HomeMy WebLinkAboutInformation Report - Cost-of-Services Fee Study on Fiscal Year 2009 / 2010CITY OF PALM DESERT
FINANCE DEPARTMENT
INFORMATIONAL STAFF REPORT
Request: Receive and file the informational report relative to the Cost -of -Services
Fee Study based on FY 2009-2010 actual expenditures and provide
direction to staff relative to implementation of fee schedules.
Submitted by: Paul S. Gibson, Finance Director
Date: June 23, 2011
Attachments: Exhibit A — Building and Safety Fee Comparison
Exhibit B — Community Development / Planning Fee Comparison
Exhibit C — Fire Fee Comparison
Exhibit D — Public Works Fee Comparison
Recommendation
By Minute Motion, that the City Council:
receive and file the informational report relative to the Cost -of -Services Fee
Study based on FY 2009-2010 actual expenditures; and
2. provide direction to staff relative to implementation of fee schedules.
Background
In 2006, the City Council adopted Resolution No. 06-164, which approved fee schedules based
on FY 2004-2005 actual costs. These schedules trail current costs by five years. On average, the
result of keeping the costs frozen at FY 2004-2005 rates has cost the City approximately
$200,000 - $300,000 annually, for a total of $1.5 million. It is no longer in the best interest of the
City to maintain costs at this level. Following is an estimate of fee increases compared to the
previously adopted fee schedules:
• Building & Safety: average fee increase is 11 %. This study includes additional estimated
time required for plan checking and inspections due to the new Green Building codes and
energy codes.
• Public Works: average fee increase is 11 %.
• Planning: average fee increase is 35%.
• Fire: average fee increase is 31 %.
There are a number of items in the FY 2004-2005 fee schedule that reflect a waived fee such as
inspections for water heaters, HVAC replacements, PV solar system inspections. Due to more
Staff Report
Review and Consider Comprehensive Cost of Services Study
June 23, 2011
Page 2 of 2
stringent regulations issued by the State, the amount of time required for inspections has doubled
and in some cases tripled in order to meet the requirements for reducing our carbon footprint.
Therefore, staff recommends that the fees no longer be waived.
The following is a summary of Residential Development Fee Study, which was conducted by the
Rose Institute of State and Local Government at Claremont McKenna College in March 2008 and
compares the fees charged by valley cities. The total fees per unit include Building permit fees,
Impact fees, Environmental fees, Engineering fees, and Planning fees. According to the report,
the City of Palm Desert has the lowest total fees.
2,500 Sq.ft - includes A/C
400 S .ft Garage
2007 DATA
35 UNIT SUBDIVISION
2007 DATA
60 UNIT SUBDIVISION
CITY IN RIVERSIDE COUNTY/
COACHELLA VALLEY
TOTAL FEES
TOTAL FEES
TOTAL FEES
TOTAL FEES
PER UNIT
PER SUBDIVISON
PER UNIT
PER SUBDIVISON
PALM DESERT
$25,082.40
$877,883.90
$24,892.71
$1,493,562.40
CATHEDRAL CITY
$28,139.51
$984,882.80
$26,393.50
$1,583,609.80
LA QUINTA
$28,806.16
$1,007,104.98
$26,824.65
$1,602,721.52
RANCHO MIRAGE
$31,180.44
$1,091,315.30
$28,806.01
$1,728,360.80
INDIAN WELLS
$31,861.50
$1,115,152.65
$29,486.21
$1,769,172.60
COACHELLA
$35,781.32
$1,252,346.28
$34,537.51
$2,072,250.77
INDIO
$35,788.36
$1,252,592.70
$34,080.05
$2,044,803.20
PALM SPRINGS
$37,226.45
$1,302,925.81
$34,993.21
$2,099,592.56
RIVERSIDE COUNTY
$39,341.44
$1,376,950.45
$37,125.68
$2,227,540.73
DESERT HOT SPRINGS
$45,773.11
$1,602,164.00
$44,839.98
$2,690,399.00
Staff intends to present the proposed fee schedule for review and approval at the August 25, 2011
Council meeting. At that meeting, Council may also wish to consider the option of phasing in these
fees over a period of two to three years so that it does not present a large impact on the public.
