency: C22870B 112484 8 YES I (NO> Account No. 1 400-4359-433-4001 Project No. 647-04 Vendor No. 1 1010 You are hereby requested to comply with the following changes from the contract plans and specifications: DESCRIPTION OF CHANGES DECREASE INCREASE (Attached Supplemental Plans and Specifications) In Contract Price In Contract Price 1. Additional compensation for differing site conditions encountered during $19,391.00 drilling for CIDH piling at Bent 2 (Piles 1, 7, 8, 12, 13, 15, 16, 18 & 20), Bent 2 (Pile 13), and Bent 4 ( Pile 8) at an agreed lump sum price . 2. Revise channel slope paving details to install #4 rebars@18" in lieu of $44,460.00 #3 rebars©4" on centers each way at an agreed lump sum credit. 3. Reimburse contractor for incurred costs due to the 77 calendar delay in $89,936.00 relocation of Verizon conduits, manholes, and cables at an agreed price. 4. Delete existing landscaping and irrigations plans and specifications and $95,000.00 Bid Item, #46, Landscaping and Irrigation, at an agreed lump sum credit. 5. Provide a 77 calendar day time extension for Verizon delay, a 52 calendar day time extension for Change Order No. 6, and a 63 calendar day extension for Change Order No. 7. The revised contact completion date is November 16, 2007. TOTALS: $139,460.00 $109,327.00 NET CHANGE IN CONTRACT PRICE: ($30,133.00) JUSTIFICATION: 1. The contactor encountered large cobbles not indicated on the log of test borings (Drawing BR-13) that resulted in significant re -drilling of CIDH piles and repair of excavations with cement slurry. 2. The rebar size and spacing for channel slope paving was revised to meet CVWD standards. 3. The cost of the delay for the Verizon delay was negotiated for contractor labor, equipment, traffic control, dust control, and office expenditures. 4 The landscaping and irrigation plans and specifications were revised to meet current landscape standards and requests of adjacent property owners. Staff was unable to agree with contractor for the cost of the revised landscaping and irrigation and will therefore be deleted in its entirety from the Contract. 5. The Contract is extended for various previous change orders and delays. TOTAL BUDGET FOR PROJECT: Less: Expend. & Encumb. To Date: Less: This Change Order Amount: BALANCE OF BUDGET REMAINING FOR PROJECT: + 14,390,871.00 - 13,148, 556.00 - (30,133.00) 1,272,448.00 CONTINGENCY: Amount Approved by Council: Less: Prior Change Order(s): Less: This Change Order: Balance Remaining of Contingency: + $1,004,604.60 - $1,004,604.60 $0.00 The amount of the Contract will be decreased by the sum of: Thirty Thousand, one Hundred and Thirty-three Dollars ($30,133.00). See reverse ... Contract C22870B Change Order No. 8 Continued from front This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order items for a lump sum price agreed upon between the Contractor and the City of Palm Desert, otherwise referred to as Owner. Contract Time Extension: 192 calendar days. Revised Contract Total: $11,080,535.00 The undersigned Contractor approves the foregoing Change Order # 8 as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order # 8. The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of that directly or indirectly related to the approved time extension, required to complete the Change Order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the Owner. Execution of this Change Order by the Contractor constitutes a binding accord and satisfaction that fully satisfies, waives, and releases the Owner from all claims, demands, costs, and liabilities, in contract, law or equity, arising out of or related to the subject of the Change Order, whether known or unknown, including but not limited to direct and indirect costs and/or damages for delay, disruption, acceleration, Toss of productivity, and stacking of trades, as well as any and all consequential damages. This document will become a supplement to the Contract and all provisions will apply hereto, all items included above must have required signatures as per the purchase resolution. 1. REQUESTED BY: 2. ACCEPTED BY: DEPARTMENT HEAD 3. CERTIFIED FUNDS AVAILABLE: NOTE: No payments will be made prior to City Manager and Council approval FINANCE DIRECTOR CONTRACTOR Date Accepted 4. APPROVED BY: RICHARD S.KELLY, MAYOR Date Approved CITY MANAGER Date Approved See reverse ... VV H / T VV A T R C H A N N VICINITY MAP L T PROJECT LOCATION PROJECT LOCATION - PORTOLA AVENUE o 87.5 175 CROSSING AT WHITEWATER CHANNEL 350 Location Map 525 700 Feet