HomeMy WebLinkAboutC25570A CO5 Section 29 Assessment District No. 2004-02REQUEST: SUBMITTED BY: CONTRACTOR: DATE: CONTENTS: Recommendation: CITY OF PALM DESERT PUBLIC WORKS DEPARTMENT STAFF REPORT XPJ Approve Change Order No. 5 to Contract No. C25570A for Assessment District 2004-02 Mark Greenwood, P.E., Director of Public Works Skanska Civil USA West (formerly Yeager-Skanska Inc.) 1995 Agua Mansa Road Riverside, California 92509 March 27, 2006 Change Order No. 5 Vicinity Map That City Council, by Minute Motion: 1. Approve Change Order No. 5 to Contract No. C25570A with Skanska Civil USA West for the construction of Section 29 Assessment District 2004-02 in the amount of $ (13,132.76) and 2. Authorize the Mayor to execute the same. Discussion: On April 26, 2007, City Council awarded the construction contract for the infrastructure of Assessment District 2004-02 (Section 29) to Yeager-Skanska, Inc., in the amount of $14,470,270.58. Construction on Assessment District 2004-02 has been underway since July 25, 2007 and, with the exception of the construction of the I-10/UPRR (Union Pacific Railroad) sewer crossing, the project is substantially complete. There have been four contract change orders previously submitted and approved for this project. The total contract change order value to date is $342,918.29, or 2.36% of the contract value. Construction Contract Change Order #5 consists of a number of different items involving changes in field conditions, design modification, and safety concerns. The most significant element involves the construction of the I-10/UPRR sewer main undercrossing. Using a value engineering approach, the City's construction manager, Berg & Associates, working with the contractor, design engineer (MSA Consulting, Inc.), the Coachella Valley Water District (CVWD), the State of California Department of Transportation (Caltrans), Union Pacific Railroad (UPRR) and City staff successfully revised the construction/installation concept resulting in a savings of approximately $200,000.00. Staff Report -Approve CO # 5 to C25570A 627-05 Page 2of2 March 27, 2008 A recap of the items follows: 1 I-10/UPRR Sewer Crossing ($206,369.80) 2 Extra work carry-over CCO#1 4,950.80 3 AC Paving in lieu of ARHM-three locations 47,561.40 4 Safety handrail at 42" storm drain outlet 4,237.75 5 Electrical service installation for all traffic 50,000.00 signals 6 Installation of additional storm drain facility 43,013.71 7 Installation of unreinforced concrete cut-off 12,941.42 walls for retention basin 8 Gerald Ford Drive water main revision (sewer 15,105.25 and point of service conflict) 9 Sidewalk removal and replacement for access 2,356.42 conformance 10 Installation of irrigation sleeving 7,660.67 Total ($13,132.76) Therefore, staff recommends that City Council approve Change Order No. 5 to Contract No. C25570A with Skanska Civil USA West (formerly Yeager-Skanska Inc.), with a net reduction in cost of $13,132.76; and authorize the Ma or to execute the same. CITY COUNCIL CTION=DENIED APPROVED OTHER RECEIVED MEETING DATE '7-1)S" AYES : >< i15�11 NOES: N�1��, ABSENT: Nn!) c. - ABSTAIN: No(1t'_ VERIFIED BY: lkir'a Clerk's Office Original on File with)City Mark GreenOood, P.E. Director of Public Works Approv Homer Croy ACM for De Carlos L. Ort City Manager opment Services Finance Director /cls/dhl G:IPubWorks\Staff Reports120081March 27108 CO 5 C25570A Skanska 627-051Approve CO 5 C25570A Skanska 627-05.doc CITY OF PALM DESERT CONSTRUCTION CHANGE ORDER Contract Purpose Consultant's Name Address: Section 29 Assessment District Skanska Civil USA West 1995 Agua Mansa Road, Riverside, California 92503 Contract # / P.O. # Change Order No. Contingency: Account No. Project No. Vendor No. C25570A/14156 5 1 NO 4•'- 504334001 627-05 You are hereby requested to comply with the following changes from the contract plans and specifications: DESCRIPTION OF CHANGES DECREASE