The comprehensive Cost of Services studies have been sent to Mr. Bill Blankenship, Deputy
Director of Building Industrial Association, Desert Chapter and James Brownyard, Chief
Operating Officer of Desert Valley Builders Association for their review and comment prior to the
August Council meeting. CITY COUNCILACTION
APPROVED DENIED
RECEIVED! OTHER
SU d by:
Gl�
Paul S. Gibson, Finance Director
E
M. Wohlmuth, City Manager
MEETING DATE L,-,,�3"�--)0/
AYES• ALe-,-hL 41r/lif,
NOES: ti24)1 f
ABSENT: 1-10fle
ABSTAIN:
VERIFIED BY:
Original on File with City Clerk's Office
*With City Council concurrence, received and filed
the report and asked staff to provide further
information once the responses have been received
from the local builders groups.
G:\Finance\Niamh Ortega\Staff Reports\SR-review and consider cost of services fee study 062311.docx
EXHIBIT C
FIRE FEE
FEE COMPARISON
Item
Current Resolution No. 06-164
Adopted Fee based on FY 04-05 Cost
Proposed Fee Based :,nFY 09-10
Cost
37. Plan Check Submittals Exceeding Original and One Correction
Plan Check
$170.00
$250
Inspection
$72.00
$113
39. Minimum Fee
Plan Check
$85.00
$125
Inspection
$72.00
$113
BILLABLERATESPER HOUR USED IN MISANALYSIS WASCIVEN BYRIMSIB£NUMYRREOEPARTMENT
Nah: Additlonal ServlresforwhiN a fee has notbeen esiabiished shall he charge al Me h..dy rate.
FS1=Fire Safety lesperear
FSS = Fife Safety Speciality
Fim Fee MeiY is
3
EXHIBIT D
PUBLIC WORKS
FEE COMPARISON
Item
Current Resolution No. 06-164
Adopted Fee based on FY 04-05 Cost
Proposed Fee Based on FY 09-10
Actual Cost
1. Application Processing Fees
$225
$279
2. Final Map Per Lot
$898+68 Per Lot
$1,253+$125 Per Lot
Plan Check
$341
$411
Plan Check
$557
$842
prorated)
3. Hall'Streets per Each 1,000 Lineal ft Under Over 1,000 Lineal R wHl b414431,17641
7
$3,435
Plan Check
1
$891
Inspection
6
$2,544
4. Fu11 Is r Eacb 1,000 Lineal ft (Under Over 1,000 Lineal R will b
70
$4,730
Pan ec
0
Inspection
0
3,180
S.St and Striping -Per Project:
0
$2,700
Plan Check
2
$1,130
Inspection
8
$1,590
6. TrafficSignal -Per Intersection
6
$6,940
Plan Check
1,480
Ins action
$4,830
1 $5,460
7. Residential Par Dwelling Unit
$50
$50
8. Commercial per 1,000s it Building Area
$500
f500
9. Industrial perAcre
$500
$500
10. Storm Drain U m 1,000 Lineal R or Fmcdon Thereof
$3,648
$4,412
Plan Check
$1,29
$$1,550
Ins action
$2,358
$2,862
DRAINAGE IMPAc r FEES (PER CITY ORDINANCE)
11. Drainage South ol'Whitewater Acre
$4,000
1 $4,000
PerCay Ordinance
$4,000
$4,000
12. Drainage Between Whitewater and Sand Ridge Line per Acre
$1,500
$1,500
Per City Ordinance
$1,500
$1,500
13. Drainage Between Ridge Line and South 1.10 Freeway per Acre
$1,000
$1,000
Per City Ordinance
$1,000
$1,000
EXTERNAL FEES
14.Loeal Develo ment Mltl tlon Fee DMF-CVMSHCP
H drolo ergcre
$2,371
$310
Plan Check
$310
16. Sin a Famil
$751
rCVAGHANDBOOK15.
