Loading...
HomeMy WebLinkAboutInformation Report - Cost-of-Services Fee Study on Fiscal Year 2009 / 2010CITY OF PALM DESERT FINANCE DEPARTMENT INFORMATIONAL STAFF REPORT Request: Receive and file the informational report relative to the Cost -of -Services Fee Study based on FY 2009-2010 actual expenditures and provide direction to staff relative to implementation of fee schedules. Submitted by: Paul S. Gibson, Finance Director Date: June 23, 2011 Attachments: Exhibit A — Building and Safety Fee Comparison Exhibit B — Community Development / Planning Fee Comparison Exhibit C — Fire Fee Comparison Exhibit D — Public Works Fee Comparison Recommendation By Minute Motion, that the City Council: receive and file the informational report relative to the Cost -of -Services Fee Study based on FY 2009-2010 actual expenditures; and 2. provide direction to staff relative to implementation of fee schedules. Background In 2006, the City Council adopted Resolution No. 06-164, which approved fee schedules based on FY 2004-2005 actual costs. These schedules trail current costs by five years. On average, the result of keeping the costs frozen at FY 2004-2005 rates has cost the City approximately $200,000 - $300,000 annually, for a total of $1.5 million. It is no longer in the best interest of the City to maintain costs at this level. Following is an estimate of fee increases compared to the previously adopted fee schedules: • Building & Safety: average fee increase is 11 %. This study includes additional estimated time required for plan checking and inspections due to the new Green Building codes and energy codes. • Public Works: average fee increase is 11 %. • Planning: average fee increase is 35%. • Fire: average fee increase is 31 %. There are a number of items in the FY 2004-2005 fee schedule that reflect a waived fee such as inspections for water heaters, HVAC replacements, PV solar system inspections. Due to more Staff Report Review and Consider Comprehensive Cost of Services Study June 23, 2011 Page 2 of 2 stringent regulations issued by the State, the amount of time required for inspections has doubled and in some cases tripled in order to meet the requirements for reducing our carbon footprint. Therefore, staff recommends that the fees no longer be waived. The following is a summary of Residential Development Fee Study, which was conducted by the Rose Institute of State and Local Government at Claremont McKenna College in March 2008 and compares the fees charged by valley cities. The total fees per unit include Building permit fees, Impact fees, Environmental fees, Engineering fees, and Planning fees. According to the report, the City of Palm Desert has the lowest total fees. 2,500 Sq.ft - includes A/C 400 S .ft Garage 2007 DATA 35 UNIT SUBDIVISION 2007 DATA 60 UNIT SUBDIVISION CITY IN RIVERSIDE COUNTY/ COACHELLA VALLEY TOTAL FEES TOTAL FEES TOTAL FEES TOTAL FEES PER UNIT PER SUBDIVISON PER UNIT PER SUBDIVISON PALM DESERT $25,082.40 $877,883.90 $24,892.71 $1,493,562.40 CATHEDRAL CITY $28,139.51 $984,882.80 $26,393.50 $1,583,609.80 LA QUINTA $28,806.16 $1,007,104.98 $26,824.65 $1,602,721.52 RANCHO MIRAGE $31,180.44 $1,091,315.30 $28,806.01 $1,728,360.80 INDIAN WELLS $31,861.50 $1,115,152.65 $29,486.21 $1,769,172.60 COACHELLA $35,781.32 $1,252,346.28 $34,537.51 $2,072,250.77 INDIO $35,788.36 $1,252,592.70 $34,080.05 $2,044,803.20 PALM SPRINGS $37,226.45 $1,302,925.81 $34,993.21 $2,099,592.56 RIVERSIDE COUNTY $39,341.44 $1,376,950.45 $37,125.68 $2,227,540.73 DESERT HOT SPRINGS $45,773.11 $1,602,164.00 $44,839.98 $2,690,399.00 Staff intends to present the proposed fee schedule for review and approval at the August 25, 2011 Council meeting. At that meeting, Council may also wish to consider the option of phasing in these fees over a period of two to three years so that it does not present a large impact on the public. The comprehensive Cost of Services studies have been sent to Mr. Bill Blankenship, Deputy Director of Building Industrial Association, Desert Chapter and James Brownyard, Chief Operating Officer of Desert Valley Builders Association for their review and comment prior to the August Council meeting. CITY COUNCILACTION APPROVED DENIED RECEIVED! OTHER SU d by: Gl� Paul S. Gibson, Finance Director E M. Wohlmuth, City Manager MEETING DATE L,-,,�3"�--)0/ AYES• ALe-,-hL 41r/lif, NOES: ti24)1 f ABSENT: 1-10fle ABSTAIN: VERIFIED BY: Original on File with City Clerk's Office *With City Council concurrence, received and filed the report and asked staff to provide further information once the responses have been received from the local builders groups. G:\Finance\Niamh Ortega\Staff Reports\SR-review and consider cost of services fee study 062311.docx EXHIBIT C FIRE FEE FEE COMPARISON Item Current Resolution No. 06-164 Adopted Fee based on FY 04-05 Cost Proposed Fee Based :,nFY 09-10 Cost 37. Plan Check Submittals Exceeding Original and One Correction Plan Check $170.00 $250 Inspection $72.00 $113 39. Minimum Fee Plan Check $85.00 $125 Inspection $72.00 $113 BILLABLERATESPER HOUR USED IN MISANALYSIS WASCIVEN BYRIMSIB£NUMYRREOEPARTMENT Nah: Additlonal ServlresforwhiN a fee has notbeen esiabiished shall he charge al Me h..dy rate. FS1=Fire Safety lesperear FSS = Fife Safety Speciality Fim Fee MeiY is 3 EXHIBIT D PUBLIC WORKS FEE COMPARISON Item Current Resolution No. 06-164 Adopted Fee based on FY 04-05 Cost Proposed Fee Based on FY 09-10 Actual Cost 1. Application Processing Fees $225 $279 2. Final Map Per Lot $898+68 Per Lot $1,253+$125 Per Lot Plan Check $341 $411 Plan Check $557 $842 prorated) 3. Hall'Streets per Each 1,000 Lineal ft Under Over 1,000 Lineal R wHl b414431,17641 7 $3,435 Plan Check 1 $891 Inspection 6 $2,544 4. Fu11 Is r Eacb 1,000 Lineal ft (Under Over 1,000 Lineal R will b 70 $4,730 Pan ec 0 Inspection 0 3,180 S.St and Striping -Per Project: 0 $2,700 Plan Check 2 $1,130 Inspection 8 $1,590 6. TrafficSignal -Per Intersection 6 $6,940 Plan Check 1,480 Ins action $4,830 1 $5,460 7. Residential Par Dwelling Unit $50 $50 8. Commercial per 1,000s it Building Area $500 f500 9. Industrial perAcre $500 $500 10. Storm Drain U m 1,000 Lineal R or Fmcdon Thereof $3,648 $4,412 Plan Check $1,29 $$1,550 Ins action $2,358 $2,862 DRAINAGE IMPAc r FEES (PER CITY ORDINANCE) 11. Drainage South ol'Whitewater Acre $4,000 1 $4,000 PerCay Ordinance $4,000 $4,000 12. Drainage Between Whitewater and Sand Ridge Line per Acre $1,500 $1,500 Per City Ordinance $1,500 $1,500 13. Drainage Between Ridge Line and South 1.10 Freeway per Acre $1,000 $1,000 Per City Ordinance $1,000 $1,000 EXTERNAL FEES 14.Loeal Develo ment Mltl tlon Fee DMF-CVMSHCP H drolo ergcre $2,371 $310 Plan Check $310 16. Sin a Famil $751 rCVAGHANDBOOK15. Plan Check $620 Ins ection $131 17. Subdivision 1-8 Lotr Tract Parcel Ma $2,860 Plan Check $1,550 Ins ecilan $1,310 $1,590 10. Subdivisions Over8 Lots Tral Parcel Ma Plan Check $1550+$78 Per Lot Over 8 $1,628+$78 Per Lot Dyer Inspection $1310+$131 Per Lot Over 8 $L590+$159 Per Lot Over 19. Grading Non-Subdivitsion Up to 3Acres PP CUP HDP, Etc. $21085 $2,443 Plan Check $775 $853 Inspection $1,310 $1,590 20. Grading Non -Subdivision Over 3 Acres P CUP HDP, Etc. Plan Check $775+$310 Acres tiver3 $853+$310 Acres Over3 Ins 'on ENCROACHMENT PERMITS 21. Permit Issuance Fee $1310+$393 Acres Dyer $81 $1,590+$477 Acres Over3 $92 pmcenn,Fee $81 $92 22. Residential Improvement Curb Core I Drain Inspection NEW $80 Public Wo" Fee Analysis 1 M EXHIBIT D PUBLIC WORKS FEE COMPARISON Item Current Resolution No. 06-164 Adopted Fee based on FY 04-OS Cost Proposed Fee Based on FY 09-10 Actual Cost Driveway Approach Inspection $404 $159 23. Curbs and Gutters 0 to 100 Linear it (Prorate after 100 Linear ft) $182 $159 Inspection $182 $159 24. Sidewalk 0 to 100 Linear It Prorate after 100 Linear R $546 $159 Inspection $546 $159 25. Commercial Driveways $819 $310 Inspection $919 $318 26. Excavation 0 to 100 Linear FL Prorate after 100 Linear it $808 11 $636 Ins ectfon $808 $636 27. Utlil Cut G W S ft $159 inspection NEW $159 28. Pavement Overlay Slur -Per Project $276 $328 Inspection $276 $318 29. Traffic Project per day $131 $159 Ins ectfon $131 $159 30. Commercial, Industrial, Hotels and Similar Buildings $2 pers Gross Building Area or Not to Exceed$3,500 perBuildfn Permit/Project 31. Residential Building Permits $35 per Residential Unit, Accessoyy Buildings Exemted 32. All Residential Remodeling Building Permits Exem ted 33. Tenant Improvements Commercial Industrial Buildings and Similar Buildin Proetts f0.06 ers rBuildin over 10,000s oro maximum Flat eeo $1,188 LANDSCAPF 34. Non -Residential Landscape Imrovements or Renovations Up to 10,000s it $900 $1,220 Plan Check $476 $632 Int ecNon $424 $SOB 35. Non. Residential Landscape Imrovements or Renovations 10,001-22,000 sq it $1,125 $1,525 Plan Check $595 $790 Inspect"', $530 $735 36. Non -Residential Landscape Imrovements or Renovations Over 22,000 sq ft $2,025 $2,745 Plan Check $1,071 $1,422 Ins ectfon $954 $1,323 37. Tree Removal, Plant Removal or Pruning (based on bourl rate Ins ectian one hour $106 $147 Inspection I wo hours $Z32 $Z94 Ins action Three hours $318 $441 30. Residential Tracts Per Unit (Single - FamilHome) $389 $531 Plan Check $183 $237 Ins 'on $206 $294 39. Residential Tract Models Per Unit $727 $763 Plan Check $446 $395 Ins "art $281 $368 40. PMIO $651 $555 Plan Check $258 $78 Ins ectian $393 $477 41. SWPP NPDES Processing $399 $494 Plan Check $137 $176 Ins Non $262 $318 42. Water Quality Management Plan(WQMP'S)- NEW $2,000 Plan Check - Trust Deposit Fae(Initial d osit NEW $2,000 43. Easements Deeds, Right ofW2Dedication, Sidewalk Easement, etc. $323 $468 Plan Check $323 $468 44. Abandonments, Right ofWa, and Easement Vacations $1,136 $1,496 Plan Check $620 $748 Plan Check $516 $748 45. City Engineer Variance $770 $880 Plan Check $770 $880 46. Plan Submittals Exceeding Original and Two Corrections $323 $388 Plan Check $323 $388 47. TransportationDemand Management