STAFF REPORT
REQUEST: Approve Request by the County of Riverside to Install a Traffic Signal on
Washington Street at 41S'Avenue
SUBMITTED BY: Mark Greenwood, P.E., Director of Public Works
APPLICANT: County of Riverside
c/o Lawrence Tai, T.E
Traffic Engineering Division Manager
3525 14th Street
Riverside, CA 92501
DMC Design Group, Inc.
c/o Joshua D. Cosper, P.E.
Project Engineer
140 N. Maple Street, Suite 104
Corona, CA 92880
DATE: March 12, 2009
CONTENTS: Vicinity Map
Letter from DMC Design Group, Inc.
Recommendation:
Approve the request by the County of Riverside to install a traffic signal on Washington
Street at 41 St Avenue.
Background:
The Church of Jesus Christ Latter-Day Saints is proposing to construct a church facility on the
northeast corner of Washington Street and 41S' Avenue in unincorporated Riverside County
territory. The church anticipates beginning construction in April 2009.
The traffic study prepared for the proposed Church indicated that a traffic signal was warranted
at the intersection of Washington Street and 41St Avenue. As a condition of approval of the
proposed development, the County of Riverside is requiring the Church to design and construct
a traffic signal at the subject intersection. With the west half of Washington Street being in Palm
Desert, the City must agree to the traffic signal before the installation can occur.
Discussion:
41 St Avenue is an east-west collector street located halfway between Country Club Drive and
Hovley Lane East/42�d Avenue. The roadway extends from Washington Street to east of Adams
Street and serves the heart of the Bermuda Dunes residential area. The proposed traffic signal
will provide fully-controlled access to Washington Street from 41 St Avenue. Please note that
Washington Street at 41St Avenue is a "T" intersection and the proposed traffic signal will not
provide any direct access benefits for Palm Desert residents.
Staff Report
Proposed Traffic Signal Installation on Washington Street at 41St Avenue
Page 2 of 3
March 12, 2009
There has been a long standing flooding problem on Washington Street in the vicinity of 41St
Avenue. County staff reports that this project will improve this situation by providing a retention
basin on the Church site.
As previously mentioned, a traffic signal is currently warranted at the intersection and the need
for a signal will only increase with future development in the Bermuda Dunes area. In staff's
opinion, the traffic signal should be installed at this time because the construction costs will be
paid by the Church development. Should the Council choose to approve the proposed traffic
signal, staff recommends that the following conditions be imposed:
1. The traffic signal and interconnect improvements shall be designed and constructed at
no cost to the City of Palm Desert.
2. The signal construction shall include installation of interconnect conduit and fiber optic
cable along Washington Street between Harris Lane and Hovley Lane East.
3. Maintenance and operation duties shall be performed by Palm Desert staff. The County
of Riverside and the City of Palm Desert shall enter a standard reimbursement
agreement for annual maintenance and operation costs. Since the location is a "T"
intersection and two of the three approaches are in the County, the County shall be
responsible for 66.7% of the annual costs.
Therefore, staff recommends that City Council approve the request for a traffic signal on
Washington Street at 41S`Avenue and impose the delineated conditions as described herein.
Fiscal Impact: The City of Palm Desert will be responsible for 33.3% (approximately
$4,000) of the annual maintenance and operations costs estimated at $12,000 per year.
Prepared By: ,� j Submitt d y• ��
.
1"1" �
���
Mar S. Diercks, P.E. Mark Green ood, P.E.
Transportation Engineer Director of Public Works
Approval:
Homer Croy �' n ohlmuth
ACM for Develop�, Services � ity Manager
/bl
CITY COUNCILAC ON
APPROVED_�,_.._DENtED
RECEIVED OTHER
Mi;F.Tt G DATE ' a`
AYES: �� ��
NOES:
ABSENT: l
A(3STA I1V:
VERIr[F:D BY: �—
Original on File with City ! k's Office
DMC Design Group,Inc. -� �--------
�
Maple Centre �' � ��� ,�
140 N.Maple St.,Suite 104 ��������
, r ��
Corona,CA 92880 �� � � "�'�'� i�''�
����
��`:����1 � _ �� --
951 549-8100 Fax 951 549-8102 ���
�3�, r���a��z������ —
February 11,2009
Mark Crreenwood,T.E.—Direcfor of�'ublic Works �
73-510 Fred Waring Drive
Palm Desert,CA 92260-2578
RE Riverside County Plot Plan No.21408—La Quinta/Palm Springs Stake Heritage 98
Dear Mark:
The Church of Jesus Chr�ist Latter-Day Saints is proposing to construct a church facility at the vacant
lot at the northeast corner of the Washington Street and 41� Avenue, in unincorporated Riverside
County territory. The City of Palm Desert is located west of the Washington Street Centerline and
South of the 41� Avenue Centerline. The County of Riverside has requested the Ch�ch of Jesus
Christ Lattex-Day Saints to install a traffic signal at the Washington Street and 41St Avenue
intersection per the following conditions of Approval for Plot Plan No.21408:
■ 80.TRANS 027—The project proponent s�hall be responsible for the design of traffic signals
at the intersections of: 41�` Avenue & Washington Street with fee eligibility Washington
Street (NS} and 41S` Avenue (EW} with fee credit eligibility or as approved by the
Transportation Department Installation of the signals shall be per 90.TR.ANS.21.