Plan Check
$620
Ins ection
$131
17. Subdivision 1-8 Lotr Tract Parcel Ma
$2,860
Plan Check
$1,550
Ins ecilan
$1,310
$1,590
10. Subdivisions Over8 Lots Tral Parcel Ma
Plan Check
$1550+$78 Per Lot Over 8
$1,628+$78 Per Lot Dyer
Inspection
$1310+$131 Per Lot Over 8
$L590+$159 Per Lot Over
19. Grading Non-Subdivitsion Up to 3Acres PP CUP HDP, Etc.
$21085
$2,443
Plan Check
$775
$853
Inspection
$1,310
$1,590
20. Grading Non -Subdivision Over 3 Acres P CUP HDP, Etc.
Plan Check
$775+$310 Acres tiver3
$853+$310 Acres Over3
Ins 'on
ENCROACHMENT PERMITS
21. Permit Issuance Fee
$1310+$393 Acres Dyer
$81
$1,590+$477 Acres Over3
$92
pmcenn,Fee
$81
$92
22. Residential Improvement
Curb Core I Drain Inspection
NEW
$80
Public Wo" Fee Analysis
1
M
EXHIBIT D
PUBLIC WORKS
FEE COMPARISON
Item
Current Resolution No. 06-164
Adopted Fee based on FY 04-OS Cost
Proposed Fee Based on FY 09-10
Actual Cost
Driveway Approach Inspection
$404
$159
23. Curbs and Gutters 0 to 100 Linear it (Prorate after 100 Linear ft)
$182
$159
Inspection
$182
$159
24. Sidewalk 0 to 100 Linear It Prorate after 100 Linear R
$546
$159
Inspection
$546
$159
25. Commercial Driveways
$819
$310
Inspection
$919
$318
26. Excavation 0 to 100 Linear FL Prorate after 100 Linear it
$808
11 $636
Ins ectfon
$808
$636
27. Utlil Cut G W S ft
$159
inspection
NEW
$159
28. Pavement Overlay Slur -Per Project
$276
$328
Inspection
$276
$318
29. Traffic Project per day
$131
$159
Ins ectfon
$131
$159
30. Commercial, Industrial, Hotels and Similar Buildings
$2 pers Gross Building Area or Not to Exceed$3,500 perBuildfn Permit/Project
31. Residential Building Permits
$35 per Residential Unit, Accessoyy Buildings Exemted
32. All Residential Remodeling Building Permits
Exem ted
33. Tenant Improvements Commercial Industrial Buildings and Similar Buildin Proetts
f0.06 ers rBuildin over 10,000s oro maximum Flat eeo $1,188
LANDSCAPF
34. Non -Residential Landscape Imrovements or Renovations Up to 10,000s it
$900
$1,220
Plan Check
$476
$632
Int ecNon
$424
$SOB
35. Non. Residential Landscape Imrovements or Renovations 10,001-22,000 sq it
$1,125
$1,525
Plan Check
$595
$790
Inspect"',
$530
$735
36. Non -Residential Landscape Imrovements or Renovations Over 22,000 sq ft
$2,025
$2,745
Plan Check
$1,071
$1,422
Ins ectfon
$954
$1,323
37. Tree Removal, Plant Removal or Pruning (based on bourl rate
Ins ectian one hour
$106
$147
Inspection I wo hours
$Z32
$Z94
Ins action Three hours
$318
$441
30. Residential Tracts Per Unit (Single - FamilHome)
$389
$531
Plan Check
$183
$237
Ins 'on
$206
$294
39. Residential Tract Models Per Unit
$727
$763
Plan Check
$446
$395
Ins "art
$281
$368
40. PMIO
$651
$555
Plan Check
$258
$78
Ins ectian
$393
$477
41. SWPP NPDES Processing
$399
$494
Plan Check
$137
$176
Ins Non
$262
$318
42. Water Quality Management Plan(WQMP'S)-
NEW
$2,000
Plan Check - Trust Deposit Fae(Initial d osit
NEW
$2,000
43. Easements Deeds, Right ofW2Dedication, Sidewalk Easement, etc.
$323
$468
Plan Check
$323
$468
44. Abandonments, Right ofWa, and Easement Vacations
$1,136
$1,496
Plan Check
$620
$748
Plan Check
$516
$748
45. City
Engineer Variance
$770
$880
Plan
Check
$770
$880
46. Plan Submittals Exceeding Original and Two Corrections
$323
$388
Plan Check
$323
$388
47. TransportationDemand Management rrDM)
Per City Ordinance
PerCity Ordinance
NrCity0rdinance
48. Temporary C/O
$262
$318
Inspection
$262
$318
49. Record Documents
$89
$112
Plan Check
$46
$56
Pubin Works Fee Analysis
2
EXHIBIT D
PUBLIC WORKS
FEE COMPARISON
Ihm
Current Resolution No. 06-164
Adopted Fee based on FY 04-05 Cost
Proposed Fee Rased on PY 09-10
Actual Cost
Inspection
$43
$56
50. Revision
An hourly roteshall be charged depending on the numberof revisions and the size ofthe rojea.
