HomeMy WebLinkAboutSR - 07-02, C/Z 07-01, PP 07-09, & CUP 07-10 - WLC Architects CITY OF PALM DESERT DEPARTMENT OF COMMUNITY DEVELOPMENT STAFF REPORT REQUEST: Approval of a General Plan Amendment from Industrial-Business Park (I- B.P) to Public/Quasi, Public Facilities (PF), Change of Zone from Service industrial (S.I) to Public Institution (P), precise plan, conditional use permit, and a Mitigated Negative Declaration of Environmental Impact to allow construction of a new 42,512 square foot two-story Administrative Faciliry for Coachella Valley Water District. Subject property is located at 75-515 Hovley Lane East. (APN: 632-030-003 and 632-030-015) SUBMITTED BY: Kevin Swartz, Assistant Planner APPLICANT: WLC Architects, Inc. 10470 Foothill Blvd. Rancho Cucamonga, CA 91730 CASE NOS: GPA 07-02, C/Z 07-01, PP 07-09 and CUP 07-10 DATE: May 8, 2008 CONTENTS: Draft Resolution No.os-2s Draft Ordinance No. 1 i55 Draft Resolution No.08-29 Planning Commission Minutes for Case Nos. GPA 07-02, C/Z 07-01, PP 07-09 and CUP 07-10 Planning Commission Resolution No. 2471 Planning Commission Staff Report dated April 1, 2008 Initial Study Comments from other departments ARC Minutes Plans and Exhibits Recommendation: That the Ciry Council waive further reading, and: 1) Adopt Resolution No. OR-2R approving General Plan Amendment 07-02. 2) Pass Ordinance No.1155 to second reading approving Change of Zone 07- 01. Staff Report GPA 07-02, C2 07-01, PP 07-09 & CUP 07-10 May 8, 2008 Page 2 of 9 3) Adopt Resolution No. 08-29 approving Precise Plan 07-09, Conditional Use Permit 07-10, and a Mitigated Negative Declaration of Environmental Impact, subject to conditions attached. Executive Summary: The project is located on the southeast corner of Hovley Lane East and Beacon Hill. The applicant is requesting an amendment to the General Plan and change of zone to facilitate approval of a precise plan of design and Conditional Use Permit to allow construction of a new Coachella Valley Water District (CVWD) two-story administrative facility building totaling 42,512 square feet. Discussion: I. BACKGROUND: A. PROPERTY DESCRIPTION: The project is located at 75-515 Hovley Lane East, east of Cook Street and west of Eldorado Drive. The property totaling approximately 5.83 acres is a relatively flat triangular shape lot and is surrounded by industrial and residential zoned properties. Access is from Hovley Lane East and Beacon Hill. B. ZONING AND GENERAL PLAN DESIGNATION: The property is currently zoned (S.I.} - Service Industrial and is designated (I- B.P.) - Industrial, Business Park in the General Plan. C. ADJACENT ZONING AND LAND USE: North: P.R. - 5-Planned Residential South: S.I. - Service industrial East: P - Public Institution West: S.I. - Service industrial D. PLANNING COMMISSION: The proposed project was presented to the Planning Commission on April 1, 2008. The Commissioners stated that the proposed General Plan Amendment and change of zone is consistent with the area and the overall height of the building at 42 feet is acceptable due to large building set backs and being surrounding by industrial buildings and two-story homes; the Commission recommended approval of the project on a 5-0 vote. C:�PlanningVCevin Swanz\Wurd�PP 07-(�TpP-07-09_CC RP7'.doc Staff Report G PA 07-02, C2 07-01, P P 07-09 & C U P 07-10 May 8, 2008 Page 3 of 9 II. PROJECT DESCRIPTION: Coachella Valley Water District (CVWD� has a current administrative faciliry located in Coachella and is relocating to Palm Desert next to their existing water conservation facility. The new facility includes a board room and office space for 108 employees in the finance, communications, engineering, administration, human resources and risk management departments. The two-story building will be approximately 42,512 square feet in total floor area. There will be a surface parking lot with 150 employee parking spaces covered with solar panels along the west side of the new building, and 105 public parking spaces located in front of the building. The project also includes an outdoor amphitheater that will be used for weekend workshops on plant and water conservation, an entry gate off of Hovley Lane East for public and staff use, and two gates off of Beacon Hill for public, staff and oversize vehicle use. The project will require a General Plan Amendment from Industrial, Business Park (I- BP) to PubliclQuasi-Public Facilities (PF), a change of zone from Service Industrial (SI) to Pubfic Institution (P), a Precise Plan, a Conditional Use Permit and an Adoption of a Mitigated Negative Declaration as it relates to the project. The Initial Study and Mitigated Negative Declaration were completed in accordance with the City's guidelines implementing the California