HomeMy WebLinkAboutLndscp Btfctn Cmte - 07/21/2010 . �
CITY OF PALM DESERT
�-1�-�
� � MINUTES
LANDSCAPE BEAUTIFICATION COMMITTEE
REGULAR MEETING
� � Wednesday, July 21, 2010 — 11:30 a.m.
Administrative Gonference Room — Palm Desert Civic Center
73-510 Fred Waring Drive, Palm Desert, California 92260
I. CALL TO ORDER
Chairman Knight convened the meeting at 11:30 a.m.
I1. ROLL CALL
Present: Absent:
Chairman H. Spencer Knight Member Mark Greenwood
Vice-Chairman Lauri Aylaian Member Richard S. Kelly
�Aornhor nn.,�+;,, o�.,�ro� (alt. Ruth Ann Moore) Member Jay Niemczak
Member Connor Limont
Member Bob Spiegel
Member John M. Wohlmuth CITY COUNCILACTION
API'KOVED nI:NIF.D
Also Present: RFCCIVED �� �" OTHCR
Diane Hollinger, Landscape Specialist ,__��_���v
Pedro Rodriguez, Senior Code Officer �FF.TING DATE
Cora Gaugush, CIP Technician AYF�:�' �"".��"�u��� oun�n �����l,Fine�'-��
���.�.,'�—
Bertha A. Gonzalez, Recording Secretary N��rs: �...��
AI3SCNT: r� Lne_
III. ORAL COMMUNiCATIONS ARSTAIN: � cn�
VF,ItIFIF.D BY: ��-�rC� _
NONE Qriginal on File with City Clerk s Uflice
IV. CONSENT CALENDAR
A. MINUTES of the Regular Landscape Beautification Committee Meeting of
Wednesday, May 19, 2010.
Approve as presented.
Upon a motion by Chairman Knight, second by Member Spiegel, and 5-1-0
vote of the Committee Board with Member Limont abstaining, the Consent Calendar
was approved as presented.
� LANDSCAPE BEAUTIFICATION COMMITTEE
APPROVED MINUTES
July 21, 2010
V. CONSENT ITEMS HELD OVER
NONE
VI. NEW BUSINESS
A. Monterev/Dinah Shore Slope Landscape Desiqn Criteria and Costs
Chairman Knight presented the Committee with a cost estimate and map
of the proposed landscape installation for the Monterey/Dinah Shore ramp
slope that is located east of Costco. The estimated cost of $86,896
includes ground and vertical shrubs, palm trees, a water meter, an
irrigation system, earthwork and rough grading, and a 9�-day
maintenance period. The estimate is based on coverage, but no design
plan has been created. Staff included enough plant material to give 100%
ground coverage withaut the need of decomposed granite or boulders. In
addition, staff will design the landscape plan in-house, in an effort to
reduce cost. Mrs. Ruth Ann Moore of the Redevelopment Agency will
contact Costco regarding their willingness to share the cost of the
installation and maintenance of the landscape. Chairman Knight noted
that he would prefer for the City to maintain the landscape, since Costco
does not maintain their landscape according to the City's standards.
Member Limont suggested City staff maintain the landscape and invoice
half of the expense to Costco. Mrs. Moore will schedule a meeting with
Costco and City staff to further discuss the item.
No motion; the item was continued.
B. Larkspur Lot Parkwav Landscape Design Criteria and Costs
Chairman Knight presented the Committee with the design criteria and
cost estimate of the proposed landscape installation at the comer of
Larkspur and Shadow Mountain. Staff will install a 15 foot wide planter
along the parkway for an estimated cost of $46,165. The empty lot will
continue to be used as parking; therefore, staff will retain the finro driveway
openings on Larkspur and Shadow Mountain. The Committee suggested
staff prune the oleanders on the back wall and along the side, especially
off Shadow Mountain; no modifications will be done to the north wall.
Member Wohlmuth also suggested staff install plant material that matches
the plant material across the street of Larkspur. In response to Vice-
Chairman Aylaian's question, Chairman Knight noted that it will be too
expensive to relocate some the trees, but, should the Committee require
it, he will present a cost estimate for the relocation of a couple of them.
2
� LANDSCAPE BEAUTIFICATION COMMITTEE
APPROVED MINUTES
July 21, 2010
No motion; the item was continued until a design and a more accurate
cost is available.
VI1. CONTINUED BUSINESS
A. New Monterev Avenue Medians Landscape Desiqn Criteria and Costs
Chairman Knight presented three scenarios for the landscape installation
of the new Monterey medians between Country Club and Gerald Ford:
• First scenario included: decomposed granite, grading, and mobilization
for an estimated cost of$173,808.
• Second scenario included: decomposed granite, irrigation, trees,
grading and mobilization for an estimated cost of$394,728.
• Third scenario included a complete landscape design for an estimated
cast of$795,427.
According to staff, Br�ace Harry, Director of Public Works for the City of
Rancho Mirage, is waiting on the Committee's direction before addressing
the item within his organization. Mr. John Wohlmuth inquired on the
availability of the Segovia funds; Chairman Knight will investigate.
Member Spiegel stated that the median is in poor condition and it needs to
be immediately addressed. Member Limont suggested adding
abbreviated irrigation, which means the irrigation will be permanent, but
not complete, as a cost saving measure. The Committee also suggested
installing 15 gallon trees instead of 24" box trees.
No motion; the Item was continued until a cost estimate that includes
abbreviated irrigation is developed and Chairman Knight investigates on
the availability of the Segovia funds and the City of Rancho Mirage's
willingness to share the cost.
VIII. OLD BUSINESS
NONE
IX. REPORTS AND REMARKS
A. Portola Aesthetic Wall Treatment and Landscape Update
Staff member, Mrs. Cora Gaugush, informed the Committee of the status
of the Portola Aesthetic Wall Improvements. She stated that the design
from David Evans and Associates is 95% complete, but the utilities have
become a challenge. Nonetheless, Mrs. Gaugush met with a number of
planners from Southern California Edison (SCE) and she was assured
3
• LANDSCAPE BEAUTIFICATION COMMITTEE
APPROVED MINUTES
July 21, 2010
they will move the project forward within the SCE process. The total
budget for the project is $2.1 million; this includes $669,000 for utility
undergrounding.
X. ADJOURNMENT
With no further business or discussion, and Landscape Beautification
Committee Board concurrence, the meeting was adjourned at 12:06 p.m.