$155
51. Parkim act Fee
Per Ci Ordinance
52. Discretion, Proects - Hour) Rate:
SE=Senior EngineerEngineerl City Sury r
$155
$187
CE=City Engineer
$154
$176
AE=AssistantE Ince
$129
RR
PWI= Public Warkslns r Blendedrate
$131
$159
1NE=7nMSporumon Englneer
147
18
TST=Tra cSilnalS eciallst
$138
$158
OA=O ce Assistant
108
V21
Avee: Au o esmrwmcn a ree nas not own esmDushea snail he charge at Me Uty's tally burdened hourly rate.
•' lhsl Depasl[ Fee reFlece Nelnitlalamwn[oldeposit lorapv¢n appfiotian. A EIIIaElepoutlyrate (or City inglneer
w111bebilled,gaimtnndepv tsupplkdbytheappllontat Net eo(submiml.Appli antw111benotl0edwbenlnibaldepoeltlsn,ardepl,d,,,nd
additional Nndog a re,l.. Upon pto1M «mpktlon anyftnda remnining In Ne deposltwlll be reNrn<d b epPlkan[
Public Wort Fee Ahalnis
3
51�
EXHIBIT A
BUILDING AND SAFETY
FEE COMPARISON
Item
Current Resolution No. 06-164 Adopted Fee
based on FY 04-05 Cost
Proposed Fee Based on FY 09-10 Actual Cast
1. Permitlssuance
RESIDENTIAL SINGLE FAMILY DWELLINGS'
96
$105.00
2. 1-2,500 sq itSin le Family Dwelling Custom or Tract Model
Plan Check Architectural •••
$0.45
$0.50
Plan Check Structural
$0.20
$0.22
Inspection """
$1.10
$1.14
3.1-2,500 sq R Tract Production Model Revised
Plan Check Architectural
$0.23
$0.27
Plan Check Structural
$0.11
$0.12
Inspection
$1.10
$1.10
4. 1-2,500 sq R Production Model Unchanged
Plan Check Architectural
$0.20
$0.20
Inspection
$0.99
$1.02
5. 2,501sq ft or Larger Custom or Tract Model Single Famil Dwellin
Plan Check Architectural "'
$0,35
$0.37
Plan Check, Structural
$0.17
$0.18
Inspection
$0.77
$0.80
6. 2,501 sq it or Larger Model Production Revised
Plan Check Architectural ""'
$0.23
$0.25
Plan Check Structural
$0.07
$0.08
Inspection ""
$0.75
$0.80
7. 2,901 sq R or Larger Single Family Production Unchan ed
Plan Check Architectural $0.20
$0.24
Plan Check Structural $0.03
$0.08
Inspection $0.55
$0.57
8. Residential Remodel under 500 scift
Plan Check Architectural
41
$0.64
$0.70
inspection
$0.83
$0.86
9 Residential Remodel over 500 s .ft.
Plan Check, Architectural
1 $0.57
$0.57
Inspection
1 $0.55
$0.56
9. Residential Alteration per $3,000 value'
Plan Check Architectural $142.00
$168
Inspection $138.00
$159
MULTIPLE FAMILY DWELLINGS
10. Up to 15,000 sq ft Multiple Family Dwelling
Plan Check Architectural'"'
$0.19
$0.20
Plan Check Structural
$0.09
so.10
Inspection
$0.35
$0.36
11. 1S,001 sq Rand Larger Multiple Family Dwelling
Plan Check Architectural ••• $0.16
$0.18
Plan Check Structural $0.09
$0.10
Inspection'"' $0.29
$0.30
COMMERCIAL/INDUSTRIAL
12. 1-30,000 sq R Concrete Improved
Plan Check Architectural...