rrDM) Per City Ordinance PerCity Ordinance NrCity0rdinance 48. Temporary C/O $262 $318 Inspection $262 $318 49. Record Documents $89 $112 Plan Check $46 $56 Pubin Works Fee Analysis 2 EXHIBIT D PUBLIC WORKS FEE COMPARISON Ihm Current Resolution No. 06-164 Adopted Fee based on FY 04-05 Cost Proposed Fee Rased on PY 09-10 Actual Cost Inspection $43 $56 50. Revision An hourly roteshall be charged depending on the numberof revisions and the size ofthe rojea. $155 51. Parkim act Fee Per Ci Ordinance 52. Discretion, Proects - Hour) Rate: SE=Senior EngineerEngineerl City Sury r $155 $187 CE=City Engineer $154 $176 AE=AssistantE Ince $129 RR PWI= Public Warkslns r Blendedrate $131 $159 1NE=7nMSporumon Englneer 147 18 TST=Tra cSilnalS eciallst $138 $158 OA=O ce Assistant 108 V21 Avee: Au o esmrwmcn a ree nas not own esmDushea snail he charge at Me Uty's tally burdened hourly rate. •' lhsl Depasl[ Fee reFlece Nelnitlalamwn[oldeposit lorapv¢n appfiotian. A EIIIaElepoutlyrate (or City inglneer w111bebilled,gaimtnndepv tsupplkdbytheappllontat Net eo(submiml.Appli antw111benotl0edwbenlnibaldepoeltlsn,ardepl,d,,,nd additional Nndog a re,l.. Upon pto1M «mpktlon anyftnda remnining In Ne deposltwlll be reNrn<d b epPlkan[ Public Wort Fee Ahalnis 3 51� EXHIBIT A BUILDING AND SAFETY FEE COMPARISON Item Current Resolution No. 06-164 Adopted Fee based on FY 04-05 Cost Proposed Fee Based on FY 09-10 Actual Cast 1. Permitlssuance RESIDENTIAL SINGLE FAMILY DWELLINGS' 96 $105.00 2. 1-2,500 sq itSin le Family Dwelling Custom or Tract Model Plan Check Architectural ••• $0.45 $0.50 Plan Check Structural $0.20 $0.22 Inspection """ $1.10 $1.14 3.1-2,500 sq R Tract Production Model Revised Plan Check Architectural $0.23 $0.27 Plan Check Structural $0.11 $0.12 Inspection $1.10 $1.10 4. 1-2,500 sq R Production Model Unchanged Plan Check Architectural $0.20 $0.20 Inspection $0.99 $1.02 5. 2,501sq ft or Larger Custom or Tract Model Single Famil Dwellin Plan Check Architectural "' $0,35 $0.37 Plan Check, Structural $0.17 $0.18 Inspection $0.77 $0.80 6. 2,501 sq it or Larger Model Production Revised Plan Check Architectural ""' $0.23 $0.25 Plan Check Structural $0.07 $0.08 Inspection "" $0.75 $0.80 7. 2,901 sq R or Larger Single Family Production Unchan ed Plan Check Architectural $0.20 $0.24 Plan Check Structural $0.03 $0.08 Inspection $0.55 $0.57 8. Residential Remodel under 500 scift Plan Check Architectural 41 $0.64 $0.70 inspection $0.83 $0.86 9 Residential Remodel over 500 s .ft. Plan Check, Architectural 1 $0.57 $0.57 Inspection 1 $0.55 $0.56 9. Residential Alteration per $3,000 value' Plan Check Architectural $142.00 $168 Inspection $138.00 $159 MULTIPLE FAMILY DWELLINGS 10. Up to 15,000 sq ft Multiple Family Dwelling Plan Check Architectural'"' $0.19 $0.20 Plan Check Structural $0.09 so.10 Inspection $0.35 $0.36 11. 1S,001 sq Rand Larger Multiple Family Dwelling Plan Check Architectural ••• $0.16 $0.18 Plan Check Structural $0.09 $0.10 Inspection'"' $0.29 $0.30 COMMERCIAL/INDUSTRIAL 12. 1-30,000 sq R Concrete Improved Plan Check Architectural... $0.23 $0.24 Plan Check Structural $0.08 $0.08 Inspection "•• $0.25 $0.27 13. 30,001 sq ft and Larger Concrete Improved Plan Check, Architectural •'" $0.20 $0.21 Plan Check, Structural $0.07 $0.07 Inspection *"' $0.20 $0.21 14. 