■ 80.TRANS 028—T'he intersection of Washington �treet (NS} and 41�Avenue (EV� sha11
be improved to provide the following geametrics:
o Northbound: one left turn(far U-tums), two through lanes, on shared through/right-
turn lane.
o Southbouzid:one left-tum lane,three through laxxes.
o Eastbound:N/A. �
o Westbound: one left-turn lane, one right-turn lane or as approved by the
Transportation Depar�ment.
All improvements listed represent existing conditions and are requirements for interim
conditions only. Full right-of-way and roadway half sections adjacent to the property for the
ultimate roadway cross-section per the County's Road Improvement Standards and
Specifications naust be provided. Any off-site widening required to provide the geometrics
will be the responsibility of the landowner/developer.
■ 90.TRANS 021 — The project and proponent shall be respozisible for the construction and
installa�ion of traffic sigials at the following locations: 41�Avenue and Washington Street
with fee credit eligibility Washington Strcet(NS) at 41�`Avenue (EV�with credait given to
Traffic Signal Mitigation Fees or as approved by the Transportation Department.
P:�DMC2W7107-070 BERiv1UDA�UNES CHUftCH�DII.IVFRN90211-Later m Ciry of Palm De.an Reqiwsn��Crty Ca:x,�l Ivleefiog�A90211-Lette�ro City of Palm Deaat Reqiwsti��g Ciry Courcil •
MaeBng.doc
February 11,2009
Page 2
The propos�i traffc signal at the 41S`Avenue and Washington Street intersection will impacf the City
of Palm Desert roadway facilities including. but not limited to, the landscape median modificafion
required to install a left turn pocket for uturns {North Bound), SE Curb return/sidewaltc facilities
(North Bound}, Washington Street sidewallc facilities {West Bound), and roadway striping
improvements. �
Per my previous conversations with Mark Dierckes,the City of Palm Desert Traffic Engineer,it is my
understanding this proposed tra�ic signal will requ.ire City Council Approval and has requested a
formal letter to be written requesting this item to be scheduled for a City Council meeting. Please
consider this letter my official request to schedule this far the next availahle City Council meeting.
The owner has had coordination with the County of Riverside, CA for almost 5 years through the
planning stages and improvenaent plan stage and would appreciate any attempt to schedule this for the
first City Council meeting in March,2009 if at all possible.
Please review this merno and contact me at 951-549-8100 iu�nmediately if you need any additional
information to move forward. I have providetl Mark Dierckes a location map and conditions of
approval per a previous submittal. I really appreciate your help in ttus matter and look forward to
working with you throughout this process.
Sincerely
D Design Group,Inc. -
Co r,P.E.-Project Engineer
���� �
J:.+JJ"�"
J?ESIG"t+!'G1FYF3U1� .' �
W
� J �
� N � �-+— Z w
� 4 �
Z � r� ; Q c�—�, a
z ��"`�� �� � � U �
� i � �
� , � � � � � � Q �
i � � �
Z � o
U `� "
oz
_ �
� � N
� a
�
, t , ,
, , � � ,,
;
�;;;�., ' __.
v„Y�✓ ,
A
<...
..... _.._:._._...� . �r
'`� ; .__.__'__.
, ; z '1S SW`d
, , ;� O ' _�
, �;,,,
. � ,
, �
.`� Y.
i �� +
. ...� , ; ,�......__......
j Y��,
r`
___ � r V '-'-'
,
\ 0 �
,�
�'
; ��_.
�; .. __,_
i ,
��
, �
V � R
; ' v
W � ,= ; _ �_
;
; '� �z d- , ,� �
O ,r ;
>
..�., ,�.�
� �
� ���'� a
. =�� c�3
_ _
� � Q13 � S 1 �
Q � � �
_ �
Q
� �
0
z ¢ �
Q . Z
� � � �
= o N
�
m � ¢ W
J � 1 r �-' II
� Id �
� - N�pN
z
�,�:�
w
, n . .. . _ _.. ...,., ,.. �