$0.23
$0.24
Plan Check Structural
$0.08
$0.08
Inspection "••
$0.25
$0.27
13. 30,001 sq ft and Larger Concrete Improved
Plan Check, Architectural •'"
$0.20
$0.21
Plan Check, Structural
$0.07
$0.07
Inspection *"'
$0.20
$0.21
14. 1-30,000s itMasonry Improved
Plan Check Architectural •••
$0.24
$0.26
Plan Check Structural
$0.12
$0.13
Inspection ••'
E0.27
$0.30
builaing aMty ree AnaIY515
EXHIBIT A
BUILDING AND SAFETY
FEE COMPARISON
Item
Current Resolution No. 06-164 Adopted Fee
based on FY 04-05 Cost
Proposed Fee Based on FY 09-10 Actual Cost
15. 30,001 sq it and Larger Masonry Improved
Plan Check Architectural :•"
$0.22
$0.22
Plan Check, Stmctuml
$0.09
$0.10
Inspection
$0.49
$0.24
16. 130,000 sq it Wood Frame Improved
Plan Check Architectural •••
$0.20
$0.21
Plan Check Structural
$0.10
$0.10
Inspection """
1 $0.36
$0.32
17. 30,001.50,000 sq R and Larger Wood Frame
Plan Check Architectural """
$0.21
$0.22
Plan Check Stmctural
$0.09
$0.10
Inspection "'"
$0.29
$0.29
18. 30,001-50,000 sq ft Wood Frame Shell Less%15hnproved Fee)
19. 1-50,000 sq Rand Larger
Plan Check Architectural "'"
$0.05
$0.06
Plan Check Structural
$0.03
$0.04
Inspection •"" $0.07
$0.08
TENANI IMPROVEMENTS
20. 1- 5,000 sq R Tenant Improvement
Plan Check Architectural "'•
$0.17
$0.18
Plan Check Stmctural
$0.06
$0.07
Inspection """
$0.29
$0.30
21. 5000-15,000 sq ft Tenant Improvement
Plan Check Architectural ""
$0.14
$0.15
Plan Check Stmctural
$0.04
50.05
inspection •••
$0.22
$0.23
22. 15,001.25,000 sq ftTenent Improvement
Plan Check Architectural'""
$0.13
$0.13
Plan Check Structural
$0.06
$0.07
Inspection ""
$0.21
50.21
23. 25,001-50,000 sq Rand LargerTenant Improvement
Plan Check Architectural "'"
$0.11
$0.12
Plan Check Structural 1
$0.06
$0.07
Inspection '•' $0.18
RE -ROOFING
W. Residential Re roof
$0.18
Inspection $130.00
$159.00
25. Commercial/Industrial Re -roof
Inspection $276.00
$318.00
26. Each Plumbing Fixture
inspection $138.00
$159.00
27. Plumbing Re -pipe or Repair Residential
Inspection $138.00
$159.00
2& Plumbing Re -pipe or Repair Commercial
Inspection $138.00
$159.00
29. Water Service Replacement
Inspection $138.00
$159.00
30. Water Heater Each
Inspection Fee Waived
$80.00
31. Gas Pipe Each 50 it or Fraction Thereof
Ins ection $138.00
MECHANICAL
$159.00
Building Safety Fee Analysis
EXHIBIT A
BUILDING AND SAFETY
FEE COMPARISON
Item
Current Resolution No. 06-164 Adopted Fee
based on FY 04-05 Cost
Proposed Fee Based on FY 09.10 Actual Cost
32. Mechanical Appliances Each Residential
Inspection $138.00
$159.00
33. Mechanical Appliances Each Commercial Indntrial
Inspection $276.00
$318.00
34. Mechanical Ducts Each 50 It or Fraction Thereof
inspection $138.00
$159.00
35. Mechanical Outlets or Inlets Each
Inspection $138.00
$159.00
36. HVAC Replacements Residential
Inspection Fee Waived
$199.00
37. HVAC Replacements Commercial/Industrial
Inspection Fee Waived
$239.00
38. Installation of PV solar system
Ins ection Fee Waived
39. Electrical Plug, Switch or Similar Outlet - Five Each or Fraction Thereof
$239.00
Inspection $138.00
$159.00
40. Electrical Appliance Each
Inspection $138.00
$159.00
41. MotorsDevice
Inspection $138.00
$159.00
42. Bus way Each 50 it or Fraction Thereof
Inspection $138.00
$159.00
43. Conduit Each 50 it or Fraction Thereof
inspection $138.00
$159.00
44. Electric Service Up to 200 Amps
Inspection $138
$159.00
45. Electric Service 201-400 Amps
Inspection $207
$239.00
46. Electric Service 401-600 Amps
inspection $294.00
$318.00
47. Electric Service Over 600 Amps
Inspection
$294.00
$318.00
EXTERNAL FEES
48. TUMF Fee
49. Local Develo meat Miti Hon Fee 11,DMF.CVMSHCP
OTHERHEMS
50, Over Submittal and Two Corrections
Plan Check $283.00
$336.00
51. Inspections after one Inspection
Inspection $138.00
$159.00
52. Building Official Variance Consideration
Plan Check $435.00
$531.00
53. Appeals Board Application
Plan Check $726.00
$885.00
54. Parldug Lot Re-strlpin
Plan Check
$425.00
5504.00
Inspection
$690.00
$636.00
55. Block Retaining Wall (Use minimum fejper hour
Inspection $276.00
$159.00
56. Swimming Pool
Inspection $276.00
$318.00
57. Mobile Home Permlt Fees
Based on provisions set forth by the California Code of Regulations Title 25.