1-30,000s itMasonry Improved Plan Check Architectural ••• $0.24 $0.26 Plan Check Structural $0.12 $0.13 Inspection ••' E0.27 $0.30 builaing aMty ree AnaIY515 EXHIBIT A BUILDING AND SAFETY FEE COMPARISON Item Current Resolution No. 06-164 Adopted Fee based on FY 04-05 Cost Proposed Fee Based on FY 09-10 Actual Cost 15. 30,001 sq it and Larger Masonry Improved Plan Check Architectural :•" $0.22 $0.22 Plan Check, Stmctuml $0.09 $0.10 Inspection $0.49 $0.24 16. 130,000 sq it Wood Frame Improved Plan Check Architectural ••• $0.20 $0.21 Plan Check Structural $0.10 $0.10 Inspection """ 1 $0.36 $0.32 17. 30,001.50,000 sq R and Larger Wood Frame Plan Check Architectural """ $0.21 $0.22 Plan Check Stmctural $0.09 $0.10 Inspection "'" $0.29 $0.29 18. 30,001-50,000 sq ft Wood Frame Shell Less%15hnproved Fee) 19. 1-50,000 sq Rand Larger Plan Check Architectural "'" $0.05 $0.06 Plan Check Structural $0.03 $0.04 Inspection •"" $0.07 $0.08 TENANI IMPROVEMENTS 20. 1- 5,000 sq R Tenant Improvement Plan Check Architectural "'• $0.17 $0.18 Plan Check Stmctural $0.06 $0.07 Inspection """ $0.29 $0.30 21. 5000-15,000 sq ft Tenant Improvement Plan Check Architectural "" $0.14 $0.15 Plan Check Stmctural $0.04 50.05 inspection ••• $0.22 $0.23 22. 15,001.25,000 sq ftTenent Improvement Plan Check Architectural'"" $0.13 $0.13 Plan Check Structural $0.06 $0.07 Inspection "" $0.21 50.21 23. 25,001-50,000 sq Rand LargerTenant Improvement Plan Check Architectural "'" $0.11 $0.12 Plan Check Structural 1 $0.06 $0.07 Inspection '•' $0.18 RE -ROOFING W. Residential Re roof $0.18 Inspection $130.00 $159.00 25. Commercial/Industrial Re -roof Inspection $276.00 $318.00 26. Each Plumbing Fixture inspection $138.00 $159.00 27. Plumbing Re -pipe or Repair Residential Inspection $138.00 $159.00 2& Plumbing Re -pipe or Repair Commercial Inspection $138.00 $159.00 29. Water Service Replacement Inspection $138.00 $159.00 30. Water Heater Each Inspection Fee Waived $80.00 31. Gas Pipe Each 50 it or Fraction Thereof Ins ection $138.00 MECHANICAL $159.00 Building Safety Fee Analysis EXHIBIT A BUILDING AND SAFETY FEE COMPARISON Item Current Resolution No. 06-164 Adopted Fee based on FY 04-05 Cost Proposed Fee Based on FY 09.10 Actual Cost 32. Mechanical Appliances Each Residential Inspection $138.00 $159.00 33. Mechanical Appliances Each Commercial Indntrial Inspection $276.00 $318.00 34. Mechanical Ducts Each 50 It or Fraction Thereof inspection $138.00 $159.00 35. Mechanical Outlets or Inlets Each Inspection $138.00 $159.00 36. HVAC Replacements Residential Inspection Fee Waived $199.00 37. HVAC Replacements Commercial/Industrial Inspection Fee Waived $239.00 38. Installation of PV solar system Ins ection Fee Waived 39. Electrical Plug, Switch or Similar Outlet - Five Each or Fraction Thereof $239.00 Inspection $138.00 $159.00 40. Electrical Appliance Each Inspection $138.00 $159.00 41. MotorsDevice Inspection $138.00 $159.00 42. Bus way Each 50 it or Fraction Thereof Inspection $138.00 $159.00 43. Conduit Each 50 it or Fraction Thereof inspection $138.00 $159.00 44. Electric Service Up to 200 Amps Inspection $138 $159.00 45. Electric Service 201-400 Amps Inspection $207 $239.00 46. Electric Service 401-600 Amps inspection $294.00 $318.00 47. Electric Service Over 600 Amps Inspection $294.00 $318.00 EXTERNAL FEES 48. TUMF Fee 49. Local Develo meat Miti