HomeMy WebLinkAboutSR - C27320 - Rplcmnt of Floor Tile @ Prkvw CmplxContract No.C27320
CITY OF PALM DESERT
FINANCE DEPARTMENT
STAFF REPORT
REQUEST: Award the Contract with Temalpakh, Inc. DBA the Works Floor & Wall to
remove and replace the floor the in the entry ways and second floor at the
Parkview Office Complex buildings, and appropriate $107,431.89 from
fund 510.
APPLICANT: Temalpakh, Inc.
DBA: The Works Floor & Wall
36-660 Cathedral Canyon Dr.
Cathedral City, CA 92234
(760) 250-7862
Michael Collins
DATE: February 28, 2008
CONTENTS: One (1) Sample Copy of Contract , 3 Pictures
Recommendation:
By Minute Motion, Award the Contract with Temalpakh, Inc. DBA the
Works Floor & Wall to remove and replace the floor tile in the entry ways
and second floor at the Parkview Office Complex buildings, and
appropriate $107,431.89 from fund 510.
Background:
The City of Palm Desert's Parkview Office Complex entry ways and
second floor tile is in dire need of replacing. For several years certain
areas of the second story walkways tile have been replaced. At this point
there are several different types and shades of floor tiles which is
noticeable and does nothing for the aesthetics of the building. During the
month of November 2007 the City published seeking bids to replace the
tile at the Parkview Office Complex. During the mandatory walkthrough
approximately 16 different contractors attend. At the close of the bidding
period the City received only one bid for $80,000. This bid did not consider
the substrate problem discovered. This was rejected at the December 13,
2007 Council meeting because the bidder did not meet the qualifications
as specified in the "Request for Proposals"; namely the bidder did not
possess a C54 Floor Tile license. Subsequently, one of the prospective
bidders mentioned that there was a substrate problem with the flooring. As
Staff Report
City of Palm Desert Parkview Office Complex Floor Tile Installation Roofing System
February 28, 2008
Page 3 of 3
a result we met with The Works to discuss the issues and concerns of the
building floor tile.
After, investigation of the substrate (plywood paneling for floor), it was
discovered that at 15 areas of the second story floor tile is damaged from
dry rot of the wood floor, causing a breaking of the floor tile ( see pictures
enclosed). The Works' bid provides for an allowance to completely remove
and replace the wood paneling for those identified 15 substrate areas. It
was determined the dry rot of those areas resulted from moisture
penetrating and damaging plywood flooring, by the lack of flashing with
drip edge. The proper flashing will be installed. The tile will meet the break
strength, and friction requirements for public access outside tile (A sample
of the tile is included with this staff report).
The demolition of the floor tile will be done in the evening or the
weekends, to avoid disruption to the tenants. Installation of the floor tile
will be done in a manner to provide continued access to all tenant suites
and maintain all ADA and path of travel requirements. All necessary
precautions will be in place and areas will be taped off when tile is
installed. The Works is very familiar with installing tile for business that
continue to operate; evidence by the fact that they install a lot of tile the
Eisenhower Hospital and they won the bid to do the flooring for the new
wing at the Eisenhower Hospital.
The following Bids were received:
1. The Works Tile & Floor
2. Southwest Contractors
$107,431.89
$115,000.00
No other bids were received; because of the complexity of the project.
Once the entire new tile is installed the Parkview Office Complex will be
given a 10-year systems warranty on all products and a 5-year
workmanship warranty for installation.
City staff along agree that the Works bid proposal offers the best solution
for Parkview Office Complex. The Works bid considers all potential issues
and concerns and provides a solution for those matters. Additionally, the
Works proposal provides for a 10-year warranty on products (include tile,
cement, float and grout) and a 5-year workmanship warranty.
Staff Report
City of Palm Desert Parkview Office Complex Floor Tile Installation Roofing System
February 28, 2008
Page3of3
It is staff's recommendation to award the bid and approve the contract for
the removal and installation of the floor tile at the Parkview Office Complex
and to appropriate $107,431.89 from fund 510.
Paul S. Gibson, Director of Finance
Approval:
Carlos L. Ortega C. anager
PSG:AH:ah
Attachments (1)
CITY COUNCIL �SCTION:
APPROVED ✓ DENIED
RECEIVED OTHER
MEETING DATE
AYES: r -
NOES : /\
ABSENT:
ABSTAIN: f:n-
VERIFIED BY: r4(Xc/J) f-r I
Original on File tnitth City Clerk's Office
ccrzl 'lY)