58. Mills Acts - Restoration,rehabilitation, Presevation, and maintenance of historic pmerty
EXHIBIT A
BUILDING AND SAFETY
FEE COMPARISON
Item
Current Resolution No. 06-164 Adopted Fee
based on BY 04-05 Cost
Proposed Fee Based on FY 09-10 Actual Cost
Application Flat Fee
NEW
$318.00
59. Mills Acts - Restoration, rehabilitation, Presevation, and maintenance of historic property
Contract Initiation - Trust Deposit Fee (Initialaleosit) NEW
$1,000.00
60. Fuel Cell Permit and Plan Check Fee
Per Resolution No. 08.12 NEW
Fee Waived
60. Minimum Fee Per Hour
Plan Check
'142.00
Inspection
$138.00
61. Discretionary Projects Hourly Rate:
DES= Director of Building &Safety
$145.00
$177
PCM = Plan Check Manager
$145.00
$168
61= Building Inspector Blended Rate
$138.00
$159
BPS = Building PermitSpecialist Blended Rate)
$138.00
$140
FSI=Fire Safety Inspector
$72.00
$113
FSS = Fire Safety Supervisor
$85.00
$125
Note: Additional Services for which a fee has not been established shall be charge at the City's fully burdened hourly rate.
Trust Deposit Fee reflects the Initial mount of deposit for a given applicaflan. A billable howdy rate for Director of Building &Safely and/or City Ationey
will be billed against the deposit supplied by the applicant at the time df mbmittal. Applicant will be notified when initial deposit Is near depletion and
additional funding is required. Upon project completion any funds remaining in the deposit will be returned to applicant.
Plan Check & Inspection fees re0ected additional times required for 2010 Green Building Code, 2008 Cal. Energy code and SB 1606.
Building Safety Fee Analysis
EXHIBIT B
COMMUNITY DEVELOPMENT / PLANNING
FEE COMPARISON
Permit Type
Current Resolution No. 06-164 Adopted Fee based on
PY 04-05 Cost
Proposed Flat Fee and Trust Deposit Based on
FY 09-10 Actual Cost
Adjustments (Flat Fee)
$128
$168
Planner (blended rate)
$105
$138
Clerical Staff blended rate
$23
$29
Appeals (Flat Fee)
$210
$276
Building Permits, Exterior Reviews Flat Fee
$26
$39
Certificate Of Use Review(Flat Fee
$26
$35
Conditional Use Permits for Short -Term Vacation Rentals
(Flat Fee)
NEW
$500
Development Use Permlh (Trust Deposit Cases)***
Minor Conditional Use Permit'*'
NEW
$1,500
Conditional Use Permit ***
$2,915
$2,894
Planner blended rate)
$1,890
$2,070
Clerical Staff blended rate
$180
$234
Fire Safety Specialist
$85
$125
Associate Transportation Planner
$760
$465
Development Agreement ***
NEW
$3,004
City Attorney (blended rate)
$2,080
Planner (blended rate)
$690
Clerical Stag blended rate
$234
Precise Plan ***
$2,915
$2,894
Planner blended rate
$1,890
$2,070
Clerical Staff(blended rate
$180
$234
Fire Safety Specialist
$85
$125
Associate Transportation Planner
$760
$465
Parcel Map Waivers(Flat
Fee
$615
$810
Planner (blended
rate)
$105
$138
Clerical Staff blended rate
$45
$117
Public Works Senior Engineer
$465
$555
TentUse Permit Flat Fee)
$67
$87
Planner (blended rate)
$53
$69
Clerical Staff blended rate
$14
$18