Hon Fee 11,DMF.CVMSHCP OTHERHEMS 50, Over Submittal and Two Corrections Plan Check $283.00 $336.00 51. Inspections after one Inspection Inspection $138.00 $159.00 52. Building Official Variance Consideration Plan Check $435.00 $531.00 53. Appeals Board Application Plan Check $726.00 $885.00 54. Parldug Lot Re-strlpin Plan Check $425.00 5504.00 Inspection $690.00 $636.00 55. Block Retaining Wall (Use minimum fejper hour Inspection $276.00 $159.00 56. Swimming Pool Inspection $276.00 $318.00 57. Mobile Home Permlt Fees Based on provisions set forth by the California Code of Regulations Title 25. 58. Mills Acts - Restoration,rehabilitation, Presevation, and maintenance of historic pmerty EXHIBIT A BUILDING AND SAFETY FEE COMPARISON Item Current Resolution No. 06-164 Adopted Fee based on BY 04-05 Cost Proposed Fee Based on FY 09-10 Actual Cost Application Flat Fee NEW $318.00 59. Mills Acts - Restoration, rehabilitation, Presevation, and maintenance of historic property Contract Initiation - Trust Deposit Fee (Initialaleosit) NEW $1,000.00 60. Fuel Cell Permit and Plan Check Fee Per Resolution No. 08.12 NEW Fee Waived 60. Minimum Fee Per Hour Plan Check '142.00 Inspection $138.00 61. Discretionary Projects Hourly Rate: DES= Director of Building &Safety $145.00 $177 PCM = Plan Check Manager $145.00 $168 61= Building Inspector Blended Rate $138.00 $159 BPS = Building PermitSpecialist Blended Rate) $138.00 $140 FSI=Fire Safety Inspector $72.00 $113 FSS = Fire Safety Supervisor $85.00 $125 Note: Additional Services for which a fee has not been established shall be charge at the City's fully burdened hourly rate. Trust Deposit Fee reflects the Initial mount of deposit for a given applicaflan. A billable howdy rate for Director of Building &Safely and/or City Ationey will be billed against the deposit supplied by the applicant at the time df mbmittal. Applicant will be notified when initial deposit Is near depletion and additional funding is required. Upon project completion any funds remaining in the deposit will be returned to applicant. Plan Check & Inspection fees re0ected additional times required for 2010 Green Building Code, 2008 Cal. Energy code and SB 1606. Building Safety Fee Analysis EXHIBIT B COMMUNITY DEVELOPMENT / PLANNING FEE COMPARISON Permit Type Current Resolution No. 06-164 Adopted Fee based on PY 04-05 Cost Proposed Flat Fee and Trust Deposit Based on FY 09-10 Actual Cost Adjustments (Flat Fee) $128 $168 Planner (blended rate) $105 $138 Clerical Staff blended rate $23 $29 Appeals (Flat Fee) $210 $276 Building Permits, Exterior Reviews Flat Fee $26 $39 Certificate Of Use Review(Flat Fee $26 $35 Conditional Use Permits for Short -Term Vacation Rentals (Flat Fee) NEW $500 Development Use Permlh (Trust Deposit Cases)*** Minor Conditional Use Permit'*' NEW $1,500 Conditional Use Permit *** $2,915 $2,894 Planner blended rate) $1,890 $2,070 Clerical Staff blended rate $180 $234 Fire Safety Specialist $85 $125 Associate Transportation Planner $760 $465 Development Agreement *** NEW $3,004 City Attorney (blended rate) $2,080 Planner (blended rate) $690 Clerical Stag blended rate $234 Precise Plan *** $2,915 $2,894 Planner blended rate $1,890 $2,070 Clerical Staff(blended rate $180 $234 Fire Safety Specialist $85 $125 Associate Transportation Planner $760 $465 Parcel