HomeMy WebLinkAboutRatify - Grant Application - Citys Electric Charging StationContract No. C32260
CITY OF PALM DESERT
SPECIAL PROGRAMS DEPARTMENT
STAFF REPORT
REQUEST: Ratification of Grant Application Submittal to MSRC for Upgrading
the City's Electric Charging Station and Authorization to Request
Proposals
SUBMITTED BY: Frankie Riddle, Director of Special Programs
APPLICANT: City of Palm Desert
DATE: September 13, 2012
CONTENT: None
Recommendation
By Minute Motion,
1. Ratify staffs submittal of grant application to MSRC for Upgrading the
City's Electric Charging Station at the Civic Center Park Complex, and
2. Authorize staff to publish Notice Inviting Bids.
Discussion
Originally AB2766 Funds were targeted for the Bus Shelter Improvement Program and
CVAG's Regional Street Sweeping Program. However, recently staff was asked to
review alternative projects that may qualify for AB2766 Funds such as soil stabilization,
alternative fuel/energy, etc. Currently, the City has available $258,000 for identified
project. Since the City has an active focus on energy and sustainability programs, staff
thought that utilizing a portion of the existing funds and combining them with Mobile
Source Air Pollution Reduction Review Committee (MSRC) grant funding would provide
an opportunity to update the City's existing obsolete electric charging station. Moving
forward with this viable project would promote and support the electric/alternative fuel
vehicle movement thereby encouraging community members to utilize the charging
station for its intended use.
Current Use of Charging Station: The charging station is primarily being utilized as a
parking structure; however, staff recently observed visitors utilizing the electric outlets at
the charging station to charge their electric vehicle. (Note: I spoke with the couple and
they indicated that they drive from 29 Palms, park here at the Civic Center Park, and
walk to Westfield Shopping Town to shop and have lunch. While shopping, they leave
their electric vehicle to charge at the station. However, they indicated that they need to
STAFF REPORT
RATIFICATION OF MSRC GRANT APPLICATION SUBMITTAL
SEPTEMBER 13, 2012
PAGE 2
utilize two (2) of the 110 outlets instead of the charging units to recharge their vehicle
because the charging units themselves are obsolete and do not fit the new electric
vehicle plug-in system.)
The electric vehicle industry has now standardized all Level 2 charging units for electric
vehicles, as well as the plug-in system on the vehicles. This now allows uniformity
within the industry regardless of which make or model of car purchased, thereby making
it more appealing to purchase these vehicles. However, the standardization only
pertains to the Level 2 charging units which are considered the slow charging units
intended to recharge vehicles over an extended period of time (e.g., while at work,
shopping, etc.). Depending on how much of a charge the vehicle requires, charging
could take from one to eight hours. The Level 3 charging unit is considered the fast
charge and can charge a vehicle within 15 — 30 minutes; however, this unit has not
been standardized to date, but the industry continues to work toward standardization for
this system as well. While this unit does not have a standard connection, it has been
developed so that it can be upgraded to the standard connection when the time comes.
At this time, staff plans to install a Level 3 unit that accommodates the majority of
electric vehicles driven.
Upgrading the Electric Charging Station infrastructure includes the removal of old,
obsolete charging units and installation of upgraded Level 2 wall and pedestal mounted
units and installation of one Level 3 that meets new industry standards. Upgrading of
the electrical source (i.e., installation of a new electric panel box/pedestal and
transformer) to the station will be required to accommodate the new Level 3 unit. Staff
is currently working with Southern California Edison to prepare a Utility Plan that will
address this need.
In addition, part of the new electric vehicle movement and infrastructure improvements
was the ability for participating businesses with charging units/stations to recoup the
cost of electric use. This issue was thoroughly vetted and resolved with Southern
California Edison. As a result, the newer charging units have the ability to charge a fee
for use through a credit card system. Staff is not proposing to charge a fee at this time;
however, if in the future a fee is required to recoup costs incurred by the City, the option
is there.
The total estimated project budget is $154,770 with a 50/50 grant match from MSRC in
the amount of $77,385. Other costs associated with the project are related to the use of
electricity that would fluctuate monthly, and, if the City opted to charge a fee, there
would be a monthly cost to connect to the network system designed to accept credit
cards and track use.
The benefits of upgrading the facility are:
• Facility infrastructure will be in -line with current industry standards
• Station/units should be upgradable if changes occur in the future
STAFF REPORT
RATIFICATION OF MSRC GRANT APPLICATION SUBMITTAL
SEPTEMBER 13, 2012
PAGE 3
• MSRC grant funds will cover 50% of project costs, unless the project goes over
budget
• May encourage and promote the use of electric vehicles
• Provides a benefit to both residents and visitors
• May encourage other cities and businesses to install electric charging
stations/units
• The City will continue to promote its focus of being energy and environmentally
forward thinking
The cons of upgrading the facility are:
• Unknown usage by residents and visitors
• Unknown increased cost to the City associated with electricity usage
• Increased cost to the City associated with the network system, that is if the City
opted to charge a fee
Staff recommends that City Council ratify submittal of grant application to MSRC and
authorize staff to publish a Notice Inviting Bids to move the project forward to the next
step. This project will be brought back before City Council for award of contract and
further consideration at that time.
Fiscal Analysis
There will be no negative impact to the City's General Fund. Funding for this project is
a 50/50 match with MSRC grant funds and the City's AB2766 funds in the amount of
$77,385. In addition, if project costs exceed budgeted amount, there is a total of
$258,000 available in the AB2766 fund.
Submitted By:
Frankie Riddle,
I
f Special Progra
CITY COUNCILv'tON
APPROVED DENIED
RECEIVED OTHER
MEETING DATE�T�
Revie AYES: (-.1.a2.. rni k
NOES:
ABSENT: Y7er l.�_
ABSTAIN: Ala7�
Pau Gibson, Director of Finance �'fI��FII?I� BY: ��
Orii ia.0 on File with City
Approval:
JohrVM. Wohlmuth, City Manager
is Office