Temporary Use Permit, Non-profit Organization
N/A
N/A
Tentative Tract Ma ***
$2,915
$3,308
Planner blended rate
$1,890
$2,484
Clerical Staff blended rate
$180
$234
Fire Safety Specialist
$85
$125
Associate Transportation Planner
$760
$465
Tentative Parcel Ma ***
$950
$1,203
Planner (blended rate)
$315
$414
Fire Safety Specialist
$170
$234
Public Works Senior Engineer
$465
$555
Varlaum ***
$2,363
$2,924
Planner blended rate)
$1,575
$2,070
Clerical Staff (blended rate)
$180
$234
Associate Transportation Planner
$608
$620
Change of Zone C ***
$1,230
$2,007
Planner (blended rate)
$1,050
$1,656
Clerical Staff(blended rate)
$180
$351
Planning Fee Analysis
1
EXHIBIT B
COMMUNITY DEVELOPMENT / PLANNING
FEE COMPARISON
Permit Type
Current Resolution No. 06-164 Adopted Fee based on
FY 04-05 Cost
Proposed Flat Fee and Trust Deposit Based on
FY 09-10 Actual Cost
Combined Applications (PP/CUP/TT/TPM) •."
NEW
$4,019
Planner blended rate
$2,760
Clerical Staff(blended rate
$234
Fire Safety Specialist
$250
Associate Transportation Planner
$775
Combined Applications with GPA / C/Z "••
NEW
$4,%3
Planner blended rate
$3,450
Clerical Stab blended rate
$468
Fire Safety Specialist
$250
Associate Transportation Planner
$775
Environmental Impact Report (EIR) •"•
Consultants cost+ 10%
Consultants cost+ 10%
Environmental Review
Environmental Assessments
$210
$276
Categorical Exem [ions
$0, art of other ermits
$0, art of other permits
Negative Declaration
210
276
General Plan Amendment (GPA)
$1,230
$2,007
Planner blended rate
$1,050
$1,656
Clerical Staff blended rate
$180
$351
Misc. Architectural Review
Single Family Home Exceptions
$168
$226
Planner (blended rate)
$105
$138
Clerical Staff blended rate
$68
$88
Commercial (ARC non public hearing cases)
$353
$531
Planner (blended rate)
$263
$414
Clerical Staff blended rate
$90
$117
Signs Awnings
Banners
$26
$35
S (OTC)
$75
$98
Planner (blended rate)
$53
$69
Clerical Staff(blended rate
$23
$29
Signs (ARC) / Sign Programs Monument
$300
$393
Planner (blended rate)
$210
$276
Clerical Sta0(blended rate
$90
$117
Discretionary Pro ects - Hourl Rate:
Planner (blended rate)
$105
$138
Clerical Staff(blended rate
$90
$117
Printing Costs
Freedom Of Information Act Requests
plus copy costs of.15
plus copy costs of.15
Zoning Map
$5
$20
General Plan Map
$15
$50
Zoning Ordinance
$50
$60
General Plan Text
$100
$125
General Plan Draft EIR / Final EIR
$100/$15
$12S/$SO
General Plan Traffic Study Appendices
$70
$100
Zoning Confirmation Letters
$210
$176
Copy Machine
.15/page
AS/page
•" Trust Deposit Fees reflect the Initial amount of deposit fora given appilanao, an average hourly rate for Planner. Clerical Staff, Engineer City Attorney, and Fire Safety
Specialist will be billed against the deposit supplied by the applh antat the time of submittal. Applicant will be mulned when Initial deposit sonar deplekon and
additional funding is required. Upon project completion any funds remaining In the deposit will he resumed to applicant.
