HomeMy WebLinkAboutR30070 - CO1 - PD Visitor Center T.I. CITY OF PALM DESERT / PALM DESERT REDEVELOPMENT AGENCY
STAFF REPORT
REQUEST: APPROVAL OF CHANGE ORDER NO. 1 TO CONTRACT NO.
R30070 (ORR BUILDERS), IN THE DEDUCTIVE AMOUNT OF
$52,133.00 FOR THE PALM DESERT VISITOR CENTER TENANT
IMPROVEMENT PROJECT LOCATED AT 73-470 EL PASEO,
SUITE 14
SUBMITTED BY: Martin Alvarez, Redevelopment Manager
CONTRACTOR: Orr Builders
39301 Badger Street, Suite 300
Palm Desert, CA 92211
DATE: December 9, 2010
CONTENTS: Change Order No. 1
Recommendation
By Minute Motion:
1. Approve Change Order No. 1 to Contract No. R30070 with Orr Builders
in the deductive amount of $52,133.00 for the Visitor Center Tenant
Improvement project located at 73-470 EI Paseo Suite 14; and
2. Authorize the Chairman to execute the said documents.
Executive Summary
On September 9, 2010, the Agency Board awarded a contract to Orr Builders in the
amount of $288,600.15 for the tenant improvements at the new Visitor Center location
(73-470 EI Paseo, Suite 14). As part of the approval, the Board directed staff to work
with the contractor to value engineer the project in order to reduce construction costs.
Change Order No. 1 achieves a deductive change order in the amount of $52,133.00.
The cost savings were achieved by redesigning portions of the project, utilizing existing
materials/infrastructure and using alternate project finishes that were compatible with
the project design. The project is complete and will be open by December 9, 2010.
Staff recommends approval of the deductive change order.
Backqround
On June 12, 2010, the Agency Board authorized staff to proceed with relocating the
Visitor Center operation to 73-470 EI Paseo, Suite 14. The relocation to the new EI
Staff Report
Change Order No. 1 to Contact No. R30070 (Orr Builders)
December 9, 2010
Page 2 of 3
Paseo location facilitates the opening of a satellite facility by the Palm Springs Art
Museum at the existing Visitor Center site located at Entrada del Paseo.
Prest-Vuksic Architects (PVA) completed the tenant improvement construction plans for
the new 1,972 square foot Visitor Center.
The project scope includes, but is not limited to the following components:
• Demolition of existing interiors that formerly housed real estate offices.
• Remodel public restroom to serve EI Paseo and Visitor Center customers.
• Addition of storage space to accommodate retail and informational materials.
• Creation of a functional front counter with incorporated workstations for staff.
• Design of display areas for informational materials and retail fixtures.
• Maintaining of small break room/kitchenette.
• Reduction of manager's office to accommodate additional storage.
Public bids were opened on September 7, 2010, and on September 9, 2010, Orr
Builders was awarded a contract in the amount of $288,600.15 for the tenant
improvement project. As part of the approval, the Agency Board directed staff to work
with the contractor to value engineer the project in order to reduce construction costs.
Staff worked with the project architect and the contractor to redesign portions of the
project, utilize existing materials, and alternate project finishes that would reduce
construction costs.
As part of the value engineering process, the following project components where
modified which led to a project cost savings without significantly altering the project
design and functionality:
• Existing drywall was utilized where feasible.
• Existing doors, windows, lighting, and plumbing connections were incorporated in
the new design.
• Alternate lighting fixtures were utilized.
• Existing T-bar ceiling utilized in storage and office areas.
• New T-bar ceiling utilized in public spaces.
• Alternate counter top finishes utilized.
• Additional restroom was omitted.
As a result of these changes, Change Order No. 1 reduces the contract amount by
$52,133.00.
Schedule
The project is now complete and furniture will be moved in starting December 6, 2010.
The new Visitor Center will reopen on December 9, 2010.
G:IrdalMartinA/va�ez120101SRIVisitor CenterC010rr12-09-10.doc
Staff Report
Change Order No. 1 to Contact No. R30070 (Orr Builders)
December 9, 2010
Page 3 of 3
Fiscal Analvsis
Change Order No. 1 results in a costs savings of $52,133.00. There is no fiscal impact
on the City's General Fund.
Submitted By:
-� � � : �,.�'
� �
artin Alvarez, Redevelopment Manager ponna Gomez, Visit�ir Center Ma,;�ger
i
Department Head: `'�
CiTY COUNCILA�2'�`ION
. APPROVED fl�p
RECEIVED OTHER
J ti McCarthy, A abl�r Redevelopment ,
MEET G D TE —
AYES: �
NOES:
Paul S. Gibson, Director of Finance ABSENT:
ABSTA1Nt
Ap val: VERIFIED BY:
Original on File wtth City lerk's Oflice
� —
Jo n M. Wohlmuth, Executive Director/City Manager ����
�r�o�►
�-��tir�
C�PV_�� C��—o�C?il�
vERe�w�� ��r��C
C)riqin�i r�r� fiil� uvi#�i �ity Cl�rk's �Jfficr=
GlydalMartinAlvarez120101SRIVisitor CenterCOlOrr12-09-10.doc
PALM DESERT REDEVELOPMENT AGENCY Contract#/P,O.# R2oo7o 17035
CONSTRUCTION CHANGE ORDER Amendmen�
Change Order No. �
Contingency: YES NO
Contract Purpose Visitor Center Tenant Improvements ,4ccount No. 850-4430-422-3421
Contractor's Name Orr Buiiders Project No.
