CITY OF PALM DESERT
STAFF REPORT
REQUEST: RATIFICATION OF CONTRACTS WITH TRI COUNTY COMPANY
AND CLOUDBURST ENGINEERING IN AN AMOUNT NOT-TO-
EXCEED $52,253.35 FOR THE REPAIR OF WELL NO. 1 AT THE
DESERT WILLOW GOLF RESORT
SUBMITTED BY: Martin Alvarez, Redevelopment Manager
CONTRACTOR: Tri County Pump Company
241 South Arrowhead
San Bernardino, CA 92408
Cloudburst Engineering
71825 Cholla Way
Palm Desert, CA 92260
DATE: May 27, 2010
CONTENTS: Tri County Pump Company Proposal
Cloudburst Engineering Proposal
Recommendation
By Minute Motion:
1. Ratify a Contract with Tri County Pump Company in the amount not-to-
exceed $43,412.40 for the repairs to Well No. 1 at the Desert Willow Golf
Resort;
2. Ratify a Contract with Cloudburst Engineering in the amount not-to-
exceed $8,840.95 for the motor repair associated with Well No. 1 at the
Desert Willow Golf Resort; and
3. Appropriate $52,253.35 from Golf Course Maintenance, Account No. 241-
4195-495-8092.
Executive Summary
Well No. 1,which serves the Firecliff Golf Course recently failed. In order to avoid damage to
the golf course, the City Manager authorized two contracts in the amount not-to-exceed
$52,253.35 with Tri County Pump Company and Cloudburst Engineering to repair the well
pump and motors. Approval of staff's recommendation will ratify the contracts executed by
the City Manager. Staff recommends approval.
Backqround
On May 20, 2010, the City Manager approved two contracts in the amount not-to-exceed
$52,253.35 with Tri County Pump Company and Cloudburst Engineering for the repairs to
Staff Report
Ratify Contracts w/Tri County Pump Co. and Cloudburst Engineering for Well No.1 Repair
May 27, 2010
Page 2 of 2
Well No. 1 at Desert Willow Golf Resort. Well No. 1 serves the Firecliff golf course with
fresh water to irrigate the golf course. Currently, the City utilizes a combination of reclaimed
water provided by the Coachella Valley Water District (CVWD) and aquifer well water to
irrigate the golf courses. Well No. 1 has been in operation for 15 years.
The City contracted Tri County Pump Company to investigate the cause and extent of the
damage to the well. The existing well has a maximum depth of 900 feet, and the current
depth of the well pump rests at 362 feet. The contractor determined that the well failed due
to a fluctuation in the well's water level. Lack of water at the current pump depth caused the
pump and motors to overheat and fail. This is a trend that other golf courses and wells have
experienced in recent years.
In order to avoid potential damage to the golf course, the City Manager authorized two
emergency contracts as follows:
• Contract with Tri County Pump Company to pull up the well's tube and shaft, assess
the pump condition, clean the column assembly and column perforations, add 60
feet of depth to the shaft and tube, and reinstall the pump to a new depth of 422 feet.
The total cost of this repair is in the amount not-to-exceed $43,412.40.
• Contract with Cloudburst Engineering to repair the 250 horse power pump motor
damaged as a result of overheating in the amount not-to-exceed $8,840.95.
The repairs will allow for consistent water level draw to alleviate the concern of water depth.
The contract also includes the installation of a Poly Airline and gauge. This will allow the
operator to monitor the depth of the well's water level to avoid damage to the pump and
motors.
Fiscal Analysis
The repairs to the well are necessary to avoid damage to the golf course plant life, greens,
and loss of revenue. The cumulative cost to repair the well is in the amount not-to-exceed
$52,253.35. Funds are available in Golf Course Maintenance, Account No. 241-4195-495-
8092.
Submitted B � Department Head:
. %�l /� G� L
rtin Alvarez, Redeve opment Manager J in McCarthy, ACM f development
Approval•
;
L.___,�
Paul S. Gibson, Director of Finance J n M. Wohlmuth, City Manager
;,,
G:\rda\Martin Alvarez�2010\SR15-27-10 DW Well Repair.doc
REGULAR PALM DESERT CITY COUNCIL MEETING MAY 27, 2010
XIV. NEW BUSINESS
A. REQUEST FOR RATIFICATION OF CONTRACTS WITH TRI COUNTY
COMPANY AND CLOUDBURST ENGINEERING IN AN AMOUNT NOT
TO EXCEED $52,253.35 FOR REPAIR OF WELL N0. 1 AT THE
DESERT WILLOW GOLF RESORT.
Rec: By Minute Motion: 1) Ratify a contract with Tri County Pump
Company, San Bernardino, California , in an amount not to exceed
$43,412.40 for repairs to Well No. 1 at Desert Willow Golf Resort
(Contract No. C29770A) ; 2) ratify a contract with Cloudburst
Engineering, Palm Desert, California, in an amount not to exceed
$8,840.95 for the motor repair associated with Well No. 1 at Desert
Weillow Golf Resort (Contract No. C29770B) ; 3) appropriate
$52,253.35 from the Golf Course Maintenance Account No. 241-
4195-495-8092 for this purpose.