Environmental Quality Act. A. Site Plan: _ The site plan illustrates that there are three vehicular entrances to the property from Hovley Lane East and Beacon Hill into the facility. The main vehicular entrance is accessed through Hovley Lane East facing north, with a secondary access through Beacon Hill facing west. Hovley Lane East has a left in and right out. Beacon Hill will have full egress and ingress and both entrances will be maintained by a six-foot high steel gate that will be set back approximately 10 feet from property line and will be open during the hours of 7:00 a.m. to 6:00 p.m., Monday through Friday, for public and staff use. A secondary entrance for oversized vehicles located on the southwest corner of Beacon Hill will have full egress and ingress, with a six-foot high steel gate. The proposed administrative facility has been designed to have a pad level three feet lower then street level and will be set back 100 feet from the new front property line (Hovley Lane East), approximately 384 feet from the street side (Beacon Hill) property line. The applicant is proposing a lot line adjustment and at this time has not identified precisely where the rear and side property lines will be located, but a condition of approval has been placed on the project such that the new property lines will meet all development standards placed on the project, including setback location. G:�PlanningUCevin Swartz\Wurd�PP 117-(XXPR07-(N)_CC_RPI'Aix Staff Report GPA 07-02, C/Z 07-01, PP 07-09 & CUP 07-10 May 8, 2008 Page 4 of 9 The site plan also includes: a community plaza with a flagpole; 255 parking spaces; (150 for staff, 105 for visitors); an outdoor trash bin area; an outdoor amphitheater; an outdoor break area; sidewalk around the perimeter of the property along with a stabilized decomposed granite path on properry; and landscaping requirements. B. Building Description: The proposal is for a two-story 42,512 square foot building measuring 42 feet to the highest architectural feature. Roofline heights vary on the main building and range in height from the predominant building line of 30 feet high to the tallest tower element of 42 feet high. The first floor to the second floor is 14 feet high. From the second floor to the roof height is 27 feet with a parapet roof at 30 feet. The upper roof is at 40 feet with the tower element over the boardroom at 42 feet. A condition of approval has been placed on the project requiring all roof mounted equipment to be screened from public view. The building offers customers and employees either an elevator or stairs to get from the first floor to the second floor. The building consists of a series of defined modulations including multiple planed facades (recessed entries, trellis, and pop-outs), gable roof pitch, and entry ways. This style is not found in the immediate area, but is a style that will enhance the surrounding neighborhood. The building's proposed architecture is described in detail in the following section. C. Architecture: The project will incorporate a Modern architectural style, including standing seam metal roof to present a soft appearance while protecting from solar gain, earth-toned colors, and will include multiple planned facades (recessed entries and pop-outs�. Surface finishes consist of plaster and Angelus block including; "Oak" splitface, "Charcoal" precision and "Sandstone" precision. The exterior paint will be Dunn Edwards "Sandpit" and Dunn Edwards "Regency Cream". The building will incorporate Atlantic Float glass and is proposed to be framed with clear anodized aluminum mullions. The building has a small portion that is proposed to be decorated with a geometrically symmetrical pattern of glass fixed in the walls. At its meeting of February 13, 2008 the Architectural Review Commission (ARC) reviewed the project. The Commission generally supported the concept and offered minimal comments. The Commission requested a restudy of the mechanical equipment screening to create an architectural feature, and allowing the elevator tower to come to a point. The Commission agreed that the project architects have provided a well designed project, and G:�Planning\Ke�'in Swanz\Wurd�PP 07�(X7�PP�07-IM)_CC_RPT.dcx Staff Report GPA 07-02, CIZ 07-01, PP 07-09 & CUP 07-10 May 8, 2008 Page 5 of 9 it was approved on a 4-0-0-2 vote, Commissioners Hanson ar►d Lambell absent. D. Landscaping: The landscape palette will focus on a desert theme, with plants requiring minimal water usage. The plant se{ection is in conformance with the City's Landscape Maintenance Guide and recommendations. Preliminary approval from the City's Landscape Specialist has been granted. Also a condition of approval has been placed on the project that all landscaping and