INCREASE In Contract Price In Contract Price I-10/UPRR Sewer Crossing (Item SCI-1 and SCI-8 Bid $928,073.00; Revised $ 721,703.20) -$206,369.80 Extra Work Carryover (CCO#1) $4,950.80 Conventional Asphalt Paving (AC) in lieu Asphalt Hot Rubber Mix $42,340.50 (AHRM)-Gerald Ford Drive (WB) 47045 @ .90 AC in lieu of AHRM-Gerald Ford Drive Median @ Ponderosa 3101 3101 $2,790.90 SF @ .90 AC in lieu of AHRM-Dinah Shore Drive (EB) 2700 SF A .90 $2,430.00 Safety Handrail at 42" Storm Drain Outlet Structure 1 $4,237.751 Electrical Service Installation for all Traffic Signal Location $50,000.00 Installation of additional Storm Drain Facilities (catch basin/Pipe/Depression) Portola Avenue at Dinah Shore Drive $43,013.71 Installation of unreinforced Concrete Cut-off Walls for Retention Basin $5,409.62 Installation of Sloped Protection Barrier for 42" Outlet Structure 1 $12,941 .42 Gerald Ford Drive water main revision (sewer and point of connection conflict resolution $15,105.25 Sidewalk removal and replacement for access conformance $2,356.421 Installation of Irrigation Sleeves (Gerald Ford Drive at Ponderosa $7,660.671 1 TOTALS: (206,369.80) 193,237.041 NET CHANGE IN CONTRACT PRICE: (13,132.76)y JUSTIFICATION: The use of AC in lieu of AHRM, I-10/UPRR Sewer Crossing; Extra Work Carryover (CCO#1; installation of safety handrail at outlet structure; electrical service installation for all traffic signals; installation of additional storm drain facility; installation of unreinforced concrete cut-off wall for retention basin; installation of sloped protection barrier at outlet structure; water main revision due to conflict; sidewalk removal and replacement for access conformance; and installation of irrigation sleeves. TOTAL BUDGET FOR PROJECT: Less: Expend. & Encunb. To Date: I ecs: Ills Charige Oder k arlt: BALANCE OF BUDGET REMAINING FOR FRQJECT: + 14,813,188.89 14,813,188.89 (13,132.76) 13,132.76 C Nfl NC NCY: Arnow Approved byCouicil: Less: A-ior Change Order(s): Less: This Change Oder. Balance Rend ni ng of Contingency: 1,447,027.061 + 1,447,027.06 342,918.28 (13,132.76) 1,117,241.54 The amount of the Contract will be Decreased by the Sum of: Thirteen Thousand One Hundred thirty two and 76/00 Dollars ($13,132.76). This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order items for a lump sum price agreed upon between the Contractor and the City of Palm Desert, otherwise referred to as Owner. Contract Time Extension N/A Days Revised Contract Total N/A Days The undersigned Contractor approves the foregoing Change Order # 5 as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order # 5 . The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of that directly or indirectly related to the approved time extension, required to complete the Change Order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the Owner. Execution of this Change Order by the Contractor constitutes a binding accord and satisfaction that fully satisfies, waives, and releases the Owner from all claims, demands, costs, and liabilities, in contract, law or equity, arising out of or related to the subject of the Change Order, whether known or unknown, including but not limited to direct and indirect costs and/or damages for delay, disruption, acceleration, loss of productivity, and stacking of trades, as well as any and all consequential damages. This document will become a supplement to the Contract and all provisions will apply hereto, all items included above must have required signatures as per the purchase resolution. 1. REQUESTED BY: 2. ACCEPTED BY: DEPARTMENT HEAD 3. CERTIFIED FUNDS AVAILABLE: 4. APPRO FINANCE DIRECTOR NOTE: No payments will be made prior to City Manager and Council approval CONTRACTOR Date Accepted VED BY: JEAN M. BENSON, MAYOR Date Approved CITY MANAGER Date Approved JMONTEREY AVE 0 z rn m -4 VICINITY MAP ASSESSMENT DISTRICT 29 Project 627-05 oGERALD FORD DR] 0 0