CITY COUNCIL�CTION
APPROVED UF.NiED
RECEIVED OTHER
MEET G A �' �7' U�G
AYES: � � '�'`
NOES:
ABSENT: �y � 71
ABSTAIN:
VERIF[ED BY:
Uriginal on File with City erk's Office
"`�� TRI �OUNTY PUMP_COMPANY
'��
- ' WATERWELL ANO PUMP SERVICE
2#1 SOUTH ARROWHEAD-SAN BERNARDINO.CA 92-108
PHONE 909-888-7706-FAX 909-888-3653
LICENSE a 7d4742
Aprii 29,2010
Desert Willow Golf Resort
38-995 Desert Willow Drive
Palm Desert,CA 92260
Attention: Mr.Mike Tellier
Subject: Well#1
We have pulled,disassembled,inspected and documented the subject pump. The bowl assembly is beyond repair,5 pieces of
column need to be replaced,and we can rebuilt the tube and shafting. We ha�e also completed a video log,and the perforations
are plugged. The following estimate is for the remainder of the project,which includes all materials,all field labor,and all shop
labor to complete this project. We will also be lowering the pump an additiona160'to a new setting of 422'.
Field Labor
Travel to and from jobsite;bail oil,attempt to fish out suction pipe,wire brush,swab,and bail to bottom
2 man crew and equipment-24 hours total @$220.00 per hour $5,280.00
Per Diem-2 men 2 nights @$100 per night $400.00
Travel to and from jobsite;install pump,adjust,start up,and test run
4 man crew and equipment- 12 hours @$350.00 per hour $4,200.00
Shop Labor
Pull Tube and Shafting From Column,Pull Shafting From Tube,Disassemble
Tubes,Check and Replace all Bearings,Clean,Set up and Face Tubes,Replace
Shaft Couplings,Clean and Straighten Shafting,Assemble Tubes,Stab Shafting
Into Tubes and Stab Tubes Into Column $5,760.00
Sandblast Discharge Head and Paint $350.00
Materials
1 -Lot;Oil Disposal Fee $150.00
1 -Wire Brush/Swab Rental $900.00
1 -Goulds 14RJMC-5 Sfage Oil Lube Bowl Assembly
(Pump rated for 2000GPM @ 356'TDH) $8,600.00
8- 10"x 20'T&C Butt Column Pipe @$725.00 each $5,800.00
3-3"x 1-15/16°x 20'Inner Column Assembly @$855.00 each $2,565.00
1 - 10"x 24"TBE Butt Column Pipe $203.00
1 -3"Top Tube $250.00
1 -Receiver Bearing $375.00
19- 1-15/16"Line Shaft Couplings @$29.00 each $551.00
1 - 1-15/16"x 68"416SS Head Shaft $880.00
72-3"x 1-15/16"Oil Tube Bearings @$44.00 each $3,168.00
1 - 10"x 10'TOE Suction Pipe $300.00
l - 10"Galvanized Cone Strainer $325.00
1 -Lot; 1/4"Poly Airline w/Gauge,Bracket,and Fittings $534.00
1 -Electrical Connection Kit $75.00
1 -Lot;Miscellaneous Shop Supplies $40.00
1 -Lot;Estimated Incoming Freight $500.00
Page 1 of 2
w
� RI OUNTY j�UMP COMPANY
.�„� T C
WATERWELL AND PUMP SERVICE
241 SOUTH ARROWHEAD-SAN BERNARDINO,CA 92-108
PHONE 909-888-7706-FAX 909-888-3G53
LICENSE a 7-t47�12
Desert Willow Golf Resort
Well#1
Apri126,2010
Page 2
Estimated Labor $15,990.00
Estimated Materials $25,216.00
Sales Tax 8.75% $2,206.40
Total Estimate $43,412.40
We can procure all items and complete this repair within 2-3 weeks from your approval and authorization to proceed. This
estimate is valid for thirty(30)days from the above date,and subject to review thereafter. We trust this estimate will suffice for
your needs,and should any additional information be required,please do not hesitate to contact us.
Sincerely,
Andy Bradbury
Customer Instructions:
Proceed with repairs_Stop I'll call you
Use PO# Signed Date:
Please fax this authorization to 909 888-3653
Page 2 of 2
Cloudburst Engineering, Inc It1vOICe
71-825 Cholla�ay
Palm Desert, CA 92260
(760)674-3046 F� (760)772-0850 S/19/2010 698
Bill To
Desert Willow Golf Resort
Michael J Tellier
38-995 Desert Willow Dr.
Palm Desert, Ca 92260
Fax: 760-773-3876
Terms
Net 3 0
Quantity Item Code Description Price Each Amount
1 labor Service ealls North 250HP we11 motor 1,800.00 1,800.00
1 labor Motor repair labor 4,957.00 4,957.00
1 pai-ts Motor repair material 1,143.QO 1;143.00T
1 parts Wire 525.00 525.00T
1 crane Crane 270.OU 270.00
Sales Tax 8.75% 145.95
Totai �s,s4o.9s