lighting for the facility will be strictly on site and will not intrude onto surrounding properties. III. ANALYSIS: A. Project Data: The project includes a General Plan Amendment and change of zone to Public/Institution District, which states that the development standards are as approved. The following table provides the proposed project development standards. STANDARD ZONE PROJECT Coverage As Approved 6.63% Height As Approved 42 feet from finished floor Front Setback As Approved 100 feet Rear Setback As Approved 81 feet Side Setbacks As Approved 384 feet/ 289 feet Parking 144 255 Complies with the City's Landscape Landscaping As Approved Ordinance for parking lots, commercial develo ment and water efficienc . Although the zone does not provide any development standards, the applicant has worked diligently with staff to make sure the proposed project is compatible with the surrounding neighborhood and provides all the services and needs required by CVWD. The design and layout of the proposed project will not interfere with the use and enjoyment of neighboring existing or future development, and will not result in vehicular and/or pedestrian hazards. G:�Planning\Ke�'in Swartz\Wurd�PP 07-(W�PP-07-fW CC_RPf.d�u Staff Report G PA 07-02, C2 07-01, PP 07-09 & C U P 07-10 May 8, 2008 Page 6 of 9 B. Height: The current height in the S.I. zone is 35 feet. To the south and west of the project there are existing industrial buildings ranging in size from 22 to 35 feet in height. To the north are existing two-story condos ranging from 22 to 24 feet in height. The existing CVWD bui{ding is to the east at 30 feet in height. When the applicant first submitted the project, the proposed building height was 52 feet to the tallest architectural feature. Knowing that taller buildings are a potential concern for the adjacent residential properties, staff worked with the applicant to reduce the size and massing of the building to be in keeping with the surrounding neighborhood, while maintaining the design needs for CVWD. The applicant reduced the overall building height from 52 feet to 42 feet and the project was presented to the ARC. The proposed architectural and overall building height was granted preliminary approval by the ARC due to its substantial setbacks from the streets and surrounding buildings and overall design integrity with the 42-foot tower element. While height can be potentially an issue when adjacent to a residential zone, it was concluded that, due to the proposed building setbacks and being surrounded by other industriaf buildings, the height of the structure would not create a negative visual impact as seen from Hovley Lane East and Beacon Hill. C. Findings of Approval for Precise Plan and Conditional Use Permit: In accordance with the City of Palm Desert Zoning Ordinance 25.72.070, the following findings for a Conditional Use Permit are required to be made before granting a Conditional Use Permit: 1. The proposed location of the project is in accordance with the objectives of the Zoning Ordinance and the purpose of the district in which the site is tocated. The proposed project is located in a Sl, Service Industrial zone but the applicant is requesting a change of zone to P, Public Institution. Chapter 25.38 of the City of Palm Desert's Zoning Ordinance section 25.38.020 states no use shall be permitted without a conditional use permit. The proposed use is consistent with the uses outlined in section 25.38.030 Conditional Uses. G:�PlanningUCevin Sxartz\Word�PP 07-(MN'P-07-(N_CC'_RPT.dcx Staff Report G PA 07-02, C2 07-01, PP 07-09 & C U P 07-10 May 8, 2008 Page 7 of 9 The Public Institution zone does not have any development standards except what is approved by City Council. Additionally, conditions have been added to the project to ensure that all the minimum requirements of the Palm Desert Municipal Code are met, including Public Works, Building and Safety, and the Fire Department conditions. 2. The proposed location of the project and the conditions under which it will be operated and maintained will not be detrimental to the public health, safety or general welfare, or be materially injurious to properties or improvements in the vicinity. The proposed project as conditioned will comply with current Building and Safety Codes, Fire Department and will be reviewed by the City's Engineering Department for compliance with City ordinances. The use of the administrative facility is permitted within the P, Public Institution zone subject to a General Plan Amendment and a change of zone, with a Conditional Use Permit (for the land use), is consistent with the intent of the City's Zoning Ordinance as described in the staff report. The site has been designed to meet setbacks, lot coverage, building