address: 39301 Badger Street, Suite 300 vendor rvo. 3997
Palm Desert, CA 92211
You are hereby requested to comply with the following changes from the contract plans and specifications:
DECREASE INCREASE
DESCRIPTION OF CHANGES In Contract Price In Contract Price
Value Engineering:
Existing drywall utilized where feasible
Utilized existing doors, windows, lighting, plumbing connections
Utilized alternate lighting fixtures
Used existing T-bar ceilings in storage and office areas
New T-bar ceilings only in public spaces
Utilized alternate counter top finishes
Additional restroom omitted 52,133.00
TOTALS: 52,133.00 -
NET CHANGE IN CONTRACT PRICE: 52 133.00
JUSTIFICATION:
TOTAL BUDGET FOR PROJECT: + 288,600.15 CONTINGENCY:
Less: Expend.& Encumb. To Date: - 288,600.15 Amount Approved by Board: +
Less: This Change Order Amount: - 52,133.00 Less: Prior Amendment(s): -
BALANCE OF BUDGET Less: This Amendment: -
REMAINING FOR PROJECT: 52 133.00 Balance Remainin of Contin enc : -
The amount of the Contract will be (Decreased)�sfea�sed by the Sum of: Fiftv-two Thousand. One Hundred
Thirtv-three and NO/100 Dollars ($52,133.00).
G:1rdaWgenda Items\2010\12-9-10\Orr R30070 CO-1.doc See reverse ...
Contract R30070 Change Order No. 1 Continued from front
This Contract Amendment covers changes to the subject contract as described herein. The consultant shall perform
all work as necessary or required to complete the Contract Amendment items for a lump sum price agreed upon
between the Consultant and the Palm Desert Redevelopment Agency, otherwise referred to as Owner.
Contract Time Extension -0- Days.
Revised Contract Total $236,467.15
The undersigned Consultant approves the foregoing Change Order # 1 as to the changes, if any, in the contract
price specified for each item including any and all supervision costs and other miscellaneous costs relating to the
change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said
Change Order # 1 . The Consultant agrees to furnish all labor and materials and perform all other necessary work,
inclusive of that directly or indirectly related to the approved time extension, required to complete the Contract
Amendment items. This document will become a supplement of the contract and all provisions will apply hereto. It is
understood that the Contract Amendment shall be effective when approved by the Owner.
Execution of this Contract Amendment by the Consultant constitutes a binding accord and satisfaction that fully
satisfies, waives, and releases the Owner from all claims, demands, costs, and liabilities, in contract, law or equity,
arising out of or related to the subject of the Contract Amendment, whether known or unknown, including but not
limited to direct and indirect costs and/or damages for delay, disruption, acceleration, and loss of productivity, as well
as any and all consequential damages.
This document will become a supplement to the Contract and all provisions will apply hereto, all items included above
must have required signatures as per the purchase resolution.
1. REQUESTED BY: 2. ACCEPTED BY:
EXECUTIVE DIRECTOR CONTRACTOR
3. CERTIFIED
FUNDS AVAILABLE: 4. APPROVED BY: 12/9/10
FINANCE DIRECTOR CHAIRMAN Date Approved
NOTE: No payments will be made
prior to Executive Director and 12/9/10
Agency Board approval SECRETARY Date Approved
G:UdaWgenda Items�2010\12-9-10\Orr R30070 CO-1.doc .S@@ f@V8f S@ ...
� � o
� o a� M
U +-•
Q � N O U �
�' f� m� � �
� �— C N � 00
Z (h "_' U O
� � O � V
c� Z V m
2 �
H U Z
p � O � �
� �O O � c2l-
a� o m � � U
V � � � � � �
O c ap �`= �'a F-
Q � N � O .� Z
0 0 � Q o O
N �
� cu c
Z �L
W o � �
� a � �
a p �, r�
> � Q c�o a�i � �
� W � � �
� pp �... +-• (p
� � ,� N � U I'-' N
_ � 0
F- W o
Z (� ti
Q Z o 0 0
� �
Z Q o 0 0
W N V �p Cfl
2 � ,� � p O
~ (� p w 00 QO
I— \ � � �
� U O o p i i
N Q Z U
a � ~
U ^ ^
W � � o 0
o V � c�i c�
f� � s... C M M
� � Z � � � � �--
M Q O � '� O N N
~ } V ~ L Q � .�.� �
w Q Q U Q
�
U = Z
� v� O
0 0
� �
> U `�
� Z v�i �
U w � a_°i
C�
� L �
Z
� N
N� � F' Q � �
N � � � O �
N U U F— � c
�i J J J C �p�
� Z Z Z V W J
� C� C� C� � �
o`no O O O > �
�
� � N M d' �
U