Map Waivers(Flat Fee $615 $810 Planner (blended rate) $105 $138 Clerical Staff blended rate $45 $117 Public Works Senior Engineer $465 $555 TentUse Permit Flat Fee) $67 $87 Planner (blended rate) $53 $69 Clerical Staff blended rate $14 $18 Temporary Use Permit, Non-profit Organization N/A N/A Tentative Tract Ma *** $2,915 $3,308 Planner blended rate $1,890 $2,484 Clerical Staff blended rate $180 $234 Fire Safety Specialist $85 $125 Associate Transportation Planner $760 $465 Tentative Parcel Ma *** $950 $1,203 Planner (blended rate) $315 $414 Fire Safety Specialist $170 $234 Public Works Senior Engineer $465 $555 Varlaum *** $2,363 $2,924 Planner blended rate) $1,575 $2,070 Clerical Staff (blended rate) $180 $234 Associate Transportation Planner $608 $620 Change of Zone C *** $1,230 $2,007 Planner (blended rate) $1,050 $1,656 Clerical Staff(blended rate) $180 $351 Planning Fee Analysis 1 EXHIBIT B COMMUNITY DEVELOPMENT / PLANNING FEE COMPARISON Permit Type Current Resolution No. 06-164 Adopted Fee based on FY 04-05 Cost Proposed Flat Fee and Trust Deposit Based on FY 09-10 Actual Cost Combined Applications (PP/CUP/TT/TPM) •." NEW $4,019 Planner blended rate $2,760 Clerical Staff(blended rate $234 Fire Safety Specialist $250 Associate Transportation Planner $775 Combined Applications with GPA / C/Z "•• NEW $4,%3 Planner blended rate $3,450 Clerical Stab blended rate $468 Fire Safety Specialist $250 Associate Transportation Planner $775 Environmental Impact Report (EIR) •"• Consultants cost+ 10% Consultants cost+ 10% Environmental Review Environmental Assessments $210 $276 Categorical Exem [ions $0, art of other ermits $0, art of other permits Negative Declaration 210 276 General Plan Amendment (GPA) $1,230 $2,007 Planner blended rate $1,050 $1,656 Clerical Staff blended rate $180 $351 Misc. Architectural Review Single Family Home Exceptions $168 $226 Planner (blended rate) $105 $138 Clerical Staff blended rate $68 $88 Commercial (ARC non public hearing cases) $353 $531 Planner (blended rate) $263 $414 Clerical Staff blended rate $90 $117 Signs Awnings Banners $26 $35 S (OTC) $75 $98 Planner (blended rate) $53 $69 Clerical Staff(blended rate $23 $29 Signs (ARC) / Sign Programs Monument $300 $393 Planner (blended rate) $210 $276 Clerical Sta0(blended rate $90 $117 Discretionary Pro ects - Hourl Rate: Planner (blended rate) $105 $138 Clerical Staff(blended rate $90 $117 Printing Costs Freedom Of Information Act Requests plus copy costs of.15 plus copy costs of.15 Zoning Map $5 $20 General Plan Map $15 $50 Zoning Ordinance $50 $60 General Plan Text $100 $125 General Plan Draft EIR / Final EIR $100/$15 $12S/$SO General Plan Traffic Study Appendices $70 $100 Zoning Confirmation Letters $210 $176 Copy Machine .15/page AS/page •" Trust Deposit Fees reflect the Initial amount of deposit fora given appilanao, an average hourly rate for Planner. Clerical Staff, Engineer City Attorney, and Fire Safety Specialist will be billed against the deposit supplied by the applh antat the time of submittal. Applicant will be mulned when Initial deposit sonar deplekon and additional funding is required. Upon project completion any funds remaining In the deposit will he resumed to applicant. Now Additional Services for which a fee has not been established shall be charge at the City's fully burdened