height, land use, and parking such that it will not be detrimental to the public interest, health, safety, welfare and will not be materially injurious to properties or improvements in the vicinity as described in more detail in the staff report. A condition of approval has been placed on the project that will require the project proponent to construct all necessary on and off-site infrastructure to provide utilities to the proposed project prior to the issuance of building permits. Water, sanitation and public utilifies and services are available in Hovley Lane East, a public street. An environmental assessment leading to a mitigated negative declaration has been prepared which concludes that rhere will be no adverse environmental effects. 3. The proposed project will comply with each of the applicable provisions of this title. The proposed use is consistent with the intent of the Zoning Ordinance since the applicant is requesting a change of zone and the standards meets and/or exceeds the minimum development standards of the P, Public Institution zone. Additionally, conditions have been added to the project to ensure that all the minimum requirements of the Palm Desert Municipal Code are met, including building, landscaping, public works, and the fire department conditions. G:�Planning\Ktvin Swanz\WurdV'P 07-(WWP-07-(�_CC_RPfAuc Staff Report GPA 07-02, C/Z 07-01, PP 07-09 & CUP 07-10 May 8, 2008 Page 8 of 9 4. The proposed project complies with the goals, objectives, and policies of the city's adopted General Plan. The General Plan land use designation for the site is "Industrial / Business Park (I-B.P.)': The applicant is requesting a General Plan Amendmenf fo P.F., Public/Quasi-Public. A primary objective stated in the Land Use Element of the General Plan under Public Services and Facilities Goals, Policies and Programs is Policy 1, which states the Ciry shall pro-actively cooperate and coordinate wit.h all providers of utiliry and public facilities and safety services in the community to assure adequate and quality levels of service. Program 1.A of the General Plan Land Use Element is that the City shall regularly coordinate and, as appropriate, cooperate with the various public and private providers responsible for utilities, police, fire, health and other protection and care services in the community. Policy 2 of the General Plan Land Use Element is that the Cify shall encourage the timely development of public services and facilities in a manner which assures adequate levels of service, while remaining compatible with exisiing and future land uses. This project maintains a land use that is consistent with the goals, policies, and programs of the General Plan. The project is consistent with the General Plan because the project proposes a public facility use, which is compatible with the existing uses within the surrounding area, and offers an excellent service to ihe community. IV. ENVIRONMENTAL REVIEW: CVWD as lead agency has prepared an Environmental Assessment that resulted in a Mitigated Negative Declaration for the project site. (See attachments). The site was analyzed based on the attributes and requirements of an infill project. Therefore, mitigations are those �egularly associated with development of this type. An impact fee for the Fringe-toed Lizard/Multiple Species Habitat Conservation Plan, as applicable, will be required when obtaining permits. G:�PlanningUCcvin Swanz\Word�PP U7-(X7�PP-07-(M)_CC_RPI'Aix Staff Report GPA 07-02, C/Z 07-01, PP 07-09 & CUP 07-10 May 8, 2008 Page9of9 V. CONCLUSION: In conclusion, staff finds that, by granting a General Plan Amendment and Change of Zone, the property will be consisted with the current zoning and General Plan designation of the existing CVWD property. The administrative facility as approved will conform to all zoning regulations. Therefore, approving a Precise Plan of design and Conditional Use permit will provide the City with a public facility as well as creating jobs. The building's impact on the surrounding properties would be minimal as the overall building height would not have a negative visual impact due to building setbacks and being surrounded by industrial buildings and two-story homes then any other use allowed in the approved zone. Submitted By: Department Head: � ���_�� 1 � Kevin Swartz Lauri Aylaian Assistant Planner Director, Community Development Approval: ,.- > � �` :;ITY COIJNCIL P�TION; -�l������' APPROVED � D�NIED Homer Croy ��EI� pTHER.���'��SS ACM for Devel ment Services � j,1 a MEETI � DIa7['i, - � - � AYES• �) 1 . C �� � � NOE3: Carlos L. Ortega �5ENT: ABSTi1IN: City Manager VEgIFIED BY• / �riginal on File w th City Clerk's Offi��. G�.\Planning\Kevin Swanz\Word\PP 07-09\PP-07-09_CC_RPT.doc