Now Additional Services for which a fee has not been established shall be charge at the City's fully burdened hourly rate.
planning Fee Analysis
2
EXHIBIT C
FIRE FEE
FEE COMPARISON
Item
Current Resolution No. 06-164
Adopted Fee based on FY 04-05 Cost
Proposed Fee Based on FY 09-10
Cost
a. Fire Permit Issuance
Plan Check $96 $101
z. 1-15,000 sq ft Multi Family
Plan Check
$0.0211
$0Inspection 044
$0.0300
s. 15,001.30,000 sq ft Multi Family
Plan Check
$0.0185
$0.0250
Inspection
$0.0174
$0.0260
4. Up to 30,000 sq ft Commercial or Industrial - Improved
Plan Check
$0'0'11
$0.0164
Inspection
$0.0083
$0.0131
s. 30,001-70000 and Higher Multi Family
Plan Check
$0.0144
$0.0196
Inspection
$0.0648
$0.0403
6. 1-5,000 sq It Tenant Improvements
Plan Check
$0.0200
$0.0375
Inspection
$0.0172
$0.0226
v. 5,001-15,000s ft Tenant Improvements
Plan Check
$0.0123
$0.0188
Inspection
$0.0119
$0.0226
e. 15,001.25,000 sq It Tenant Improvements
Plan Check
$0.0087
$0.0091
Inspection
$0.0151
$0.0164
9. 25,001-50,000 sq It Tenant Improvements
Plan Check
$0.0059
$0.0069
Inspection
$0.0064
$0.0068
to. 1-30,000 sq ft Commercial Industrial Building
Plan Check $0.0133
$0.0150
Inspection $0.0107
$0.0170
m 30,001-80,000 sq ft and Higher Commercial Industrial Building
Plan Check
$0.0088
$0.0091
Inspection
$0.0052
$0.0085
sz. ParldngGarap
Plan Check
$0.0010
$0.0019
Inspection
$72
$226
13. Fire Spxinkler Systems up to 30 Heads
Plan Check
$128
$250
Inspection
$82
$226
14. Fire S rinkler Systems up to 100 Heads or Fraction Thereof
Plan Check
$170
$250
Inspection
$180
$226
is. Fire Sprinkler Systems 101-299 Heads
Plan Check
$287
$375
Inspection
$216
$339
14. Fire Sprinkler Systems 300-700 Heads
Plan Check
$581
$750
Inspection
$446 41$678
sf. Fire Sprinkler Systems over 700 Heads
Plan Check
$719 1
$1,000
Inspection
$638
$1,017
is. Residential Fire Sprinklers
Plan Check
$170
$250
Inspection
$144
$226
Fire Fee An*m
1
EXHIBIT C
FIRE FEE
FEE COMPARISON
Item
Current Resolution No. 06-164
Adopted Fee based on FY 04-05 Cost
Proposed Fee Based on FY 09.10
Cost
34. Fire Alarms Tenant Improvements 1-24
Plait Check
$255
$375
Inspection
$144
$339
zo. Fire Alarms Tenant Improvements - Over 24
Plan Check
$589
$375
Inspection
$376
$452
zi. Fire Alarms - New Systems Under 24 Devices
Plan Check
$260
$375
Inspection
$175
$226
zz. Fire Alarms- New system 74-FOT Devices
Plan Check
$561
$750
Inspection
$481
$678
23. Fire Alarms - Over 100 Devices
Plan Check
$732
$1,000
Inspection
8612
$1,017
z4. Stand Pie Systems
Plan Check
$170
$250
Ins ection
$144
$226
zs. Private Fire Hydrant System
Plan Check
$298
$375
Inspection
$173
$226
26. Fire Pump Installation
Plan Check
$660
$1,000
Inspection
$720
$1,130
zn. Fire Alarm Control Monitor
Plan Check
$255.00
$375
Inspection
$288.00
$339
za. Undergroand Storage Tank
Plan Check
$340.00
$375
Inspection
$288.00
$339
zs. Above Ground Storage Tank
Plan Check
$340.00
$500
Inspection
$288.00
$452
3a. Hoods - Suppression
Plan Check
5170.00
$125
Inspection
5108.00
$113
33. Residential Care Facilities
Plan Check
$340.00
$500
Inspection
$360.00
$565
32. Tents and Canopies
Plan Check
$85.00
$125
Inspection
$144.00
$226
33. Private Schools
Plan Check
$170.00
$250
Inspection
$144.00
$226
34. Special Inspections
Plan Check
$170.00
$250
Inspection
$144.00
$226
35. Site Plan- Conditions ofApproval
Plan Check
$170.00
$250
Inspection
$144.00
$226
36. Fire Works
Plan Check
$170.00
$125
Inspection
$144.00
$113
F" Fee Malnis