hourly rate. planning Fee Analysis 2 EXHIBIT C FIRE FEE FEE COMPARISON Item Current Resolution No. 06-164 Adopted Fee based on FY 04-05 Cost Proposed Fee Based on FY 09-10 Cost a. Fire Permit Issuance Plan Check $96 $101 z. 1-15,000 sq ft Multi Family Plan Check $0.0211 $0Inspection 044 $0.0300 s. 15,001.30,000 sq ft Multi Family Plan Check $0.0185 $0.0250 Inspection $0.0174 $0.0260 4. Up to 30,000 sq ft Commercial or Industrial - Improved Plan Check $0'0'11 $0.0164 Inspection $0.0083 $0.0131 s. 30,001-70000 and Higher Multi Family Plan Check $0.0144 $0.0196 Inspection $0.0648 $0.0403 6. 1-5,000 sq It Tenant Improvements Plan Check $0.0200 $0.0375 Inspection $0.0172 $0.0226 v. 5,001-15,000s ft Tenant Improvements Plan Check $0.0123 $0.0188 Inspection $0.0119 $0.0226 e. 15,001.25,000 sq It Tenant Improvements Plan Check $0.0087 $0.0091 Inspection $0.0151 $0.0164 9. 25,001-50,000 sq It Tenant Improvements Plan Check $0.0059 $0.0069 Inspection $0.0064 $0.0068 to. 1-30,000 sq ft Commercial Industrial Building Plan Check $0.0133 $0.0150 Inspection $0.0107 $0.0170 m 30,001-80,000 sq ft and Higher Commercial Industrial Building Plan Check $0.0088 $0.0091 Inspection $0.0052 $0.0085 sz. ParldngGarap Plan Check $0.0010 $0.0019 Inspection $72 $226 13. Fire Spxinkler Systems up to 30 Heads Plan Check $128 $250 Inspection $82 $226 14. Fire S rinkler Systems up to 100 Heads or Fraction Thereof Plan Check $170 $250 Inspection $180 $226 is. Fire Sprinkler Systems 101-299 Heads Plan Check $287 $375 Inspection $216 $339 14. Fire Sprinkler Systems 300-700 Heads Plan Check $581 $750 Inspection $446 41$678 sf. Fire Sprinkler Systems over 700 Heads Plan Check $719 1 $1,000 Inspection $638 $1,017 is. Residential Fire Sprinklers Plan Check $170 $250 Inspection $144 $226 Fire Fee An*m 1 EXHIBIT C FIRE FEE FEE COMPARISON Item Current Resolution No. 06-164 Adopted Fee based on FY 04-05 Cost Proposed Fee Based on FY 09.10 Cost 34. Fire Alarms Tenant Improvements 1-24 Plait Check $255 $375 Inspection $144 $339 zo. Fire Alarms Tenant Improvements - Over 24 Plan Check $589 $375 Inspection $376 $452 zi. Fire Alarms - New Systems Under 24 Devices Plan Check $260 $375 Inspection $175 $226 zz. Fire Alarms- New system 74-FOT Devices Plan Check $561 $750 Inspection $481 $678 23. Fire Alarms - Over 100 Devices Plan Check $732 $1,000 Inspection 8612 $1,017 z4. Stand Pie Systems Plan Check $170 $250 Ins ection $144 $226 zs. Private Fire Hydrant System Plan Check $298 $375 Inspection $173 $226 26. Fire Pump Installation Plan Check $660 $1,000 Inspection $720 $1,130 zn. Fire Alarm Control Monitor Plan Check $255.00 $375 Inspection $288.00 $339 za. Undergroand Storage Tank Plan Check $340.00 $375 Inspection $288.00 $339 zs. Above Ground Storage Tank Plan Check $340.00 $500 Inspection $288.00 $452 3a. Hoods - Suppression Plan Check 5170.00 $125 Inspection 5108.00 $113 33. Residential Care Facilities Plan Check $340.00 $500 Inspection $360.00 $565 32. Tents and Canopies Plan Check $85.00 $125 Inspection $144.00 $226 33. Private Schools Plan Check $170.00 $250 Inspection $144.00 $226 34. Special Inspections Plan Check $170.00 $250 Inspection $144.00 $226 35. Site Plan- Conditions ofApproval Plan Check $170.00 $250 Inspection $144.00 $226 36. Fire Works Plan Check $170.00 $125 Inspection $144.00 $113 F" Fee Malnis 2